a) Function I
b=0, c=4.5
Function (II)
Maximum point (0,0.5) and pass through point (2,0)
b=0, c=0.5
Function (III)
b=2, c=4.5
Further Exploration
(a)(i) Structure 1
(ii) Structure 2
(iii) Structure 3
(iv) Structure 4
Conclusion
Structure 4 will cost the minimum to construct
a(ii)
As the president, I will choose structure 4 so that I can minimise the construction cost.
To export the picture, select all the objects, right click on it, select save as picture.
(b)(i)
(b)(ii)
Area to be painted
When
The shape of the concrete is a rectangle with length 4m and breadth 0.5m.