Professional Documents
Culture Documents
HAND BOOK
ON
BILLING AND CUSTOMER CARE
SYSTEM
IN
GSM NETWORK
I. FUNCTIONS:
The major functions of B&CCS are:
1. Inventory and SIM management.
2. Activation / deactivation of mobile numbers.
3. Provisioning / de-provisioning of various services to the subscribers.
4. Handling of requests from customer care centers regarding telephony services and billing
queries.
5. Swapping of SIM and MSISDN.
6. Collecting, processing and storing of CDRs (Call Detail Records) from the Network
Elements.
7. Rating the CDRs and Billing.
8. Payment and Collection
9. Billing for Inter connect Usage Charges
10. Provision for testing new products / services before commercial launching.
11. Threshold monitoring.
12. Intrusion detection and Fire wall functions.
13. Trouble Ticket (Remedy) system.
14. Handling of TAPIN & TAPOUT for Revenue settlement with roaming partners.
The B&CCS network at one station is connected to a system at a geographically distant location
for Disaster Management purpose. (e.g. In south zone, the B&CCS n/w at Trichy is connected to
disaster recovery system at Hyderabad ).
Servers &
Storage devices
------
Level I Router
Central Router
E1 Link
Level II Router
MSC
MSC N/W
ISDN
CLOUD
ISDN BRI
7. Trouble Ticket (Remedy) server takes care of complaints booking. This server
processes any complaint in respect of GSM service booked from any customer care centre. The
details of the complaint are sent to respective sections, viz, MSC, IN, OM, and BP etc. for
further action. The subscriber is given a complaint Id. No. (i.e. docket) for reference. The status
of the complaint is also updated in the system as and when it is attended and data is input to the
system. The same can be queried and viewed from any CCN terminal. It should be capable
of generating required types of reports.
8. In order not to loose any data from the B&CCS system, in case of crash, the whole
data in the network is backed up in tape storage devices through a system called Back up server.
A tape library is connected to the
Back up server. This server controls the tape library, client backups and schedules. This server
stores the data from the nodes on to the tapes. The present system takes Full back up on weekly
basis and Incremental back up daily.
9. Data warehouse system: As the CDRs of Prepaid services need not be rated in the
BP, instead of just discarding them, these CDRs are stored in Data warehouse system for future
VI. Testing of B&CCS network: The tests on B&CCS equipments can be broadly classified
into two categories. They are: Tests on Hardware and that on Software (i.e. functionality tests).
1. Hardware tests:
1.1 Pre switch on tests: The pre switch on tests like the ones given below are carried out as
usual for any other system.
- Check of Earthing System and its Distribution
- Check of Air Conditioning
- Check of Fire Alarm System
- Check of False Flooring / Antistatic Flooring / False Ceiling
- Check of Engine Alternator
- Check of Power Plant / Battery including UPS with battery backup
- Check of Lighting and Power Outlets
- Check of Cable Laying and Termination
- Approved Lay out, LAR, Approved IP allotment & General Inspection
- Hardware Conformity Test including racks, Lap Top Computers, spares & etc.
- Check of Ethernet Cabling
- QA Certificate for the indigenous Equipments
1.2.2. SERVER:
The following are the Hardware tests for Servers.
- Customer name
- Account number
- Service type
- External id and company name
All of these criteria shall support wildcard searches.
- Changing Account.
- Changing Service.
- Transfer of Service.
- Delete Account.
- Assign Credit Limit to the customer through GUI with some restrictions.
2.8 BILLING:
- Verify bulk and incremental discounts and taxation methodologies.
- BIP discount prorating when change in discount rate during bill cycle.
- Verify special balance-due amounts to exclude
- Disputed amounts
- Amounts in collections
- Amounts on invoices whose payment date has not yet been passed
- Check different discount Rates & special rates based on customer category
- Verify special rate, discount or both with customizable plan Id
- Verify special rate, discount or both - Demonstrate Cross product discount
- Check Friends & Family using Corridor plan feature
TECHNICAL & DEVELOPMENT CIRCLE Issue - I
JABALPUR Page 12 of 18 Date 01-08-
2008
- Verify invoice cycle including annual, monthly, bi-monthly, quarterly, weekly
and even daily cycles.
- Various options with regard to the timing within each bill cycle when the
customer receives an invoice
- Testing for Interim Bills/ Proforma and hot bill
- Hot invoice generation
- Verify Invoice timing enabling customers to change invoice cycles.
- Easy introduction of new billing cycles.
- Restrict discount to specific account category
- Verification of Discount based on the accumulated gross amount of qualifying
usage charges during a specified periodÆ Discount should get applied only on
usage that falls between bill period
- Flexible formatting of InvoicesÆ Bill message flexibility should be there
- Preparation of detailed bill based on type of usage like Local, STD, ISD
- Bill split / refinance optionÆ Customer should be allowed to pay dues in
installments of equal amount
- Real time and batch invoice calculation
- Support for Tax & exemptions
- Separate taxes to both products and services
- Verification of tax in a flexible manner, either in the form of a fixed amount, a
percentage or combination of bot
- Verify localized printing facility including bar-code printing
- Verify Rating and Billing of existing RC'sÆ Rating and Billing should be done as
per tariff
- Verify Rating and Billing of existing NRC'sÆ Rating and Billing should be done
as per tariff
- Verify Rating and Billing of existing Usage TypesÆ Rating and Billing Should
be done as per tariff
- Incremental discount functionality & complex discount functionality
- Verify BIP Back out functionality
- Verify if BIP supports -ve new charges
- Rollover unit credit functionalityÆ Rollover unit credit should be applied first
- Check new discount restrictions based usage guided to one or more product
elements
- Daily unit creditsÆ Customer should get discounted charges
- BIP Supports embedded Bit Map graphics
- Display of Tax in flexible manner i.e. different components like education cess,
higher education cess should be displayed separately and accordingly
reports should be generated
- Bill cycle change and reflection on BIF
TECHNICAL & DEVELOPMENT CIRCLE Issue - I
JABALPUR Page 13 of 18 Date 01-08-
2008
- Reconciliation of loaded charge matrix with Corporate Charge matrix