Module SEV
ID
1 PP
2 PP
3 PP
4 PP
5 PP
6 PP
7 PP
8 PP
9 MM
10 MM
11 MM
12 MM
13 MM
14 MM
15 MM
16 MM
17 MM
18 MM
19 MM
20 MM
21 MM
22 MM
23 MM
24 MM
25 MM
26 MM
27 MM
28 MM
29 MM
30 MM
31 MM
32 MM
33 MM
34 MM
35 MM
36 MM
37 MM
38 MM
39 MM
40 MM
41 MM
42 MM
43 MM
44 MM
45 MM
46 MM
47 MM
48 MM
49 MM
50 MM
51 MM
52 MM
53 MM
54 MM
55 MM
56 MM
57 MM
58 MM
59 MM
60 MM
61 MM
62 MM
63 MM
64 MM
65 MM
66 MM
67 MM
68 MM
69 MM
70 MM
71 MM
72 MM
Description
Some items / part nos. show reporting point error despite showing in routing.
There is limitation of 499 items in each sub-assembly(BOM), please allow upto 2000.
There is problem in down loading of BOM using pull list to Excel sheet , it leaves out items
showing red indicator.
Downloading of BOM using CS03 is not possible. We are using copy and paste method
page by page to down load the BOM to excel sheet.
Pending ID report.
Any report which can show material picked from QA whether okay or reject.
MB52 to show material under hold (restricted) and material received as sales return
(Return Qty).
Fix consumption level of any general item on cost centre level basis.
How to fix minimum and maximum stock of any item and what is its impact on other
functions. (production – keep production in mind which can be variable/ non-
production).like MRP...
Separate storage location to be created for Re-work / final dispatch area enabling issue of
material to re-work final dispatch area through system instead of material issue slip.
Printing of ABC
Printing of Non-moving
Printing of Excess stock based on production target-In excess of the delivery schedule
Rejection report to be clubbed with vendor due payments to avoid undue payments.
How to raise RGP / job work challan through (941) for material received after job work but
found incomplete / re-workable and should be able to pick from restricted column..
Job work material when found defective and rejection invoice is raised it picks the price of
the material without job work charges. Can we have options wherein we can select – a.
Charges for material only
b. Charges for job work only.
c. Charges for material and job work.
Reservation list appears without material description, it should be with material description.
MBLB only shows pending material for job work but does not show completed / partly
completed and received material.
Material return to stores inward procedure. (for Material issued on Material issue slip) –
MB1c – which movement type?.
MBLB to show storage location field. Can be used for SPD also.
How to make job work challan for material without Job work Po but involves cost.
Vendor to vendor job work, how to print the job work challan.
Rejection invoice against general items, at times, soed not show value but at the accounts
end it shows value. Similarly the tax value differs at the stores end (1%) and at accounts
end (4%) in some cases.
349 (blocked to QA), 343 (blocked to unrestricted) and 922 (LR to QI – Unrestricted to QI)
does not effect vendor ?
try using cs12 here u will get the direct direct download
option
Effort Agin Aging
Issue Type
Spent g Trend
configuration
based
Report based
configuration
based
Report based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
Report based
configuration
based
Report based
configuration
based
Report based
Report based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
Report based
configuration
based
Report based
Report based
Report based
Report based
Report based
Report based
Report based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
Report based
Report based
configuration
based
Report based
Report based
configuration
based
configuration
based
configuration
based
configuration
based
Report based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
configuration
based
Report based
configuration
based
configuration
based
configuration
based
configuration
based
Report based
Report based
Requ Custo SEV Description Ticket
est ID mer Status
Name
Created Date Expected Date
Action taken Fix Issue Type
Agent/Cor
e Team
Gap Request Effort
No. Spent