CLIENT NAME: MARIANNE ROCA

PROJECT LOCATION: EASTLAND HEIGHTS

NO. SCOPE OF WORKS DURATION NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY

1 STRUCTURAL WORKS WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 1 WEEK 2 WEEK 3 WEEK 4

1.1 BASEMENT

1.1.1 COLUMN FOOTING

1.1.2 RETAINING WALL FOOTING

1.1.3 RETAINING WALL

1.1.4 FOOTING TIE BEAM

1.1.5 COLUMN

1.1.6 BACKFILL

1.1.7 SLAB ON GRADE

1.2 GROUND FLOOR

1.2.1 COLUMN FOOTING

1.2.2 WALL FOOTING

1.2.3 FOOTING TIE BEAM

1.2.4 COLUMN

1.2.5 SLAB ON GRADE

1.3 SECOND FLOOR

1.3.1 SECOND FLOOR BEAM

1.3.2 SUSPENDED SLAB

1.3.3 COLUMN

1.4 ROOF LEVEL

1.4.1 ROOF BEAM

1.4.2 TRUSSES

1.4.3 ROOFINGS

2 ARCHITECTURAL WORKS

2.1 SECOND FLOOR

2.1.1 AAC LAYING

2.1.2 CEILING WORKS

2.1.3 TILING WORKS

2.1.4 PAINTING WORKS

2.1.5 INTALLATION OF DOORS

2.1.6 INTALLATION OF LIGHTING FIXTURES

2.1.7 INSTALLATION OF GLASS/WINDOWS

2.1.8 INSTALLATION OF PLUMBING FIXTURES

2.1.9 INSTALLATION OF SWITCHES AND OUTLETS

2.1.10 FABRICATION AND INSTALLATION OF CABINETS

2.1.11 INSTALLATION OF PLANKS AND RAILINGS

2.2 GROUND FLOOR

2.2.1 AAC LAYING

2.2.2 CEILING WORKS

2.2.3 TILING WORKS

2.2.4 PAINTING WORKS

2.2.5 INTALLATION OF DOORS

2.2.6 INTALLATION OF LIGHTING FIXTURES

2.2.7 INSTALLATION OF GLASS/WINDOWS

2.2.8 INSTALLATION OF PLUMBING FIXTURES

2.2.9 INSTALLATION OF SWITCHES AND OUTLETS

2.2.10 FABRICATION AND INSTALLATION OF CABINETS

2.2.11 INSTALLATION OF QUARTZ

2.2.12 INSTALLATION OF PLANKS AND RAILINGS

2.3 BASEMENT

2.3.1 AAC LAYING

2.3.2 CEILING WORKS

2.3.3 TILING WORKS

2.3.4 PAINTING WORKS

2.3.5 INTALLATION OF DOORS

2.3.6 INTALLATION OF LIGHTING FIXTURES

2.3.7 INSTALLATION OF GLASS/WINDOWS

2.3.8 INSTALLATION OF PLUMBING FIXTURES

2.3.9 INSTALLATION OF SWITCHES AND OUTLETS

2.3.10 INSTALLATION OF CHB RAILINGS

2.4 INSTALLATION OF FENCE

2.4.1 MASONRY

2.4.2 PAINTING WORKS

2.5 PEBBLE WASHOUT (EXTERIOR)

3 ELECTRICAL WORKS

3.1 BASEMENT

3.1.2 ROUGHING INS

3.1.3 WIRING

3.2 GROUND FLOOR

3.2.1 ROUGHING INS

3.2.2 WIRING

3.3 SECOND FLOOR

3.3.1 ROUGHING INS

3.3.2 WIRING

4 PLUMBING WORKS

4.1 BASEMENT

4.1.1 STUB-OUT FOR PLUMBING FIXTURES

4.2 GROUND FLOOR

4.2.1 STUB-OUT FOR PLUMBING FIXTURES

4.3 SECOND FLOOR

4.3.1 STUB-OUT FOR PLUMBING FIXTURES