You are on page 1of 4

Project : Landmark Church School.

Work Breakdown Structure


Project Start Date: Tuesday August 27, 2019.
Phases Level WBS
Phase 1 1 Site Preparation(10%) 1.1 Survey

1.2 Land Preparation

Phase 2 2 Foundation (25%) 2.1 Dig

2.2 Frame

2.3 Concrete

Phase 3 3 Exterior (35%) 3.1 Framing

3.2 Roofing

3.3 Doors
3.4 Windows
3.5 Siding

3.6 Painting
Phase 4 4 Interior (20%) 4.1 Electrical

4.2 Pumbing
4.3 Walls

Phase 5 5 Finishing (10%) 5.1 Doors

5.2 Windows
5.3 Plumbing

5.4 Floors
5.5 Electrical
5.6 Painting
5.7 Appliances
ect : Landmark Church School.
Work Breakdown Structure
art Date: Tuesday August 27, 2019.
Task Description
1.1.1 Land Measurement
1.1.2 Land demarcation
1.1.3 Pegging and staking
1.2.1 Cutting of trees
1.2.2 Removal of trees and shrubs
1.2.3 Grading of Land
1.2.4 Filling and leveling of Land
2.1.1 Wetting of the ground
2.1.2 Manual Digging/excavation
2.1.3 Removal of dirt and sand
2.2.1 Installation of metal rods
2.2.2 installation of fabricated lumber
2.2.3 inserting Braces
2.3.1 Pouring of concrete
2.3.2 Compacting
2.3.3 Casting
2.3.4 Even Spreading
3.1.1 Installation of 8 inch Frames
3.1.2 Bracing
3.1.3 Calking of lumber
3.1.4 Erection of lumber
3.1.5 Framing Insoection by county
3.2.1 Carpentary wood work
3.2.2 Masonry work
3.2.3 Installation of Shingles
3.2.3 Installation of gutters
3.2.4 Installation of roof vents
3.3.1 Framing of Door points
3.4.1 Framing of Window points
3.5.1 Installation of wood work
3.5.2 Attaching siding to wood work
3.5.3 Installation of trims
3.5.4 Installation of insulation
3.6.1 Painting of the exterior of the house
4.1.1 Rough in
4.1.2 Testing
4.1.3 Installation of fittings
4.2.1 Channeling of waste lines
4.2.2 Drainage
4.2.3 installation of pipes
4.2.4 Installation of hot and cold lines
4.3.1 Interior Frames
4.3.2 Installation of drywall post insulation
4.3.2 Painting
5.1.1 Installation of exterior doors
5.1.2 Installation of interior doors
5.2.1 Installation of windows
5.3.1 Installation of water faucet toilet and sink
5.3.2 Installation of Furnaces
5.4.1 Installation of tiles
5.5.1 Connection of furnaces and other appliances to power
5.6.1 Painting of walls
5.7.1 Installation of Appliances