Civil 3D Assignment

ASSIGNMENT - CLASS 2020


Instructions
Assignment date 21st June 2020 Submission date 6th July 2020
This is an open book practical assignment containing total marks of 100. You are asked to
submit your working in Civil 3d file and written answers in PDF. Do your submission to
following e mail address indicating your name with initials in the file.
dushyantha.arc@gmail.com

Brief
You are assigned to create a road with the given surface file “Assignment2020.dwg”. you
can include snap shot of each sub question you have answered for better clarity

1. QUESTION 01
1.1. Draw an alignment connecting A,B,C. Assign design speed of 50mi/h, name the
alignment as main road, (save two copies of this file le for answering question 4
and 5 for later use)
1.2. Create Existing profile and design road profile, name the design road profile as
“Main Road design profile”
1.3. Create a suitable assembly to the Main Road and name as “Main Road Assembly”
(note assembly components should have the option to integrate super elevation
calculation, include appropriate curb, pavement of 3 ft and daylight) also rename
sub assembly components to indicate the left and right side of the road
1.4. Do the super elevation calculation and state the standards and minimum radius
table you followed.
1.5. Create Assembly using the super elevation calculation, show snap shot of the road
section at station 7+00, 9+00 & 12+00 and 17+00

Marks (30)

2. QUESTION 02

2.1. Create road surface from the Main road you created name as “Main Road finish”
2.2. Create sample lines along the main road (you are free to propose frequencies or
use frequency at tangent 50ft and at curvatures 25 ft) & propose sample line offset
lengths for each side of the road)
2.3. Create road cross sections using the samples lines you have created
2.4. Using Road assembly components and create road datum surface and do the cut
and fill calculation.
2.5. Review your road assembly component and do a material calculation along the
road corridor you made,
Note : you can opt to represent the cut and fill details as tables in the view or
separately as a table relevant to the stations
Dushynatha Senanayake Page 1|2
Civil 3D Assignment

Marks (30)

3. QUESTION 03
Switch on and unfreeze “property” layer

3.1. Create “Lucky Street alignment joining station 6+50 of main street and point D,
Mark 12 ft offsets from the road center to indicate ROW, propose suitable turning
circle at the point D and mark it (use poly lines to do the ROW marking).
3.2. Use the land boundary marked by polyline to create a parcel and name it as
property. Using the ROW you marked by poly lines further subdivide the land
3.3. Create land plots of 40 ft frontage and close to 10 perch of land area for each
3.4. Re number the created land plots and annotate the boundaries of land plot 4 ,5 &
6.
3.5. Indicate the number of land plots you divided and indicate the area of land plot 1,2
and 3.
Marks (20)

4. QUESTION 04
Switch on and unfreeze “building complex” layer. This land E is marked with a
poly line and it is proposed to develop a building complex. Proposed building pad
height is 850 ft

4.1. Create feature line and assign building pad elevation


4.2. Create infill
4.3. Create cut slopes (30%) and fill slopes (45%)
4.4. Calculate cut and fill
4.5. Comment about the suitability of proposed building pad height

Marks (20)

----End of Assignment---