Item SPECIFICATION No L

1 SUBSTRUCTURE

1 Earthwork
1.1 site clearing 1 20
excaviation in wall trenches not
1.2 exceed 1.7m form reduced level

master room

2 5.6
long wall
short wall 2 3.8
Bed room 1
long wall 2 4.6
short wall 2 3.8
Bed room 2
long wall 2 4.6
short wall 2 3.8
Bed room 3
short wall 2 3.4
arc wall 1 6.46
Saloon
long wall 2 5.6
short wall 2 3.8
kitchen
long wall 1 3.6
short wall 2 2.8
Store
long wall 1 0
short wall 2 2.3
Wc of master room
short wall 2 1.3
WC B/W B.R1 & B.R2
short wall 2 1.3
corridor enter
wall 1 1.3

verranda wall

wall 1 1 9.67

1.3 foundation stone wall


400mm foundation masanory stone
wall 1:3 cement sand mortar
Master room
long wall 2 5.6
short wall 2 3.8
Bed room 1
short wall 2 4.6
long wall 2 3.8
Bed room 2
short wall 2 4.6
long wall 2 3.8
Bed room 3
short wall 2 3.4
arc wall 1 6.46
Saloon
long wall 2 5.6
short wall 2 3.8
kitchen
long wall 1 3.6
short wall 2 2.8
Store
long wall 1 0
short wall 2 3.1
Wc of master room
short wall 2 1.3
WC B/W B.R1 & B.R2
short wall 2 1.3
corridor enter
wall 1 1.3
verranda wall
wall1 1 9.67

250mm rcc foundation ground beam


1.4 in1:2:3 cemet sand aggregate 1 114.63
earth work backfilling
300mm thick compacted sand soil
1.5 in 150 mm layers--
Master room 1 4.8
Bedroom1 1 3.8
Bedroom2 1 3.8

saloon 1 4.8
kitchen 1 2.8
store 1 2.3
Wc of master room 1 2.6
WC B/W B.R1 & B.R2 1 2.4
bedroom3 1 3.5
arc area 1 5.38
corridor enter
A1 1 1.5
A2 1 1.3
A3 1 1.3
A4 1 1.3
verranda
A1 1 5.5
A2 1 3.43
A3 2 0.335

1.5 100 mm thick compected core stone 1 131.37


1.6 50mm thick plinding pcc 1:3:6 1 131.37
1.7 Lime concrete in foundation
stepA 1 2.4
stepB 1 1.8
stepC 1 3.05

1st class brick work in founation and


1.8 plinth in 1:6 cement mortar
STEPS A
1ST Step 1 2.3
2nd step 1 2.3
3rd step 1 2.3
STEPS B
1ST Step 1 1.7
2nd step 1 1.7
STEPS c
1ST Step 1 2.78
2nd step 1 3.05
2 SUPER STRUCTURE

200mm thick 1st class concrete block


2.1 in 1:4cement sand mortar

master room 2 5.4


long wall 2 4
short wall
bed room 1 2 4.4
long wall 2 4
short wall
bed room 2 2 4.4
long wall 2 4
short wall
bed room 3 1 6.26
arc wall 2 3.6
short wall
saloon 2 5.4
long wall 2 4
short wall
kitchen 1 3.4
long wall 2 3
short wall
store 2 2.5
long wall 1 0.4
short wall
Wc of master room 2 1.5
short wall
WC B/W B.R1 & B.R2 2 1.5
short wall
corrider 1 1.5
wall
verranda 1 9.87
wall 1 51
parpet wall

DEDUCT
door oppenings 8 0.9
D1 1 1.2
D2 2 0.8
D3 1 0.9
D4
Window opening 7 1.5
W1 1 1
W2 1 1
W3 1 2
W4 2 0.6
W5 1 1
empty window 1 115.792
lintels beam 1 115.792
roof beam rcc section
empty verrsnda 1 5.84
A1 2 0.9
A2 4 0.2
Column

2.2
RCC works 1 116.63
lintels 4 0.03
column 200diameter including
concrete and reinforcement bars
centring and shuttering

2.21
2.22 1 116.63

200*600 roof beam insutu concrete


1:2:3 excluding reinforcement bars
2.23 but including centering and shuttering 1 21.46

150mm verranda slab insutu concrete


1:2:3 includng reinforcement bars but
2.24 including centering and shuttering 1 193.93

2.25 dittu verranda slab


T10 high yeild reinforcement bars in
2.26 verranda slab
2.27
roof terrace 1 161.048
2.3
plastering works
inside plastering apply 150mm thick
cement plastering 1:4
master room 2 5
long wall 2 4
short wall 1 5.2
left side corridor wall of m/room 1 4.2
front wall of m/room
bed room 1 2 4
long wall 2 4
short wall 1 4
front coriddor wall of bed room1 1 4
left side corridor wall of room 1
bed room 2 2 4
long wall 2 4
short wall 1 4.2
front wall of bed room2 at b/c 1 3.7
side wall of bed room3 1 4.4
side of the corridor
bed room 3 2 3.6
long wall 1 5.75
short wall 1 3.6
side of the corridor bed room 3
saloon 2 5
long wall 2 4
short wall 1 4.4
front corridor wall of saloon 1 5.2
right side corridor wall of saloon 1 4
left side corridor wall of saloon
kitchen 1 3
long wall 2 3
short wall 1 3.2
front corridor wall of kitchen
store 2 2.5
long wall 1 2.5
right side corridor wall of store

Wc of master room 2 1.5


short wall 1 1.5
left side corridor wall of wc
WC B/W B.R1 & B.R2 2 1.5
short wall 1 1.5
front corridor wall of wc 1 1.5
corridor entrence
verranda 1 9.5
long wall 1 5.7
short wall

2.31
Out side plastring

1 56.71
Super structure walls 2 56.71
parpel wall

Deduct
Door Opending 8 0.9
D1 1 1.2
D2 2 0.8
D3 1 0.9
D4
Window Opening 7 1.5
W1 1 1
W2 1 1
W3 1 2
W4 2 0.6
W5 1 1
Empty Window

colour washing and white washing


2.32 work
white washing 3 Coat (inside)
master room
long wall 2 5
short wall 2 4
left side corridor wall of m/room 1 5.2
front wall of m/room 1 4.2
bed room 1
long wall 2 4
short wall 2 4
front coriddor wall of bed room1 1 4
left side corridor wall of room 1 1 4
bed room 2
long wall 2 4
short wall 2 4
front wall of bed room2 at b/c 1 4.2
side wall of bed room3 1 3.7
side of the corridor 1 4.4
bed room 3
long wall 2 3.6
short wall 1 5.75
side of the corridor bed room 3 1 3.6
saloon
long wall 2 5
short wall 2 4
front corridor wall of saloon 1 4.4
right side corridor wall of saloon 1 5.2
left side corridor wall of saloon 1 4
kitchen
long wall 1 3
short wall 2 3
front corridor wall of kitchen 1 3.2
store
long wall 2 2.5
right side corridor wall of store 1 2.5
Wc of master room
short wall 2 1.5
left side corridor wall of wc 1 1.5
WC B/W B.R1 & B.R2
short wall 1 1.5
front corridor wall of wc 1 1.5
corridor entrence
verranda 1 9.5
long wall 1 5.7
short wall

Colour Washing Two coat Over One


coat Washing (Outside) 1 56.71
Super structure walls 2 56.71

2.33 parpel wall


Deduct
Door Opending
D1 8 0.9
D2 1 1.2
D3 2 0.8
D4 1 0.9
Window Opening
W1 7 1.5
W2 1 1
W3 1 1
W4 1 2
W5 2 0.6
Empty Window 1 1

plastering works
inside plastering apply 150mm thick
cement plastering 1:4
2.4 master room 2 5
long wall 2 4
short wall 1 5.2
left side corridor wall of m/room 1 4.2
front wall of m/room
bed room 1 2 4
long wall 2 4
short wall 1 4
front coriddor wall of bed room1 1 4
left side corridor wall of room 1
bed room 2 2 4
long wall 2 4
short wall 1 4.2
front wall of bed room2 at b/c 1 3.7
side wall of bed room3 1 4.4
side of the corridor
bed room 3 2 3.6
long wall 1 5.75
short wall 1 3.6
side of the corridor bed room 3
saloon 2 5
long wall 2 4
short wall 1 4.4
2.4 front corridor wall of saloon 1 5.2
right side corridor wall of saloon 1 4
left side corridor wall of saloon
kitchen 1 3
long wall 2 3
short wall 1 3.2
front corridor wall of kitchen
store 2 2.5
long wall 1 2.5
right side corridor wall of store

Wc of master room 2 1.5


short wall 1 1.5
left side corridor wall of wc
WC B/W B.R1 & B.R2 2 1.5
short wall 1 1.5
front corridor wall of wc 1 1.5
corridor entrence
verranda 1 9.5
long wall 1 5.7
short wall

Out side plastring

1 56.71
Super structure walls 2 56.71
parpel wall

Deduct
Door Opending 8 0.9
D1 1 1.2
D2 2 0.8
D3 1 0.9
D4
Window Opening 7 1.5
W1 1 1
W2 1 1
W3 1 2
W4 2 0.6
W5 1 1
Empty Window

Flooring
Sreending 1 4
Master room 1 4
bed room 1 1 4
bed room 2 1 3.7
bed room 3 1 5.38
arce area 1 5
salon 1 3
kitchen 1 2.5
store 1 1.5
w/c master 1 1.5
w/c
Corridor 1 1.4
a1 1 8.8
a2 1 1.7
a3 1 5.2
a4 1
Veranda 1 1.7
a1 1 3.5
a2 2 0.385
a3

TIELE 1 149.26
B H Q

20 400

0.4 1.25
5.6
0.4 1.25 3.8

0.4 1.25 4.6


0.4 1.25 3.8

0.4 1.25 4.6


0.4 1.25 3.8

0.4 1.25 3.4


0.4 1.25 3.23

0.4 1.25 5.6


0.4 1.25 3.8

0.4 1.25 1.8


0.4 1.25 2.8
0.4
0.4 1.25
0.4 1.25 2.3

0.4 1.25 1.3


0.4 1.25 1.3

0.4 1.25 0.65

0.4 1.25 4.835


TOTAL
EXCAVIATION 57.215
cum

0.4 1.45 6.496


0.4 1.45 4.408

0.4 1.45 5.336


0.4 1.45 4.408

0.4 1.45 5.336


0.4 1.45 4.408

0.4 1.45 3.944


0.4 1.45 3.7468

0.4 1.45 6.496


0.4 1.45 4.408

0.4 1.45 2.088


0.4 1.45 3.248

0.4 1.45 0
0.4 1.45 3.596

0.4 1.45 1.508

0.4 1.45 1.508

0.4 1.45 0.754

0.4 1.45 5.6086

TOTAL FOUNTION
STONE WALL 67.2974
CUM

0.4 0.25 11.463

3.8 0.3 5.472


3.8 0.3 4.332
3.8 0.3 4.332

3.8 0.3 5.472


2.8 0.3 2.352
1.3 0.3 0.897
1.3 0.3 1.014
1.3 0.3 0.936
3.5 0.3 3.675
1 0.3 1.614
0
0.88 0.3 0.396
8.6 0.3 3.354
1.3 0.3 0.507
5.1 0.3 1.989

1.55 0.3 2.5575


0.65 0.3 0.66885
0.3 0.201
TOTAL EARTH
FILLIG 39.76935
CUM

0.1 13.137
0.05 6.5685

1 0.15 0.36
0.7 0.15 0.189
0.7 0.15 0.32025
total 0.86925
cum

0.3 0.15 0.1035


0.6 0.15 0.207
0.9 0.15 0.3105

0.3 0.15 0.0765


0.6 0.15 0.153

0.3 0.15 0.1251


0.6 0.15 0.2745
total 1.2501
cum

3.5 37.8
3.5 28

3.5 30.8
3.5 28

3.5 30.8
3.5 28

3.5 21.91
3.5 25.2

3.5 37.8
3.5 28

3.5 11.9
3.5 21

3.5 17.5
3.5 1.4

3.5 10.5

3.5 10.5

3.5 5.25
3 29.61
1 51
total block wall 454.97
SQM

2.1 15.12
2.1 2.52
2.1 3.36
2.1 1.89

1.2 12.6
1.5 1.5
2 2
1.6 3.2
0.7 0.84
1.2 1.2
0.2 23.1584
0.6 69.4752
0.45
1 5.84
1.16 2.088
3 2.4

total deduction of
block wall 147.1916

Total net block 307.7784


SQM

0.2 0.2 23.326


3 0.36
total 23.686

0.2 0.6 13.9956

1 0.15 3.219

1 0.15 29.0895
total 46.3041

1
1 0.1 16.105

3.5 35
3.5 28
3.5 18.2
3.5 14.7

3.5 28
3.5 28
3.5 14
3.5 14

3.5 28
3.5 28
3.5 14.7
3.5 12.95
3.5 15.4

3.5 25.2
3.5 20.125
3.5 12.6

3.5 28
3.5 15.4
3.5 18.2
3.5 14

3.5 21
3.5 11.2
0
3.5 17.5
3.5 8.75

3.5 10.5
3.5 5.25

3.5 10.5
3.5 5.25
3.5 5.25

3.5 33.25
3.5 19.95
Total inside plastring 560.875
sqm

4.2 238.182
1 113.42
Total outside plastring 351.602
sqm

2.1 15.12
2.1 2.52
2.1 3.36
2.1 1.89

1.2 12.6
1.5 1.5
2 2
1.6 3.2
0.7 0.84
1.2 1.2
Total Deduction 44.23
Net Outside
Plastering 307.372
Total Palstring Inside
and Outside 868.247

3.5 35
3.5 28
3.5 18.2
3.5 14.7

3.5 28
3.5 28
3.5 14
3.5 14

3.5 28
3.5 28
3.5 14.7
3.5 12.95
3.5 15.4

3.5 25.2
3.5 20.125
3.5 12.6

3.5 35
3.5 28
3.5 15.4
3.5 18.2
3.5 14

3.5 10.5
3.5 21
3.5 11.2

3.5 17.5
3.5 8.75

3.5 10.5
3.5 5.25

3.5 5.25
3.5 5.25

3.5 33.25
3.5 19.95
Total inside plastring 595.875
sqm

4.2 238.182
1 113.42
Total Outside Colour
Washing 351.602

sqm
2.1 15.12
2.1 2.52
2.1 3.36
2.1 1.89
0
1.2 12.6
1.5 1.5
2 2
1.6 3.2
0.7 0.84
1.2 1.2
Total Deduction 43.03
Net Outside
Colour washing 308.572

Total color
washing and
white
washingInside
and Outside 308.572

3.5 35
3.5 28
3.5 18.2
3.5 14.7
3.5 28
3.5 28
3.5 14
3.5 14

3.5 28
3.5 28
3.5 14.7
3.5 12.95
3.5 15.4

3.5 25.2
3.5 20.125
3.5 12.6

3.5 28
3.5 15.4
3.5 18.2
3.5 14

3.5 21
3.5 11.2
0
3.5 17.5
3.5 8.75

3.5 10.5
3.5 5.25
3.5 10.5
3.5 5.25
3.5 5.25

3.5 33.25
3.5 19.95
Total inside plastring 560.875
sqm

4.2 238.182
1 113.42
Total outside plastring 351.602
sqm

2.1 15.12
2.1 2.52
2.1 3.36
2.1 1.89

1.2 12.6
1.5 1.5
2 2
1.6 3.2
0.7 0.84
1.2 1.2
Total Deduction 44.23
Net Outside
Plastering 307.372
Total Palstring Inside
and Outside 868.247

5 20
4 16
4 16
3.6 13.32
1 5.38
4 20
3 9
1.5 3.75
2.8 4.2
2.6 3.9

1.5 2.1
1.5 13.2
1 1.7
1.5 7.8

5.7 9.69
0.7 2.45
1 0.77
total screening 149.26
sqm
1 149.26
sqm
EXPLONATRY NOTE

c/c = 5+0.2=5.2 L=5.2+0.4=5.6

C/C=4+0.2=4.2 L=4.2-0.4=3.8

C/C=4+0.2=4.2 L=4.2+0.4=4.6
C/C=4+0.2=4.2 L=4.2-0.4=3.8

C/C=4+0.2=4.2 L=4.2+0.4=4.6
C/C=4+0.2=4.2 L=4.2-0.4=3.8

C/C=3.6+0.2=3.8 L=3.8-0.4=3.4
Lm=6.06 L=6.06+0.4=6.46

C/C=5+0.2=5.2 L=5.2+0.4=5.6
C/C=4+0.2=4.2 L=4.2-0.4=3.8

C/C=3+0.2=3.2 L=3.2+0.4=3.6
C/C=3+0.2=3.2 L=3.2-0.4=2.8

C/C=0.2+0.2=0.4 L=0.4-0.4=0
C/C=2.5+0.2=2.7 L=2.68+0.4=3.08

C/C=1.5+0.2=1.7 L=1.7-0.4=1.2
all
c/c=11
C/C=1.5+0.2=1.7 L=1.7-0.4=1.2 7.73
junctio
ns=19
C/C=1.5+0.2=1.7 L=1.7-0.4=1.2

C/C=1.86+1.86+1.40+1.40+3.55=10.07
L=10.07-0.4=9.67m

c/c = 5+0.2=5.2 L=5.2+0.4=5.6

C/C=4+0.2=4.2 L=4.2-0.4=3.8

C/C=4+0.2=4.2 L=4.2+0.4=4.6
C/C=4+0.2=4.2 L=4.2-0.4=3.8

C/C=4+0.2=4.2 L=4.2+0.4=4.6
C/C=4+0.2=4.2 L=4.2-0.4=3.8

C/C=3.6+0.2=3.8 L=3.8-0.4=3.4
Lm=6.06 L=6.06+0.4=6.46

C/C=5+0.2=5.2 L=5.2+0.4=5.6
C/C=4+0.2=4.2 L=4.2-0.4=3.8

C/C=3+0.2=3.2 L=3.2+0.4=3.6
C/C=3+0.2=3.2 L=3.2-0.4=2.8

C/C=0.2+0.2=0.4 L=0.4-0.4=0
C/C=2.5+0.2=2.7 L=2.68+0.4=3.08

C/C=1.5+0.2=1.7 L=1.7-0.4=1.2

C/C=1.5+0.2=1.7 L=1.7-0.4=1.2

C/C=1.5+0.2=1.7 L=1.7-0.4=1.2
C/C=1.86+1.86+1.40+1.40+3.55=10.07

L=10.07-0.4=9.67m

L=118.63-20(0.2)=114.63m

arc area=5.38
B=1.03 H=0.65
L=9.432 BLOCK

A=0.16+2.16+3.52=5.84m

arc area=a1=tri=0.279a2=rec=1.558
area=9.876

L=118.63-20(0.1)=116.63m
area of the circular column=πd^2/4=0.03
LARCE =5.75
L= 1.7+1.7+1.3+1.3+3.5=9.5m

h=3.5+0.45+0.1+0.15=4.2m

L=1.8+1.8+1.47+1.47+3.6+1+0.2+5+0.2+1.
5+0.2+4+0.2+0.2+4+0.2+1.5+0.2+4+0.2+0.
3+3.6+6.37+2.5+0.2+0.4+3+0.2+0.2+3+1+
0.2+3=56.7m

Deduction From Plastering shoud be


made in only One Face (Inside or Outside
LARCE =5.75
L= 1.7+1.7+1.3+1.3+3.5=9.5m

L=1.8+1.8+1.47+1.47+3.6+1+0.2+5+0.2+1.
5+0.2+4+0.2+0.2+4+0.2+1.5+0.2+4+0.2+0.
3+3.6+6.37+2.5+0.2+0.4+3+0.2+0.2+3+1+
0.2+3=56.7m
Deduction From Plastering shoud be
made in only One Face (Inside or Outside
LARCE =5.75
L= 1.7+1.7+1.3+1.3+3.5=9.5m

h=3.5+0.45+0.1+0.15=4.2m

L=1.8+1.8+1.47+1.47+3.6+1+0.2+5+0.2+1.
5+0.2+4+0.2+0.2+4+0.2+1.5+0.2+4+0.2+0.
3+3.6+6.37+2.5+0.2+0.4+3+0.2+0.2+3+1+
0.2+3=56.7m

Deduction From Plastering shoud be


made in only One Face (Inside or Outside

You might also like