Professional Documents
Culture Documents
4.3 Before and after photos and accomplishment report shall be given to the Engineering Office upon completion of the project. 1 lot Inclusive
4.4 Warranty certificate shall be submitted upon completion and acceptance of the project. 1 lot Inclusive
5 CARI (COMPREHENSIVE ALL RISK INSURANCE) INCLUSIONS
5.1 Both parties (DLS-CSB and CONTRACTOR) shall have the authority to claim.
Full responsibility for any work -related incidents, personnel injuries or death brought about by accidents and/or non-compliance with
5.2 safety standard engineering work procedures, during and/or after work implementation of the project that may occur to their workers or
any third party within the building premises and its perimeter.
1 lot
Full responsibility for any work -related incidents brought about by accidents and/or non-compliance with safety standard engineering
5.3 work procedures, during and/or after work implementation of the project that may occur to the work site, bring damage to existing
facilities, property and building premises of DLS-CSB, and its perimeter.
6 DISCLAIMER AND NOTICE OF CONFIDENTIALITY
The content of this document and pertinent attachments, are intended solely for the bid participants and other individuals or entities who are authorized to receive these. Please be
6.1 advised that disclosure, distribution or copying of the information herein is strictly prohibited and may be unlawful. If you get hold of these in error or unintentionally, please notify the
Center for Engineering Services and/or return the documents immediately.
TOTAL COST P
VERY IMPORTANT: Submit this OFFICIAL BID TEMPLATE ( 1 orig.+ 1 photocopy), with no alterations. Other format will NOT be accepted. Please fill in all the
required fields Below
AMOUNT IN WORDS
INCLUSIVE OF VAT
COMPANY NAME
BUSINESS ADDRESS
AUTHORIZED
SIGNATORY (NAME
AND POSITION)
SIGNATURE OVER
PRINTED NAME
DATE