Professional Documents
Culture Documents
93
F 1.00 unit
A A
TEATER SABA
A
LIFT
D
TANGGA DARURAT SANGGAR KENYEM
B 686.68 M2 A 972.11 M2
D 15.12 M2
M2 H 31.08 M2
TOILET FEMALE
A
JEMBATAN ANTUNG ANTUNG
A R. PRANALA
LIFT
C
A
LIFT
SELERA NUSAN
TARA
C
R. SLOCA
A TOILET MALE
C 188.71 M2
A
A
B KRAMIK MOTIF KAYU
209.72 M2
A RABATAN LANTAI
161.34 M2
A
REKAP ADENDUM PEKERJAAN
SIPIL KAMPUNG LANGIT
PROYEK THE KERANJANG BALI
TAHUN ANGGARAN 2019
REKAP SPK REKAP ADENDUM
NO URAIYAN PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA VOL SAT
I. PEKERJAAN LANTAI
A. PEK. PEDESTRIAN
1 Pasang lantai batu alam 430.00 m2 140,190 60,281,493 686.68 m2
A1 TOTAL : 309,112,459 B1
B1 - A1 = 130,511,243
SISA TAGIHAN SIPIL KMP LANGIT
tambah pengecatan dinding partisi bro yg di mezanin dan skat yg samping bale
REKAP ADENDUM
140,190 96,265,339
59,214 11,174,195
59,214 57,562,113
59,214 11,174,195
137,376 -
140,262 31,699,212
66,169 14,954,194
- -
134,918 18,883,123
134,918 18,883,123
17,500 2,449,300
111,025 3,450,657
92,521 641,171
148,034 12,853,792
118,427 1,790,616
15,000,000 15,000,000
7,000,000 7,000,000
4,811,103 4,811,103
TOTAL : 341,350,130
- -
- -
- -
- -
120,000 14,880,000
145,000 12,615,000
500,000 14,000,000
18,504 -
18,504 -
185,042 555,127
2,590,594 -
2,590,594 5,181,188
2,590,594 5,181,188
6,461,698 -
62,914 20,447,189
40,000 19,400,000
18,504 6,013,879
TOTAL : 98,273,572
TOTAL : 439,623,702