Before (Existing) After (Refurbish) Method of construction Tools

Hall Hall (Seating) - Building the Frame


- Lay out the frame

- Glue/drill the rails. Now that your rails


have pilot holes, you're ready to drill
your first joint

- Put a concrete slab


-
Part of frontal corridor Admin Wall will be hack. Concrete slab will be added.
and part of green turfting
Store Restroom
Store Belleria Need opening (window) and huge mirror on
wall. Railing on one side. Floor finish is of
wood panel.
None Small Auditoria Raised stage (450mm) of wood panel finish.
Vinyl finish of other area of floor
None Orchestraria Floor finish of vinyl. False ceiling is of acoustic
fibrous board.
Hall Function Room 1 Under seating slanting slab. Carpet for floor
finish.
Hall Function Room 2 (Press ditto
Conference)
Store Utilities Gift Shop Wall of clear glass
None Ampthitheater Conc.
None (Landscape) Series of serening
gardens
None (Landscape) Canteen Conc slab. Less wall except prep booth
None Outdoor Overflow Area Less wall. Floor slab is existing conc. Flat roof.
Void within upper lobby Cut off existing floor slab.