You are on page 1of 2

MERIDIAN 

  BIOENERGY 
Multi‐Stage 
  Waste To Energy 
    Process Flow Diagram 

The Right Place 
  The Right Time 
  The Right GREEN Technology 

MERIDIAN 
BIOENERGY 
11983 Tamiami Trail North, #113 
Naples, Florida 34110 
Office  239.331.7048 
Fax  239‐331‐7049 
 
www.meridianbioenergy.com 
The Right Place 
  The Right Time 
  The Right GREEN Technology 
MERIDIAN 
Initial biogas production facility located in Houston,
BIOENERGY  Texas
Ley Road Renewable Energy Facility 
3 facilities to be operating within 5 years in major
9425 Ley Road  metropolitan areas
Houston, Texas  Advanced multi-stage anaerobic digestion technolo-
gy reduces production time and generates more bio-
gas per pound of feedstock than conventional diges-
Nature wastes nothing—neither should we  tion technology
Pressure Swing Adsorption (PSA) gas processing
technology provided by subsidiary of BASF
Gas delivery of 2 million cubic feet per day of pipe-
line quality natural gas anticipated during third or
fourth quarter 2011
Permits and land sufficient to double capacity at cur-
rent location
Bilateral gas transport arranged from Houston to
SOCAL Topock, Needles, California
Feedstock utilized will be brown “trap” grease and
any organic food waste streams
Research and testing cooperative agreement with
Fortune 500 company utilizing same anaerobic di-
gester technology
Byproduct is an organic soil amendment suitable for
sale to local agricultural users
Campaign targeting restaurant chains, megastores,
grocery chains and food processors to provide envi-
ronmentally conscious, low-cost waste disposal solu-
tions
Conveniently located near major  
Ongoing discussions underway with major waste
transportation arteries in Houston, Texas  management firms and waste haulers to supply long
term feedstock supply
Houston and Texas Commission of Environmental
Quality (TCEQ) very supportive of Meridian opera-
tions

You might also like