P ro j e c t R e f e re n c e 7-6

Substation Automation
The Benefits reaped by POWERGRID:

 Low risks ensured by efficient project manage-  Efficient training and support
ment and leading-edge technology  High-speed project execution and reliable
 Enhanced life cycle management with low life service and commissioning afforded through
cycle cost through future-proof system with strong technical know-how and global experi-
IEC 61850 interoperability: ence of ABB coupled with local competence Protection, Substation Automation & Network Control
Fully integrated SA system interoperating with

Powergrid owns India’s



3rd party Main 2 devices
POWERGRID’s
Maharanibagh HV GIS station is
 Reuse of engineering data for extensions, up- not only the country’s very first substation to be

first IEC 61850 substation


grades and replacements equipped with an IEC 61850-compliant automa-
 Efficient maintenance and consistent data tion system, but also features ABB India’s first lo-
management with standardized documentation cally engineered and manufactured Local Control

automation system
 Safeguarded investment into future utility com- Cubicles (LCCs). Excellent coordination and co-
munication architecture beyond the substation operation between the customer’s and vendor’s
 Highest safety in control and protection teams resulted in a system that is optimized to
POWERGRID’s needs and expectations.
Customer satisfaction:
Powergrid’s SAS 690 substation automation system
IEC 60870-5-101 For its first SA-project with
IEC 61850, POWERGRID
sought a supplier with ex-
Laser printer GPS pertise in the standard and
DR workstation Redundant HMI Gateway

a thorough know-how of sys-


DMP
tem integration for achieving
complete interoperability.
It relied on ABB, being a
Switch Switch
technology leader with strong
IEC 61850-8-1 redundant ring network
local competence, high
Switch Switch Switch reliability, excellent project
management and domain
expertise. ABB India imple-
mented this maiden project
REC 670 REL 670 REC 670 RET 670 REC 670 REC 670
Main 1 Main 1
in the country, ensuring on-
time delivery of a fully interop-
REL 670
7SA522
Main 2
REB 500 Main 1 erable system. It also has a
RET 670
Main 2
strong network for providing
REL 670
POWERGRID with immediate
© Copyright 2007 ABB. All rights reserved.

REB 500 Main 2

service and support.

BBP bay units


Main 1, Main 2
BBP bay units
Main 1, Main 2
BBP bay units
Main 1, Main 2 POWERGRID relies on ABB’s IEC 61850 SA solutions for its first 400 kV GIS substation
Maharanibagh. It benefits from:
2 x Line 2 x Autotransformer 1 x Bus coupler Auxiliaries Busbar

 Fully interoperable system with IED 670 for protection and control and 3rd party Main 2 devices
For more information please refer to the responsible ABB sales engineer for your country or to the address mentioned below.  Cost-efficient solution through full exploitation of the IEDs’ functional capabilities including
GOOSE-based functionality
ABB Switzerland Ltd ABB Limited  High system availability with fully redundant operator workstations and independent gateways
Substation Automation Systems Substation Automation Systems
 Guaranteed system openness for future hardware and functional extensions through high-quality
Bruggerstrasse 72 Plot Nos. 5 & 6, II Phase
CH-5400 Baden/Switzerland Peenya Industrial Area, P.B. No. 5806 engineering
Phone +41 -58-585 77 44 Bangalore - 560 058
Fax +41 -58-585 55 77 INDIA
E-mail substation.automation@ch.abb.com Phone +91-80-22949414
www.abb.com/substationautomation Fax +91-80-28396121
E-mail abb.sa.training@in.abb.com
www.abb.co.in
The Customer The Challenge

POWER GRID CORPO-


For the new Maharanibagh 400 kV GIS substa-
RATION OF INDIA LTD.
(POWERGRID), India’s Central tion, an automation system based on the most
Transmission Utility owns
modern technology is required. The station
about 63,000 km of trans-
mission lines and 107 sub- is located in the centre of New Delhi and sup-
stations with a transformation
plies both commercial and residential areas.
capacity of 63,000 MVA. Its
best standards and practices A very high system availability of 99.98 percent
help maintain grid availability
shall be ensured through field-proven IEDs and
consistently over 99 %. Per
annum, about 200 billion TWh a redundancy concept for local operation as
power are transmitted across
well as remote control and supervision from
the entire length and breadth
of the country. The national the Remote Control Centre (RCC) and Regional
grid operator is India’s first
System Coordination Centre (RSCC) via IEC 101
power utility to be accredited
with ISO 9001. With its protocol. Using components with verified
in-house expertise in all areas
IEC 61850 implementation as well as SCL-
of transmission including
800 kV AC, 500 kV HVDC, based tools, the vendor shall ensure a fully
etc., it plans to create a
integrated and interoperable system that
strong and vibrant national
grid by 2012. Until then, over is easy to expand in the future.
60,000 km of transmission
ABB’s solution
lines shall be added to
evacuate an additional The solution chosen is based on ABB’s state-of-the-art IED 670 for protection and
100,000 MW of electrical control of each bay and dual station HMIs in a hot-standby configuration. It also fea-
energy. tures redundant COM 581 communication gateways for telecontrol from the RCC at
Ballabhgarh and the RSCC at New Delhi. The system’s fault-tolerant ring configuration
using Ethernet switches with dual power supplies interconnects all IEDs including the
3rd party Main 2 protection IEDs, which have successfully been integrated. GOOSE
messaging is used for software interlocks, auto-reclosing as well as triggering of distur-
bance recording. The complete substation, including the gas insulated switchgear and
transformers, is supplied by ABB as a turnkey package. It is the first such station
to be equipped with Local Control Cubicles (LCC) that are locally engineered and man-
ufactured by ABB India.
The Customer The Challenge

POWER GRID CORPO-


For the new Maharanibagh 400 kV GIS substa-
RATION OF INDIA LTD.
(POWERGRID), India’s Central tion, an automation system based on the most
Transmission Utility owns
modern technology is required. The station
about 63,000 km of trans-
mission lines and 107 sub- is located in the centre of New Delhi and sup-
stations with a transformation
plies both commercial and residential areas.
capacity of 63,000 MVA. Its
best standards and practices A very high system availability of 99.98 percent
help maintain grid availability
shall be ensured through field-proven IEDs and
consistently over 99 %. Per
annum, about 200 billion TWh a redundancy concept for local operation as
power are transmitted across
well as remote control and supervision from
the entire length and breadth
of the country. The national the Remote Control Centre (RCC) and Regional
grid operator is India’s first
System Coordination Centre (RSCC) via IEC 101
power utility to be accredited
with ISO 9001. With its protocol. Using components with verified
in-house expertise in all areas
IEC 61850 implementation as well as SCL-
of transmission including 800
kV AC, 500 kV HVDC, etc., based tools, the vendor shall ensure a fully
it plans to create a strong and
integrated and interoperable system that
vibrant national grid by 2012.
Until then, over 60,000 km of is easy to expand in the future.
transmission lines shall
ABB’s solution
be added to evacuate an
additional 100000 MW of The solution chosen is based on ABB’s state-of-the-art IED 670 for protection and
electrical energy. control of each bay and dual station HMIs in a hot-standby configuration. It also fea-
tures redundant COM 581 communication gateways for telecontrol from the RCC at
Ballabhgarh and the RSCC at New Delhi. The system’s fault-tolerant ring configuration
using Ethernet switches with dual power supplies interconnects all IEDs including the
3rd party Main 2 protection IEDs, which have successfully been integrated. GOOSE
messaging is used for software interlocks, auto-reclosing as well as triggering of distur-
bance recording. The complete substation, including the gas insulated switchgear and
transformers, is supplied by ABB as a turnkey package. It is the first such station
to be equipped with Local Control Cubicles (LCC) that are locally engineered and man-
ufactured by ABB India.
P ro j e c t R e f e re n c e 7-6 Substation Automation
The Benefits reaped by POWERGRID:

 Low risks ensured by efficient project manage-  Efficient training and support
ment and leading-edge technology  High-speed project execution and reliable
 Enhanced life cycle management with low life service and commissioning afforded through
cycle cost through future-proof system with strong technical know-how and global experi-
IEC 61850 interoperability: ence of ABB coupled with local competence Protection, Substation Automation & Network Control
Fully integrated SA system interoperating with

Powergrid owns India’s



3rd party Main 2 devices
POWERGRID’s
Maharanibagh HV GIS station is
 Reuse of engineering data for extensions, up- not only the country’s very first substation to be

first IEC 61850 substation


grades and replacements equipped with an IEC 61850-compliant automa-
 Efficient maintenance and consistent data tion system, but also features ABB India’s first lo-
management with standardized documentation cally engineered and manufactured Local Control

automation system
 Safeguarded investment into future utility com- Cubicles (LCCs). Excellent coordination and co-
munication architecture beyond the substation operation between the customer’s and vendor’s
 Highest safety in control and protection teams resulted in a system that is optimized to
POWERGRID’s needs and expectations.
Customer statements:
Powergrid’s SAS 690 substation automation system
IEC 60870-5-101 For its first SA-project with
IEC 61850, POWERGRID
sought a supplier with ex-
Laser printer GPS pertise in the standard and
DR workstation Redundant HMI Gateway

a thorough know-how of sys-


DMP
tem integration for achieving
complete interoperability.
It relied on ABB, being a
Switch Switch
technology leader with strong
IEC 61850-8-1 redundant ring network
local competence, high
Switch Switch Switch reliability, excellent project
management and domain
expertise. ABB India imple-
mented this maiden project
REC 670 REL 670 REC 670 RET 670 REC 670 REC 670
Main 1 Main 1
in the country, ensuring on-
time delivery of a fully interop-
REL 670
7SA522
Main 2
REB 500 Main 1 erable system. It also has a
RET 670
Main 2
strong network for providing
REL 670
POWERGRID with immediate
© Copyright 2007 ABB. All rights reserved.

REB 500 Main 2

service and support.

BBP bay units


Main 1, Main 2
BBP bay units
Main 1, Main 2
BBP bay units
Main 1, Main 2 POWERGRID relies on ABB’s IEC 61850 SA solutions for its first 400 kV GIS substation
Maharanibagh. It benefits from:
2 x Line 2 x Autotransformer 1 x Bus coupler Auxiliaries Busbar

 Fully interoperable system with IED 670 for protection and control and 3rd party Main 2 devices
For more information please refer to the responsible ABB sales engineer for your country or to the address mentioned below.  Cost-efficient solution through full exploitation of the IEDs’ functional capabilities including
GOOSE-based functionality
ABB Switzerland Ltd ABB Limited  High system availability with fully redundant operator workstations and independent gateways
Substation Automation Systems Substation Automation Systems
 Guaranteed system openness for future hardware and functional extensions through high-quality
Bruggerstrasse 72 Plot Nos. 5 & 6, II Phase
CH-5400 Baden/Switzerland Peenya Industrial Area, P.B. No. 5806 engineering
Phone +41 -58-585 77 44 Bangalore - 560 058
Fax +41 -58-585 55 77 INDIA
E-mail substation.automation@ch.abb.com Phone +91-80-22949414
www.abb.com/substationautomation Fax +91-80-28396121
E-mail abb.sa.training@in.abb.com
www.abb.co.in

You might also like