CARMEL VALLEY RECLAIMED WATER PIPELINE
LOCATION MAP
TEGEND
‘PROPOSED CARMEL VALLEY
[RECLAIMED WATER PIPELINE.
Public Information Line
|\ signees (619) 533-4207Carmel Valley Recycled Water Pipeline
‘Background
In Decernber 200, te City of San Diego developed the Water Reclamation Master Plan
which evaluated area demands for reclaimed water and established the bass fr planning of
Capit improvencas. The Maser Pan ideatified a dstibutionnetvrk io tanst wate fo
"apily growing areas othe north, thee phase: Phase Tas been completed, potions of
Pace Ihave been and are planed o be constructed simultaneously with ongoing and
Fuure development, while Phase Il remains concep in nature.
‘The Carmel Valley Resyeled Water Pipeline is a component of the City of San Diego
Recycled Wate: Maser Plan Update 2005, Phase Il system expansion intended to achiove
‘he 2010 EPA goa. This project wil comply withthe Land-Use Adjacency Guidelines of
1 Cin’s Mute Species Cmeraon Progam as sujet to Ste Delopment
Peni for mpects to environmentally sean
Project Overview
“hist il nsl pprosaty 12.00 ine fet of nc, inch, inch and 12
dn PVE pple, epoing ste Cre Vey Rolo Sats Rod
‘mersange sang Highway 96, Te pln wl extend sxe allowing he Palacio
Del Mar ep acento Rete de Mer, then extend south slong Carma County
Road The itn wl provide eyed wate he Grand Dl Mor ol Cs, Pao
DelMarHantower's Associaton and fare cxtomer inte 300 zone wit he western
Dorion of Camel Vale. Once nope, he Net City Reclamation Stn wl
[ede he Cn’ depedence on ord wate thereby ening the demands on te cing
yore ter en,
Construction Schedule
{Conston sched fo sn in Septenber 210 adi estimate ob ample by Fay
S01 Cnarctin of ths poet wl ecenr Manay to Fidayberween te ho 030
fim and330 pan Constocton wl pci losing of te Ste Rete Sé ie pth
‘ctvcen Cat ally ond snd Camel Coury Ron om Soper 10 wo Febery
Dori, Biya willbe dere by sigs wo State bike lant on pie.
The pipsine consraion wll impact sets win the Palacio De Mar howsing
‘eeepnent Taio wil be alowed ving ours of constuction sd he en
‘ch wor the ene set wl be opened ona ai onto. Te rest
iin prtts of the allowing see Roce De Me, Cait Exgoin. Chto
Radiat Old Cael Vay Road Camel Vay Ren, snd Camel County Ros.
Cost
‘The projet cot is approximately $338 milion,
Additional Informatio
Additional information about the Carmel Vallty Recycled Water Pipsine and other
‘inporaatinfrastrocture projects cn be found enine st www.sundiego.govenginesring-
ip, orbycaling the publi information neat (619) 533-4207
‘Working together to engineer a beter tomorrow.”
ecb oyu ao print be Einring @ Cpl Pret Dipari
Pouce Pt ora Lind) S0-armonasnywen