RENCANA ANGGARAN BIAYA

PEKERJAAN : INTERIOR
LOKASI : MARISA KAB. POHUWATO GORONTALO

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN BIAYA
(Rp.) (Rp.)
1 2 3 4 5 6
1. RUANG TAMU
1 Backdrop dinding 11.25 M2 1,000,000.00 11,250,000.00
-Plywood
-HPL texture by design
-Lampu LED Strip
-kaca 8mm
2 Partisi kisi-kisi dan kaca ( Batas R.Tamu dan Mushollah ) 7.85 Ls 1,000,000.00 7,850,000.00
-Plywood
-HPL texture by design
-kaca 8mm
TOTAL JUMLAH 1 19,100,000.00

2. MUSHOLLAH
1 Panel Backdrop Sisi Barat 11.10 M2 1,000,000.00 11,100,000.00
-Plywood
-HPL texture by design
-lampu LED
TOTAL JUMLAH 2 11,100,000.00

3. RUANG KELUARGA
1 Rak Backdrop TV 27.20 M2 1,000,000.00 27,197,000.00
-Plywood
-HPL texture by design
-lampu LED strip
-cermin 8mm bevel
2 Backdrop Panel 3d 17.28 M2 1,000,000.00 17,280,000.00
-Plywood
-Panel 3d
-HPL texture by design
-lampu Spotlight
3 Rak Partisi ( Batas R.Keluarga dan R.Tamu ) 8.00 M2 1,000,000.00 8,000,000.00
-Plywood
-HPL texture by design
-Lampu Spotlight
4 Backdrop Dinding Bidang Kamar Mandi 12.00 M2 1,000,000.00 12,000,000.00
-Plywood
-HPL texture by design
-Cermin 8mm bevel
TOTAL JUMLAH 3 64,477,000.00

4. TANGGA
1 Backdrop Tangga 9.06 M2 1,000,000.00 9,060,000.00
-Plywood
-Wallpaper
-lampu LED strip
-cermin
2 Railing 27 bh 350,000.00 9,450,000.00
-Pipa giv
3 Rak bawah tangga 3.87 m2 800,000.00 3,096,000.00
-Plywood
-HPL texture by design
-kaca 8mm
-lampu LED strip
TOTAL JUMLAH 4 21,606,000.00

5. RUANG MAKAN
1 Rak Wastafel 0.90 M2 1,000,000.00 900,000.00
-Plywood
-HPL texture by design

Page 1 of 36
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN BIAYA
(Rp.) (Rp.)
1 2 3 4 5 6
TOTAL JUMLAH 5 900,000.00

6. MINIBAR
1 Meja Minibar 1.80 M2 1,000,000.00 1,800,000.00
-Plywood
-HPL texture by design
2 Rak dan Backdrop 9.40 M2 1,000,000.00 9,400,000.00
-Plywood
-HPL texture by design
-lampu LED strip
TOTAL JUMLAH 6 11,200,000.00

7. DAPUR
1 Kitchen Set 17.40 M2 2,500,000.00 43,500,000.00
-Plywood
-HPL texture by design
-lampu LED strip
-engsel
-mozaic hexagone hitam
2 Top Table Granit 3.00 M2 1,500,000.00 4,500,000.00
-Granit hitam
TOTAL JUMLAH 6 48,000,000.00

8. RUANG TIDUR UTAMA


1 Wardrobe / Lemari Pakaian 49.32 M2 2,500,000.00 123,300,000.00
-Plywood
-HPL texture by design
-lampu LED strip
-engsel
-kaca 8mm
-cermin 8mm
-Pipa Stainless
2 Rak Backdrop tv dan Meja rias 6.13 M2 1,000,000.00 6,130,000.00
-Plywood
-HPL texture by design
-lampu LED strip
-cermin 8mm
3 Partisi kisi-kisi 3.50 M2 1,000,000.00 3,500,000.00
-Plywood
-HPL texture by design
4 Bed + Nakas 3.00 M2 1,000,000.00 3,000,000.00
-Plywood
-HPL texture by design
-lampu LED strip
5 Plafond 13.60 M2 1,000,000.00 13,600,000.00
-Plywood
-HPL texture by design
-lampu LED strip
-lampu Spotlight
TOTAL JUMLAH 8 149,530,000.00

9. KAMAR MANDI UTAMA


1 Partisi dan Pintu kaca 23.12 M2 800,000.00 18,496,000.00
-Kaca 9mm
2 Rak Wastafel 1.50 M2 1,000,000.00 1,500,000.00
-Plywood
-HPL texture by design
-cermin 9mm
-lampu LED strip
3 Wardrobe 7.00 M2 1,000,000.00 7,000,000.00
-Plywood
-HPL texture by design
TOTAL JUMLAH 9 26,996,000.00

GRAND TOTAL 352,909,000.00


TERBILANG :

Page 2 of 36
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN BIAYA
(Rp.) (Rp.)
1 2 3 4 5 6

Makassar, 26 Juni 2020


CV. TRIPOD CIPTA DESIGN

Adnand Suryana Mansyur, ST


Direktur

Page 3 of 36
REKAPITULASI

PEKERJAAN : RENOVASI GUDANG PT. AKSARA GRAFIKA MAKASSAR, TBK.


LOKASI : KAWASAN GUDANGPERINDUSTRIAN PARANGLOE INDAH BLOK F3. NO. 15-17
JL. IR. SUTAMI PARANGLOE, TAMALANREA, MAKASSAR 90244

NO. URAIAN PEKERJAAN JUMLAH HARGA

A. #REF! #REF!
###
B. #REF! #REF!
###
C. #REF! #REF!

D. #REF! #REF!
###
E. #REF! #REF!
###
F. #REF! #REF!

JUMLAH #REF!
PPN #REF!
JUMLAH #REF!
DUBULATKAN #REF!
#REF!
Harga 1m2
Makassar, 02-Agustus-2018
PELAKSANA
CV.TRIPOD CIPTA DESIGN

ADNAND SURYANA MANSYUR, ST.


Direktur
RENCANA ANGGARAN BIAYA

PEKERJAAN : RENOVASI KOLAM RENANG DAN INTERIOR


LOKASI : PERUMAHAN GRAND SULAWESI
JL. TODDOPULI 10 MAKASSAR
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN BIAYA
(Rp.) (Rp.)
1 2 3 4 5 6
1. PRILIMINERIES
1 Pek. Pembongkaran 1.00 Ls 5,000,000.00 5,000,000.00
2 Pek. Reposisi Instalasi Pipa Kolam 1.00 Ls 3,000,000.00 3,000,000.00
3 Pek. Pembersihan 1.00 Ls 2,000,000.00 2,000,000.00
TOTAL JUMLAH 1 10,000,000.00

2. PANEL WALL TANGGA


1 Multipleks 9mm 40.00 M2 1,000,000.00 40,000,000.00
2 Mirror 4.00 M2 350,000.00 1,400,000.00
3 Lighting Led Strip 10.00 M' 75,500.00 755,000.00
5 Karet topi 1mm 4.00 M2 25,000.00 100,000.00
6 Panel 3d wall 6.00 M2 345,000.00 2,070,000.00
TOTAL JUMLAH 2 42,255,000.00

3. PEKERJAAN PLAFOND
1 Pek. Plafond Kamar depan Lt. 1 13.50 M2 175,238.36 2,365,717.86
2 Pek. Plafond Kamar Mandi Khalilah Lt. 2 3.75 M2 175,238.36 657,143.85
3 Pek. Plafond KM Umum. Lt. 2 2.55 M2 175,238.36 446,857.82
5 Finishing Cat 19.80 M2 40,403.44 799,988.11
TOTAL JUMLAH 3 4,269,707.64

4. KOLAM RENANG
1 Pek. Galian sedalam 1m 5.10 M2 103,125.00 525,937.50
2 Pek. Pengurugan Tanah dan Pasir 1.50 M3 148,500.00 222,750.00
3 Pek. Pembesian Kolam 80.00 Kg 176,264.00 14,101,120.00
4 Pek. Bekisting Dinding Kolam 9.40 M2 395,348.80 3,716,278.72
5 Pek. Beton Kolam 5.80 M3 1,215,772.38 7,051,479.81
6 Pek. Beton bak kontrol 1.00 M3 1,059,808.77 1,059,808.77
7 Pas. Lapisan Sika Grout 9.40 M2 183,700.00 1,726,780.00
8 Pas. Lapisan MU Cemen 9.40 M2 145,000.00 1,363,000.00
9 Keramik Mozaik 11.10 M2 900,000.00 9,990,000.00
10 Bata Andesit bibir kolam 3.00 M2 210,000.00 630,000.00
11 Inlet Fitting Boost 6.00 Bh 127,000.00 762,000.00
12 Outlet Water main drain 1.00 Bh 326,500.00 326,500.00
13 Pek. Instalasi Sanitasi kolam 1.00 Ls 4,500,000.00 4,500,000.00
14 Pek. Lantai Decking 40.36 M2 855,000.00 34,507,800.00
15 Pek. Rangka Lantai Deck 40.36 M2 215,000.00 8,677,400.00
16 Lighting floor deck 17.00 Bh 195,000.00 3,315,000.00
17 Pintu Kaca Tempered 12mm Ruang Bilas + handle : engsel 3.00 m2 2,250,000.00 6,750,000.00
18 Kursi Beton plat 0.15 M3 1,215,772.38 182,365.86
TOTAL JUMLAH 4 99,408,220.65

5. PEKERJAAN DINDING DEPAN


1 Pek. Dinding Depan 15.19 M2 255,973.58 3,889,262.50
2 Pek. Pembesian 15.51 Kg 176,264.00 2,733,854.64
3 Pek. Kolom Beton 0.16 M3 1,059,808.77 169,569.40
4 Finishing Cat 15.19 M2 57,289.98 870,463.96
TOTAL JUMLAH 5 6,792,686.54

6. PEKERJAAN PANEL BATU ALAM


1 Pas. Batu Alam tekstur by design 24.85 M2 355,000.00 8,821,750.00
2 Finishing Top Clear Coating 24.85 M2 57,289.98 1,423,656.00
TOTAL JUMLAH 6 10,245,406.00

Page 5 of 36
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN BIAYA
(Rp.) (Rp.)
1 2 3 4 5 6

TOTAL 172,971,020.84

Makassar, 26 Juni 2020


CV. TRIPOD CIPTA DESIGN

Adnand Suryana Mansyur, ST


Direktur

Page 6 of 36
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
BERDASARKAN PERATURAN MENTERI PEKERJAAN UMUM
NO. 28/PRT/M/2016

NO. KODE JENIS PEKERJAAN HARGA

A A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A. 2.2.1.1 Pembuatan 1 M2 pagar sementara dari kayu tinggi 2 meter 294,565.15
2 A. 2.2.1.2 Pembuatan 1 M2 pagar sementara dari seng gelombang tinggi 2 meter 488,337.03
3 A. 2.2.1.4 Pengukuran dan pemasangan 1 m’ Bouwplank 61,597.25
4 A. 2.2.1.5 Pembuatan 1 M2 kantor sementara lantai kerja 1,380,719.23
5 A. 2.2.1.6 Pembuatan 1 M2 rumah jaga ( konstruksi kayu ) 1,196,693.30
6 A. 2.2.1.7 Pembuatan 1 M2 gudang semen dan peralatan 1,130,600.63
7 A. 2.2.1.8 Pembuatan 1 M2 bedeng pekerja 1,151,998.10
8 A. 2.2.1.9 Pembersihan 1 M2 lapangan dan perataan 18,810.00
9 A. 2.2.1.10 Pembuatan 1 M2 steger/perancah dari bambu 432,190.00
10 A. 2.2.1.11 Pembuatan 1 buah kotak adukan ukuran 40 x 50 x 25 cm 263,577.60
B A.2.2.2 HARGA SATUAN PEKERJAAN PERSIAPAN
1 Analisa Lapangan 1 m³ Pembongkaran beton bertulang 934,989.00
2 Analisa Lapangan 1 M2 Pekerjaan Bongkaran Dinding 74,250.00
3 Analisa Lapangan 1 m2 Pekerjaan bongkaran atap 44,550.00
4 Analisa Lapangan 1 m2 Pekerjaan Bongkaran tegel 59,400.00
5 Analisa Lapangan 1 M2 Pekerjaan Bongkaran Plafond 44,550.00
6 Analisa Lapangan 1 m2 Pekerjaan bongkaran kusen dan jendela 103,125.00
7 Analisa Lapangan 1 m2 Pekerjaan Bongkaran Sanitasi 148,500.00
C A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
1 A. 2.3.1.1. Penggalian 1 m³ tanah biasa sedalam 1 m 103,125.00
2 A. 2.3.1.2. Penggalian 1 m³ tanah biasa sedalam 2 m 126,225.00
3 A. 2.3.1.9. Pengurugan kembali 1 m³ galian tanah 74,250.00
4 A. 2.3.1.11. Pengurugan 1 m³ dengan pasir urug 74,250.00
D A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
1 A. 3.2.1.3. Pemasangan 1 m³ pondasi batu belah campuran 1SP : 5PP 709,470.96
2 A. 3.2.1.9. Pemasangan 1 m³ batu kosong (anstamping) 374,806.08

E A.4.1.1 HARGA SATUAN PEKERJAAN BETON

1 A.4.1.1.4 Membuat 1 M3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0.87 963,717.97
2 A.4.1.1.5 Membuat 1 M3 beton mutu f' = 14,5 Mpa (K 175), slump (12 ±2) cm, w/c = 0,66 #REF!
3 A.4.1.1.7 Membuat 1 M3 beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58 1,059,808.77
4 A.4.1.1.8 Membuat 1 M³ beton mutu f’c = 21,7 Mpa (K 250), Slump (12 ± 2 cm), w/c = 0,56 1,075,563.82
5 A.4.1.1.9 Membuat 1 M³ beton mutu f’c = 24,0 Mpa (K 275), Slump (12 ± 2 cm), w/c = 0,53 1,102,563.13
6 A.4.1.1.11 Membuat 1 M³ beton mutu f’c = 28,8 Mpa (K 325), Slump (12 ± 2 cm), w/c = 0,49 1,204,800.24
7 A.4.1.1.12 Membuat 1 M³ beton mutu f’c = 31,2 Mpa (K 350), Slump (12 ± 2 cm), w/c = 0,48 1,215,772.38
8 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir 176,264.00
9 A.4.1.1.19 Pemasangan kabel 10 kg jaring kawat baja (wiremesh) 158,147.00
10 A.4.1.1.20 Pemasangan 1 m² bekisting untuk pondasi 211,467.30
11 A.4.1.1.21 Pemasangan 1 m² bekisting untuk Sloof 350,234.50
12 A.4.1.1.22 Pemasangan 1 m² bekisting untuk kolom 387,654.30
13 A.4.1.1.23 Pemasangan 1 m² bekisting untuk balok 403,659.30
14 A.4.1.1.24 Pemasangan 1 m² bekisting untuk lantai 418,454.30
15 A.4.1.1.25 Pemasangan 1 m² bekisting untuk dinding 395,348.80
16 A.4.1.1.26 Pemasangan 1 m² bekisting untuk tangga 360,438.65
17 A.4.1.1.27 Pemasangan 1 m² bekisting untuk pengecoran Beton 111,631.52
18 A.4.1.1.28 Membuat 1 m³ pondasi beton bertulang (150 kg besi + bekisting ) 4,650,939.70
19 A.4.1.1.29 Membuat 1 m³ sloof beton bertulang (200 kg besi + bekisting) 5,750,044.30
20 A.4.1.1.30 Membuat 1 m³ kolom beton bertulang (300 kg besi + bekisting ) 9,438,407.00
21 A.4.1.1.31 Membuat 1 m³ balok beton bertulang (200 kg besi + bekisting ) 7,293,928.40
22 A.4.1.1.32 Membuat 1 m³ kolom beton bertulang (150 kg besi + bekisting ) 6,337,929.40
23 A.4.1.1.34 Membuat 1 m³ dinding beton bertulang (200 kg besi + bekisting ) 6,759,435.10
24 A.4.1.1.35 Membuat 1 m' kolom praktis beton bertulang ( 11 x 11 ) cm 146,536.50
25 A.4.1.1.36 Membuat 1 m; ring balok beton bertulang ( 10 x 15 ) cm 122,897.23
F A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
1 A.4.2.1.11 Pemasangan 1 m2 kusen pintu alluminium 153,827.30
2 Analisa Lapangan Pemasangan 1 BH pintu kaca rangka aluminium 781,855.80
3 A.4.2.1.14. Pemasangan 1 bh Jendela kaca rangka aluminium 381,004.25
4 A.4.2.1.18. Pemasangan 1 m ² talang datar/jurai seng bjls 28 lebar 90 cm 179,800.50
5 A.4.2.1.20. Pemasangan 1 m² rangka besi hollow 1x40.40.2mm, modul 60x120 cm, dinding partisi 147,620.00
6 A.4.2.1.21. Pemasangan 1 m² rangka besi hollow 1x40.40.2mm, modul 60x60 cm, plafon 148,335.00
7
G A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

1 A.4.4.1.1. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal campuran 1SP:2PP 255,973.58
2 A.4.4.1.2. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:3PP 243,075.28
3 A.4.4.1.3. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:4PP 234,629.26
4 A.4.4.1.4. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP 229,904.73
5 A.4.4.1.5. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP 227,527.91
6 A.4.4.1.7. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 123,909.31
7 A.4.4.1.8. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 117,940.76
8 A.4.4.1.9. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 4PP 114,432.95
9 A.4.4.1.10. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 5PP 112,221.45
10 A.4.4.1.11. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP 110,902.11
11 A.4.4.1.12. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 8PP 108,557.63
12 Analisa Lapangan. 1 M2 Partisi Gipsum Rangka Hollow ( 1 Muka) 140,338.53
13 Analisa Lapangan. 1 M2 Partisi Gipsum Rangka Hollow ( 2 Muka) 211,377.07
14 Analisa Lapangan. 1 M2 Partisi Gipsum Dengan Rangka Metal (1 Muka) 162,320.97
15 Analisa Lapangan. 1 M2 Partisi Gipsum Dengan Rangka Metal (2 Muka) 233,121.95
16 Analisa Lapangan. 1 M2 Pasangan Bacdroop 672,899.92
17 Harga Lapangan. 1 Bh. Logo Pada Bacdroop Uk 40 X 45 654,500.00
18 Harga Lapangan. 1 Bh. Huruf T. 30 cm 210,000.00
19 Analisa Lapangan. 1 M2 Partisi GRC Dengan Rangka Metal 275,784.35
H A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

1 A.4.4.2.3. Pekerjaan 1 m² Plesteran 1SP : 3PP tebal 15 mm 69,344.88


2 A.4.4.2.5. Pekerjaan 1 m² Plesteran 1SP : 5PP tebal 15 mm 66,614.46
3 A.4.4.2.27. Pekerjaan 1 m² acian 41,824.06
I A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
0 A.4.4.3.0. Pemasangan 1 m² lantai sika grout 183,700.00
1 A.4.4.3.1. Pemasangan 1 m² lantai Homogeneus ukuran 60 cm x 60 cm 2,666,510.50
2 A.4.4.3.2. Pemasangan 1 m² lantai keramik ukuran 40 cm x 40 cm 271,773.88
3 A.4.4.3.3. Pemasangan 1 m² lantai keramik ukuran 30 cm x 30 cm 260,411.55
4 A.4.4.3.4. Pemasangan 1 m² lantai keramik ukuran 20 cm x 20 cm 246,488.63
5 Analisa Lapangan Pemasangan Top Table Solid Surface Snow White W = 70 cm, T = 9 mm 2,374,718.50
6 Analisa Lapangan Pemasangan Approon Solid Surface Snow White W = 15 cm, T = 9 mm 592,718.50
7 Analisa Lapangan Pemasangan Surface Snow White H = 70 cm, T = 9 mm 2,374,718.50
8 A.4.4.3.5. Pemasangan 1 m' Plint lantai keramik ukuran 10 cm x 60 cm 125,024.72
9 A.4.4.3.6. Pemasangan 1 m' Plint lantai keramik ukuran 10 cm x 40 cm 103,849.72
10 A.4.4.3.7 Pemasangan 1 m' Plint lantai keramik ukuran 10 cm x 30 cm 106,068.05
11 Analisa Lapangan Pemasangan 1m² Plint kayu tebal 1 cm lebar 10 cm 75,311.69
12 A.4.4.3.8. Pemasangan 1 m² dinding porslen 20 cm x 20 cm 264,888.58
13 A.4.4.3.9. Pemasangan 1 m² dinding porslen 30 cm x 30 cm 286,030.58
14 A.4.4.3.10. Pemasangan 1 m² walpaper lebar 50 cm 109,293.25
K A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) DAN ATAP

1 A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon 127,985.00
2 A.4.5.1.7 Pemasangan 1 m2 langit-langit Klasiboard (120x240x90 mm tebal 4 mm) 44,991.10
3 A.4.5.1.7 Pemasangan 1 m2 langit-langit Gypsum Board (120x240x90 mm tebal 9 mm) 47,253.36
4 Analisa Lapangan Memasang 1 M' List Plafond Gipsum 16,020.07
5 Analisa lapangan, Pemasangan 1 M2 Atap Baja Ringan Dengan Atap Spadek 0,35 284,449.00
6 A.4.6.1.21 Pemasangan 1 M’ lisplank Kalsiplank 30 cm 109,142.00
7 Analisa lapangan, Pemasangan 1 M2 Atap Baja Ringan dengan polycarbonate 293,632.77

J A.4.6.1 HARGA SATUAN PEKERJAAN KAYU DAN KACA

1 A.4.6.1.1. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 15,515,779.40
2 A.4.6.1.2. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III 9,742,957.40
3 A.4.6.1.5. Pembuatan dan Pemasangan 1 m² daun pintu panel, kayu kelas I 986,033.62
4 A.4.6.1.6. Pembuatan dan Pemasangan 1 m² daun pintu dan jendela kaca, kayu kelas I 702,170.17
5 A.4.6.1.8. Pembuatan 1 m² daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) 595,689.60
6 Analisa Lapangan Pemasangan I Unit Pintu Alumunium Toilet + Kusen 2,696,925.00
7 A.4.6.1.21. Pemasangan 1 m² lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II #REF!
8 A.4.6.1.22. Pemasangan 1 m² lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II #REF!
9 A.4.6.2.1. Pemasangan 1 buah kunci tanam 369,611.00
10 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi 349,173.00
11 A.4.6.2.4. Pemasangan 1 buah kunci silinder 181,742.00
12 A.4.6.2.5. Pemasangan 1 buah buah engsel pintu 57,695.00
13 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu 42,641.50
14 A.4.6.2.6. Pemasangan 1 buah Grendel Jendela 29,628.50
15 A.4.6.2.9. Pemasangan 1 buah kait angin 43,021.00
16 A.4.6.2.10. Pemasangan 1 buah door closer 265,925.00
17 Analisa lapangan Pemasangan 1 m' Sliding Door 160,968.50
18 A.4.6.2.11. Pemasangan Handele Pintu C Stanlist 306,537.00
19 A.4.6.2.11. Pemasangan Pintu Kaca Tempered 2 daun + Assesories 8,058,600.00
20 A.4.6.2.16. Pemasangan 1 m² kaca tebal 3 mm 130,315.13
21 A.4.6.2.17. Pemasangan 1 m² kaca tebal 5 mm 142,447.25
22 A.4.6.2.18. Pemasangan 1 m² kaca tebal 8 mm 187,797.06
23 Analisa Lapangan . Pemasangan 1 m² kaca tebal 10 mm 286,387.20
24 Analisa Lapangan . Pemasangan 1 m² kaca tebal 12 mm 386,377.20
23 Analisa Lapangan . Pemasangan 1 m Sanblas 61,886.00
L A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

1 A.4.7.1.1. 1 m² Pengikisan/Pengerokan permukaan cat lama 22,935.00


2 A.4.7.1.2. 1 m² Pembersihan bidang permukaan tembok yang pernah dicat 18,535.00
3 A.4.7.1.4. 1 m²Pengecatan bidang kayu baru (1 plamur, 1 lapis plamur,1 lapis cat dasar, 2 lapis cat penutup 40,403.44
4 A.4.7.1.5. 1 m² Pengecatan bidang kayu baru (1 plamur, 1 lapis plamur,1 lapis cat dasar, 3 lapis cat penutup 57,289.98
5 A.4.7.1.10. Pengecatan 1 m² tembok baru (1 Lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) 52,267.38
6 A.4.7.1.11. Pengecatan 1 m² tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) 39,718.80
7 A.4.7.1.18. Pengecatan 1 m² permukaan baja galvanis secara manual 4 lapis 69,378.87
8 A.4.7.1.19. Pengecatan 1 m² permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 31,548.88
9 A.4.7.1.20. Pengecatan 1 m² permukaan baja galvanis secara manual sistem 3 lapis 101,587.75
10 A.4.7.1.21. Pengecatan 1 m² permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir 179,425.51
11 A.4.7.1.22. Pengecatan 1 m² permukaan lantai epoxy sika grout 154,642.51
12 Analisa Lapangan Pemasangan 1m2 Wallpaper 74,761.94
M A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

1 A.5.1.1.1. Pemasangan 1 buah closet duduk/monoblock 3,066,829.70


2 A.5.1.1.2. Pemasangan 1 buah closet jongkok porselen 894,557.40
3 A.5.1.1.4. Pemasangan 1 buah urinoir 1,987,871.60
4 A.5.1.1.5. Pemasangan 1 buah westafel 1,181,217.40
5 A.5.1.1.12. Pemasangan 1 buah wastafel stainlessteel 871,783.00
6 A.5.1.1.14. Pemasangan 1 buah floor drain 66,561.00
7 A.5.1.1.15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 482,936.30
8 A.5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm 718,172.95
9 A.5.1.1.17. Pemasangan 1 buah bak kontrol pasangan bata 60cmx60cmtinggi 60 cm 1,206,382.32
10 A.5.1.1.18. Pemasangan 1 m1 galvanis diameter ½" 46,944.33
11 A.5.1.1.19. Pemasangan 1 buah kran diameter ½" atau 3/4'' 59,170.38
12 A.5.1.1.19. Pemasangan 1 buah kran Wastavel Leher Angsa 111,068.38
13 Analisa Lapangan Pemasangan 1 buah Shower 166,001.00
14 A.5.1.1.20. Pemasangan 1 m² pipa galvanis diamter 3/4" 76,581.45
15 A.5.1.1.21. Pemasangan 1 m1 pipa galvanis diamter 1" 96,470.55
16 A.5.1.1.22. Pemasangan 1 m1 pipa galvanis diameter 1 ½" 148,283.03
17 A.5.1.1.23. Pemasangan 1 m1 pipa galvanis diameter 3" 379,203.55
18 A.5.1.1.25. Pemasangan 1 m1 pipa PVC tipe AW diameter 1/2" 18,849.60
19 A.5.1.1.26. Pemasangan 1 m1 pipa PVC tipe AW diameter 3/4 20,334.60
20 A.5.1.1.27. Pemasangan 1 m1 pipa PVC tipe AW diameter 1" 22,854.15
21 A.5.1.1.28. Pemasangan 1 m² pipa PVC tipe AW diameter 11/2" 37,382.40
22 A.5.1.1.29. Pemasangan 1 m1 pipa PVC tipe AW diameter 2" 41,471.10
23 A.5.1.1.30. Pemasangan 1 m1 pipa PVC tipe AW diameter 21/2" 42,027.15
24 A.5.1.1.31. Pemasangan 1 m1 pipa PVC tipe AW diameter 3" 51,815.78
25 A.5.1.1.32. Pemasangan 1 m1 pipa PVC tipe AW diameter 4" 58,243.35
N HARGA SATUAN PEKERJAAN ELEKTRIKAL

1 A.8.4.6.1 Memasang 1 titik lampu 231,176.00


2 A.8.4.6.2 Memasang 1 titik stop kontak 231,176.00
3 A.8.4.6.3 Pemasangan 1 bh Saklar Tunggal 38,060.00
4 A.8.4.6.4 Pemasangan 1 bh Saklar Seri/ Ganda 49,060.00
5 A.8.4.6.5 Pemasangan 1 bh Stop Kontak 43,230.00
6 A.8.4.6.6 Pemasangan 1 bh Lampu Down Light 205,183.00
7 A.8.4.6.7 Pemasangan 1 bh Lampu RM 2 x 40 watt 376,860.00
8 A.8.4.6.8 Pemasangan 1 bh Lampu DL 1x 18 watt 17,710.00
9 Analisa Lapangan Pemasangan 1 bh Lampu Spot Light 67,210.00

N PEKERJAAN FURNITURE

1 Harga Workshop 1 m2/ M1 Lemari Gantung Atas/Bawah Playwood 15 mm + Fin HPL + ACC (Tarikan+Gantungan) 2,035,000.00
2 Harga Workshop 1 Buah Meja Staf 1/2 Biro Playwood 18 mm + Fin HPL + ACC (Tarikan+Gantungan) 2,450,000.00
3 Harga Workshop 1 Buah Meja Staf 1 Biro Playwood 18 mm + Fin HPL + ACC (Tarikan+Gantungan) 2,750,000.00

Harga Workshop Pekerjaan Pembuatan Meja Rapat, Playwood 18 mm + Fin HPL + ACC (Ornamen) 1,980,000.00
4
Pekerjaan Pembuatan Meja Kerja CS Playwood 18 mm + Fin HPL + ACC (Tarikan+Gantungan) +
Harga Workshop 2,900,000.00
Top Table Granit
5
Pekerjaan Pembuatan Meja Screen/ Apotek dan Nurse Station Playwood 18 mm + Fin HPL + ACC
Harga Workshop (Tarikan+Gantungan) + Top Table Granit 2,900,000.00
6
Pekerjaan Pembuatan Meja Screen/ Apotek dan Nurse Station Playwood 18 mm + Fin HPL + ACC
Harga Workshop 2,900,000.00
7 (Tarikan+Gantungan) + Top Table Granit

Harga Toko Pengadaan Kursi Kerja Hidrolic 1,200,000.00


8
A. 4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
Haraga Satuan
NO Uraian Kode Satuan Koofisien Jumlah Harga (Rp)
(RP)

A.4.2.1.11. Pemasangan 1 m kusen pintu aluminium


A TENAGA
Pekerja L.01 OH 0.043 96,000 Rp 4,128.00
Tukang Alumnium L.03 OH 0.043 120,000 Rp 5,160.00
Kepala tukang L.03 OH 0.043 130,000 Rp 5,590.00
Mandor L.04 OH 0.002 150,000 Rp 315.00
JUMLAH TENAGA KERJA Rp 15,193.00
B BAHAN
Profil Aluminium m² 1.100 110,000 Rp 121,000.00
Skrup Fixer buah 2.000 250 Rp 500.00
Sealant tube 0.060 52,500 Rp 3,150.00
JUMLAH HARGA BAHAN Rp 124,650.00
C PERALATAN

JUMLAH HARGA ALAT Rp -


D Jumlah (A+B+C) Rp 139,843.00
E Overhead and Profit (contoh 10%X D) 10% Rp 13,984.30
F Harga Satuan Pekerjaan (D + E) Rp 153,827.30

A.4.2.1.13. Pemasangan 1 BH pintu kaca rangka aluminium


A TENAGA
Pekerja L.01 OH 0.085 96,000 Rp 8,160.00
Tukang Alumunium L.03 OH 0.085 120,000 Rp 10,200.00
Kepala tukang L.03 OH 0.009 130,000 Rp 1,170.00
Mandor L.04 OH 0.005 150,000 Rp 750.00
JUMLAH TENAGA KERJA Rp 20,280.00
B BAHAN
Profile Pintu Aluminium m 4.400 120,000 Rp 528,000.00
Kaca 8 mm m2 1.050 141,260 Rp 148,323.00
Sealant Tube 0.270 52,500 Rp 14,175.00
JUMLAH HARGA BAHAN Rp 690,498.00
C PERALATAN

JUMLAH HARGA ALAT Rp -


D Jumlah (A+B+C) Rp 710,778.00
E Overhead and Profit (contoh 10%X D) 10% Rp 71,077.80
F Harga Satuan Pekerjaan (D + E) Rp 781,855.80

A.4.2.1.14. Pemasangan 1 bh Jendela kaca rangka aluminium


A TENAGA
Pekerja L.01 OH 0.085 96,000 Rp 8,160.00
Tukang alumunium L.03 OH 0.085 120,000 Rp 10,200.00
Kepala tukang L.03 OH 0.009 130,000 Rp 1,170.00
Mandor L.04 OH 0.005 150,000 Rp 750.00
JUMLAH TENAGA KERJA Rp 20,280.00
B BAHAN
Profile Jendela Alumunium m 3.700 55,000 Rp 203,500.00
Kaca 5 mm m2 1.050 103,250 Rp 108,412.50
Sealant Tube 0.270 52,500 Rp 14,175.00
JUMLAH HARGA BAHAN Rp 326,087.50
C PERALATAN

JUMLAH HARGA ALAT Rp -


D Jumlah (A+B+C) Rp 346,367.50
E Overhead and Profit (contoh 10%X D) 10% Rp 34,636.75

Page 12 of 36
F Harga Satuan Pekerjaan (D + E) Rp 381,004.25

A.4.2.1.18. Pemasangan 1 m ² talang datar/jurai seng bjls 28 lebar 90 cm


A TENAGA
Pekerja L.01 OH 0.200 96,000 Rp 19,200.00
Tukang L.03 OH 0.200 120,000 Rp 24,000.00
Kepala tukang L.03 OH 0.020 130,000 Rp 2,600.00
Mandor L.04 OH 0.001 150,000 Rp 150.00
JUMLAH TENAGA KERJA Rp 45,950.00
B BAHAN
Seng plat lbr 1.050 60,620 Rp 63,651.00
Paku 1 cm - 2,5 cm kg 0.015 43,600 Rp 654.00
Papan Kayu kelas II atau III m³ 0.019 2,800,000 Rp 53,200.00
JUMLAH HARGA BAHAN Rp 117,505.00
C PERALATAN

JUMLAH HARGA ALAT Rp -


D Jumlah (A+B+C) Rp 163,455.00
E Overhead and Profit (contoh 10%X D) 10% Rp 16,345.50
F Harga Satuan Pekerjaan (D + E) Rp 179,800.50

A.4.2.1.20. Pemasangan 1 m² rangka besi hollow 1x40.40.2mm, modul 60x120 cm, dinding partisi
A TENAGA
Pekerja L.01 OH 0.600 96,000 Rp 57,600.00
Tukang L.03 OH 0.200 120,000 Rp 24,000.00
Kepala tukang L.03 OH 0.020 130,000 Rp 2,600.00
Mandor L.04 OH 0.030 150,000 Rp 4,500.00
JUMLAH TENAGA KERJA Rp 88,700.00
B BAHAN
Rangka metal hollow
40.40.2mm M1 3.500 6,500 Rp 22,750.00
Aksesoris (perkuatan, las dll) ls 100%x rangka 1.00 Rp 22,750.00
JUMLAH HARGA BAHAN Rp 45,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) Rp 134,200.00
E Overhead and Profit (contoh 10%X D) 10% Rp 13,420.00
F Harga Satuan Pekerjaan (D + E) Rp 147,620.00

A.4.2.1.21. Pemasangan 1 m² rangka besi hollow 1x40.40.2mm, modul 60x60 cm, plafon
A TENAGA
Pekerja L.01 OH 0.350 96,000 Rp 33,600.00
Tukang L.03 OH 0.350 120,000 Rp 42,000.00
Kepala tukang L.03 OH 0.035 130,000 Rp 4,550.00
Mandor L.04 OH 0.018 150,000 Rp 2,700.00
JUMLAH TENAGA KERJA Rp 82,850.00
B BAHAN
Rangka metal hollow
40.40.2mm M1 4.000 6,500 Rp 26,000.00
Aksesoris (perkuatan, las dll) ls 100%x rangka 1.00 Rp 26,000.00
JUMLAH HARGA BAHAN Rp 52,000.00
C PERALATAN

JUMLAH HARGA ALAT Rp -


D Jumlah (A+B+C) Rp 134,850.00
E Overhead and Profit (contoh 10%X D) 10% Rp 13,485.00
F Harga Satuan Pekerjaan (D + E) Rp 148,335.00

Page 13 of 36
A. 4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
Haraga Satuan
NO Uraian Kode Satuan Koofisien Jumlah Harga (Rp)
(RP)

A.4.4.1.1. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal campuran 1SP:2PP


A TENAGA
Pekerja L.01 OH 0.600 96,000 Rp 57,600.00
Tukang batu L.02 OH 0.200 120,000 Rp 24,000.00
Kepala Tukang L.03 OH 0.020 130,000 Rp 2,600.00
Mandor L.04 OH 0.030 150,000 Rp 4,500.00
JUMLAH TENAGA KERJA Rp 88,700.00
B BAHAN
Bata Merah m³ 140.000 575 Rp 80,500.00
Semen Portlan kg 43.500 1,238 Rp 53,831.25
Pasir Pasang m³ 0.080 120,900 Rp 9,672.00
JUMLAH HARGA BAHAN Rp 144,003.25
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 232,703.25
E Overhead and Profit (contoh 10%X D) 10% Rp 23,270.33
F Harga Satuan Pekerjaan (D + E) Rp 255,973.58

A.4.4.1.2. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:3PP
A TENAGA
Pekerja L.01 OH 0.600 96,000 Rp 57,600.00
Tukang batu L.02 OH 0.200 120,000 Rp 24,000.00
Kepala Tukang L.03 OH 0.020 130,000 Rp 2,600.00
Mandor L.04 OH 0.030 150,000 Rp 4,500.00
JUMLAH TENAGA KERJA Rp 88,700.00
B BAHAN
Bata Merah m³ 140.000 575 Rp 80,500.00
Semen Portlan kg 32.950 1,238 Rp 40,775.63
Pasir Pasang m³ 0.091 120,900 Rp 11,001.90
JUMLAH HARGA BAHAN Rp 132,277.53
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 220,977.53
E Overhead and Profit (contoh 10%X D) 10% Rp 22,097.75
F Harga Satuan Pekerjaan (D + E) Rp 243,075.28

A.4.4.1.3. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:4PP
A TENAGA
Pekerja L.01 OH 0.600 96,000 Rp 57,600.00
Tukang batu L.02 OH 0.200 120,000 Rp 24,000.00
Kepala Tukang L.03 OH 0.020 130,000 Rp 2,600.00
Mandor L.04 OH 0.030 150,000 Rp 4,500.00
JUMLAH TENAGA KERJA Rp 88,700.00
B BAHAN
Bata Merah m³ 140.000 575 Rp 80,500.00
Semen Portlan kg 26.550 1,238 Rp 32,855.63
Pasir Pasang m³ 0.093 120,900 Rp 11,243.70
JUMLAH HARGA BAHAN Rp 124,599.33
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 213,299.33
E Overhead and Profit (contoh 10%X D) 10% Rp 21,329.93
F Harga Satuan Pekerjaan (D + E) Rp 234,629.26

A.4.4.1.4. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP

Page 14 of 36
A TENAGA
Pekerja L.01 OH 0.600 96,000 Rp 57,600.00
Tukang batu L.02 OH 0.200 120,000 Rp 24,000.00
Kepala Tukang L.03 OH 0.020 130,000 Rp 2,600.00
Mandor L.04 OH 0.030 150,000 Rp 4,500.00
JUMLAH TENAGA KERJA Rp 88,700.00
B BAHAN
Bata Merah m³ 140.000 575 Rp 80,500.00
Semen Portlan kg 22.200 1,238 Rp 27,472.50
Pasir Pasang m³ 0.102 120,900 Rp 12,331.80
JUMLAH HARGA BAHAN Rp 120,304.30
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 209,004.30
E Overhead and Profit (contoh 10%X D) 10% Rp 20,900.43
F Harga Satuan Pekerjaan (D + E) Rp 229,904.73

A.4.4.1.5. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
A TENAGA
Pekerja L.01 OH 0.600 96,000 Rp 57,600.00
Tukang batu L.02 OH 0.200 120,000 Rp 24,000.00
Kepala Tukang L.03 OH 0.020 130,000 Rp 2,600.00
Mandor L.04 OH 0.030 150,000 Rp 4,500.00
JUMLAH TENAGA KERJA Rp 88,700.00
B BAHAN
Bata Merah m³ 140.000 575 Rp 80,500.00
Semen Portlan kg 18.500 1,238 Rp 22,893.75
Pasir Pasang m³ 0.122 120,900 Rp 14,749.80
JUMLAH HARGA BAHAN Rp 118,143.55
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 206,843.55
E Overhead and Profit (contoh 10%X D) 10% Rp 20,684.36
F Harga Satuan Pekerjaan (D + E) Rp 227,527.91

A.4.4.1.7. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
A TENAGA
Pekerja L.01 OH 0.300 96,000 Rp 28,800.00
Tukang batu L.02 OH 0.100 120,000 Rp 12,000.00
Kepala Tukang L.03 OH 0.010 130,000 Rp 1,300.00
Mandor L.04 OH 0.015 150,000 Rp 2,250.00
JUMLAH TENAGA KERJA Rp 44,350.00
B BAHAN
Bata Merah m³ 70.000 575 Rp 40,250.00
Semen Portlan kg 18.950 1,238 Rp 23,450.63
Pasir Pasang m³ 0.038 120,900 Rp 4,594.20
JUMLAH HARGA BAHAN Rp 68,294.83
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 112,644.83
E Overhead and Profit (contoh 10%X D) 10% Rp 11,264.48
F Harga Satuan Pekerjaan (D + E) Rp 123,909.31

A.4.4.1.8. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
A TENAGA
Pekerja L.01 OH 0.300 96,000 Rp 28,800.00
Tukang batu L.02 OH 0.100 120,000 Rp 12,000.00
Kepala Tukang L.03 OH 0.010 130,000 Rp 1,300.00
Mandor L.04 OH 0.015 150,000 Rp 2,250.00

Page 15 of 36
JUMLAH TENAGA KERJA Rp 44,350.00
B BAHAN
Bata Merah m³ 70.000 575 Rp 40,250.00
Semen Portlan kg 14.370 1,238 Rp 17,782.88
Pasir Pasang m³ 0.040 120,900 Rp 4,836.00
JUMLAH HARGA BAHAN Rp 62,868.88
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 107,218.88
E Overhead and Profit (contoh 10%X D) 10% Rp 10,721.89
F Harga Satuan Pekerjaan (D + E) Rp 117,940.76

A.4.4.1.9. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 4PP
A TENAGA
Pekerja L.01 OH 0.300 96,000 Rp 28,800.00
Tukang batu L.02 OH 0.100 120,000 Rp 12,000.00
Kepala Tukang L.03 OH 0.010 130,000 Rp 1,300.00
Mandor L.04 OH 0.015 150,000 Rp 2,250.00
JUMLAH TENAGA KERJA Rp 44,350.00
B BAHAN
Bata Merah m³ 70.000 575 Rp 40,250.00
Semen Portlan kg 11.500 1,238 Rp 14,231.25
Pasir Pasang m³ 0.043 120,900 Rp 5,198.70
JUMLAH HARGA BAHAN Rp 59,679.95
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 104,029.95
E Overhead and Profit (contoh 10%X D) 10% Rp 10,403.00
F Harga Satuan Pekerjaan (D + E) Rp 114,432.95

A.4.4.1.10. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 5PP
A TENAGA
Pekerja L.01 OH 0.300 96,000 Rp 28,800.00
Tukang batu L.02 OH 0.100 120,000 Rp 12,000.00
Kepala Tukang L.03 OH 0.010 130,000 Rp 1,300.00
Mandor L.04 OH 0.015 150,000 Rp 2,250.00
JUMLAH TENAGA KERJA Rp 44,350.00
B BAHAN
Bata Merah m³ 70.000 575 Rp 40,250.00
Semen Portlan kg 9.680 1,238 Rp 11,979.00
Pasir Pasang m³ 0.045 120,900 Rp 5,440.50
JUMLAH HARGA BAHAN Rp 57,669.50
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 102,019.50
E Overhead and Profit (contoh 10%X D) 10% Rp 10,201.95
F Harga Satuan Pekerjaan (D + E) Rp 112,221.45

A.4.4.1.11. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
A TENAGA
Pekerja L.01 OH 0.300 96,000 Rp 28,800.00
Tukang batu L.02 OH 0.100 120,000 Rp 12,000.00
Kepala Tukang L.03 OH 0.010 130,000 Rp 1,300.00
Mandor L.04 OH 0.015 150,000 Rp 2,250.00
JUMLAH TENAGA KERJA Rp 44,350.00
B BAHAN
Bata Merah m³ 70.000 575 Rp 40,250.00
Semen Portlan kg 8.320 1,238 Rp 10,296.00
Pasir Pasang m³ 0.049 120,900 Rp 5,924.10

Page 16 of 36
JUMLAH HARGA BAHAN Rp 56,470.10
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 100,820.10
E Overhead and Profit (contoh 10%X D) 10% Rp 10,082.01
F Harga Satuan Pekerjaan (D + E) Rp 110,902.11

A.4.4.1.12. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 8PP
A TENAGA
Pekerja L.01 OH 0.300 96,000 Rp 28,800.00
Tukang batu L.02 OH 0.100 120,000 Rp 12,000.00
Kepala Tukang L.03 OH 0.010 130,000 Rp 1,300.00
Mandor L.04 OH 0.015 150,000 Rp 2,250.00
JUMLAH TENAGA KERJA Rp 44,350.00
B BAHAN
Bata Merah m³ 70.000 575 Rp 40,250.00
Semen Portlan kg 6.500 1,238 Rp 8,043.75
Pasir Pasang m³ 0.050 120,900 Rp 6,045.00
JUMLAH HARGA BAHAN Rp 54,338.75
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 98,688.75
E Overhead and Profit (contoh 10%X D) 10% Rp 9,868.88
F Harga Satuan Pekerjaan (D + E) Rp 108,557.63

Analisa Lapangan. 1 M2 Partisi Gipsum Rangka Hollow


A TENAGA
Pekerja L.01 OH 0.500 96,000 Rp 48,000.00
Tukang batu L.02 OH 0.050 120,000 Rp 6,000.00
JUMLAH TENAGA KERJA Rp 54,000.00
B BAHAN
Rangka hollow 40 x 40 mm btng 1.000 6,500 Rp 6,500.00
Paku sekrup untuk pasang hollow bh 10.000 250 Rp 2,500.00
Gypsum board 9 mm lbr 0.353 64,150 Rp 22,627.49
Paku sekrup untuk pasang gypsum bh 30.000 250 Rp 7,500.00
Kompon kg 0.100 19,530 Rp 1,953.00
Amplas biasa lbr 0.500 5,000 Rp 2,500.00
Textile tape m' 2.500 12,000 Rp 30,000.00
JUMLAH HARGA BAHAN Rp 73,580.49

PATISI GYPSUM 9 mm 1 MUKA Rp 127,580.49


Overhead and Profit (contoh 10%X D) 10% Rp 12,758.05
Rp 140,338.53
PATISI GYPSUM 9 mm 2 MUKA Rp 192,160.97
Overhead and Profit (contoh 10%X D) 10% Rp 19,216.10
Rp 211,377.07

Analisa Lapangan. 1 M2 Partisi Gipsum Dengan Rangka Metal


A TENAGA
Pekerja L.01 OH 0.400 96,000 Rp 38,400.00
Tukang batu L.02 OH 0.040 120,000 Rp 4,800.00
JUMLAH TENAGA KERJA Rp 43,200.00
B BAHAN
Metal stud 34 X 64 cm btng 2.500 15,000 Rp 37,500.00
Paku sekrup untuk pasang rangka bh 10.000 250 Rp 2,500.00
Gypsum board 9 mm lbr 0.365 64,150 Rp 23,388.02
GRC 12mm lbr 0.353 380,000 Rp 134,036.55
Paku sekrup untuk pasang gypsum bh 30.000 250 Rp 7,500.00
Kompon kg 0.050 19,530 Rp 976.50

Page 17 of 36
Amplas biasa lbr 0.500 5,000 Rp 2,500.00
Textile tape m' 2.500 12,000 Rp 30,000.00
JUMLAH HARGA BAHAN Rp 238,401.07

PATISI GYPSUM 9 mm 1 MUKA Rp 147,564.52


Overhead and Profit (contoh 10%X D) 10% Rp 14,756.45
Rp 162,320.97
PATISI GYPSUM 9 mm 2 MUKA Rp 211,929.04
Overhead and Profit (contoh 10%X D) 10% Rp 21,192.90
Rp 233,121.95
PATISI GRC 12mm 1220x2440 Rp 250,713.05
Overhead and Profit (contoh 10%X D) 10% Rp 25,071.30
Rp 275,784.35

Analisa Lapangan. 1 M2 Pasangan Bacdroop


A TENAGA
Pekerja L.01 OH 0.8000 96,000 Rp 76,800.00
Tukang Kayu L.02 OH 2.0000 120,000 Rp 240,000.00
Kepala Tukang L.03 OH 0.2000 130,000 Rp 26,000.00
Mandor L.04 OH 0.0400 150,000 Rp 6,000.00
JUMLAH TENAGA KERJA Rp 348,800.00
B BAHAN
Rangka metal hollow m' 2.0000 6,500 Rp 13,000.00
Paku sekrup untuk pasang rangka bh 20.0000 250 Rp 5,000.00
Multipleks 15 mm lbr 0.3700 186,760 Rp 69,101.20
HPL lbr 0.3700 250,000 Rp 92,500.00
Lem Kay ltr 0.2500 19,530 Rp 4,882.50
Accessories Lainnya Ls 1.0000 68,444 Rp 68,443.50
Alat Bantu + Perlengkapan LS 1.0000 10,000 Rp 10,000.00
JUMLAH HARGA BAHAN Rp 262,927.20
D Jumlah (A+B+C) Rp 611,727.20
E Overhead and Profit (contoh 10%X D) 10% Rp 61,172.72
F Harga Satuan Pekerjaan (D + E) Rp 672,899.92

Page 18 of 36
DAFTAR HARGA BAHAN/MATERIAL

HARGA
NO MATERIAL SAT.
(Rp)

A AGREGAT HALUS
1 Pasir Urug /Pasir TImbunan M3 93,000.00
2 Pasir Pasang / Kali M3 120,900.00
3 Pasir Beton M3 150,000.00
4 Pasir Batu (Sirtu) M3 132,000.00
5 Kerikil Koral M3 265,000.00
6 Kerikil Sungai M3 189,350.00
7 Kerikil Tersaring M3 252,420.00
8 Kerikil Sungai Royalti M3 227,220.00
9 Kerikil Sungai Pecah Tersaring M3 315,560.00
10 Kerikil Sungai Tidak Tersaring M3 252,420.00
11 Tanah Timbunan Pilihan M3 123,970.00
12 Tanah Timbunan Biasa M3 84,560.00
13 Tanah Liat M3 45,080.00
14 Air Kerja Liter 350.00

B AGREGAT KASAR
1 Batu Kali M3 147,000.00
2 Batu Karang Hitam M3 74,410.00
3 Batu Karang Putih/ Batu Gunung M3 136,360.00
4 Batu Pecah 10 - 15 cm M3 136,360.00
5 Batu Pecah 7 - 10 cm M3 150,010.00
6 Batu Pecah 5 - 7 cm M3 154,700.00
7 Batu Pecah 3 - 5 cm M3 235,550.00
8 Batu Pecah 2 - 3 cm M3 260,330.00
9 Batu Pecah 1 - 2 cm M3 278,950.00
10 Batu Pecah 0.5 - 1 cm M3 282,660.00
11 Batu Belah M3 129,920.00
12 Batu Bata Standar (besar) Klas I Buah 1,000.00
13 Batu Bata Standar Buah 575.00
14 Kapur Zak 15,200.00
15 Aspal Kg 10,700.00
16 Tali ijuk Kg 25,000.00

C SEMEN
1 Semen Portland (PC) Kg 1,237.50
2 Semen MU 400 Kg 5,480.00
3 Semen Warna Kg 1,140.00
4 Sika Grout Kg 4,800.00

D KAYU
1 Balok Kayu Klas I M3 8,804,600.00
2 Papan Kayu Klas I M3 9,604,980.00
3 Balok Kayu Klas II M3 4,850,000.00
4 Papan Kayu Klas II M3 4,700,000.00
5 Balok Kayu Klas III M3 2,425,500.00
6 Papan Kayu Klas III M3 2,800,000.00

E KAYU LAPIS
1 Tripleks 3 mm (Uk. 120 x 240 ) Lembar 46,970.00
2 Tripleks 4 mm (Uk. 120 x 240 ) Lembar 61,880.00
3 Tripleks 6 mm (Uk. 120 x 240 ) Lembar 76,860.00
4 Tripleks 9 mm (Uk. 120 x 240 ) Lembar 133,420.00
5 Tripleks 12 mm (Uk. 120 x 240 ) Lembar 149,380.00
6 Tripleks 15 mm (Uk. 120 x 240 ) Lembar 186,760.00
7 Tripleks 18 mm (Uk. 120 x 240 ) Lembar 208,110.00
8 HPL Lembar 250,000.00
9 Klasiboard Tebal 4 mm Lembar 58,500.00
10 Dolken (d.8-10cm) 4 m Batang 7,000.00
11 Bambu diameter 6 - 8/600 cm Batang 15,000.00
F GYPSUM
1 Gypsum (120 x 240) Lembar 64,150.00
2 Kalsiplank M1 34,500.00
3 GRC 12mm 1222x2444 M2 380,000.00

G LIST PROFIL
1 List Profil K1 A M1 24,700.00
2 List Profil T 11 M1 17,100.00
3 List Profil kayu 7 cm M1 23,300.00
4 Lambersering 9 cm M1 8,400.00

H PAKU
1 Paku Kayu / Tripleks Uk. 1 - 4 cm Kg 31,000.00
2 Paku Kayu / Tripleks Uk. 5 - 12 cm Kg 23,700.00
3 Paku Beton Biasa (semua ukuran) Kg 19,500.00
4 Paku Beton Bagus (semua ukuran) Doz 43,600.00
5 Paku Perahu Uk. 1 - 4 cm Kg 43,600.00
6 Paku Perahu Uk. 5 - 12 cm Kg 33,800.00
7 Paku Asbes Kg 34,300.00
8 Sekrup Spendek Bh 500.00
9 Kawat Beton Kg 23,700.00
10 Kawat Duri M1 2,000.00

I SENG
1 Seng Gelombang Bjls 0,25 Lembar 62,510.00
2 Seng Gelombang Bjls 0,30 Lembar 73,920.00
3 Seng Licin Bjls 0.20 - 6 Kaki Lembar 65,170.00
4 Seng Licin Bjls 0.30 - 6 Kaki Lembar 61,950.00
5 Asbes Gelombang Besar (300 x 102 x 5 mm) Lembar 117,390.00
6 Asbes Gelombang Besar (200 x 102 x 5 mm) Lembar 90,370.00
7 Asbes Gelombang Besar (180 x 102 x 5 mm) Lembar 77,000.00
8 Asbes Gelombang Kecil (300 x 102 x 5 mm) Lembar 78,960.00
9 Asbes Gelombang Kecil (270 x 102 x 5 mm) Lembar 68,950.00
10 Asbes Gelombang Kecil (210 x 102 x 5 mm) Lembar 56,000.00
11 Asbes Gelombang Kecil (180 x 102 x 5 mm) Lembar 49,070.00
12 Asbes Gelombang Kecil (150 x 102 x 5 mm) Lembar 47,950.00
13 Asbes Gelombang Kecil (240 x 102 x 5 mm) Lembar 74,550.00
14 Asbes Nok Gelombang Besar Lembar 50,890.00
15 Asbes Nok Gelombang Besar Lembar 33,460.00
16 Seng Plat 0.35 -6 Kaki Lembar 60,620.00
17 Spandek 0.35 mm warna M2 63,000.00
18 Nok Spandek 0.35 mm warna lebar 40 cm M1 45,000.00
19 Genteng Metal Zincalume Polos ( 80 x 77 cm ) M2 92,400.00
20 Reng Metal M' 20,000.00
17 Wood Plank M' 35,000.00
J BAHAN BESI
1 Besi Beton Polos Kg 13,000.00
2 Besi Strip Tebal Kg 15,600.00
3 Besi Profil IWF Kg 14,800.00
4 Besi Siku L 30 x 30 x 3 mm Batang 80,920.0
5 Besi Siku L 40 x 40 x 4 mm Batang 132,860.0
6 Besi Siku L 50 x 50 x 5 mm Batang 240,100.0
7 Besi Beton 6 mm ( 12 m ) Batang 31,780.0
8 Besi Beton 8 mm ( 12 m ) Batang 53,760.0
9 Besi Beton 10 mm ( 12 m ) Batang 77,980.0
10 Besi Beton 12 mm ( 12 m ) Batang 125,160.0
11 Besi Beton 16 mm ( 12 m ) Batang 231,140.0
12 Besi Beton 19 mm ( 12 m ) Batang 332,990.0
13 Besi Beton Ulir 10 mm Batang 95,060.0
14 Besi Beton Ulir 13 mm Batang 171,080.0
15 Besi Beton Ulir 16 mm Batang 236,040.0
16 Besi Beton Ulir 19 mm Batang 332,150.0
17 Angkur Kg 19,180.0
18 Besi Beugel / baut Kg 23,450.0
19 Boundeck M2 95,000.0

J BAHAN ALUMUNIUM DAN BESI HOLLOW


1 Profil Alumunium m' 110,000.00
2 Skrup Fixer bh 250.00
3 Sealant tube 52,500.00
4 Profile Pintu Alumunium m' 120,000.0
4 Profile Jemdela Alumunium m' 55,000.0
5 Metal Stud 34 x 64 mm m' 15,000.0
6 Besi Hollow 40 x 40 mm m' 6,500.0
7 Besi Hollow 20 x 40 mm m' 5,000.0

K KERAMIK/ TEGEL
1 Keramik Uk. 20 x 20 cm (w. Putih) M2 46,970.00
3 Keramik Dinding Uk. 20 x 40 cm ( W. Tua) M2 80,000.00
4 Keramik Dinding Uk. 20 x 40 cm ( W. Muda) M2 90,000.00
5 Keramik Lantai Uk 20 x 20 cm (W. Putih) M2 38,780.00
6 Keramik Lantai Uk. 30 x 30 cm (W. Putih) M2 58,000.00
7 Keramik Lantai Uk. 40 x 40 cm (W. Putih) M2 70,000.00
8 Keramik Plint 7,5 x 20 cm Buah 5,460.00
9 Keramik Plint 8 x 25 cm Buah 16,310.00
10 Kuku Macan Buah 1,960.00
11 Granit 40 x 40 cm Buah 23,905.00
12 Granit 60 x 60 cm (W. Muda) Buah 210,000.00
13 Granit 60 x 60 cm (W. Tua) Buah 210,000.00
14 Plint 10 x 60 cm Buah 35,000.00
15 Plint 10 x 40 cm Buah 17,500.00
16 Plint 10 x 30 cm Buah 19,333.33
17 Top Table Solid Surface Snow White W = 70 cm, T = 9 mm m1 1,750,000.00
18 Approon Solid Surface Snow White W = 15 cm, T = 9 mm m1 400,000.00
19 Dinding Solid Surface Snow White H = 70 cm, T = 9 mm m1 1,750,000.00
L KACA
1 Kaca bening tebal 3 mm M2 92,330.00
2 Kaca bening tebal 5 mm M2 103,250.00
3 Kaca bening tebal 8 mm M2 141,260.00
4 Kaca bening tebal 10 mm M2 230,000.00
5 Kaca bening tebal 12 mm M2 320,000.00
6 Kaca Rayban Tebal 3 mm M2 70,630.00
7 Kaca Rayban Tebal 5 mm M2 72,240.00
8 Kaca Rayban Tebal 6 mm M2 135,800.00
9 Kaca Rayban Tebal 8 mm M2 239,050.00
10 Nako Buah 11,970.00
11 Pintu Kaca Tempered 12 mm Uk 90 x 210 cm lbr 2,000,000.00
12 Pintu Alumunium Toilet Unit 2,000,000.00
13 Kaca Tempered 12 mm m2 1,155,000.00
14 Sanblas Kaca m 50,000.00

M BAHAN ATAP
1 Genteng Beton Biasa Buah Rp 3,920.00
2 Genteng Kanmuri Glasure Buah Rp 7,630.00
3 Genteng Kanmuri Biasa Buah Rp 6,150.00
4 Karet Lapis Genteng M2 Rp 21,700.00
5 Genteng Keramik Natural Buah Rp 5,460.00
6 Genteng Keramik Maroon Buah Rp 9,800.00
7 Nok Keramik Buah Rp 11,410.00
8 Nok Beton Press Buah Rp 6,510.00
9 Ujung Nok Buah Rp 48,930.00
10 Genteng Metal Zincalume Kasar (100x77 cm) - Multiroof M2 Rp 190,190.00
11 Genteng Metal Zincalume Polos (100x77 cm) - Multiroof M2 Rp 169,540.00
12 Genteng Metal Zincalume Kasar (88x77 cm) - Suryaroof M2 Rp 158,410.00
13 Genteng Metal Zincalume Polos (88x77 cm) - Suryaroof M2 Rp 135,520.00
14 Spandek 0,35 M2 Rp 45,000.00
15 Nok Spandek 0,35 M1 Rp 30,000.00
14 Genteng Asbes Buah Rp 38,010.00
15 Polycarbonate m2 Rp 54,545.45

N BAJA RINGAN
1 Main Truss C 75 - 0.8 Btg Rp 70,000.00
2 Main Truss C 75 - 0.6 Btg Rp 60,000.00
3 Reng Btg Rp 30,000.00
4 Baut (Screw Driver) bj Rp 1,500.00
5 Dynabolt bj Rp 1,000.00
6 Talang Jurai ls Rp 5,000.00

N SANRANGAN / BUIS BETON


1 Dia. 80 x 50 Buah 65,170.00
2 Dia. 70 x 50 Buah 54,320.00
3 Dia. 60 x 50 Buah 43,470.00

O GORONG-GORONG
1 Dia. 1 x 60 Buah Rp 65,170.00
2 Dia. 1 x 50 Buah Rp 54,320.00
3 Dia. 1 x 40 Buah Rp 48,930.00
4 Dia. 1 x 30 Buah Rp 32,620.00
5 Dia. 1 x 20 Buah Rp 21,700.00
6 Dia. 1 x 100 Buah Rp 108,640.00

P PAVING BLOK
1 Uk. 6 cm (60 bh/m2) M2 Rp 65,170.00
2 Uk. 8 cm (60 bh/m2) M2 Rp 78,260.00
3 Loster semen (Uk. 15x30 cm) Buah Rp 17,010.00
4 Loster semen (Uk. 20x30 cm) Buah Rp 24,290.00
5 Bataco 40x20x10 Buah Rp 3,430.00
6 Rumput Peking M2 Rp 48,500.00
Q PIPA
1 Pipa PVC Type AW. 1/2" M1 Rp 4,000.00
2 Pipa PVC Type AW. 3/4" M1 Rp 5,000.00
3 Pipa PVC Type AW. 1" Batang Rp 40,180.00
4 Pipa PVC Type AW. 1.1/4" Batang Rp 59,780.00
5 Pipa PVC Type AW. 1.1/2" Batang Rp 72,800.00
6 Pipa PVC Type AW. 2" Batang Rp 89,320.00
7 Pipa PVC Type AW. 2,5" Batang Rp 135,380.00
8 Pipa PVC Type AW. 3" M1 Rp 43,557.50
9 Pipa PVC Type AW. 4" M1 Rp 72,117.50
10 Pipa PVC Type AW. 5" Batang Rp 479,640.00
11 Pipa PVC Type AW. 6" Batang Rp 633,080.00
12 Pipa PVC Type AW. 8" Batang Rp 1,163,120.00
13 Pipa PVC Type C. 1/2" Batang Rp 14,560.00
14 Pipa PVC Type C. 3/4" Batang Rp 21,350.00
15 Pipa PVC Type C. 1" Batang Rp 24,290.00
16 Pipa PVC Type C. 2" Batang Rp 41,860.00
17 Pipa PVC Type C. 2,5" Batang Rp 52,780.00
18 Pipa PVC Type C. 3" Batang Rp 61,950.00
19 Pipa PVC Type C. 4" Batang Rp 79,310.00
20 Pipa PVC Type D. 1.1/4" Batang Rp 26,320.00
21 Pipa PVC Type D. 1.1/2" Batang Rp 32,060.00
22 Pipa PVC Type D. 2" Batang Rp 42,630.00
23 Pipa PVC Type D. 3" Batang Rp 92,330.00
24 Pipa PVC Type D. 4" Batang Rp 118,300.00
25 Pipa PVC Type D. 5" Batang Rp 178,500.00
26 Pipa PVC Type D. 6" Batang Rp 272,090.00
27 Pipa PVC Type D. 8" Batang Rp 456,400.00
28 Pipa Galvanis Medium (GIP ) 1/2 " Batang Rp 165,200.00
29 Pipa Galvanis Medium (GIP ) 3/4 " Batang Rp 215,180.00
30 Pipa Galvanis Medium (GIP ) 1 " Batang Rp 295,540.00
31 Pipa Galvanis Medium (GIP ) 1.1/4 " Batang Rp 386,820.00
32 Pipa Galvanis Medium (GIP ) 1.1/2 " Batang Rp 443,310.00
33 Pipa Galvanis Medium (GIP ) 2 " Batang Rp 586,810.00
34 Pipa Galvanis Medium (GIP ) 2.1/2 " Batang Rp 746,480.00
35 Pipa Galvanis Medium (GIP ) 3 " Batang Rp 1,336,580.00

R SAMBUNGAN PIPA
1 Knie L - 1/2" Buah Rp 3,500.00
2 Knie L - 3/4" Buah Rp 4,200.00
3 Knie L - 1" Buah Rp 4,900.00
4 Knie L - 1.1/4" Buah Rp 8,300.00
5 Knie L - 1.1/2" Buah Rp 10,400.00
6 Knie L - 2" Buah Rp 11,100.00
7 Knie L - 2.1/2" Buah Rp 11,800.00
8 Knie L - 3" Buah Rp 13,900.00
9 Knie L - 4" Buah Rp 23,300.00
10 Knie L - 5" Buah Rp 62,900.00
11 Knie L - 6" Buah Rp 82,400.00
12 Tee - 1/2" Buah Rp 4,200.00
13 Tee - 3/4" Buah Rp 4,900.00
14 Tee - 1" Buah Rp 7,000.00
15 Tee - 1.1/4" Buah Rp 5,500.00
16 Tee - 1.1/2" Buah Rp 7,000.00
17 Tee - 2" Buah Rp 8,800.00
18 Tee - 2.1/2" Buah Rp 14,900.00
19 Tee - 3" Buah Rp 7,500.00
20 Tee - 4" Buah Rp 21,900.00
21 Tee - 5" Buah Rp 65,200.00
22 Tee - 6" Buah Rp 102,500.00
23 Socket - 1/2" Buah Rp 2,800.00
24 Socket - 3/4" Buah Rp 3,200.00
25 Socket - 1" Buah Rp 4,200.00
26 Socket - 1.1/4" Buah Rp 5,500.00
27 Socket - 1.1/2" Buah Rp 4,200.00
28 Socket - 2" Buah Rp 4,900.00
29 Socket - 2.1/2" Buah Rp 6,500.00
30 Socket - 3" Buah Rp 7,900.00
31 Socket - 4" Buah Rp 11,200.00
32 Socket - 5" Buah Rp 32,600.00
33 Socket - 6" Buah Rp 46,600.00
34 Knie 45" - 2" Buah Rp 102,500.00
35 Knie 45" - 2.1/2" Buah Rp 14,000.00
36 Knie 45" - 3" Buah Rp 20,500.00
37 Knie 45" - 4" Buah Rp 37,300.00

S KUNCI
1 Kunci tanam double slag Ex Dekson/Setara Buah 250,000.00
2 Kunci lemari Buah 16,310.00
3 Door holder Buah 19,530.00
4 Kunci tanam selindir Buah 97,790.00
5 Kunci kamar mandi Buah 29,330.00
6 Engsel pintu kuningan 3" Buah 16,310.00
7 Engsel pintu kuningan 4" Buah 15,190.00
8 Engsel pintu nilon 3" Buah 9,730.00
9 Engsel pintu nilon 4" Buah 10,850.00
10 Engsel Steinless Stell 3" Buah 24,430.00
11 Engsel Steinless Stell 4" Buah 30,940.00
12 Grendel Uk. 5 - 10 cm Buah 12,600.00
13 Grendel Uk. 11 - 15 cm Buah 16,520.00
14 Grendel Uk. 16- 20 cm Buah 24,290.00
15 Kait angin kuningan Uk. 10 - 20 cm Buah 16,520.00
16 Kait angin kuningan Uk. 21 - 30 cm Buah 19,390.00
17 Espagnolet tanam Uk. 21 - 30 cm Buah 24,290.00
18 Door closer type 81 new star Buah 170,000.00
19 Door stop lokal Buah 10,850.00
20 Handle Pintu C Stanlist Psg 250,000.00
21 Floor hinges bh 750,000.00
22 Top Center bh 75,000.00
23 Patch fitting bh 150,000.00
24 Handle C Stenlist bh 250,000.00
25 Top Center M2 150,000.00
26 cylinder bh 45,000.00
27 Engsel Pintu 77 Buah 13,020.00
28 Engsel Jendela 77 Buah 14,140.00
29 Hak angin 8" Buah 14,560.00
30 Rel pintu Dorong Buah 9,730.00
31 Pintu PVC Buah 130,410.00
32 Pintu Aluminium Buah 363,860.00
33 Rolling Door bahan besi M2 388,080.00
34 Rolling Door bahan Alluminium M2 325,990.00
35 Sunscreen aluminium M2 391,160.00
36 Pintu gulung Besi M2 358,610.00
37 Pintu besi baja M2 1,032,290.00
38 Jendela besi M2 1,086,610.00
39 Floor drain bh 45,500.00
40 Sliding Door m' 120,000.00

T SANITASI
1 Bak air mandi fiberglass 0.3 M3 Buah 387,800.00
2 Kloset Jongkok standar Buah 485,100.00
3 Kloset duduk standar Lengkap Ex Toto Buah 2,182,950.00
4 Urinoir Buah 1,358,280.00
5 Wastafel standar kecil Buah 586,810.00
6 Wastafel standar besar Buah 717,150.00
6 Wastavel Zing Stanlies Buah 650,000.00
7 Gate Valve 3" Buah 16,000.00
8 Kran air 3/4" atau 1/2" Buah 22,820.00
9 Kran air wastafel model Angsa Buah 70,000.00
10 Shower + Kran Buah 120,000.00
11 Tempat Sabun Porselin Buah 29,330.00
12 Tangki air fiberglass Bulat 1000 Ltr Buah 1,358,280.00
13 Seltape Kecil Buah 2,450.00
14 Pipa Fleksibel 59,780.00

U CAT DAN MINYAK


1 Cat Besi / Kayu warna standar Kg 45,640.00
2 Cat besi / Kayu Warna Khusus Kg 57,610.00
3 Cat Besi Kayu Kg 45,460.00
4 Cat Tembok (Penutup) Kg 16,310.00
5 Cat Tembok ( Dasar ) Kg 13,580.00
6 Cat Tembok Interior warna standar Liter 45,640.00
7 Cat Tembok Exterior warna standar Liter 72,240.00
8 Cat Tembok Interior warna standar Liter 54,740.00
9 Cat Tembok Exterior warna standar Liter 84,770.00
10 Cat Meni Besi Kg 19,040.00
11 Cat Meni Kayu Kg 19,040.00
12 Dempul Kayu Kg 38,010.00
13 Plamur Kg 19,530.00
13 Cornice Zak 65,000.00
14 Waterproof Kg 85,000.00
15 Teak oil Liter 29,890.00
16 Pernis Liter 22,820.00
17 Minyak Cat Liter 13,020.00
18 Thinner A Liter 12,530.00
19 Thinner Biasa Liter 11,410.00
20 Spirtus Liter 10,850.00
21 Wood Filler Kg 28,280.00
22 wallpaper m 17,000.00
23 Kuas Roll Buah 16,310.00
24 Kuas 1" Buah 7,280.00
25 Kuas 2,5" Buah 14,560.00
26 Kuas 4" Buah 16,520.00
26 Kertas Amplas lbr 5,000.00
27 Lem Kayu Fox Kg 19,390.00
28 Residu Liter 14,140.00
28 Solar Liter 6,500.00
29 Minyak Beskisting Liter 9,730.00
30 Silicon Kg 52,500.00
31 Soda Api Kg 120,000.00
32 Sabun Kg 40,000.00
32 Textile tape m 12,000.00
33 epoxy lantai upox kg 23,500.00
V ELECTRIKAL
1 Skun 16 mm Batang Rp 2,170.00
2 Spiral kabel M1 Rp 76,090.00
3 Kabel Tg Batang Rp 560.00
4 Kabel NYY - 2 x 1.5 Roll Rp 271,670.00
5 Kabel NYY - 2 x 2.5 M' Rp 4,340.00
6 Kabel NYY - 2 x 2.5 - Eterna Roll Rp 363,860.00
7 Kabel NYY - 3 x 2.5 - Eterna Roll Rp 407,470.00
8 Kabel NYY - 3 x 4 - Eterna Roll Rp 54,340.00
9 Kabel NYY - 4 x 16 M1 Rp 38,010.00
10 Kabel NYY - 4 x 2.5 M1 Rp 8,120.00
11 Kabel NYY - 4 x 4 M1 Rp 10,850.00
12 Kabel NYA - 10 mm M1 Rp 9,730.00
13 BC 50 mm Kg Rp 40,180.00
14 Spit tembaga Asli Buah Rp 7,630.00
15 Tiang Spit Buah Rp 27,160.00
16 Arde 4 m Asli Batang Rp 38,310.00
17 Down Light Kuning Buah Rp 38,010.00
18 Down Light Besar Buah Rp 54,320.00
19 Down Light sedang Buah Rp 48,930.00
20 Lampu Mercuri Philips 250 watt Asli Buah Rp 325,990.00
21 Lampu Mercuri 250 watt Buah Rp 54,320.00
22 Lampu Mercuri Philips 250 watt (untuk jalan) Set Rp 869,330.00
23 Lampu TL 20 watt Philips Set Rp 54,320.00
24 Lampu LED 12 watt Philips Set Rp 70,000.00
24 Lampu soltone 40 watt philips Buah Rp 48,930.00
25 Lampu Rm 2x40 watt Buah Rp 325,000.00
26 Lampu Spot ight 5 watt Buah Rp 45,000.00
27 Fitting lampu batu Buah Rp 4,830.00
28 Kayu Roset Buah Rp 1,470.00
29 MCB 16 Group MG Asli Buah Rp 48,930.00
30 MCB 10 Group MG Asli Buah Rp 43,470.00
31 Sisir MCB Legrand Buah Rp 21,700.00
32 Box MCB 4 Group IB Buah Rp 27,160.00
33 Box MCB Plastik Group MCB Asli Set Rp 706,300.00
34 MCB 63 Amp MG Buah Rp 239,050.00
35 Panel OB + MCB 12 Amp. Set Rp 543,340.00
36 MCB 30 Amp 3 Phase Buah Rp 488,950.00
37 Saklar 63 Amp Buah Rp 146,720.00
38 Box MCB Buah Rp 38,010.00
39 Panel Kas 30 x 40 cm Unit Rp 70,630.00
40 Panel kas Untuk Lampu Mercuri Asli Set Rp 923,650.00
41 Panel kas lengkap Asli MG Set Rp 2,281,930.00
42 KWH 3 Phase japan Buah Rp 869,330.00
43 MCB + KWH Meter + OK Set Rp 249,900.00
44 MCB 3 Phase Asli MG Buah Rp 760,620.00
45 OHM Saklar Buah Rp 488,950.00
46 NFB Buah Rp 165,200.00
47 Engkel IB Buah Rp 13,020.00
48 Stop Arde IB Mekel Buah Rp 9,730.00
49 Saklar Seri Mekel / Stop Arde Mekel Buah Rp 25,000.00
50 Saklar Tunggal Buah Rp 17,000.00
51 OHN Saklar 60 Group Set Rp 271,670.00
52 Stop Arde + Tedos OB Buah Rp 21,700.00
53 Steker Arde Buah Rp 10,640.00
54 Engkel IB Mekel Buah Rp 10,850.00
55 Kabel Arde M1 Rp 13,020.00
56 Sakelar Engkel + Tedos Set Rp 32,620.00
57 Pipa kabel 5/8 " Btg Rp 3,000.00
58 T dus Buah Rp 2,000.00
59 L Bow Buah Rp 1,500.00
60 Klem Buah Rp 500.00
61 Mangkok Buah Rp 10,000.00
62 Las dop Buah Rp 5,000.00
63 Dora Dos Buah Rp 27,160.00
ESTIMATED ENGINEERING
INTERIOR SUNRISE HOMSTAY

POHUWATO, GORONTALO
BILL OF QUANTITY (BOQ)

PEKERJAAN : INTERIOR SUN RISE HOME STAY


LOKASI : MARISA, GORONTALO
PERIODE : '2022

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN BIAYA
(Rp.) (Rp.)
1 2 3 4 5 6

1. PRELIMINERIES

1 Pekerjaan Pembersihan awal dan akhir 1.00 LS - -

2 Mobilisasi dan Demobilisasi 1.00 LS - -

TOTAL JUMLAH 1 -
2. AULA

2 Meja Rapat 4.00 M1 600,000.00 2,400,000.00


-Plywood
-HPL texture by design
TOTAL JUMLAH 2 2,400,000.00
3. RECEPTIONS

1 Backdrop dinding 8.10 M2 300,000.00 2,430,000.00


-Plywood
-HPL texture by design

2 Meja Reception 2.50 M1 600,000.00 1,500,000.00


-Plywood
-HPL texture by design
TOTAL JUMLAH 3 3,930,000.00
4. BEER HOUSE

1 Rak Etalase Minuman 7.50 M2 600,000.00 4,500,000.00


-Plywood
-HPL texture by design

2 Meja Bar 4.37 M2 600,000.00 2,622,000.00


-Plywood
-HPL texture by design

3 Meja Wastafel 1.00 LS 500,000.00 500,000.00


-Plywood
-HPL texture by design

4 Rak Gantung 3.75 M2 600,000.00 2,250,000.00


-Plywood
-HPL texture by design

5 Backdrop Dinding 14.55 M2 300,000.00 4,365,000.00


-Plywood
-HPL texture by design

6 Backdrop Dinding Biliyard 4.75 M2 300,000.00 1,425,000.00


-Plywood
-HPL texture by design
TOTAL JUMLAH 4 15,662,000.00

Page 29 of 36
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN BIAYA
(Rp.) (Rp.)
1 2 3 4 5 6

5. HOME STAY 5 KAMAR

1 Wardrobe / Lemari Pakaian 8.40 M2 600,000.00 5,040,000.00


-Plywood
-HPL texture by design
-engsel
-Pipa Stainless
-Led Strip
2 Rak tv 5.00 LS 300,000.00 1,500,000.00
-Plywood
-HPL texture by design
TOTAL JUMLAH 5 6,540,000.00
6. PENGINAPAN 14 KAMAR

1 Wardrobe / Lemari Pakaian x 14 22.40 M2 600,000.00 13,440,000.00


-Plywood
-HPL texture by design
-engsel
-Pipa Stainless
-Led Strip
2 Rak tv x 14 14.00 M2 300,000.00 4,200,000.00
-Plywood
-HPL texture by design
3 Gnatungan Gorden x 14 14.00 LS 100,000.00 1,400,000.00
-Plywood
-HPL texture by design

TOTAL JUMLAH 6 19,040,000.00


7. PEKERJAAN PANEL PINTU PENGINAPAN

1 Pekerjaan Pintu X 14 14.00 LS 350,000.00 4,900,000.00


-Plywood
-HPL texture by design

TOTAL JUMLAH 7 4,900,000.00


TOTAL 52,472,000.00
TERBILANG : Dua Ratus Tujuh Puluh Enam Juta Tiga Ratus Lima Puluh Ribu Rupiah DIBULATKAN 276,350,000.00

Gorontalo 11 Mei 2022


Dibuat Oleh :
ANANTHA STUDIO

Ar. Muhammad Angga Restu Dinata,ST,IAI


Arsitek. 207422023500

Page 30 of 36
ANALISA HARGA SATUAN

PEKERJAAN :
JENIS PEKERJAAN : Pemasangan Backdrop / Panel Dinding
SATUAN : M2

Harga
No. Uraian Sat Volume Satuan
(Rp.)

A. BAHAN
1 Multipleks 8 mm lbr 1.000 145,000
2 Multipleks 15 mm lbr 1.000 200,000
3 HPL ex Taco lbr 1.000 200,000
Lem Kuning kg 1.700 45,000
Lem Rajawali Putih kg 1.200 18,000
Paku Tembok No. 25 doz 0.680 30,000
Sekrup 4 cm Dos 1.000 15,000
Kertas Gosok 80 lbr 0.500 3,000
Kertas Gosok 100 lbr 0.500 3,500
Cat kg 0.250 25,000
Dempul kg 0.200 30,000
Isolasi Kertas m 1.000 3,000

Sub Total A

B. UPAH
1 Pekerja m2 1.0000 120,000.00
2 Tukang Kayu m2 1.0000 130,000.00
3 Kepala Tukang m2 1.0000 150,000.00
4 Mandor m2 1.0000 150,000.00

Sub Total B
C. Jumlah Harga Satuan ( A + B )
D. Over head & Profit 15 %
E. Jumlah Harga ( C + D )
Jumlah
Harga
(Rp.)

145,000.00
200,000.00
200,000.00
76,500.00
21,600.00
20,400.00
15,000.00
1,500.00
1,750.00
6,250.00
6,000.00
3,000.00

697,000.00

120,000.00
130,000.00
250,000.00
150,000.00

650,000.00
1,347,000.00
202,050.00
1,549,050.00
DAFTAR HARGA SATUAN BAHAN

URAIAN SAT

UPAH
Mandor Interior OH
Kepala Tukang Interior OH
Kepala Tukang OH
Mandor OH
Tukang Batu OH
Tukang Besi OH
Tukang Kayu OH
Tukang Las OH
Tukang Listrik OH
Tukang Cat OH
Pekerja OH
Pimpinan Teknik OB

INTERIOR
Multipleks 8 mm
Multipleks 15 mm
HPL ex Taco
Lem Kuning
Lem Rajawali Putih
Paku Tembok No. 25
Sekrup 4 cm
Kertas Gosok 80
Kertas Gosok 100
Cat
Dempul
Isolasi Kertas

STRUKTUR
Semen
Pasir
Split/batu Pecah
Besi Beton
Dynabolt
pipa Giv Hollow 4x4
Kayu Kelas 3
Atap Spandek
Bubungan Atap
Sekrup
Kawat Beton
Pelumas
Las Karbit
Paku
N BAHAN
HARGA
(Rp)

300,000.00
250,000.00
150,000.00
135,000.00
130,000.00
130,000.00
130,000.00
130,000.00
130,000.00
130,000.00
120,000.00
1,250,000.00

lbr 180,000
lbr 250,000
lbr 220,000
kg 55,000
kg 22,000
doz 38,000
Dos 18,000
lbr 4,000
lbr 4,500
kg 32,000
kg 32,000
m 3,500

Kg -
m3 170,000
m3 300,000
Kg 14,000
Bh 5,000
M1 45,000
m3 ###
Lbr 456,000
M1 25,000
Bh 600
Kg 3,000
Ltr 25,000
Kg
Kg 25,000

You might also like