You are on page 1of 2

Page 1 of 2

Radiogram No. 6136u Form 24 for 09/18/07


Progress 360 Undocking from SM AO [Propulsion Compartment]. СОЖ Food Container Audit
GMT CREW ACTIVITY

06:00-06:10 Morning inspection


06:10-06:40 Post-sleep
06:40-07:30 BREAKFAST
07:30-07:55 Prep for Work
07:55-08:10 Daily Planning Conference (S-band)
08:10-08:25 FE-2 SLEEP - Actiwatch set up
08:10-08:15 CDR, FE-1 Prep for Work
Replacement of СО2 ИК0501 filter unit (БФ) (Install БФ # 059, b/c 005633R
08:15-08:30 FE-1
(СМ1РО_4_449_1, bag III-1 248-22). Stow removed unit)
08:15-08:30 CDR Regeneration of Micropurification Unit (БМП) Absorption Cartridge Ф2 (start)
08:25-08:45 FE-2 Experiment SLEEP: Data download and donning Actiwatch device
08:30-09:00 CDR Fan cleaning in Node1
PROFILAKTIKA. FE1 TVIS Test Exercise (Subject). Tagup with specialists (S-
08:30-10:30 FE-1
band)
08:45-09:15 ITCS Fluid Sampling
FE-2
09:15-09:45 ITCS Low Flow Jumper Installation
09:30-10:00 CDR (assist) PROFILAKTIKA. FE1 Test Exercise on TVIS
09:45-11:15 FE-2 ITCS Fluid Servicing System (FSS) Setup
10:00-10:30 IMV Flow Measurement
CDR PROFILAKTIKA. CDR TVIS Test Exercise (Subject). Tagup with specialists
10:30-12:30
(S-band)
10:30-10:35 Connect DCP power cable
FE-1
10:50-11:20 DIATOMEA. World Ocean Observations
11:15-11:45 FE-2 Reconfigure Stowage in LAB1P6 & LAB1S6
11:20-11:50 FE-1 (assist) PROFILAKTIKA. Test Exercise on TVIS
11:45-12:45 FE-2 Internal Thermal Control System (ITCS) Gas Trap Fill
11:50-12:30 FE-1 Ku-band Video Downlink Config (docking preparation)
12:45-13:45 LUNCH
13:45-14:45 FE-2 ITCS LTL Coolant Refill
13:50-14:50 CDR, FE-1 MPEG-2 (КЛ-211) coder test. Tagup with specialists (S + Ku-band)
14:45-15:30 FE-2 ITCS Phosphorus Removal Assembly 1 Installation
14:50-15:40 CDR Pille dosimeter readings dump
14:50-15:00 Photo/TV: Laptop A31P deactivation
FE-1
15:00-17:20 SVO (Water Supply System) equipment audit
15:30-15:45 Private Medical Conference (S + Ku-band)
FE-2
15:45-15:55 SAMS - ICU activation, section 1
15:50-16:05 CDR Private Medical Conference (S + Ku-band)
15:55-16:00 Connect ER1 MTL QD's to the UIP
FE-2
16:00-16:30 Prep for Work
16:05-18:05 CDR СОЖ Food Container Audit
Page 2 of 2

16:30-18:00 FE-2 Physical Exercise (TVIS)


17:20-17:35 Private Medical Conference (S + Ku-band)
17:35-17:55 FE-1 IMS update
17:55-18:35 СОЖ maintenance
18:00-19:00 FE-2 Physical Exercise (RED)
18:10-19:00 CDR
Prep for Work
18:35-19:05 FE-1
19:00-19:05 FE-2 LAB Window Shutter Closure
19:00-19:05 CDR Transfer TVIS/RED/CEVIS/HRM data to MEC
19:05-19:20 Daily Planning Conference (S-band)
19:20-19:30 Prep for Work
19:30-20:00 DINNER
20:00-20:30 Daily Food Prep
20:30-21:00 CDR
Pre-sleep
20:30-21:30 FE-1, FE-2
21:00-21:15 БМП Ф2 Absorption Cartridge Regeneration (termination)
CDR
21:15-21:30 Pre-sleep
21:30-06:00 . SLEEP
Task List FE-1 GSF-JAXA. ТБУ temperature monitoring (in the morning)
Note: See OSTP for references to US activities.
End of Radiogram

You might also like