You are on page 1of 5
The West Bengal Power Development Corporation Limited (A Government of West Bengal Enterprise) Registered & Corporate Office: Bidyut Unnayan Bhavan Plot-3/C, LA- Block, Salt Lake City, Sector-Ill, Kolkata ~ 700 098, Phone: 033- 2335-0571 / 2339-3100 Fax: 083-2339-3286 / e-mail : wopde2giascl01.vsni.net.in Poe lau bogaed04] 03/1, 40-8) The Addressee (As per attached list) Date: September 13, 2010 Sub: Preparation of Feasibility Report/Detailed Project Report for coal unloading and transportation from Jetty to Sagardighi TPS Dear Sir, WBPDCL intends to bring coal for its Sagardighi TPS by Barges which will navigate from Haldia Port through the Ganges (River Bhagirathi) to a local Jetty near Intake Pump House about 5 Km away from the Power Plant boundary. Please submit properly sealed tenders (both for technical part and price part separately), in triplicate, on or before 1s October, 2010 (Friday) latest by 3.00 PM addressed to the Director (Projects), West Bengal Power Development Corporation Limited, Bidyut Unnayan Bhaban, 3/C, Block - LA, Sector - II, Salt Lake City, Kolkata - 700 098. No tender will be accepted if send through e-mail, facsimile or telegraph. The main cover of sealed tender shall be properly marked with the superscriptions, ‘Tender for preparation of Feasibility Report/Detailed Project Report for coal unloading and transportation from Jetty to Sagardighi TPS”. The tenders shall be in accordance with the terms and conditions specified in the Annexure appended to this letter. Yours faithfully, Tistha Energy Services Pvt ( Received On 4)° EP 2010 A. K. Ghosh: Enclosure: Annexure 18 SFiniborcv44 Director (Projects) Time sand BE. Contents not verified Tinded TRS] Saami TPS Kolaghat TPS | BakreswarT P-P. | Sagardighi TPP CAL 228i6389, GM. 260227 GM. 231110 GM. 220001 CM. 2855 GMO) 26846447, | Sr Mgr. (P&A)2506 | DGMIO)-231254/ | DGM{Const}220210 | STD Code. 05488 Demon) 2sei603, | Se Mgr (HeAyan034 | DGMIM)-281251 / Se Mgr(P&A) / Sr Mgr(Pa&ca}- | Elect Contr Room DGM(U)-231255 | Se. Nig (FHA. 200002 26845086 250208 DGM(Acets)-281250 Guest House Se Migr-26845083 Guest Howe SeMge. Gary zine | 2575/2536 Guest House: 2342/2600 Sr Mgr. (PA). 231298, PBX 220664, 2685201 ax: = 26217 ‘Guest House - 251252 axe 20015 Fax 25846151, STD Code- 03251 ‘STD Code- 08228 STD Code 03462 25 5 ANNEXURE REQUEST FOR PROPOSAL (RPF) Introduction WBPDCL intends to bring coal for its Sagardighi TPS by Barges which will navigate from Haldia Port through the Ganges (River Bhagirathi) to a local Jetty near Intake Pump House about 5 Km away from the power plant boundary. Coal from Barges will be unloaded at regulated rate to a Conveyor (preferably Pipe Conveyor) situated at the local Jetty for conveying up to the specified terminal at Coal Handling Plant of the Power Plant followed by suitable discharging device. ‘Scope of Preparation of Feasibility Report (FR) / Detailed Project Report (DPR) for coal unloading at Jetty and conveying to the Coal Handling Plant of Sagardighi TPS. Receipt of Tenders Properly sealed tenders (separate for Technical Part and Price Part), in triplicate, shall be submitted on or before I October, 2010 latest by 3.00 PM addressed to the Director (Projects), West Bengal Power Development Corporation Limited, Bidyut Unnayan Bhaban, 3/C, Block ~ LA, Sector ~ Ill, Salt Lake City, Kolkata ~ 700 098. No tender will be accepted if send through e-mail, facsimile or telegraph. ‘The main cover of sealed tender shall be properly marked with the superscriptions, “Tender for preparation of Feasibility Report/Detailed Project Report for coal unloading and transportation from Jetty to Sagardighi TPS”. Validity: ‘The tenders submitted by the bidders shall remain valid for a period of 90 (Ninety) days from the last date of submission of tender. Pri ‘The Price quoted by the bidders shall remain “FIRM” till completion of the Services in entirety covered under the Consultancy Contract. The quoted shall be exclusive of applicable service tax. No facilities of any kind will be provided by WBPDCL. Prior to or after award of the work, the Consultant shall make his own arrangement for transport, conveyance or accommodation etc. during his visits to the Site or to Bidyut Unnayan Bhaban or to any other place. ‘Terms of Payments: Progress Payments will be made as follows . 10% (ten percent) advance against submission of equivalent amount of Bank Guarantee and unqualified acceptance of the LOA (letter of award). Page 1 of 3 7 8 8 45% (forty five percent) of the Contract Price will be released on submission of the Draft FR/DPR (three hard copies and one soft copy in editable form). 30% (thirty percent) of the Contract Price will be released after preparation and submission of the Final FR/DPR after incorporation of necessary comments on Draft Detailed Project Report (six hard copies and one soft copy in editable form). Balance 15% (fifteen percent) of the Contract Price will be released after approval of FR/DPR (six copies and one soft copy). Standard of FR/DPR_ The Feasibility Report/Detailed Project Report shal be strictly in compliance with the guidelines of environment authorities and local municipal and other applicable laws and safety conditions. ‘The Scope of Work The scope of work shall include the following: Feasibility Report / Detailed Project Report Inspection of site, collection of various data with respect to various infrastructure requirements and environmental aspects, assessment of local social and other conditions, route survey to assess land availability and suggest action required by WBPDCL. Recommend alternative schemes of regulated barge unloading systems. Study and recommend altemative methods of coal conveying system (preferably Pipe Conveyor) and en-route layout from Barge to Power Plant. Determination of op limitations of barge ete. um capacity of coal transportation considering , jetty configuration, equipment capacity limitation Recommendation of the best options for implementation, Utility and power requirements with probable source of such facilities. Salient features of Control and Instrumentation aspects including schemes. Design Philosophy and System Description. Detailed Plant layout, longitudinal section of conveyors and general arrangement of transfer tower and barge unloading arrangement. ‘Technical description of equipment and components. Salient feature of electrical equipment and design considerations of Civil and Structural Engineering Works. Page 2 of 3 % 12. © Bill of Materials © Environment aspects: The standards stipulated by West Bengal Pollution Control Board and Central Pollution Control Board / MOEF have to be duly taken care in the DPR, local municipal laws. * Project Cost Estimates: Project cost estimate shall cover the cost for civil works, Electrical and Mechanical equipment and other associated auxiliary equipment ete, The detailed breakup of cost estimates shall be furnished ‘© Implementation Schedule with Bar Chart © Any other items specifically whether mentioned here or not required for the project, shall also be incorporated while formulating the Detailed Project Report. Time Schedule ‘The Draft FR/DPR shall be submitted within 4 weeks from the date of receipt of Order. The Final FR/DPR shall be submitted within 2 weeks after receipt of comments from WBPDCL on the Draft FR/DPR. 11, Exclusions © Required land will be acquired by WBPDCL. © Geo Technical investigation will be carried out as per the requirement, by WBPDCL. ¢ — WBPDCL will obtain the clearance for utility allocation from the appropriate authority. © Jetty Design and Construction. Correspondence () WBPDCL HQ, Corporate Office, Kolkata:~ All the official correspondences in this regard shall, normally, be made in writing and through e-mail, fax addressed to the Director (Projects), West Bengal Power Development Corporation Limited, Bidyut Unnayan Bhaban, 3/C, Block — LA, Sector ~ III, Salt Lake City, Kolkata — 700 098. Tel: 033 2335 0581, fax: 033 2339 3286, e-mail: (ii) Sagardighi Thermal Power Project, WBPDCL:- ‘The General Manager, Sagardighi Thermal Power Project, WBPDCL, P.O. — Monigram, P.S. — Sagardighi, Dist. - Murshidabad, West Bengal, PIN ~ 742 237, Phone No. 03483 237009, Fax No. 03483 237002. Page 3 of 3 ‘THE WEST BENGAL POWER DEVELOPMENT CORPN. LTD. Request for Proposal (RFP) for Consultancy Services for Preparation of Feasibility Report (FR)/Detailed Project Report (DPR) for Coal Unloading and Transportation from Jetty to Sagat TPS LIST OF ADDRESSEE Sl.No. Name of the Prospective Bidders or, |M/s Consulting Engineering Services (India) Pvt. Ltd, CES Centre, * | DM-3&4, Sector-V, Salt Lake, Kolkata -700091 02, | M/s Development Consultants Private Limited, Block-DG-4, Sector-Il, * | Kolkata - 700091. 03, | M/s Tata Consulting Engineers Limited, A-Wing, 5! Floor, Technopolis "| BP4, Sector-5, Salt Lake, Kolkata - 700091. M/s Lahmeyer International (India) Private Limited, Building Alfa, 04. |Ground Floor, Bengal Intelligent’ Park, Block-GP&EP, Salt Lake Electronics Complex, Sector-V, Bidhannagar, Kolkata -700091. =a M/s" Astha Energy ‘Services’ Private Limited, Asyst Park, 5% Floor, Block - GN - 37/1, Sector - V, Salt Lake City, Kolkata - 700 091 Copy to: - The General Manager, Sagardighi Thermal Power Project, WBPDCL, P.O. - Monigram, PS. - Sagardighi, Dist. - Murshidabad, West Bengal, PIN - 742 237. with a request to take care of the above mentioned prospective bidders during their visit to Site.

You might also like