Engineering Estimate

This engineering estimate is for the renovation of office spaces on the 17th and 18th floors of a building located in Jakarta. The estimate includes costs for project preparation, architectural work, ceilings, floors, partitions, fixtures, electrical work, and interior finishes. Major line items include mobilization, demolition of existing materials, installation of drop ceilings, vinyl floors, drywall partitions, doors, lighting fixtures, and wallpaper. The total estimated cost is over Rp. 63 million for project preparation and over Rp. 1.5 billion for architectural work on the two floors.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
362 views2 pages

Engineering Estimate

This engineering estimate is for the renovation of office spaces on the 17th and 18th floors of a building located in Jakarta. The estimate includes costs for project preparation, architectural work, ceilings, floors, partitions, fixtures, electrical work, and interior finishes. Major line items include mobilization, demolition of existing materials, installation of drop ceilings, vinyl floors, drywall partitions, doors, lighting fixtures, and wallpaper. The total estimated cost is over Rp. 63 million for project preparation and over Rp. 1.5 billion for architectural work on the two floors.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ENGINEERING ESTIMATE P

PEKERJAAN : RENOVASI RUANGAN KERJA KEMENPERIN LT. 17 & 18


LOKASI :
Jl. Gatot Subroto No.Kav. 52-53, RT.1/RW.4, Kuningan Tim., Kec. Setiabudi, Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12950

KODE HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOL. SAT.
ANALISA
Rp. Rp.
a b c d e f g = dxf

A. PEKERJAAN PERSIAPAN
1 Sistem manajemen Keselamatan dan Kesehatan Kerja (SMK3) M.001 1.00 ls 1,590,500.00 1,590,500.00
2 Mobilisasi dan Demobilisasi Alat dan Bahan 1.00 ls 2,500,000.00 2,500,000.00
3 Pek. Bongkaran plafond, dinding, keramik dan kusen Lantai 17 M.002 1.00 ls 33,447,400.00 33,447,400.00
4 Pek. Bongkaran plafond, dinding, keramik dan kusen Lantai 18 M.002 1.00 ls 23,691,800.00 23,691,800.00
5 Pek. Buangan puing bekas bongkaran yang tidak terpakai dan pembersihan M.003 1.00 ls 4,050,000.00 4,050,000.00
6 Pembuatan Papan Nama Kegiatan (Bahan Flexi) A. 0015 1.00 Unit 273,600.00 273,600.00
TOTAL A. 63,962,800.00
B. PEKERJAAN ARSITEKTUR
I. PEKERJAAN ARSITEKTUR LANTAI 17
I.1 PEKERJAAN PLAFOND
1 Pek. Rangka Plafond hollow galvalume modul 60x60 cm Aplus C. 004 902.57 m2 88,000.00 79,425,761.31
2 Pek. Pasang Plafond Gypsum Tb. 9mm Aplus G.001 902.57 m2 51,700.00 46,662,634.77
3 Pek. Pasang list plafond Gypsum G.002 312.00 m1 19,700.00 6,146,400.00
Sub Total I.1 132,234,796.07

I.2 PEKERJAAN LANTAI


1 Pemasangan underlayer (lapisan bawah vinyl) F.010 945.00 m2 81,400.00 76,923,000.00
2 Pek. Pasangan Vinyl Click Bahan Taco 5 mm F.012 945.00 m2 383,200.00 362,124,000.00
Sub Total I.2 439,047,000.00

I.3 PEKERJAAN PARTISI GYPSUM


1 Pek. Rangka Partisi Hollow uk 40.40.2 mm module 60 x 120 cm Aplus C. 003 112.00 m2 99,800.00 11,177,600.00
2
2 Pek. Partisi Gypsum Tb. 9 mm Aplus G.001 112.00 m 51,700.00 5,790,400.00
Sub Total I.3 16,968,000.00

I.4 PEKERJAAN KUSEN, INTERIOR, DAN ASSESORIS


1 Pek. Pasangan Wallpaper dinding standar F.008 186.00 m2 146,400.00 27,230,400.00
2 Pek. Perbaikan dan pasangan cover penutup beton (lebar 26 cm) L. 1 34.00 Unit 372,100.00 12,651,400.00
3 Pek. Pasangan pintu aluminium dan kaca mati (K3) L. 4 3.00 unit 12,641,800.00 37,925,400.00
Sub Total I.4 37,925,400.00
I.5 PEKERJAAN INSTALASI LISTRIK
1 Pek. Pasangan stop kontak baru (kabel eterna) termasuk kabel duct/ conduit K.005 50.00 Titik 116,400.00 5,820,000.00
2 Pek. Pasangan Stop kontak 1 phase K.005 32.00 Titik 116,400.00 3,724,800.00
3 Pek. Pasangan lampu downlight LED 13 Watt (Philips Meson) K.008 155.00 Titik 160,000.00 24,800,000.00
Sub Total I.5 34,344,800.00

II. PEKERJAAN ARSITEKTUR LANTAI 18


II.1 PEKERJAAN PLAFOND
1 Pek. Rangka Plafond hollow galvalume modul 60x60 cm Aplus C. 004 655.80 m2 168,600.00 110,567,114.08
2 Pek. Pasang Plafond Gypsum Tb. 9mm Aplus G.001 655.80 m2 45,900.00 30,101,011.48
3 Pek. Pasang list plafond Gypsum G.002 256.000 m1 71,100.00 18,201,600.00
Sub Total II.1 158,869,725.57

II.2 PEKERJAAN LANTAI


1 Pemasangan underlayer (lapisan bawah vinyl) F.010 643.00 m2 81,400.00 52,340,200.00
2 Pek. Pasangan Vinyl Click Bahan Taco 5 mm F.012 643.00 m2 383,200.00 246,397,600.00
Sub Total II.2 298,737,800.00

RINCIAN EE - 1
KODE HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOL. SAT.
ANALISA
Rp. Rp.
a b c d e f g = dxf

II.3 PEKERJAAN PARTISI GYPSUM


1 Pek. Rangka Partisi Hollow uk 40.40.2 mm module 60 x 120 cm Aplus C. 003 38.41 m2 99,800.00 3,833,318.00
2 Pek. Partisi Gypsum Tb. 9 mm Aplus G.001 38.41 m2 51,700.00 1,985,797.00
Sub Total II.3 5,819,115.00

II.4 PEKERJAAN INSTALASI LISTRIK


1 Pek. Pasangan stop kontak baru (kabel eterna) termasuk kabel duct/ conduit K.005 26.00 Titik 116,400.00 3,026,400.00
2 Pek. Pasangan stop kontak 1 phase K.005 27.00 Titik 116,400.00 3,142,800.00
3 Pek. Pasangan lampu downlight LED 13 Watt Philips Meson K.008 119.00 Titik 160,000.00 19,040,000.00
Sub Total II.5 25,209,200.00
II.5 PEKERJAAN INTERIOR, KUSEN DAN AKSESORIS
1 Pek. Pasangan Wallpaper dinding standar F.008 186.00 m2 146,400.00 27,230,400.00
2 Pek. Perbaikan dan pasangan cover penutup beton (lebar 26 cm) L. 1 28.00 Unit 372,100.00 10,418,800.00
3 Pek. Pemasangan Kusen K1 L. 2 1.00 Unit 5,988,500.00 5,988,500.00
4 Pek. Pemasangan Kusen K2 L. 3 2.00 Unit 6,694,000.00 13,388,000.00
5 Pek. Pasangan pintu aluminium dan kaca mati (K3) L. 4 1.00 Unit 12,641,800.00 12,641,800.00
Sub Total II.5 69,667,500.00

E. PEKERJAAN PENGECATAN DAN PENYELESAIAN


I. PEKERJAAN PENGECATAN DAN PENYELESAIAN LANTAI 17
1 Pek. Pengecatan dinding interior Catylax 2X I.004 343.00 m2 24,500.00 8,403,500.00
2 Pek. Pengecatan dan perapihan plafond eksisting I.004 902.57 m2 24,500.00 22,112,854.00
3 Pek. Perapihan dan Pembersihan M.003 1.00 ls 4,050,000.00 4,050,000.00
Sub Total I. 34,566,354.00
II. PEKERJAAN PENGECATAN DAN PENYELESAIAN LANTAI 18
1 Pek. Pengecatan dinding interior Catylax 2X I.004 646.93 m2 24,500.00 15,849,883.00
2 Pek. Pengecatan dan perapihan plafond eksisting I.004 655.80 m2 24,500.00 16,066,988.70
3 Pek. Perapihan dan pembersihan M.003 1.00 ls 4,050,000.00 4,050,000.00

Sub Total E. 35,966,871.70


TOTAL E. 70,533,225.70

RINCIAN EE - 2