The Basic Idea of Resource Leveling

y Reschedule activities within the limits of available float to achieve


better distribution of resource usage.

5, 5
2

5 20
5M
15M
0, 0
1 15 3
25, 25
8M FF=10

2
Resource Leveling vs. Resource
Scheduling

y Resource Leveling
Available resources are sufficient. Activities are
rescheduled within available float only. No increase in
Project Duration.

y Resource Scheduling
Resource requirement exceeds resource availability.
Resources must be increased or activities must be
rescheduled beyond their float time resulting in increased
project duration.

3
Objectives of Resource Leveling
y To meet the physical limits of the resources.

y To avoid day to day fluctuation.

y To maintain a continuous application for the


resource.

4
Resource Maximum Limit

Resource Usage

Time

5
RESOURCE LEVELING
Resource Profile
Resource Level

Resource Level

Project Duration Project Duration


NOT DESIRABLE DESIRABLE 6
Resource Leveling Additional
Considerations
y Multiple Resources
y Intermittent Activities
14
15
17
19
20
21
A Resource Scheduling Example

22
23
24
25