Project ‐ 118 PENTHOUSE ‐ LEVEL 33 & 34 FITOUT CIVIL & MEP WORKS

BILL NO. 1
BILL OF QUANTITIES SECTION 1 ‐ GENERAL REQUIREMENTS

ITEM DESCRIPTION UNIT QUANTITY RATE


AED
ABCD TEMPORARY WORKS Item Item 1
E The Contractor shall provide and maintain all necessary temporary Item Item 1
F works, including: Item 1
G Provide access to and within the site as required Item 1
HJKL The working space on site is subject to the reasonable limitations Item 1
MNP imposed by the Engineer Item Item 1
Provide temporary scaffolding as required Item Item 1
Provide temporary drainage and sewage disposal as required Item Item 1
SUNDRY ITEMS Item 1
The Contractor shall provide for all necessary sundry Items, 1
including: 1
Documentation for manuals, O & M manuals, training, as‐built 1
drawings and statutory building completion certificates 1
Dry out the works during construction; maintain the level of 1
humidity of the works as necessary for the proper incorporation
of materials
Keep the site clear of rubbish; housekeeping; removal of
protective casings and coverings, and clean the works at
completion to the satisfaction of the Engineer
Environmental protection including control the level of noise and
pollution
Maintain all existing services under, over or adjacent to the site
Possession of the site
Remove / protect all existing services within the confines of
the site as required
Temporary service connections
Fulfil all statutory obligations
All and any off‐site inspection as per the Contract
Specification
CARRIED TO COLLECTION