Resource Leveling vs. Resource
Scheduling
y Resource Leveling
Available resources are sufficient. Activities are
rescheduled within available float only. No increase in
Project Duration.
y Resource Scheduling
Resource requirement exceeds resource availability.
Resources must be increased or activities must be
rescheduled beyond their float time resulting in increased
project duration.
3
Objectives of Resource Leveling
y To meet the physical limits of the resources.
4
Resource Maximum Limit
Resource Usage
Time
5
RESOURCE LEVELING
Resource Profile
Resource Level
Resource Level