Project ‐ 118 PENTHOUSE ‐ LEVEL 33 & 34

FITOUT CIVIL & MEP WORKS

BILL OF QUANTITIES BILL NO. 2.4


LEVEL‐33 FINISHES
ITEM DESCRIPTION UNIT QUANTITY

FINISHES

Note: The Contractor shall visit the site to check the existing Works/
Conditions, before the submission of Tender

Floor Finishes
Supply and fix of 20 mm thick Granite / Marble cut to size, including
Zero joints, screed layer (if required),sealers, sealant,

fixed in coloured grouting and bedding in cement mortar cutting


and cleaning, etc., complete as per drawings ,
specification and engineer's approval

Entrance & lift Lobby Area

To entrance; Omani beige m2

To lift lobby ‐ level 33; with inserted Pattern as shown in drawings m2

A B C D To lift lobby ‐ Level 34; Omani beige m2


EFGHJ
K L To Complete Foyer area on level 33 & 34 m2
MN
Bathrooms

To Bathroom for Bedroom 1 ‐ 33 floor m2

To Bathroom for Bedroom 2 ‐ 33 floor m2

To Bathroom for Bedroom 1 ‐ 34 floor m2

To Bathroom for Bedroom 2 ‐ 34 floor m2

To Powder Room m2

Staircase

To Staircase tread m

To Staircase riser (Strip lights to risers measured else where) m

Other areas

To Inside lift flooring m2


To Pantry area ‐Level 34 m2
BILL NO. 2.4
LEVEL‐33 FINISHES
RATE AMOUNT
AED AED