You are on page 1of 13

E 86.83 M2 G 1.00 unit I 6.

93
F 1.00 unit

A A

TEATER SABA
A

LIFT

D
TANGGA DARURAT SANGGAR KENYEM

B 686.68 M2 A 972.11 M2

D 15.12 M2
M2 H 31.08 M2

TOILET FEMALE

A
JEMBATAN ANTUNG ANTUNG

A R. PRANALA

LIFT

C
A
LIFT
SELERA NUSAN
TARA
C

R. SLOCA

A TOILET MALE

C 188.71 M2
A

A
B KRAMIK MOTIF KAYU
209.72 M2

A RABATAN LANTAI
161.34 M2

A
REKAP ADENDUM PEKERJAAN
SIPIL KAMPUNG LANGIT
PROYEK THE KERANJANG BALI
TAHUN ANGGARAN 2019
REKAP SPK REKAP ADENDUM

NO URAIYAN PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA VOL SAT
I. PEKERJAAN LANTAI
A. PEK. PEDESTRIAN
1 Pasang lantai batu alam 430.00 m2 140,190 60,281,493 686.68 m2

B. PEK. RUMPUT SINTETIS


1 Pasang rumput sintetis area lansekap luar 664.24 m2 59,214 39,332,307 872.11 m2

C. PEK. LANTAI FINIS RABAT BETON


Rabat beton 5cm + acian halus hardener
1 Ruang pranala & lorong sloca 161.34 m2 59,214 9,553,519 188.71 m2
Rabat beton 5cm + acian halus hardener area
2 lantai rumput sintetis lansekap luar 664.24 m2 59,214 39,332,028 972.11 m2
3 Rabat beton 5cm + acian area mezanine / bale karya 161.34 m2 59,214 9,553,519 188.71 m2
D. PEKERJAAN BATU PIJAK
1 Area pasar demen
2 Bale penjor
3 Bale ceng-ceng
4 Pojok ayu 28.00 unit 137,376 3,846,514 unit
E. PEKERJAAN LANTAI PARKET VINYL
1 Pasang keramik motif kayu area lantai mezanine 209.72 m2 140,262 29,415,747 226.00 m2
2 Rabat beton 5cm + acian area mezanine / bale karya 209.72 m2 66,169 13,876,963 226.00 m2
F. PEKERJAAN BORDER LIST SATINLESS STEEL
1 Pasang list border satinlees steel, area mezanine / bale karya 54.00 m' - - 54.00 m'
G. PEKERJAAN LANTAI KERAMIK BATU TEGEL
pasang lantai keramik batu tegel area, selera nusantara,
1 133.03 m2 134,918 17,948,142 139.96 m2
1 sanggar kenyem, dan teater saba 133.03 m2 134,918 17,948,142 139.96 m2
Pasang nat lantai kramik batu tegel, area, selera nusantara,
2 sanggar kenyem, dan teater saba 133.03 m2 - - 139.96 m2
H. PEKERJAAN STAGE ( LEVELING LANTAI ) PEDESTAL LANTAI
1 Area selera nusantara 31.08 m2 111,025 3,450,657 31.08 m2
2 Area wayang jaman now 6.93 m2 92,521 641,171 6.93 m2
3 Area teater saba 86.83 m2 148,034 12,853,792 86.83 m2
4 Area sanggar kenyem 15.12 m2 118,427 1,790,616 15.12 m2
5 Area bale ceng - ceng 0.00 unit - - 1.00 unit
6 Kolam / pon + waterproofing 0.00 unit - - 1.00 unit
I. PEKERJAAN JEMBATAN BETON
1 Area jembatan antung - antung 1.00 unit 4,811,103 4,811,103 1.00 unit
TOTAL : 246,687,570
II. PEKERJAAN DINDING
A. PEKERJAAN DINDING KAMPUNG LANGIT
1 Pek. Dinding habble + kolom praktis + ring balok 1029.17 m2 - - 1029.17 m2
2 Pek. Plesteran dinding habble + acian 1801.92 m2 - - 1801.92 m2
3 Pek. Dinding bata + kolom praktis + ring balok 101.40 m2 - - 101.40 m2
4 Pek. Plesteran dinding bata + acian 77.40 m2 - - 77.40 m2
5 Pek. Partisi satu muka dinding bale karya 0.00 m2 - - 124.00 m2
6 Pek. Partisi dua muka GRC sanggar kenyem 0.00 m2 - - 87.00 m2
7 Pek. Cover kolom bata expos 28.00 unit 500,000 14,000,000 28.00 unit
B. PEKERJAAN PENGECATAN DINDING
1 Area Ruang peranala
2 Area lorong seloca
3 Area wayang jaman now
4 Area teater saba 304.90 m2 18,504 5,641,870 304.90 m2
5 Area mezanine / bale karya
6 Area back stage 424.87 m2 18,504 7,861,794 424.87 m2
C. PEKERJAAN INSTALASI KERAN AIR
1 Intalasi keran air kolam kampung langit 3.00 unit 185,042 555,127 3.00 unit
D. PEKERJAAN KUSEN & DAUN PINTU
1 pasang kusen dan pintu ruang saf 1.00 unit 2,590,594 2,590,594 1.00 unit
2 Pasang kusen dan pintu service kiri ( pranala & sloca ) 1.00 unit 2,590,594 2,590,594 2.00 unit
3 Pasang kusen dan pintu service kanan ( teater saba ) 1.00 unit 2,590,594 2,590,594 2.00 unit
6 Pasang pintu kaca sliding akses turun ram 1.00 unit 6,461,698 6,461,698 1.00 unit
E. PEKERJAAN CEILING
1 Ceiling gybsum rangka hollo 9 mm 320.00 m2 62,914 20,132,617 325.00 m2
2 Pasang drop ceilling 0.00 m' - - 485.00 m'
3 Pengecatan ceiling gybsum 320.00 m2 - - 325.00 m2
TOTAL : 62,424,888

A1 TOTAL : 309,112,459 B1

B1 - A1 = 130,511,243
SISA TAGIHAN SIPIL KMP LANGIT

tambah pengecatan dinding partisi bro yg di mezanin dan skat yg samping bale
REKAP ADENDUM

HARGA SAT JUMLAH HARGA

140,190 96,265,339

59,214 51,641,122 ini rabatan bro

59,214 11,174,195

59,214 57,562,113
59,214 11,174,195

137,376 -

140,262 31,699,212
66,169 14,954,194

- -

134,918 18,883,123
134,918 18,883,123

17,500 2,449,300

111,025 3,450,657
92,521 641,171
148,034 12,853,792
118,427 1,790,616
15,000,000 15,000,000
7,000,000 7,000,000

4,811,103 4,811,103
TOTAL : 341,350,130

- -
- -
- -
- -
120,000 14,880,000
145,000 12,615,000
500,000 14,000,000

18,504 -

18,504 -

185,042 555,127
2,590,594 -
2,590,594 5,181,188
2,590,594 5,181,188
6,461,698 -

62,914 20,447,189
40,000 19,400,000
18,504 6,013,879
TOTAL : 98,273,572