Project ‐ 118 PENTHOUSE ‐ LEVEL 33 & 34

FITOUT CIVIL & MEP WORKS

BILL OF QUANTITIES BILL NO. 2.4


LEVEL‐33 FINISHES
ITEM DESCRIPTION UNIT QUANTITY
FINISHES (Cont'd)
Supply and installation of Parquet/ Timber, cutting and fixing; coloured
grouting with cement mortar, cleaning, including water proofing to
wet areas etc., complete as per drawings,
specification and engineer's approval
Secondary & master bedrooms
Flooring to Bedroom 1 & 2 on 33 Floor
Flooring to Bedroom 1 & 2 on 34 Floor Flooring to Master bedroom 1 & 2 ‐ 34
floor Dark Timber flooring to Study Room
Supply and installation of Mosaic / Porcelain / Ceramic; including
joints, bedding in cement mortar / adhesive, cutting

A m2
B m2

C m2

D m2

and fixing; coloured grouting with cement mortar, cleaning, including


water proofing to wet areas etc., complete as per
drawings, specification and engineer's approval

E To terraces attached to Formal Living/ dining m2

F To terraces attached to Family living area m2

Other area floor finish complete as shown in drawings and


specifications or as directed by engineer

G To formal living/dining room flooring (Honing only to be done) m2

H To family living (Honing only to be done) m2

J To kitchen (Honing only) m2

External floor area cleaning complete as shown in drawings and
specifications or as directed by engineer
K To Terraces attached to Bedroom 1 on Level 33 & 34 m2
BILL NO. 2.4
LEVEL‐33 FINISHES
RATE AED AMOUNT AED
Page 3 of 13 Bill 2.4 Finishes