Item Description Qty Unit Unit Cost Amount

DIV. 04 MASONRY WORKS


4.1 4" thk CMU wall
Interior walls and partitions, toilets sq.m.

4.2 6" thk CMU wall, exterior walls sq.m.

Sub-total

DIV. 05 THERMAL & MOISTURE PROTECTION


5.1 Roof and Roofing Appurtenances
5.1.1 Preformed metal roofing, Gage 24 sq.m.
5.1.2 Metal gutter, Gage 24 lm
5.1.3 Metal ridge roll. Gage 24 lm

5.2 Waterproofing
5.2.1 Waterproofing at toilets only, 2nd floor sq.m.

Sub-total

DIV. 08 DOORS AND WINDOWS


8.1 Doors
sets
D-1: Panel doors and jambs, hollow core at bedrooms
D-2: Solid panel doors and jambs, main door set
D-3: Aluminum door with screen, Front door set
D-4: PVC door at toilets sets

8.2 Aluminum Windows (by size on drawings)


W1: 2.6m x 3.0m (example only) set
W2: 2.2m x 2.6m (example only) set
W3: 1.2m x 2.4m (example only) set

Sub-total

DIV. 09 FINISHES
9.1 Floor Finish
Plain cement finish (Porch) sq.m.
Concrete topping, 50mm thick (all areas) sq.m.
Ceramic tiles
Toilet at Ground floor sq.m.
2nd flr toilet sq.m.
Garage floor sq.m.
Ground floor (Kitchen, Living, Dining) sq.m.
Bedrooms sq.m.
Hallway sq.m.
Offices sq.m.
School rooms sq.m.
9.2 Wall Finish
Plain cement plaster
Exterior walls sq.m.
Interior walls sq.m.

Ceramic tiles
Toilet at Ground floor sq.m.
2nd flr toilet sq.m.

9.3 Ceiling Finish


Interior ceiling, 9mm thk. Gypsumboard on metal
sq.m.
furring frames (All Rooms)

Interior ceiling, 9mm thk. Ficemboard on metal furring sq.m.


frames (Hallways, Lobby, kitchen, living, dining)

9.4 Baseboard and Cornice


Baseboard, 4" (All rooms) lm
Cornice, 3" (All rooms) lm
Outside rooms, no baseboard and cornice