Rate Amount
Item Description Unit Quantity
(AED) (AED)
A Preliminaries
1 Site Mobilisation : including mobilisation of materials, tools, labour & Coordination works Item L.S
B Demolition
Floors
1 Remove esisting floor ,cart away debris & Dispose off Site Item
2 Carefully hack up floor screed, dispose debris & make good all other works so Disturbed Item
3 Carefully hack up Skirting , cart away debries and dispose off Site Item
Walls
1 Hack off ceramic wall tiling, dispose of debries & render Surface Item
Plumbing Installations
Electrical Installtions
1 Carefully disconnect /Remove all electrical panel, fixtures & Panel & Set aside as directed Item
Protection
C Moisture Protection
D Floors Finishes
Floor tiles , laid in whole units regular pattern on screeded floors, butt joint & Grouted in
cement motar.
1 Flooring Living Room, Bedroom incl Passage Sqm 67.12
2 Skirting 100mm M 47.09
3 Bathroom -1 Floor Sqm 8.16
4 Bathroom -2 Floor Sqm 7.44
5 Bathroom -3 Floor Sqm 7.53
E Walls
1
Alow for patching all cracks on wall surfaces using cement & Sand mortar (1:6) Item
2 Cement & Sand Rendering to walls 12mm Thick Item
Skirting
Living Room 2 12.73
2 4.18
2 9.7
Deduct Door Opening 1 1.01
1 0.98
1 1.2
2 0.98
1 0.98
39.69
4.27
23.15
67.12
25.46
8.36
19.4
-1.01
-0.98
-1.2
-1.96
-0.98
47.09
8.16
18.50 31.34
13.06
-1.69
-0.91
28.95
7.44
17.20
12.14
-1.67
-0.62
27.05
7.53
16.07
12.01
-1.69
-0.92
25.47