The document summarizes the handing over of completed lifts from a contractor to a town council. It lists 4 defects that were rectified in two lifts (A and B) located in Block 310. The defects involved water ponding on various storeys that was causing water to not flow freely to the scupper drain. After rectification work, the surfaces were smoothed so that water now flows directly to the drains.
The document summarizes the handing over of completed lifts from a contractor to a town council. It lists 4 defects that were rectified in two lifts (A and B) located in Block 310. The defects involved water ponding on various storeys that was causing water to not flow freely to the scupper drain. After rectification work, the surfaces were smoothed so that water now flows directly to the drains.
The document summarizes the handing over of completed lifts from a contractor to a town council. It lists 4 defects that were rectified in two lifts (A and B) located in Block 310. The defects involved water ponding on various storeys that was causing water to not flow freely to the scupper drain. After rectification work, the surfaces were smoothed so that water now flows directly to the drains.
Hydraulics and Fluid Mechanics: Proceedings of the First Australasian Conference Held at the University of Western Australia, 6th to 13th December 1962