HARGA DASAR SATUAN BAHAN

Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

1 Air Liter Rp. 78.00


2 Alluminium Foil DS m2 Rp. 19,200.00
3 ACP Alcopan 1220x2440x4mm PVDF Outdoor m2 Rp. 258,667.02 https://www.tokopedia.com/a
4 ACP Alcopan White Glossy PE 3mm m2 Rp. 147,809.73 https://www.tokopedia.com/a
5 Atap Aspal Bitumen CT3 Lembar Rp. 206,400.00
6 Underlayment Anti Bocor Atap m2 Rp. 76,800.00
7 Bambu Batang Rp. 147,600.00
8 Batu Bata Buah Rp. 910.00
9 Bata Ringan Tebal 7.5 cm Bh Rp. 10,800.00
10 Bata Ringan Tebal 10 cm Bh Rp. 14,400.00
11 Batu Kali / Batu Belah (Sungai / Gunung) M3 Rp. 185,000.00
12 Batang Kelapa Batang Rp. 369,000.00
13 Batu pecah 2-3 cm (1350 Kg/m3) M3 Rp. 330,000.00
14 Batu pecah 2-3 cm Kg Rp. 244.44
15 Batu Granit Kg Rp. 22,400.00
16 Batu Tempel Bh Rp. 23,100.00
17 Baut Kap Ø 1/2 - 8 Buah Rp. 6,642.00
18 Bensin (Industri) Liter Rp. 14,760.00
19 Besi Beton Polos Kg Rp. 12,000.00
20 Besi Beton Ulir Kg Rp. 14,000.00
21 Besi hollo galvanis 20x40 square m Rp. 6,250.00
22 Besi hollo galvanis 40 square m Rp. 7,000.00
23 Besi Hollow 40.40.2 mm m Rp. 22,000.00
24 Besi Hollow 40.40.1 mm m Rp. 23,466.67 https://www.tokopedia.com/a
25 Besi hollow 40x60x1 mm square m Rp. 35,200.00 https://www.tokopedia.com/b
26 Besi Profil Kg Rp. 16,700.00
27 Besi Siku L 30.30.3 Kg Rp. 15,000.00
27 Besi Siku L 40.40.4 btg Rp. 203,500.00 https://www.tokopedia.com/k
28 Besi Siku L 40.40.4 m Rp. 33,916.67 https://www.tokopedia.com/k
28 Besi Siku L 50.50.5 btg Rp. 326,700.00 https://www.tokopedia.com/k
29 Besi Siku L 50.50.5 m Rp. 54,450.00 https://www.tokopedia.com/k
29 Beton Rooster / Kerawang Buah Rp. 4,800.00
30 Bubungan Atap Aspal Bitumen M' Rp. 62,340.00
30 Cat Dasar Kg Rp. 35,000.00
31 Cat Kayu/besi Mengkilat Kg Rp. 107,010.00
32 Cat Menie Kg Rp. 46,125.00
33 Cat Thiner ltr Rp. 30,000.00
34 Cat Penutup Exterior Setara Jotun Kg Rp. 52,500.00
35 Cat Penutup Interior Setara Jotun Kg Rp. 97,500.00
36 Dempul Kg Rp. 36,900.00
37 Floor Drain Toto TX 1DB, setara Buah Rp. 313,000.00 https://www.tokopedia.com/g
38 Gypsum ( 120 x 240 cm ) Lembar Rp. 128,535.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

39 Gravel M3 Rp. 192,000.00


40 Granit Uk. 60 x 60 cm Polished Bh Rp. 103,680.00
41 Granit Uk. 60 x 60 cm Unpolished Bh Rp. 138,240.00
42 Granit Uk. 40 x 40 cm Bh Rp. 67,200.00
43 Granit Uk. 60 x 120 cm Bh Rp. 456,000.00
44 Hand Shower Toto THX19NB 2  bh Rp. 348,700.00 https://www.tokopedia.com/c
45 Ijuk Kg Rp. 14,760.00
46 Ijuk m3 Rp. 480,000.00
47 Jet washer toto THX20NB bh Rp. 231,550.00 https://www.tokopedia.com/t
48 Kawat Beton Kg Rp. 26,400.00
49 Kawat Las Kg Rp. 22,440.00
50 Kayu Kelas I (Seumantok/Ulin/dll) M3 Rp. 6,765,000.00
51 Kayu Kelas II (Kamper/Kruing/dll) M3 Rp. 5,500,000.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

52 Kayu Kelas III (Borneo/dll) M3 Rp. 4,500,000.00


53 Kayu Kelas IV (Sengon/dll) M3 Rp. 3,500,000.00
54 Kayu Dolken Ø 8-10/400 cm Batang Rp. 20,400.00
55 Kayu 5 x 7, Kayu Kelas II M3 Rp. 8,118,000.00
56 Kayu Reng, Kayu Kelas II M3 Rp. 8,118,000.00
57 Keramik Uk. 20 x 20 cm (Polished) Bh Rp. 3,424.32
58 Keramik Uk. 30 x 30 cm (Polished) Bh Rp. 7,970.40
59 Keramik Uk. 33 x 33 cm (Polished) Bh Rp. 9,644.18
60 Keramik Uk. 40 x 40 cm (Polished) Bh Rp. 15,350.40
61 Keramik Uk. 20 x 20 cm (Unpolished) Bh Rp. 3,837.60
62 Keramik Uk. 30 x 30 cm (Unpolished) Bh Rp. 8,634.60
63 Keramik Uk. 33 x 33 cm (Unpolished) Bh Rp. 10,447.87
64 Keramik Uk. 40 x 40 cm (Unpolished) Bh Rp. 15,350.40
65 Kerosen / Minyak Tanah (Industri) Liter Rp. 18,450.00
66 Kerosen / Minyak Tanah (Subsidi) Liter Rp. 13,284.00
67 Kertas Amplas Lembar Rp. 7,380.00
68 Kerikil (1350 kg/m3) M3 Rp. 260,400.00
69 Kerikil Kg Rp. 192.89
70 Kloset Duduk toto cw 421 set Rp. 2,475,000.00 https://www.tokopedia.com/r
71 Kloset Jongkok Keramik toto CE7 set Rp. 319,880.00 https://www.tokopedia.com/s
72 Koral Beton M3 Rp. 168,000.00
73 Kran air toto T 23 B13 1/2" bh Rp. 254,578.50 https://www.tokopedia.com/n
74 Kran taman toto T26-13 bh Rp. 330,000.00 https://www.tokopedia.com/t
75 Kran Cabang TOTO TX423ST1 bh Rp. 544,500.00 https://www.tokopedia.com/m
76 Kran Air Dia. 1/2" - 3/4" bh Rp. 614,400.00
77 Minyak Cat Liter Rp. 36,000.00
78 Minyak Bekesting Liter Rp. 7,800.00
79 Minyak Pelumas Liter Rp. 14,880.00
80 Mortar Siap Pakai (MSP) Kg Rp. 7,200.00
81 Mortar Utama 380 ( 40 kg ) Zak Rp. 33,600.00
82 Multipleks 3 mm Lembar Rp. 66,420.00
83 Multipleks 4 mm Lembar Rp. 95,940.00
84 Multipleks 6 mm Lembar Rp. 125,460.00
85 Multipleks 9 mm Lembar Rp. 162,000.00
86 Paku Tripleks Kg Rp. 26,568.00
87 Paku Beton 8" Kotak Rp. 22,080.00
88 Paku Beton 4" Kotak Rp. 28,800.00
89 Paku 12 cm Bh Rp. 180.00
90 Paku Kayu 2" - 3" Kg Rp. 24,000.00
91 Paku Biasa 1/2" - 1" Kg Rp. 24,000.00
92 Paku Biasa 5 cm - 10 cm Kg Rp. 24,000.00
93 Paku Biasa 5 cm - 12 cm Kg Rp. 24,000.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

94 Paku Kayu Kg Rp. 24,000.00


95 Paku Reng Kg Rp. 18,597.60
96 Paku Seng Kg Rp. 22,140.00
97 Paku skrup 10 cm Kg Rp. 42,000.00
98 Papan Kayu Kelas I m3 Rp. 6,400,000.00
99 Papan Kayu Kelas II m3 Rp. 5,500,000.00
100 Papan Kayu Kelas III m3 Rp. 4,000,000.00
101 Papan Kayu Plafond Kelas II m3 Rp. 6,768,000.00
102 Pasir Batu (Sirtu) M3 Rp. 200,000.00
103 Pasir Beton (1400 kg/m3) M3 Rp. 217,000.00
104 Pasir Beton Kg Rp. 186.00
105 Pasir Pasang (1400 kg/m3) M3 Rp. 238,700.00
106 Pasir Pasang Kg Rp. 186.00
107 Pasir Urug M3 Rp. 148,800.00
108 Paving Block M2 Rp. 95,000.00
109 Penjaga Jarak Bekesting (Spacer) bh Rp. 30,000.00
110 Pipa Leiding Ø 1" Galvanis Tebal 3.2 mm m' Rp. 60,270.00
111 Pipa Leiding Ø 3/4" Galvanis Tebal 3.2 mm m' Rp. 46,000.00
112 Pipa Leiding Ø 1/2" Galvanis Tebal 3.2 mm m' Rp. 36,900.00
113 Pipa Leiding Ø 1 1/2" Galvanis Tebal 3.2 mm m' Rp. 83,640.00
114 Pipa Leiding Ø 2" Galvanis Tebal 3.2 mm m' Rp. 105,780.00
115 Pipa Leiding Ø 3" Galvanis Tebal 3.2 mm m' Rp. 135,300.00
116 Pipa Leiding Ø 4" Galvanis Tebal 3.2 mm m' Rp. 211,560.00
117 Pipa Leiding Ø 6" Galvanis Tebal 3.2 mm m' Rp. 349,320.00
118 Pipa PVC Ø 1" m' Rp. 13,440.00
119 Pipa PVC Ø 1/2" Kualitas AWE (United) m' Rp. 7,560.00
120 Pipa PVC Ø 1 1/2" m' Rp. 23,400.00
121 Pipa PVC Ø 2" m' Rp. 30,000.00
122 Pipa PVC Ø 2 1/2" m' Rp. 43,800.00
123 Pipa PVC Ø 3" m' Rp. 60,000.00
124 Pipa PVC Ø 3/4" m' Rp. 9,960.00
125 Pipa PVC Ø 4" m' Rp. 79,200.00
126 Plamur Kg Rp. 26,400.00
127 Plint Keramik Granit 10 x 40 Bh Rp. 10,320.00
128 Plint Keramik Granit 10 x 60 Bh Rp. 15,360.00
129 Plywood 4 mm ( Ukuran 90 x 220 cm ) Lembar Rp. 93,600.00
130 Plywood 6 mm Lembar Rp. 103,200.00
131 Plywood 9 mm Lembar Rp. 162,000.00
132 Ramset Buah Rp. 420.00
133 Rangka Baja Ringan C75 kg Rp. 14,400.00
134 Rangka Baja Ringan C125 m' Rp. 146,400.00
135 Residu Kg Rp. 10,200.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

136 Roof Light Fibreglass 90 x 180 cm Lbr Rp. 312,000.00


137 Roof drain cast iron 4" ex antasan Bh Rp. 162,000.00 https://www.tokopedia.com/p
138 Seal Tape Bh Rp. 4,200.00
139 Seng BJLS 0.20 Lbr Rp. 40,800.00
140 Semen @ 40 Kg Zak Rp. 50,000.00
141 Semen @ 40 Kg Kg Rp. 1,250.00
142 Semen @ 50 Kg Zak Rp. 70,000.00
143 Semen @ 50 Kg Kg Rp. 1,400.00
144 Semen Warna @ 50 Kg Zak Rp. 80,000.00
145 Semen Warna @ 50 Kg Kg Rp. 1,600.00
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

146 Sirap Kayu Bh Rp. 14,400.00


147 Skrup Fisher Bh Rp. 300.00
148 Skrup Fisher 5 cm Bh Rp. 1,650.00 https://www.tokopedia.com/p
149 Solar (Industri) Liter Rp. 10,800.00
150 Stop Kontak + Instalasi Titik Rp. 88,560.00
151 Storox - 100 Kg Rp. 144,000.00
152 Stut Werk M3 Rp. 3,468,600.00
153 Tanah Liat M3 Rp. 48,000.00
154 Tanah Timbun M3 Rp. 84,000.00
155 Tanah Timbun Pilihan - Material Jalan M3 Rp. 168,000.00
156 Wastafel toto LW 247 komplit set Rp. 899,000.00 https://www.tokopedia.com/g
157 Waterdrain Bh Rp. 54,000.00
158 Waterstop PVC Lebar 150 mm m Rp. 29,400.00
159 Waterstop PVC Lebar 200 mm m Rp. 36,600.00
160 Waterstop Lebar 230 mm - 320 mm m Rp. 46,200.00
161 Wiremesh (Ulir) Dia. 5.0 Kg Rp. 12,000.00
162 Wiremesh (Ulir) Dia. 6.0 Kg Rp. 12,540.00
149 Besi Strip tebal 5 mm Kg Rp. 15,000.00
150 Seng Plat 3 x kk bjls 30 Lbr Rp. 100,800.00
150 Atap Apandek 0.30 mm M2 Rp. 84,000.00
151 Paku skrup + Mur bh Rp. 1,200.00
151 Kansteen 50.30.15 K 300 bh Rp. 35,000.00
152 Kayu Dolken Ø 8-10/400 cm btg Rp. 20,000.00

TAKSIRAN
153 Paving block abu abu 21x 10,5x 6 cm - K 300 m2 Rp. 63,800.00
154 Paving block abu abu 21x 10,5x 6 cm - K 400 m2 Rp. 69,300.00
155 Paving block abu abu 21x 10,5x 8 cm - K 300 m2 Rp. 84,700.00
156 Paving block abu abu 21x 10,5x 8 cm - K 400 m2 Rp. 90,200.00
157 Paving block abu abu 21x 10,5x 10 cm - K 400 m2 Rp. 123,200.00
158 Paving block abu abu 20x 20 x 6 cm - K 400 m2 Rp. 69,850.00
159 Paving block abu abu 21x 21 x 6 cm - K 400 m2 Rp. 75,350.00
160 Paving block merah 21x 10,5x 6 cm - K 300 m2 Rp. 86,900.00
161 Paving block merah 21x 10,5x 8 cm - K 300 m2 Rp. 112,200.00
162 Topi uskup pcs Rp -
163 Kansteen 10 x 20 x 40 pcs Rp. 12,650.00
164 Kansteen 15 x 25 x 40 pcs Rp. 25,850.00
165 Kansteen 15 x 30 x 50 pcs Rp. 45,100.00
166 Kansteen IV pcs Rp. 11,000.00
167 Kansteen Sepatu pcs Rp. 9,350.00
168 Perekat ( lapisan aus )- aspal cair/ emulsi ltr Rp. 21,768.75 +upah
169 Resap perekat - aspal cair/emulsi ltr Rp. 21,600.00 +upah
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

170 Laston lapis aus ( AC-WC) ton Rp. 1,380,125.00 +upah


171 Laston lapis aus ( AC-BC) ton Rp. 1,327,643.75 +upah
172 Papan GRC 9mm x 200 mm m1 Rp. 30,430.33 https://www.tokopedia.com/m
173 Rangka kuda kuda baja ringan m2 Rp. 124,987.50 https://www.tokopedia.com/s
174 Spandex warna 0,35 mm m2 Rp. 70,950.00 https://www.tokopedia.com/a
175 Skrup lisplank GRC bh Rp. 330.00 https://www.tokopedia.com/c
176 Kosen alluminium ex alexindo 3" m1 Rp. 115,000.00 toko budi jaya jakarta
177 Kosen alluminium ex alexindo 4" m1 Rp. 135,000.00 toko budi jaya jakarta
178 Skoneng pintu m1 Rp. 28,500.00 toko budi jaya jakarta
179 Sealent tube Rp. 35,000.00 toko budi jaya jakarta
180 Kaca polos 3 mm m2 toko budi jaya jakarta
181 Kaca polos 5 mm m2 Rp. 130,000.00 toko budi jaya jakarta
182 Kaca polos 8 mm ex asahimas m2 Rp. 245,000.00 toko budi jaya jakarta
183 Kaca polos 10 mm m2 Rp. 325,000.00 toko budi jaya jakarta
184 Kaca polos 12 mm m2 Rp. 425,000.00 toko budi jaya jakarta
185 Kaca polos 6 mm tempered m2 Rp. 450,000.00 toko budi jaya jakarta
186 Kaca polos 8 mm tempered m2 Rp. 310,000.00 toko budi jaya jakarta
187 Kaca polos 10 mm tempered m2 Rp. 550,000.00 toko budi jaya jakarta
188 Kaca polos 12 mm tempered m2 Rp. 625,000.00 toko budi jaya jakarta
189 Kaca cermin 3 mm m2 toko budi jaya jakarta
190 Kaca cermin 5 mm m2 Rp. 240,000.00 toko budi jaya jakarta
191 Gosok kilap m1 Rp. 20,000.00 toko budi jaya jakarta
192 Floorhinge Dorma bts84 dan patch fitting set set Rp. 2,294,250.00 https://www.tokopedia.com/c
193 Handle pull 60 cm ex dorma psg Rp. 316,250.00 https://www.tokopedia.com/g
194 Jendela Aluminium L100 x T100 + kaca 5mm m2 Rp. 1,050,000.00 https://www.tokopedia.com/d
195 Kosen dan pintu KM UPVC platinum 80 x 210 unit Rp. 1,265,000.00 https://www.tokopedia.com/h
196 Pintu Kaca , frame alluminium 90x210 unit Rp. 1,782,500.00 https://www.tokopedia.com/d
197 Lem kayu putih fox kg Rp. 36,289.00 https://www.tokopedia.com/c
198 Taco HPL urat kayu kode AA lmbr Rp. 205,400.00 https://www.tokopedia.com/p
199 Engsel Pintu Paloma Stainless BHP 414 (5"x3"x3mm) psg Rp. 97,680.00 https://www.tokopedia.com/g
200 Kunci Set PALOMA LPP 712 Handle Mortise Cylinder Lock Gagang Pint psg Rp. 232,320.00 https://www.tokopedia.com/p
201 Door Closer PALOMA 900-NHO BA DCP 102 set Rp. 343,200.00 https://www.tokopedia.com/p
202 Railling tangga pipa stainless 2" m1 Rp. 780,000.00 https://www.tokopedia.com/j
203 STP IPAL WWTP 5000 Liter BIOTECH, BIO SEPTIC TANK set Rp. 33,770,000.00 https://www.tokopedia.com/r
204 GATE VALVE KITZ 1" KUNINGAN bh Rp. 287,500.00 https://www.tokopedia.com/s
205 GATE VALVE KITZ 2" KUNINGAN bh Rp. 575,000.00 https://www.tokopedia.com/v
206 APAR 6 KG ABC POWDER - BMR bh Rp. 429,000.00 https://www.tokopedia.com/b
207 Kabel NYY 1 x 70 mm Supreme  m Rp. 153,615.00 https://www.tokopedia.com/l
208 Kabel nym 3x2.5 supreme 100m m Rp. 17,050.00 https://www.tokopedia.com/u
209 Penangkal petir kurn radius 60-80 bh Rp. 1,699,500.00 https://www.tokopedia.com/a
210 Penangkal Petir Merk ORION Radius 60-150 mtr bh Rp. 1,870,000.00 https://www.tokopedia.com/q
211 Pipa Galvanis Medium A diameter 3 inch m Rp. 245,666.67 https://www.tokopedia.com/a
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

212 Kabel BC grounding kawat 70 mm m Rp. 108,900.00 https://www.tokopedia.com/w


213 Kabel BC grounding kawat 50 mm m Rp. 80,025.00 https://www.tokopedia.com/w
214
215
216
HARGA DASAR SATUAN UPAH

Harga Satuan (Rp.)


No. Tenaga Kerja Kode Satuan Keterangan
Jam Hari

1 Pekerja L.01 OH Rp. 13,000.00 Rp. 104,400.00


2 Tukang L.02 OH Rp. 14,700.00 Rp. 117,600.00
3 Tukang Gali L.02 OH Rp. 13,000.00 Rp. 104,400.00
4 Tukang Batu L.02 OH Rp. 14,700.00 Rp. 117,600.00
5 Tukang Kayu L.02 OH Rp. 14,700.00 Rp. 117,600.00
6 Tukang Besi L.02 OH Rp. 14,700.00 Rp. 117,600.00
7 Tukang Cat / Pelitur L.02 OH Rp. 14,700.00 Rp. 117,600.00
8 Tukang Pipa / Operator Pompa L.02 OH Rp. 14,700.00 Rp. 117,600.00
9 Tukang Pengayam Bronjong L.02 OH Rp. 14,700.00 Rp. 117,600.00
10 Tukang Tebas L.02 OH Rp. 13,000.00 Rp. 104,400.00
11 Kepala Tukang L.03 OH Rp. 19,500.00 Rp. 156,000.00
12 Mandor L.04 OH Rp. 16,800.00 Rp. 134,400.00
13 Juru Ukur L.05 OH Rp. 15,900.00 Rp. 127,440.00
14 Pembantu Juru Ukur L.06 OH Rp. 15,900.00 Rp. 127,440.00
15 Ahli Alat Berat ( Mekanik ) L.07 OH Rp. 15,900.00 Rp. 127,440.00
16 Operator L.08 OH Rp. 19,500.00 Rp. 156,000.00
17 Pembantu Operator L.09 OH Rp. 15,900.00 Rp. 127,440.00
18 Sopir Truck L.10 OH Rp. 15,900.00 Rp. 127,440.00
19 Kenek Truk L.11 OH Rp. 15,900.00 Rp. 127,440.00
20 Penjaga Malam L.12 OH Rp. 15,900.00 Rp. 127,440.00
21 Juru Gambar (Drafter) L.13 OH Rp. 15,900.00 Rp. 127,440.00
22 Design Engineer L.15 OH Rp. 15,900.00 Rp. 127,440.00
23 Operator Printer/Plotter L.16 OH Rp. 15,900.00 Rp. 127,440.00
ANALISA HARGA SATUAN PEKERJAAN

AHSP A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


AHSP A.2.2.1.2 : Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter (K3) Rp. 469,724.00
AHSP A.2.2.1.4 : Pengukuran dan Pemasangan Bouwplank Rp. 117,603.00
AHSP A.2.2.1.9 : Pembersihan Lapangan dan Perataan Rp. 18,876.00
AHSP A.2.2.1.10 : Pembuatan Steger/Perancah Dari Bambu (K3) Rp. 621,241.00
AHSP A.2.2.1.13 : Pembongkaran Beton Bertulang Rp. 1,629,738.00
AHSP A.2.2.1.14 : Pembongkaran Dinding Tembok Bata Rp. 814,869.00
AHSP A.2.3.1.1 : Menggali Tanah Biasa Sedalam 1 m Rp. 89,826.00
AHSP A.2.3.1.2 : Menggali Tanah Biasa Sedalam 2 m Rp. 110,008.00
AHSP A.2.3.1.3 : Menggali Tanah Biasa Sedalam 3 m Rp. 130,487.28
AHSP A.2.3.1.7 : Pengerjaan Stripping Tanah Tebing Setinggi 1 m Rp. 6,481.00
AHSP A.2.3.1.8 : (K3) Pembuangan Tanah Sejauh 30 meter Rp. 39,375.00
AHSP A.2.3.1.9 : Pengurugan Kembali Galian Tanah Rp. 64,812.00
AHSP A.2.3.1.10 : (K3) Pemadatan Tanah ( Per 20 cm ) Rp. 64,812.00
AHSP A.2.3.1.11 : Pengurukan Dengan Pasir Urug Rp. 232,346.00
AHSP A.2.3.1.11.a : Pengurukan Dengan Tanah Urug Rp. 146,810.00
AHSP A.2.3.1.13 : Pemasangan Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan Rp. 3,187,443.00
AHSP A.2.3.1.14 : Pengurukan Sirtu Padat Rp. 296,406.00

AHSP A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


AHSP A.3.2.1.2 : Pemasangan Pondasi Batu Belah Campuran 1 SP : 4 PP Rp. 898,099.40
AHSP A.3.2.1.9 : Pemasangan Batu Kosong ( Aanstamping ) Rp. 467,393.52
AHSP A.3.2.1.10 : Pemasangan Pondasi Siklop, 60% Beton Campuran 1 SP : 2 PB : 3 Kr dan 40% Batu Belah Rp. 2,828,561.00
AHSP A.3.2.1.11 : Pemasangan Pondasi Sumuran, Diameter 100 cm Rp. 977,250.00
AHSP A.4.1.1.1 : Membuat Beton Mutu f'c = 7.4 MPa (K-100), Slump (12 ± 2 ) cm, w/c = 0.87 Rp. 960,337.62
AHSP A.4.1.1.2 : Membuat Beton Mutu f'c = 9.8 MPa (K-125), Slump (12 ± 2 ) cm, w/c = 0.78 Rp. 995,980.43
AHSP A.4.1.1.3 : Membuat Beton Mutu f'c = 12.2 MPa (K-150), Slump (12 ± 2 ) cm, w/c = 0.72 Rp. 1,023,647.90
AHSP A.4.1.1.4 : Membuat Lantai Kerja Beton Mutu f'c = 7.4 MPa (K-100), Slump (3 - 6 ) cm, w/c = 0.87 Rp. 879,555.48
AHSP A.4.1.1.5 : Membuat Beton Mutu f'c = 14.5 MPa (K-175), Slump (12 ± 2 ) cm, w/c = 0.66 Rp. 1,056,743.45
AHSP A.4.1.1.6 : Membuat Beton Mutu f'c = 16.9 MPa (K-200), Slump (12 ± 2 ) cm, w/c = 0.61 Rp. 1,146,442.46
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 104,400.00 Rp. 172,260.00
Tukang L.02 OH 0.275 Rp. 117,600.00 Rp. 32,340.00
Kepala Tukang L.03 OH 0.028 Rp. 156,000.00 Rp. 4,368.00
Mandor L.04 OH 0.083 Rp. 134,400.00 Rp. 11,155.20
Jumlah Tenaga Kerja (A) Rp. 220,123.20
B BAHAN
Semen @ 40 Kg Kg 352.000 Rp. 1,250.00 Rp. 440,000.00
Pasir Beton (1400 kg/m3) Kg 731.000 Rp. 155.00 Rp. 113,305.00
Batu pecah 2-3 cm Kg 1,031.000 Rp. 244.44 Rp. 252,022.22
Air Liter 215.000 Rp. 78.00 Rp. 16,770.00

Jumlah Harga Bahan (B) Rp. 822,097.22


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,042,220.42
E Overhead & Profit 10% x D Rp. 104,222.04
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,146,442.46
G Dibulatkan Rp. 1,146,442.46

Analisa : AHSP A.4.1.1.7


AHSP A.4.1.1.7 : Membuat Beton Mutu f'c = 19.3 MPa (K-225), Slump (12 ± 2 ) cm, w/c = 0.58 Rp. 1,171,243.19
AHSP A.4.1.1.8 : Membuat Beton Mutu f'c = 21.7 MPa (K-250), Slump (12 ± 2 ) cm, w/c = 0.56 Rp. 1,185,944.08
AHSP A.4.1.1.9 : Membuat Beton Mutu f'c = 24.0 MPa (K-275), Slump (12 ± 2 ) cm, w/c = 0.53 Rp. 1,211,334.52
AHSP A.4.1.1.10 : Membuat Beton Mutu f'c = 26.4 MPa (K-300), Slump (12 ± 2 ) cm, w/c = 0.52 Rp. 1,219,103.58
AHSP A.4.1.1.11 : Membuat Beton Mutu f'c = 28.8 MPa (K-325), Slump (12 ± 2 ) cm, w/c = 0.49 Rp. 1,314,778.42
AHSP A.4.1.1.12 : Membuat Beton Mutu f'c = 31.2 MPa (K-350), Slump (12 ± 2 ) cm, w/c = 0.48 Rp. 1,325,028.59
AHSP A.4.1.1.13 : Membuat Beton Kedap Air Dengan Strorox - 100 Rp. 1,453,025.20
REKAPITULASI ANGGARAN
Nama Kegiatan Pembangunan Gedung Asrama Putri BLK Sidoarjo
Nama Pekerjaan Pembangunan Gedung Asrama Putri BLK Sidoarjo
Lokasi Sidoarjo, Jawa Timur
Tahun Anggaran
NO URAIAN PEKERJAAN JUMLAH HARGA

A PEKERJAAN STRUKTUR
I Pekerjaan Persiapan 75,467,207
II Pekerjaan Tanah 113,421,226
III Pekerjaan Struktur 2,058,178,626
IV Pekerjaan Atap 257,815,199
V Pekerjaan Lain-lain 128,401,571
2,633,283,829
B PEKERJAAN ARSITEKTUR
I Pekerjaan Dinding 1,259,271,084
II Pekerjaan Plafond 280,966,974
III Pekerjaan Keramik 797,786,756
IV Pekerjaan Kusen Pintu dan Jendela 575,000,000
V Pekerjaan Pengecatan dan Finishing 246,284,684
VI Pekerjaan Ornamen 382,804,480
VII Pekerjaan Sanitair 203,127,087
VIII Pekerjaan Septictank 29,963,602
3,775,204,666
C PEKERJAAN MEP
I Pekerjaan Instalasi Pipa Utama 39,022,014
II Pekerjaan Instalasi Plumbing 79,835,339
III Pekerjaan Instalasi Listrik ( exclude panel, wiring ) 264,048,886
IV Pekerjaan Pemadam Kebakaran / APAR 3,432,000
V Installasi Tata Udara 60,803,552
VI Pekerjaan Instalasi Penangkal Petir 33,000,000
480,141,791
Jumlah 6,888,630,286
PPN 10% 688,863,029
Total 7,577,493,315
Dibulatkan 7,577,000,000

Terbilang:

Dibuat oleh :
PT FUJITAMA CIPTA ANDALAN

( )
DAFTAR KUANTITAS & HARGA

Nama Kegiatan Pembangunan Gedung Asrama Putri BLK Sidoarjo


Nama Pekerjaan Pembangunan Gedung Asrama Putri BLK Sidoarjo
Lokasi Sidoarjo, Jawa Timur
Tahun Anggaran 2021

NO Uraian Pekerjaan Volume Satuan Analisa Harga satuan (Rp.) Total (Rp.)

A PEKERJAAN STRUKTUR
I Pekerjaan Persiapan
1 Pembuatan Bedeng, gudang 12.00 m2 A. 2.2.1.8. 1,666,557 19,998,678
2 Pengukuran dan Pemasangan Bouwplank 70.00 m1 A. 2.2.1.4. 147,506 10,325,394
3 Pembersihan lokasi 150.00 m2 A. 2.2.1.9. 166,121 24,918,135
4 Papan Nama Proyek 1.00 ls 750,000 750,000
5 K3 Konstruksi
I Penyiapan RK3K
a Pembuatan Kartu Identitas Pekerja (KIP) 15.00 Org Rp 10,000 150,000
II Sosialisasi dan Promosi K3
a Pengarahan K3 ( Safety Briefing) 600.00 Org.hr Rp 10,000 6,000,000
b Spanduk K3 Uk.3 x1 m 1.00 Lmbr Rp 200,000 200,000
c Poster K3 Uk. 42x60 cm 1.00 Lmbr Rp 200,000 200,000
d Papan Informasi K3 1.00 Bh Rp 500,000 500,000
III Alat Pelindung Kerja
a Pembatas Area ( Restricted Area ) 1.00 Ls Rp 1,500,000 1,500,000
IV Alat Pelindung Diri
a Topi Pelindung ( Safety Helmet) 15.00 Bh Rp 35,000 525,000
b Pelindung Mata (Goggles Spectacles ) 15.00 Bh Rp 45,000 675,000
c Pelindung Pernapasan dan Mulut (Masker) 15.00 Bh Rp 10,000 150,000
d Sarung Tangan (Safety Gloves ) 15.00 Psg Rp 25,000 375,000
e Sepatu Keselamatan (Rubber Safety Shoes ) 15.00 Psg Rp 150,000 2,250,000
f Rompi Keselamatan 15.00 Bh Rp 20,000 300,000
V Asuransi dan Perijinan
BPJS Ketenaga Kerjaan dan Kesehatan Kerja (Berdasarkan 1.00 Ls
a KEPMENAKER NoKEP-196/MEN/1999, untuk Tenaga Harian Proyek Rp 2,500,000 2,500,000
VI Personil K3
a Petugas P3 K 1.00 Ls Rp 1,500,000 1,500,000
VII Fasilitas Sarana Kesehatan
a Peralatan P3K (Kotak P3K,Tandu,Tabung Oksigen,Obat Luka,Perban Dll) 1.00 Ls Rp 500,000 500,000
b Ruang P3K ( Tempat Tidur Pasien,Stetoskop,Timbangan Berat Badan,Tensi 1.00 Ls Rp 500,000 500,000
VIII Rambu - Rambu 1.00 Rp 750,000
a Rambu Petunjuk -
b Rambu Larangan 2.00 bh Rp 150,000 300,000
c Rambu Peringatan 2.00 bh Rp 150,000 300,000
d Rambu Kewajiban 2.00 bh Rp 150,000 300,000
IX Lain - Lain Terkait Pengendalian Risiko K3 1.00 Bh Rp 150,000
a Alat Pemadam Api Ringan( APAR ) 10 Kg
b Bendera K3 1.00 bh Rp 650,000 650,000
c Bendera Nasional 1.00 bh Rp 100,000 100,000
75,467,207
II Pekerjaan Tanah
1 Galian Tanah 160.06 m3 A.2.3.1.1. 122,418 19,594,271
2 Pengurugan Kembali Galian Tanah 67.10 m3 A.2.3.1.9. 87,405 5,865,241
3 Pengurukan Dengan Tanah Urug 122.40 m3 A.2.3.1.9. 87,405 10,698,400
4 Pemadatan Tanah 122.40 m3 A.2.3.1.10. 87,405 10,698,400
5 Urugan Pasir dibawah Pile Cap, Sloof dan lantai bawah=10cm 91.09 m3 A.2.3.1.11. 200,767 18,288,296
6 Lantai kerja beton f'c 7,4 Mpa dibawah Pile Cap, Sloof dan lantai = 5 cm 47.02 m3 A.A.4.1.1.4 1,026,813 48,276,619

sub total 113,421,226


III Pekerjaan Struktur
1 Pondasi
a Bored pile Ø 30 cm , 4 m ( asumsi )
Pengeboran tanah 683.20 m1 taksir 130,000 88,816,000
Besi 9,653.62 kg A.4.1.1.17 18,860.35 182,070,550
Beton f'c 21,7 Mpa 48.27 m3 A.4.1.1.8. 1,287,407 62,140,680
b Pile Cap
Begisting 103.71 m2 A.4.1.1.22a 341,995 35,467,101
Besi 6,867.84 kg A.4.1.1.17 18,860.35 129,529,847
Beton f'c 21,7 Mpa ( K 250 ) 34.34 m3 A.4.1.1.8. 1,287,407 44,208,537
c Sloof
Begisting 299.60 m2 A.4.1.1.21.a 225,023 67,416,869
Besi Ulir 6,146.00 kg A.4.1.1.17 18,860.35 115,915,694
Beton f'c 21,7 Mpa ( K 250 ) 30.73 m3 A.4.1.1.8. 1,287,407 39,562,027

2 Lantai 1
a Pelat Lantai
Besi ( polos ) 2,217.60 kg A.4.1.1.17 18,860.35 41,824,706
Beton f'c 21,7 Mpa ( K 250 ) 40.32 m3 A.4.1.1.8. 1,287,407 51,908,263
b Kolom lt 1 - lt 2
Begisting 169.65 m3 A.4.1.1.22a 341,995 58,020,187
Besi ( Ulir ) 2,262.40 kg A.4.1.1.17 18,860.35 42,669,650

Page 12 of 324
NO Uraian Pekerjaan Volume Satuan Analisa Harga satuan (Rp.) Total (Rp.)

Beton f'c 21,7 Mpa ( K 250 ) 11.31 m3 A.4.1.1.8. 1,287,407 14,563,152


c Kolom praktis
Begisting 235.47 m2 A.4.1.1.22a 341,995 80,529,223
Besi ( polos ) 1,238.63 kg A.4.1.1.17 18,860.35 23,360,999
Beton f'c 16,9 Mpa ( K 200 ) 6.19 m3 A.4.1.1.6 1,249,681 7,739,464
d Tangga ke lt atas
Begisting 24.75 m3 A.4.1.1.26 589,391 14,587,565
Besi ( Ulir ) 673.91 kg A.4.1.1.17 18,860.35 12,710,129
Beton f'c 21,7 Mpa ( K 250 ) 3.37 m3 A.4.1.1.8. 1,287,407 4,337,967

3 lantai 2
a Balok
Begisting 230.05 m3 A.4.1.1.23 353,884 81,410,203
Besi ( Ulir ) 4,657.52 kg A.4.1.1.17 18,860.35 87,842,444
Beton f'c 21,7 Mpa ( K 250 ) 23.29 m3 A.4.1.1.8. 1,287,407 29,980,627
b Pelat lantai
Begisting 486.54 m3 A.4.1.1.24a 401,395 195,295,623
Besi ( Ulir ) 5,838.50 kg A.4.1.1.17 18,860.35 110,116,185
Beton f'c 21,7 Mpa ( K 250 ) 58.39 m3 A.4.1.1.8. 1,287,407 75,165,309
c Kolom lt 2-lt atap
Begisting 103.38 m2 A.4.1.1.20a 207,932 21,495,145
Besi ( Ulir ) 985.60 kg A.4.1.1.17 18,860.35 18,588,758
Beton f'c 21,7 Mpa ( K 250 ) 4.93 m3 A.4.1.1.8. 1,287,407 6,344,343
d Kolom praktis
Begisting 232.24 m2 A.4.1.1.20a 207,932 48,290,718
Besi ( polos ) 1,238.63 kg A.4.1.1.17 18,860.35 23,360,999
Beton f'c 16,9 Mpa ( K 200 ) 6.19 m3 A.4.1.1.8. 1,287,407 7,973,109

4 lantai atap
a Balok
Begisting 54.99 m3 A.4.1.1.23 353,884 19,460,764
Besi ( Ulir ) 1,154.16 kg A.4.1.1.17 18,860.35 21,767,858
Beton f'c 21,7 Mpa ( K 250 ) 5.77 m3 A.4.1.1.8. 1,287,407 7,429,370
b Pelat lantai
Begisting 100.80 m3 A.4.1.1.24a 401,395 40,460,646
Besi ( Ulir ) 1,209.60 kg A.4.1.1.17 18,860.35 22,813,476
Beton f'c 21,7 Mpa ( K 250 ) 12.10 m3 A.4.1.1.8. 1,287,407 15,572,479
c Ring balok
Begisting 142.24 m2 A.4.1.1.23 353,884 50,336,396
Besi ( Ulir ) 1,495.20 kg A.4.1.1.17 18,860.35 28,199,991
Beton f'c 16,9 Mpa ( K 200 ) 10.25 m3 A.4.1.1.6 1,249,681 12,806,731
d Kolom lt atap - rangka atap -
Begisting 41.86 m2 A.4.1.1.20a 207,932 8,703,962
Besi ( Ulir ) 269.10 kg A.4.1.1.17 18,860.35 5,075,285
Beton f'c 21,7 Mpa ( K 250 ) 1.79 m3 A.4.1.1.8. 1,287,407 2,309,593

sub total 2,058,178,626


IV Pekerjaan Atap
1 Rangka Baja Ringan 689.83 m2 taksir 190,000 131,068,143
2 Spandek berwarna Thk. 0,35mm 689.83 kg A. 4.5.2.32a 170,000 117,271,496
3 Pekerjaan listplank kalsiplank/GRC 9 mm 105.28 m2 taksir 90,000 9,475,560

sub total 257,815,199


V Pekerjaan Lain-lain
1 Kisi - kisi t jemur -
Begisting 86.72 m2 A.4.1.1.20a 207,932 18,032,667
Besi 867.24 kg A.4.1.1.17 18,860.35 16,356,448
Beton f'c 21,7 Mpa ( K 250 ) 8.67 m3 A.4.1.1.8. 1,287,407 11,164,911
Pelester 144.54 m2 A.4.4.2.14. 98,991 14,308,121
Acian 144.54 m2 A.4.4.2.27. 55,801 8,065,435
Cat exterior 144.54 m2 A.4.7.1.10. 34,913 5,046,298
Besi hollow 40x 60 x 1 mm jarak 30 cm 133.48 m2 A.4.2.1.20. 164,815 21,999,466
Cat besi hollow ( cat semprot ) 80.09 m2 A.4.7.1.16. 41,195 3,299,225
2 Waterproofing dak atap t jemur dan screedeing -
Waterproofing coating ex sika 150.65 m2 taksir 200,000 30,129,000

sub total 128,401,571


TOTAL A 2,633,283,829

B PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
LANTAI 1
1 Pekerjaan Bata Merah 1,349.53 m2 A.4.4.1.9 139,574 188,359,564
3 Pekerjaan Plesteran 2,374.69 m2 A.4.4.2.14. 98,991 235,071,920
4 Pekerjaan Acian 2,374.69 m2 A.4.4.2.27. 55,801 132,509,170
2 Pekerjaan Dinding Loster 47.80 m2 A. 4.4.1.23 221,270 10,576,720
-
LANTAI 2
1 Pekerjaan Bata Merah 1,340.69 m2 A.4.4.1.9 139,574 187,125,726
2 Pekerjaan Plesteran 2,357.01 m2 A.4.4.2.14. 98,991 233,321,763
3 Pekerjaan Acian 2,357.01 m2 A.4.4.2.27. 55,801 131,522,613

Page 13 of 324
NO Uraian Pekerjaan Volume Satuan Analisa Harga satuan (Rp.) Total (Rp.)

4 Pekerjaan Dinding Loster 57.88 m2 A. 4.4.1.23 221,270 12,807,125


m2 -
LANTAI ATAP
1 Pekerjaan Bata Merah 279.96 m2 A.4.4.1.9 139,574 39,075,250
2 Pekerjaan Plesteran 559.92 m2 A.4.4.2.14. 98,991 55,426,894
3 Pekerjaan Acian 559.92 m2 A.4.4.2.27. 55,801 31,243,935
4 Pekerjaan Dinding Loster 10.08 m2 A. 4.4.1.23 221,270 2,230,405
sub total 1,259,271,084

II PEKERJAAN PLAFON
LANTAI 1
1 Rangka plafond hollow 40.40.0,35 644.62 m2 A.4.5.1.10 140,000 90,246,776
2 Plafond gypsum board 9mm 644.62 m2 A.4.5.1.7. 47,683 30,737,604
3 List Plafond gypsum 779.94 m taksir 22,000 17,158,680
LANTAI 2
1 Rangka plafond hollow 40.40.0,35 669.56 m2 A.4.5.1.10 140,000 93,738,400
2 Plafond gypsum board 9mm 669.56 m2 A.4.5.1.7. 47,683 31,926,834
3 List Plafond gypsum 779.94 m taksir 22,000 17,158,680
sub total 280,966,974

III PEKERJAAN KERAMIK


LANTAI 1
1 Pek. keramik lantai 60x60cm homogenous tile polished 572.36 m2 A.4.4.3.13. 402,076 230,132,320
2 Pek. keramik lantai 60x60cm homogenous tile unpolished 92.18 m2 A.4.4.3.13. 402,076 37,063,382
3 Pek. Keramik Lantai 20x20cm (kamar mandi) unpolished 42.72 m2 A.4.4.3.45. 322,798 13,789,950
4 Pek. Keramik Dinding 20x40cm (kamar mandi) polished 380.80 m2 A.4.4.3.45. 322,798 122,921,651

LANTAI 2
1 Pek. keramik lantai 60x60cm homogenous tile polished 547.42 m2 A.4.4.3.13. 402,076 220,104,470
2 Pek. keramik lantai 60x60cm homogenous tile unpolished 92.18 m2 A.4.4.3.13. 402,076 37,063,382
3 Pek. Keramik Lantai 20x20cm (kamar mandi) unpolished 42.72 m2 A.4.4.3.45. 322,798 13,789,950
4 Pek. Keramik Dinding 20x40cm (kamar mandi) polished 380.80 m2 A.4.4.3.45. 322,798 122,921,651

sub total 797,786,756

IV PEKERJAAN KUSEN PINTU & JENDELA


a lantai 1
1 Pintu PU 1.00 unit taksir 12,000,000 12,000,000
2 Pintu P1 16.00 unit taksir 5,500,000 88,000,000
3 Pintu P2 KM, PVC platinum SE 32.00 unit taksir 1,500,000 48,000,000
4 Jendela J1 16.00 unit taksir 8,000,000 128,000,000
5 Pintu t jemur 2.00 unit taksir 7,000,000 14,000,000
b Lantai 2
1 Pintu P1 16.00 unit taksir 5,500,000 88,000,000
2 Pintu P2 KM, PVC platinum SE 32.00 unit taksir 1,500,000 48,000,000
3 Jendela J1 16.00 unit taksir 8,000,000 128,000,000
4 Jendela J2 1.00 unit taksir 7,000,000 7,000,000
5 Pintu t jemur 2.00 unit taksir 7,000,000 14,000,000
sub total 575,000,000

V PEKERJAAN PENGECATAN & FINISHING


LANTAI 1
1 Pekerjaan Pengecatan Interior 2,070.95 m2 A.4.7.1.10. 34,913 72,302,548
2 Pekerjaan Pengecatan Exterior 303.74 m2 A.4.7.1.10. 34,913 10,604,418
3 Pekerjaan Pengecatan Plafond 644.62 m2 A.4.7.1.4. 45,375 29,249,568
LANTAI 2
1 Pekerjaan Pengecatan Interior 2,062.11 m2 A.4.7.1.10. 34,913 71,993,919
2 Pekerjaan Pengecatan Exterior 294.90 m2 A.4.7.1.10. 34,913 10,295,788
3 Pekerjaan Pengecatan Plafond 669.56 m2 A.4.7.1.4. 45,375 30,381,226
LANTAI ATAP
1 Pekerjaan Pengecatan Exterior 565.70 m2 A.4.7.1.10. 34,913 19,750,213
2 Pekerjaan Pengecatan Listplank GRC 37.62 m2 A.4.7.1.4. 45,375 1,707,004
sub total 246,284,684

VI PEKERJAAN ORNAMEN
1 Pekerjaan Letter GEDUNG ASRAMA 1.00 set 15,000,000 15,000,000
2 Pekerjaan Fasad Dinding ACP 454.51 m2 taksir 790,000 359,064,480
3 Pekerjaan Railing Tangga pipa besi stainless 2,5" 9.20 m taksir 950,000 8,740,000

sub total 382,804,480

VII PEKERJAAN SANITAIR


LANTAI 1
1 Kloset Duduk toto cw 421 komplit 19.20 set A.5.1.1.1. 3,900,000 74,880,000
2 Jet washer toto THX20NB 16.00 set taksir 200,000 3,200,000
3 Hand Shower Toto THX19NB 2  16.00 set taksir 350,000 5,600,000
4 Kran Cabang TOTO TX423ST1 16.00 set A.5.1.1 19. 120,579 1,929,270
5 Kran air toto T 23 B13 1/2" 32.00 set A.5.1.1 19. 120,579 3,858,541
6 Floor Drain Toto TX 1DB, setara 16.00 unit A.5.1.1 14. 102,872 1,645,957
7 Pemasangan Cermin 12.88 m2 A.4.6.2.21. 304,502 3,921,986
8 Washtafel toto LW 247 16.00 set A.5.1.1 5. 707,196 11,315,142
9 Kran t cuci 2.00 unit A.5.1.1 19. 120,579 241,159
10 Floor drain t cuci, r jemur, R bersama ; toto TX 1 DB , setara 4.00 unit A.5.1.1 14. 102,872 411,489

Page 14 of 324
NO Uraian Pekerjaan Volume Satuan Analisa Harga satuan (Rp.) Total (Rp.)

LANTAI 2
1 Kloset Duduk toto cw 421 komplit 16.00 set A.5.1.1.1. 3,900,000 62,400,000
2 Jet washer toto THX20NB 16.00 set taksir 200,000 3,200,000
3 Hand Shower Toto THX19NB 2  16.00 set taksir 350,000 5,600,000
4 Kran Cabang TOTO TX423ST1 16.00 set A.5.1.1 19. 120,579 1,929,270
5 Kran air toto T 23 B13 1/2" 32.00 set A.5.1.1 19. 120,579 3,858,541
6 Floor Drain Toto TX 1DB, setara 16.00 unit A.5.1.1 14. 102,872 1,645,957
7 Pemasangan Cermin 12.88 m2 A.4.6.2.21. 304,502 3,921,986
8 Washtafel toto LW 247 16.00 set A.5.1.1 5. 707,196 11,315,142
9 Kran t cuci 2.00 unit A.5.1.1 19. 120,579 241,159
10 Floor drain t cuci, r jemur, R bersama ; toto TX 1 DB , setara 4.00 unit A.5.1.1 14. 102,872 411,489

LANTAI ATAP
1 Pemasangan Roof Drain 8.00 set taksir 200,000 1,600,000

sub total 203,127,087


VIII SEPTICTANK
1 Bio septick tank kapasitas 5000 ltr 1.00 set taksir 14,000,000 14,000,000
2 Galian tanah 24.00 m3 A.2.3.1.1. 122,418 2,938,039
3 Urugan Pasir Sloof dan lantai bawah=10cm 1.20 m3 A.2.3.1.11. 200,767 240,921
4 Lantai kerja beton f'c 7,4 Mpa dibawah Sloof dan lantai = 5 cm 0.60 m3 A.A.4.1.1.4 1,026,813 616,088
5 Besi ( Ulir ) 360.00 kg A.4.1.1.17 18,860.35 6,789,725
6 Beton f'c 21,7 Mpa ( K 250 ) 2.40 m3 A.4.1.1.8. 1,287,407 3,089,778
7 Urugan diluar Septick tank 19.00 m3 A.2.3.1.9. 87,405 1,660,699
8 Bak kontrol 1.00 unit A.5.1.1 15. 628,352 628,352

sub total 29,963,602


TOTAL B 3,775,204,666

C PEKERJAAN MEP
Pekerjaan Instalasi Pipa Utama
1 Instalasi air bersih dari pipa induk
1 Pipa PVC AW 2" 102.50 m AHSP A.5.5.1.29 70,937 7,271,043
2 Gate Valve PVC 2" 1.00 bh taksir 575,000 575,000
2 Instalasi pipa air kotor ke Septick tank PVC AW 4" 84.00 m1 AHSP A.5.5.1.32 164,716 13,836,144
3 Instalasi pipa air bekas ke Saluran luar bangunan PVC AW 4" 99.20 m1 AHSP A.5.5.1.32 164,716 16,339,827
3 Testing dan Commissioning 1.00 ls 1,000,000 1,000,000
sub total 39,022,014
II Pekerjaan Instalasi Plumbing
LANTAI 1
a Pengadaan dan Pemasangan Pipa PVC AW ( Pipa Air Bersih )
1 Pipa PVC AW 1" t cuci 19.60 m AHSP A.5.5.1.27 36,106 707,678
2 Pipa PVC AW 1" 72.00 m AHSP A.5.5.1.27 36,106 2,599,632
3 Pipa PVC 3/4" 48.00 m AHSP A.5.5.1.26 30,173 1,448,304
4 Pipa PVC 1/2" 40.00 m AHSP A.5.5.1.25 26,081 1,043,240
5 Gate Valve PVC 1" 16.00 bh taksir 287,500 4,600,000
b Pengadaan dan Pemasangan Pipa PVC Class 10 kg (AW)
& Fitting ( Pipa Air Kotor, Air Buangan Dan Vent )
1 Instalasi Pipa Air Kotor PVC AW 4" 56.00 m AHSP A.5.5.1.32 164,716 9,224,096
2 InstalasiPipa Air Bekas PVC AW 2" 74.72 m AHSP A.5.5.1.29 70,937 5,300,413
3 InstalasiPipa vent 1 " 57.60 m AHSP A.5.5.1.27 36,106 2,079,706
DENAH LANTAI 2
a Pengadaan dan Pemasangan Pipa PVC AW ( Pipa Air Bersih )
1 Pipa PVC AW 1" t cuci 19.60 m AHSP A.5.5.1.27 36,106 707,678
2 Pipa PVC AW 1" 129.60 m AHSP A.5.5.1.27 36,106 4,679,338
3 Pipa PVC 3/4" 48.00 m AHSP A.5.5.1.26 30,173 1,448,304
4 Pipa PVC 1/2" 40.00 m AHSP A.5.5.1.25 26,081 1,043,240
5 Gate Valve PVC 1" 16.00 bh taksir 287,500 4,600,000
b Pengadaan dan Pemasangan Pipa PVC Class 10 kg (AW)
& Fitting ( Pipa Air Kotor, Air Buangan Dan Vent )
Instalasi Pipa Air Kotor
1 Instalasi Pipa Air Kotor PVC AW 4" 113.60 m AHSP A.5.5.1.32 164,716 18,711,738
2 InstalasiPipa Air Bekas PVC AW 2" 132.32 m AHSP A.5.5.1.29 70,937 9,386,384
3 InstalasiPipa vent 1 " 70.40 m AHSP A.5.5.1.27 36,106 2,541,862
Instalasi Pipa Air Hujan
1 Pipa PVC AW 3" 73.60 m AHSP A.5.5.1.31 131,980 9,713,728

sub total 79,835,339


III PANEL & INSTALASI PENERANGAN/ARMATURE
DENAH LANTAI 1
Pekerjaan Panel
1 PANEL SDP 1.00 unit 20,000,000 20,000,000
2 PP. panel penerangan.LT1 1.00 unit 12,000,000 12,000,000
3 PP. panel penerangan.LT2 1.00 unit 12,000,000 12,000,000
4 PP. Panel Power LT 1 1.00 unit 12,000,000 12,000,000
5 PP. Panel Power LT 2 1.00 unit 12,000,000 12,000,000

Pengkabelan
Kabel Feeder dari PLN ke SDP
1 Kabel NYY 4x50mm 50.00 m 580,000 29,000,000
Penerangan dan Stop Kontak
1 Lampu Downlight LED 7 Watt ( k tidur ) 48.00 titik taksir 128,964 6,190,272

Page 15 of 324
NO Uraian Pekerjaan Volume Satuan Analisa Harga satuan (Rp.) Total (Rp.)

2 Lampu Downlight LED 4 Watt ( KM ) 32.00 titik taksir 125,268 4,008,576


3 Lampu Baret 10 w 17.00 titik taksir 388,410 6,602,970
4 Lampu Baret 16 w 10.00 titik taksir 405,000 4,050,000
5 Saklar Ganda 39.00 titik taksir 31,625 1,233,375
6 Saklar Hotel Tunggal 1.00 titik taksir 30,938 30,938
7 Stop Kontak 1 Phase 71.00 titik taksir 22,688 1,610,813
8 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm 107.00 titik taksir 300,800 32,185,600
9 Inst. Stop kontak NYM 3 x 2,5 mm2 + PVC kond. 20 mm 71.00 titik taksir 388,900 27,611,900

DENAH LANTAI 2

Penerangan dan Stop Kontak


1 Lampu Downlight LED 7 Watt ( k tidur ) 48.00 titik taksir 128,964 6,190,272
2 Lampu Downlight LED 4 Watt ( KM ) 32.00 titik taksir 125,268 4,008,576
3 Lampu Baret 10 w 17.00 titik taksir 388,410 6,602,970
4 Lampu Baret 16 w 10.00 titik taksir 405,000 4,050,000
5 Saklar Ganda 39.00 titik taksir 31,625 1,233,375
6 Saklar Hotel Tunggal 1.00 titik taksir 30,938 30,938
7 Stop Kontak 1 Phase 71.00 titik taksir 22,688 1,610,813
8 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm 107.00 titik taksir 300,800 32,185,600
9 Inst. Stop kontak NYM 3 x 2,5 mm2 + PVC kond. 20 mm 71.00 titik taksir 388,900 27,611,900

sub total 264,048,886


IV PEKERJAAN SISTEM PEMADAM KEBAKARAN
Lantai - 1
1 Bh - Fire Extinguisher,ABC (Dry chemical) 4.00 bh taksir 429,000 1,716,000
Capacity (6 kg) ex BMR

Lantai - 2
1 Bh - Fire Extinguisher,ABC (Dry chemical) 4.00 bh taksir 429,000 1,716,000
Capacity (6 kg) ex BMR

sub total 3,432,000


V PEKERJAAN SISTEM TATA UDARA
DENAH LANTAI 1
1 Titik - Instalasi Daya AC 16.00 titik taksir 388,900 6,222,400
2 AC DAIKIN FTC 25 NV 1 PK standart thailand 16.00 unit taksir -
3 Pipa PVC AW 3/4 darain Ac 112.00 m AHSP A.5.5.1.26 30,173 3,379,376
4 Pipa Refrigerant 1/4 + 1/2 160.00 m taksir 90,000 14,400,000
5 Pemasangan unit 16.00 unit taksir 800,000 12,800,000
DENAH LANTAI 2
1 Titik - Instalasi Daya AC 16.00 titik taksir 388,900 6,222,400
2 AC DAIKIN FTC 25 NV 1 PK standart thailand 16.00 unit taksir -
3 Pipa PVC AW 3/4 darain Ac 112.00 m AHSP A.5.5.1.26 30,173 3,379,376
4 Pipa Refrigerant 1/4 + 1/2 160.00 m taksir 90,000 14,400,000
5 Pemasangan unit 16.00 unit taksir 800,000 12,800,000

sub total 60,803,552


VI PEKERJAAN PENANGKAL PETIR
INSTALASI
1 Pengadaan dan pemasangan Penangkal Petir ( R=60m ), Lengkap 1.00 unit taksir 33,000,000 33,000,000

sub total 33,000,000


TOTAL C 480,141,791

TOTAL KESELURUHAN 6,888,630,286

Tempat, tanggal & Bulan, 2020


Penawar
Nama Perusahaan

Nama Pimpinan
Direktur

Page 16 of 324
REKAPITULASI
DAFTAR ANALISA HARGA SATUAN POKOK KEGIATAN (HSPK)
SEMESTER I TAHUN ANGGARAN 2021

KODE
DIVISI URAIAN PEKERJAAN SATUAN HARGA SATUAN
ANALISA

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.2 A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter m2 Rp. 687,846.90

A. 2.2.1.4. A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank m2 Rp. 147,505.62

A. 2.2.1.5. A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran m2 Rp. 147,505.62

A. 2.2.1.5. A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran m2 Rp. 2,114,449.11

A. 2.2.1.7. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan m2 Rp. 1,687,676.54

A. 2.2.1.8. A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja m2 Rp. 1,666,556.54

A. 2.2.1.9. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan m2 Rp. 166,120.90

A. 2.2.1.10. A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu m2 Rp. 851,449.94

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1. A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m m3 Rp. 122,418.29

A.2.3.1.2. A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m m3 Rp. 149,508.81

A.2.3.1.7. A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter m2 Rp. 8,740.52

A.2.3.1.8. A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter m3 Rp. 53,690.25

A.2.3.1.9. A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 Rp. 87,405.23

A.2.3.1.10. A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) m3 Rp. 87,405.23

A.2.3.1.11. A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 Rp. 200,767.31

A.2.3.1.14. A.2.3.1.14. Pengurugan 1 m3 sirtu padat m3 Rp. 175,702.62

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.1. A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP m3 Rp. 937,334.09

A.3.2.1.2. A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP m3 Rp. 887,339.09

A.3.2.1.3. A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP m3 Rp. 852,689.09

A.2.3.1.10. A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) m3 Rp. 87,405.23

A.2.3.1.14. A.2.3.1.14. Pengurugan 1 m3 sirtu padat m3 Rp. 175,702.62

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A.4.1.1.1 A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa m3 Rp. 1,127,111.80

A.4.1.1.2 A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (K-175 ) m3 Rp. 1,161,187.92

A.A.4.1.1.4 A.A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 m3 Rp. 1,026,812.55

A. A.4.1.1.5. A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K-175 ) m3 Rp. 1,274,806.04

A.4.1.1.7. A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (K-225 ) m3 Rp. 1,272,168.63

A.4.1.1.8. A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (K-250 ) m3 Rp. 1,287,407.32

A.4.1.1.9. A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (K-275 ) m3 Rp. 1,313,864.20

A.4.1.1.10. A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa ( K-300) m3 Rp. 1,321,969.39

A.4.1.1.13. A.4.1.1.13. 1 m3 Beton menggunakan Ready Mixed dan Pompa Beton m3 Rp. 316,719.04

A.4.1.1.13.a A.4.1.1.13.a 1 m3 Beton dicorkan pada jarak < 25 m dengan beda tinggi < 1 m (manual ) m3 Rp. 71,672.29

A.4.1.1.13.b A.4.1.1.13.b 1 m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (Manual) m3 Rp. 87,405.23

A.4.1.1.13.c A.4.1.1.13.c 1 m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (dengan Pompa Beton) m3 Rp. 61,362.09

A.4.1.1.13.d A.4.1.1.13.d 1 m3 Beton dicorkan pada tapak setiap kenaikan 4 m vertikal (manual) m3 Rp. 43,702.62

A.4.1.1.13.d A.4.1.1.13.d 1 m3 Beton dicorkan pada tapak setiap kenaikan 4 m vertikal (dengan Pompa Beton) m3 Rp. 61,362.09

A.4.1.1.13.e. A.4.1.1.13.e. 1 m3 Pemadatan Beton pada saat mengecor ( Vibrator ) m3 Rp. 52,392.62

A.4.1.1.13.f. A.4.1.1.13.f. 1 m3 Pemadatan Beton pada saat mengecor ( Manual ) m3 Rp. 87,405.23

A.4.1.1.17 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir Kg Rp. 188,603.47

A.4.1.1.19 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) Kg 405,829.13

Page 17
A.4.1.1.20a (K3) Pemasangan 1 m2 bekisting untuk pondasi ( 1 x pakai )
A.4.1.1.20a m2 415,863.35
A.4.1.1.20b (K3) Pemasangan 1 m2 bekisting untuk pondasi (2 x pakai )
A.4.1.1.20b m2 292,806.35

A.4.1.1.21.a m2 450,045.85

A.4.1.1.21.b m2 306,479.35

A.4.1.1.22a m2 683,990.60

A.4.1.1.22b m2 433,247.25
B.23 1 m2 bekisting balok beton expose menggunakan multiplex phenolic 18 mm ( 1 x pakai )
B.23 m2 774,564.60

A.4.1.1.23 m2 707,767.10

A.4.1.1.24a m2 802,790.60

A.4.1.1.24b m2 534,923.55

A.4.1.1.25 m2 654,950.60

A.4.1.1.26 m2 589,390.60

A.4.1.1.35 A.4.1.1.35 Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm m1 119,243.18
A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
A.4.1.1.36 m1 158,474.22

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.1. Kg Rp. 35,272.17

A.4.2.1.2. Kg Rp. 35,272.17

A.4.2.1.3. Kg Rp. 356,346.20

A.4.2.1.4. m2 Rp. 1,353,727.89

A.4.2.1.11. m2 Rp. 128,545.15

A.4.2.1.12. m2 Rp. 2,219,973.09

A.4.2.1.13. m2 Rp. 1,342,664.79

A.4.2.1.18. A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm m2 Rp. 268,834.62
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm
A.4.2.1.19 m2 Rp. 105,907.13
A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x120 cm, untuk partisi
A.4.2.1.20. m2 Rp. 164,814.70
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60cm, untuk plafon
A.4.2.1.21. m2 Rp. 208,064.16
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
A.4.2.1.22. m2 Rp. 314,612.85
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
A.4.2.1.22. m2 Rp. 378,473.38

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A. 4.4.1.8 m2 Rp. 139,574.40

A.4.4.1.9 A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP m2 Rp. 139,574.40

A. 4.4.1.10 A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batucampuran 1SP :5PP m2 Rp. 133,692.70

A. 4.4.1.20 m2 Rp. 209,213.33

A. 4.4.1.21 m2 Rp. 215,780.20

A. 4.4.1.22 A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP m2 Rp. 221,270.30

A. 4.4.1.23 A. 4.4.1.23 Pemasangan 1 cmdinding terawang (rooster) 12x11x24 campuran 1SP :4PP m2 Rp. 221,270.30

A. 4.4.1.24 A. 4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP m2 Rp. 230,234.82
A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
A. 4.4.1.25 m2 Rp. 121,593.30
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
A. 4.4.1.26 m2 Rp. 151,061.27

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm
A.4.4.2.3. m2 Rp. 168,374.32
A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
A.4.4.2.4. m2 Rp. 166,342.84
A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm
A.4.4.2.5. m2 Rp. 165,162.76

A.4.4.2.14. m2 Rp. 98,990.74

A.4.4.2.15. m2 Rp. 119,831.61

A.4.4.2.16. m2 Rp. 118,313.17

A.4.4.2.27. A.4.4.2.27. Pemasangan 1 m2 acian m2 Rp. 55,800.71

A.4.4.2.28. A.4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP) m2 Rp. 60,562.38

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


Page 18
A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm
A.4.4.3.9. m2 Rp. 372,222.81

A.4.4.3.10. m2 Rp. 267,841.86


A.4.4.3.13. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60 cm x 60cm
A.4.4.3.13. m2 Rp. 402,076.18

A.4.4.3.26. m1 Rp. 90,930.31

A.4.4.3.31. m2 Rp. 295,274.25

A.4.4.3.32. m2 Rp. 259,647.25


A.4.4.3.35.Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm
A.4.4.3.35. m1 Rp. 102,048.88

A.4.4.3.45. m2 Rp. 322,798.45

A.4.4.3.50. m2 Rp. 346,813.74


A.4.4.3.53. Pemasangan 1m2 floor harderner
A.4.4.3.53. m2 Rp. 179,698.69

A.4.4.3.56. A.4.4.3.56. Pemasangan 1 m2 paving block natural tebal 6 cm m1 Rp. 198,138.42

A.4.4.3.57. A.4.4.3.57. Pemasangan 1 m2 paving block natural tebal 8 cm m2 Rp. 261,938.26

A.4.4.3.58. A.4.4.3.58. Pemasangan 1 m2 paving block berwarna tebal 6 cm m2 Rp. 201,804.72

A.4.4.3.59. A.4.4.3.59. Pemasangan 1 m2 paving block berwarna tebal 8 cm m2 Rp. 277,825.56

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.7. A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm m2 Rp. 47,683.31

A.4.5.1.8. A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium m2 Rp. 253,258.61

A.4.5.1.9. A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil m1 Rp. 46,480.82

A.4.5.1.10 A.4.5.1.10 Pemasangan 1 m2 rangka langit-langit besi hollow 40.40 m2 Rp. 208,064.16

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.39. A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang m2 Rp. 44,881.93

A.4.5.2.40. A.4.5.2.40. Pemasangan 1 m’nok atap seng m1 Rp. 38,461.77

A.4.5.2.43. A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation m2 Rp. 41,477.05

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.2. A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III m3 Rp. 11,522,451.16

A.4.6.1.5. A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II m2 Rp. 4,712,116.49

A.4.6.1.6. A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II m2 Rp. 2,845,143.49

A.4.6.1.7. A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II m2 Rp. 1,319,441.86

A.4.6.1.8. A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) m2 Rp. 1,176,939.30

A.4.6.1.9. A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II m2 Rp. 883,018.49

A.4.6.1.11. A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I m2 Rp. 874,025.99

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.2. A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa Buah Rp. 157,740.00

A.4.6.2.3. A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi Buah Rp. 140,283.00

A.4.6.2.4. A.4.6.2.4. Pemasangan 1 buah kunci silinder Buah Rp. 277,783.00

A.4.6.2.5. A.4.6.2.5. Pemasangan 1 buah engsel pintu Buah Rp. 87,288.30

A.4.6.2.10. A.4.6.2.10. Pemasangan 1 buah door closer Buah Rp. 365,728.00

A.4.6.2.11. A.4.6.2.11. Pemasangan 1 buah kunci slot Buah Rp. 59,026.00

A.4.6.2.12. A.4.6.2.12. Pemasangan 1 buah door holder Buah Rp. 118,228.00

A.4.6.2.13. A.4.6.2.13. Pemasangan 1 buah door stop Buah Rp. 68,420.00

A.4.6.2.20. A.4.6.2.20. Pengecatan 1 m2 kaca cermin tebal 5 mm m2 Rp. 191,818.00

A.4.6.2.21. A.4.6.2.21. Pengecatan 1 m2 kaca cermin tebal 8 mm m2 Rp. 304,502.00

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.4. A.4.7.1.4. Pengecatan 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat pe m2 Rp. 45,374.91

A.4.7.1.5. A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) m2 Rp. 64,792.42

A.4.7.1.7. A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 Rp. 55,312.40

A.4.7.1.9. A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis m2 Rp. 62,399.00

A.4.7.1.10. A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) m2 Rp. 34,912.81

Page 19
A.4.7.1.16. A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi m2 Rp. 41,195.00

A.4.7.1.17. A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah m2 Rp. 109,472.00

A.4.7.1.18. A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis m2 Rp. 81,612.26

A.4.7.1.20. A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis m2 Rp. 199,278.55

A.4.7.1.21. A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir m2 Rp. 180,139.96

A.4.7.1.22. A.4.7.1.22. Plituran 10 m2 dengan plitur melamic m2 Rp. 2,791,910.00

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1. A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock Unit Rp. 1,443,694.01

A.5.1.1 2. A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen Unit Rp. 695,403.41

A.5.1.1 3. A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso Unit Rp. 680,752.38

A.5.1.1 4. A.5.1.1 4. (K3) Pemasangan 1 buah urinoir Unit Rp. 613,041.22

A.5.1.1 5. A.5.1.1 5. (K3) Pemasangan 1 buah wastafel Unit Rp. 707,196.38

A.5.1.1 14. A.5.1.1 14. Pemasangan 1 buah floor drain Unit Rp. 102,872.30

A.5.1.1 15. A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm Unit Rp. 628,352.43

A.5.1.1 16. A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm Unit Rp. 937,255.73

A.5.1.1 17. A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cmtinggi 65 cm m1 Rp. 1,076,229.73

A.5.1.1 18. A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” m1 Rp. 116,220.10

A.5.1.1 19. A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ” m1 Rp. 120,579.40

A.5.1.1 25. A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” m1 Rp. 59,540.53

A.5.1.1 26. A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” m1 Rp. 73,796.53

A.5.1.1 27. A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” m1 Rp. 88,052.53

A.5.1.1 28. A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ” m1 Rp. 103,566.79

A.5.1.1 29. A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m1 Rp. 124,950.79

A.5.1.1 30. A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ” m1 Rp. 176,647.30

A.5.1.1 31. A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” m1 Rp. 201,595.30

A.5.1.1 32. A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 Rp. 201,595.30

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL

A.8.4.6.1 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu Titik Rp. 413,280.34

A.8.4.6.1 A.8.4.6.1 (K3) Pemasangan 1 buah MCB Titik Rp. 353,440.34

Sidoarjo, Februari 2021

Page 20
ANALISA HARGA SATUAN POKOK KEGIATAN (HSPK)
SEMESTER I TAHUN ANGGARAN 2021

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.1 (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)

A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang kayu L.02 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.020 157,992.00 3,159.84
JUMLAH TENAGA KERJA 93,005.84
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250 27,000.00 33,750.00
Semen portland Kg 5.000 1,300.00 6,500.00
Pasir beton m3 0.005 230,000.00 1,150.00
Koral beton m3 0.009 250,000.00 2,250.00
Kayu 5/7 m3 0.072 5,175,000.00 372,600.00
Paku biasa 2” – 5” Kg 0.060 16,000.00 960.00
Residu Liter 0.400 2,900.00 1,160.00
JUMLAH HARGA BAHAN 418,370.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 511,375.84
E Overhead & Profit (10 %) 10% x D (maksimum) 51,137.58
F Harga Satuan Pekerjaan (D+E) 562,513.42

A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang kayu L.02 OH 0.400 147,992.00 59,196.80
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.020 157,992.00 3,159.84
JUMLAH TENAGA KERJA 93,980.36
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250 27,000.00 33,750.00
Semen portland Kg 2.500 1,300.00 3,250.00
Seng gelombang Lbr 1.200 86,000.00 103,200.00
Pasir beton m3 0.005 230,000.00 1,150.00
Koral beton m3 0.009 250,000.00 2,250.00
Kayu 5/7 m3 0.072 5,175,000.00 372,600.00
Paku biasa 2” – 5” Kg 0.060 16,000.00 960.00
Meni besi Liter 0.450 31,500.00 14,175.00
JUMLAH HARGA BAHAN 531,335.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 625,315.36
E Overhead & Profit (10 %) 10% x D (maksimum) 62,531.54
F Harga Satuan Pekerjaan (D+E) 687,846.90

A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang kayu L.02 OH 0.400 147,992.00 59,196.80
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.020 157,992.00 3,159.84
JUMLAH TENAGA KERJA 93,980.36
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250 27,000.00 33,750.00
Semen portland Kg 2.500 1,300.00 3,250.00
Kawat duri m' 25.000 2,900.00 72,500.00
Pasir beton m3 0.005 230,000.00 1,150.00
Koral beton m3 0.009 250,000.00 2,250.00
Paku biasa 2” – 5” Kg 0.060 16,000.00 960.00
JUMLAH HARGA BAHAN 113,860.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 207,840.36
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 20,784.04

Page 21
F Harga Satuan Pekerjaan (D+E) 228,624.40

Page 22
A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.02 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 31,401.02
B BAHAN
Kayu balok 5/7 m3 0.012 3,500,000.00 42,000.00
Paku 2” – 3” Kg 0.020 16,000.00 320.00
Kayu papan 3/20 m3 0.007 8,625,000.00 60,375.00
JUMLAH HARGA BAHAN 102,695.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 134,096.02
E Overhead & Profit (10 %) 10% x D (maksimum) 13,409.60
F Harga Satuan Pekerjaan (D+E) 147,505.62

A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.000 143,119.40 286,238.80
Tukang kayu L.02 OH 2.000 147,992.00 295,984.00
Tukang Batu L.02 OH 1.000 147,992.00 147,992.00
Kepala tukang L.03 OH 1.000 149,992.00 149,992.00
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 888,106.40
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250 27,000.00 33,750.00
Kayu m3 0.180 4,000,000.00 720,000.00
Paku biasa Kg 0.080 16,000.00 1,280.00
Besi strip Kg 1.100 11,200.00 12,320.00
Semen portland Kg 35.000 1,300.00 45,500.00
Pasir pasang m3 0.150 150,000.00 22,500.00
Pasir beton m3 0.100 230,000.00 23,000.00
Koral beton m3 0.150 250,000.00 37,500.00
Bata merah Bh 30.000 580.00 17,400.00
Seng plat Lbr 0.250 18,000.00 4,500.00
Jendela naco bh 0.200 16,000.00 3,200.00
kaca polos m2 0.080 180,000.00 14,400.00
kunci tanam bh 0.150 76,500.00 11,475.00
playwood 4 mm lbr 0.060 62,000.00 3,720.00
JUMLAH HARGA BAHAN 950,545.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,838,651.40
E Overhead & Profit (10 %) 10% x D (maksimum) 275,797.71
F Harga Satuan Pekerjaan (D+E) 2,114,449.11

2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang kayu L.02 OH 1.500 147,992.00 221,988.00
Kepala tukang L.03 OH 0.150 149,992.00 22,498.80
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 395,505.80
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 3.000 27,000.00 81,000.00
Kayu m3 0.276 4,000,000.00 1,104,000.00
Paku biasa Kg 0.700 16,000.00 11,200.00
Seng gelombang Lbr 1.500 86,000.00 129,000.00
JUMLAH HARGA BAHAN 1,325,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,720,705.80
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 258,105.87
F Harga Satuan Pekerjaan (D+E) 1,978,811.67

Page 23
2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang kayu L.02 OH 2.000 147,992.00 295,984.00
Kepala tukang L.03 OH 0.200 149,992.00 29,998.40
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 477,001.40
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.700 27,000.00 45,900.00
Kayu m3 0.210 4,000,000.00 840,000.00
Paku biasa Kg 0.300 16,000.00 4,800.00
Semen portland Kg 10.500 1,300.00 13,650.00
Pasir beton m3 0.030 230,000.00 6,900.00
Koral beton m3 0.050 250,000.00 12,500.00
Seng gelombang Lbr 1.500 86,000.00 129,000.00
Seng plat Lbr 0.250 18,000.00 4,500.00
JUMLAH HARGA BAHAN 1,057,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,534,251.40
E Overhead & Profit (10 %) 10% x D (maksimum) 153,425.14
F Harga Satuan Pekerjaan (D+E) 1,687,676.54

A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang kayu L.02 OH 2.000 147,992.00 295,984.00
Kepala tukang L.03 OH 0.200 149,992.00 29,998.40
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 477,001.40
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250 27,000.00 33,750.00
Kayu m3 0.186 4,000,000.00 744,000.00
Paku biasa Kg 0.300 16,000.00 4,800.00
semen portland Kg 18.000 1,300.00 23,400.00
pasir beton m3 0.030 230,000.00 6,900.00
koral beton m3 0.050 250,000.00 12,500.00
Seng gelombang Lbr 1.500 86,000.00 129,000.00
Plywood 4mm Lbr 1.350 62,000.00 83,700.00
JUMLAH HARGA BAHAN 1,038,050.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,515,051.40
E Overhead & Profit (10 %) 10% x D (maksimum) 151,505.14
F Harga Satuan Pekerjaan (D+E) 1,666,556.54

2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 151,019.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 151,019.00
E Overhead & Profit (10 %) 10% x D (maksimum) 15,101.90
F Harga Satuan Pekerjaan (D+E) 166,120.90

Page 24
A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang kayu L.02 OH 2.000 147,992.00 295,984.00
Kepala tukang L.03 OH 0.200 149,992.00 29,998.40
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 477,001.40
B BAHAN
Bambu diameter 6-8/600 cm Batang 1.250 25,000.00 31,250.00
Tali ijuk m3 0.186 1,429,000.00 265,794.00
JUMLAH HARGA BAHAN 297,044.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 774,045.40
E Overhead & Profit (10 %) 10% x D (maksimum) 77,404.54
F Harga Satuan Pekerjaan (D+E) 851,449.94

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Tukang kayu L.02 OH 0.300 143,119.40 42,935.82
Kepala tukang L.03 OH 0.030 149,992.00 4,499.76
JUMLAH TENAGA KERJA 47,435.58
B BAHAN
Kayu papan kelas
III m3 0.036 4,000,000.00
144,000.00
Kayu balok 5/7 m3 0.014 5,175,000.00
kelas III 72,450.00
Paku biasa Kg 0.080 16,000.00 1,280.00
JUMLAH HARGA BAHAN 217,730.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 265,165.58
E Overhead & Profit (10 %) 10% x D (maksimum) 26,516.56
F Harga Satuan Pekerjaan (D+E) 291,682.14

A. 2.2.1.12. Pembuatan 1 m2 jalan sementara


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Mandor L.04 OH 0.005 149,992.00 749.96
JUMLAH TENAGA KERJA 143,869.36
B BAHAN
Batu belah m3 0.150 140,000.00 21,000.00
Batu pecah m3 0.090 250,000.00 22,500.00
Pasir pasang m3 0.010 150,000.00 1,500.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 188,869.36
E Overhead & Profit (10 %) 10% x D (maksimum) 18,886.94
F Harga Satuan Pekerjaan (D+E) 207,756.30

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 13.334 143,119.40 1,908,354.08
Mandor L.04 OH 0.666 149,992.00 99,894.67
JUMLAH TENAGA KERJA 2,008,248.75
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,008,248.75
E Overhead & Profit (10 %) 10% x D (maksimum) 200,824.88
F Harga Satuan Pekerjaan (D+E) 2,209,073.63

Page 25
A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 6.667 143,119.40 954,177.04
Mandor L.04 OH 0.333 149,992.00 49,947.34
JUMLAH TENAGA KERJA 1,004,124.38
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,004,124.38
E Overhead & Profit (10 %) 10% x D (maksimum) 100,412.44
F Harga Satuan Pekerjaan (D+E) 1,104,536.81

A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.042 143,119.40 6,011.01
Tukang kayu L.02 OH 0.004 147,992.00 591.97
Kepala tukang L.03 OH 0.002 149,992.00 299.98
Mandor L.04 OH 0.042 157,992.00 6,635.66
JUMLAH TENAGA KERJA 13,538.63
B BAHAN
Kawat jaring Lbr 0.143 54,240.00 7,778.02
JUMLAH HARGA BAHAN 7,778.02
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,316.65
E Overhead & Profit (10 %) 10% x D (maksimum) 2,131.66
F Harga Satuan Pekerjaan (D+E) 23,448.31

A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.038 143,119.40 5,366.98
Tukang kayu L.02 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.019 157,992.00 3,001.85
JUMLAH TENAGA KERJA 28,667.73
B BAHAN
Panel beton Lbr 0.986
pracetak -
Kolom beton Batang 0.525
pracetak -
Semen PC Kg 45.000 -
Pasir beton m3 0.074 -
Koral m3 0.146 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 28,667.73
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 2,866.77
F Harga Satuan Pekerjaan (D+E) 31,534.50

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.750 143,119.40 107,339.55
Mandor L.04 OH 0.025 157,992.00 3,949.80
JUMLAH TENAGA KERJA 111,289.35
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 111,289.35
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 11,128.94

Page 26
F Harga Satuan Pekerjaan (D+E) 122,418.29

Page 27
A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.900 143,119.40 128,807.46
Mandor L.04 OH 0.045 157,992.00 7,109.64
JUMLAH TENAGA KERJA 135,917.10
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 135,917.10
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 13,591.71
F Harga Satuan Pekerjaan (D+E) 149,508.81

A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.050 143,119.40 150,275.37
Mandor L.04 OH 0.067 157,992.00 10,585.46
JUMLAH TENAGA KERJA 160,860.83
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 160,860.83
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 16,086.08
F Harga Satuan Pekerjaan (D+E) 176,946.92

A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Mandor L.04 OH 0.032 157,992.00 5,055.74
JUMLAH TENAGA KERJA 148,175.14
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 148,175.14
E Overhead & Profit (10 %) 10% x D (maksimum) 14,817.51
F Harga Satuan Pekerjaan (D+E) 162,992.66

A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.500 143,119.40 214,679.10
Mandor L.04 OH 0.060 157,992.00 9,479.52
JUMLAH TENAGA KERJA 224,158.62
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 224,158.62
E Overhead & Profit (10 %) 10% x D (maksimum) 22,415.86
F Harga Satuan Pekerjaan (D+E) 246,574.48

Page 28
A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.200 143,119.40 171,743.28
Mandor L.04 OH 0.045 157,992.00 7,109.64
JUMLAH TENAGA KERJA 178,852.92
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 178,852.92
E Overhead & Profit (10 %) 10% x D (maksimum) 17,885.29
F Harga Satuan Pekerjaan (D+E) 196,738.21

A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.050 143,119.40 7,155.97
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 7,945.93
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 7,945.93
E Overhead & Profit (10 %) 10% x D (maksimum) 794.59
F Harga Satuan Pekerjaan (D+E) 8,740.52

A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.330 143,119.40 47,229.40
Mandor L.04 OH 0.010 157,992.00 1,579.92
JUMLAH TENAGA KERJA 48,809.32
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 48,809.32
E Overhead & Profit (10 %) 10% x D (maksimum) 4,880.93
F Harga Satuan Pekerjaan (D+E) 53,690.25

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.500 143,119.40 71,559.70
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 79,459.30
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 79,459.30
E Overhead & Profit (10 %) 10% x D (maksimum) 7,945.93
F Harga Satuan Pekerjaan (D+E) 87,405.23

Page 29
A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.500 143,119.40 71,559.70
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 79,459.30
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 79,459.30
E Overhead & Profit (10 %) 10% x D (maksimum) 7,945.93
F Harga Satuan Pekerjaan (D+E) 87,405.23

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Mandor L.04 OH 0.010 157,992.00 1,579.92
JUMLAH TENAGA KERJA 44,515.74
B BAHAN
Pasir urug m3 1.200 115,000.00 138,000.00
JUMLAH HARGA BAHAN 138,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 182,515.74
E Overhead & Profit (10%) 10% x D (maksimum) 18,251.57
F Harga Satuan Pekerjaan (D+E) 200,767.31

A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.800 143,119.40 114,495.52
Mandor L.04 OH 0.080 157,992.00 12,639.36
JUMLAH TENAGA KERJA 127,134.88
B BAHAN
Kapur Padam m3 0.135 270,000.00 36,450.00
Pasir Pasang m3 0.400 150,000.00 60,000.00
Tanah Liat m3 0.948 78,000.00 73,944.00
JUMLAH HARGA BAHAN 170,394.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 297,528.88
E Overhead & Profit (10 %) 10% x D (maksimum) 29,752.89
F Harga Satuan Pekerjaan (D+E) 327,281.77

A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 23,837.79
B BAHAN
Ijuk m3 0.600 1,429,000.00 857,400.00
JUMLAH HARGA BAHAN 857,400.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 881,237.79
E Overhead & Profit (10 %) 10% x D (maksimum) 88,123.78
F Harga Satuan Pekerjaan (D+E) 969,361.57

Page 30
A.2.3.1.14. Pengurugan 1 m3 sirtu padat
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerjaan L.01 OH 0.250 143,119.40 35,779.85
Mandor L.04 OH 0.025 157,992.00 3,949.80
JUMLAH TENAGA KERJA 39,729.65
B BAHAN
Sirtu m3 1.200 100,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 159,729.65
E Overhead & Profit (10 %) 10% x D (maksimum) 15,972.97
F Harga Satuan Pekerjaan (D+E) 175,702.62

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.500 143,119.40 214,679.10
Tukang Batu L.02 OH 0.750 147,992.00 110,994.00
Kepala tukang L.03 OH 0.075 149,992.00 11,249.40
Mandor L.04 OH 0.075 157,992.00 11,849.40
JUMLAH TENAGA KERJA 348,771.90
B BAHAN
Batu belah m3 1.200 140,000.00 168,000.00
Semen Portland kg 202.000 1,300.00 262,600.00
Pasir pasang m3 0.485 150,000.00 72,750.00
JUMLAH HARGA BAHAN 503,350.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 852,121.90
E Overhead & Profit (10 %) 10% x D (maksimum) 85,212.19
F Harga Satuan Pekerjaan (D+E) 937,334.09

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.500 143,119.40 214,679.10
Tukang Batu L.02 OH 0.750 147,992.00 110,994.00
Kepala tukang L.03 OH 0.075 149,992.00 11,249.40
Mandor L.04 OH 0.075 157,992.00 11,849.40
JUMLAH TENAGA KERJA 348,771.90
B BAHAN
Batu belah m3 1.200 140,000.00 168,000.00
Semen Portland kg 163.000 1,300.00 211,900.00
Pasir pasang m3 0.520 150,000.00 78,000.00
JUMLAH HARGA BAHAN 457,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 806,671.90
E Overhead & Profit (10 %) 10% x D (maksimum) 80,667.19
F Harga Satuan Pekerjaan (D+E) 887,339.09

A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.500 143,119.40 214,679.10
Tukang Batu L.02 OH 0.750 147,992.00 110,994.00
Kepala tukang L.03 OH 0.075 149,992.00 11,249.40
Mandor L.04 OH 0.075 157,992.00 11,849.40
JUMLAH TENAGA KERJA 348,771.90
B BAHAN
Batu belah m3 1.200 140,000.00 168,000.00
Semen Portland kg 136.000 1,300.00 176,800.00
Pasir pasang m3 0.544 150,000.00 81,600.00
JUMLAH HARGA BAHAN 426,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 775,171.90

Page 31
E Overhead & Profit (10 %) 10% x D (maksimum) 77,517.19
F Harga Satuan Pekerjaan (D+E) 852,689.09

Page 32
A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.500 143,119.40 214,679.10
Tukang Batu L.02 OH 0.750 147,992.00 110,994.00
Kepala tukang L.03 OH 0.075 149,992.00 11,249.40
Mandor L.04 OH 0.075 157,992.00 11,849.40
JUMLAH TENAGA KERJA 348,771.90
B BAHAN
Batu belah m3 1.200 140,000.00 168,000.00
Semen Portland kg 117.000 1,300.00 152,100.00
Pasir pasang m3 0.561 150,000.00 84,150.00
JUMLAH HARGA BAHAN 404,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 753,021.90
E Overhead & Profit (10%) 10% x D (maksimum) 75,302.19
F Harga Satuan Pekerjaan (D+E) 828,324.09

A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.500 143,119.40 214,679.10
Tukang Batu L.02 OH 0.750 147,992.00 110,994.00
Kepala tukang L.03 OH 0.075 149,992.00 11,249.40
Mandor L.04 OH 0.075 157,992.00 11,849.40
JUMLAH TENAGA KERJA 348,771.90
B BAHAN
Batu belah m3 1.200 140,000.00 168,000.00
Semen Portland kg 91.000 1,300.00 118,300.00
Pasir pasang m3 0.584 150,000.00 87,600.00
JUMLAH HARGA BAHAN 373,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 722,671.90
E Overhead & Profit (10 %) 10% x D (maksimum) 72,267.19
F Harga Satuan Pekerjaan (D+E) 794,939.09

A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.500 143,119.40 214,679.10
Tukang Batu L.02 OH 0.750 147,992.00 110,994.00
Kepala tukang L.03 OH 0.075 149,992.00 11,249.40
Mandor L.04 OH 0.075 157,992.00 11,849.40
JUMLAH TENAGA KERJA 348,771.90
B BAHAN
Batu belah m3 1.200 140,000.00 168,000.00
Kapur m3 0.170 270,000.00 45,900.00
Semen Portland kg 0.170 1,300.00 221.00
Pasir pasang m3 0.584 150,000.00 87,600.00
JUMLAH HARGA BAHAN 301,721.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 650,492.90
E Overhead & Profit (10 %) 10% x D (maksimum) 65,049.29
F Harga Satuan Pekerjaan (D+E) 715,542.19

Page 33
A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.500 143,119.40 214,679.10
Tukang Batu L.02 OH 0.750 147,992.00 110,994.00
Kepala tukang L.03 OH 0.075 149,992.00 11,249.40
Mandor L.04 OH 0.075 157,992.00 11,849.40
JUMLAH TENAGA KERJA 348,771.90
B BAHAN
Batu belah m3 1.200 140,000.00 168,000.00
Semen Portland kg 61.000 1,300.00 79,300.00
Kapur m3 0.147 270,000.00 39,690.00
Pasir pasang m3 0.492 150,000.00 73,800.00
JUMLAH HARGA BAHAN 360,790.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 709,561.90
E Overhead & Profit (10 %) 10% x D (maksimum) 70,956.19
F Harga Satuan Pekerjaan (D+E) 780,518.09

A.3.2.1.8.Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.500 143,119.40 214,679.10
Tukang Batu L.02 OH 0.750 147,992.00 110,994.00
Kepala tukang L.03 OH 0.075 149,992.00 11,249.40
Mandor L.04 OH 0.075 157,992.00 11,849.40
JUMLAH TENAGA KERJA 348,771.90
B BAHAN
Batu belah m3 1.200 140,000.00 168,000.00
Semen Portland kg 41.000 1,300.00 53,300.00
Kapur m3 0.131 270,000.00 35,370.00
Pasir pasang m3 0.523 150,000.00 78,450.00
JUMLAH HARGA BAHAN 335,120.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 683,891.90
E Overhead & Profit (10 %) 10% x D (maksimum) 68,389.19
F Harga Satuan Pekerjaan (D+E) 752,281.09

A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.780 143,119.40 111,633.13
Tukang Batu L.02 OH 0.930 147,992.00 137,632.56
Kepala tukang L.03 OH 0.039 149,992.00 5,849.69
Mandor L.04 OH 0.039 157,992.00 6,161.69
JUMLAH TENAGA KERJA 261,277.07
B BAHAN
Batu belah m3 1.200 140,000.00 168,000.00
Pasir urug m3 0.432 115,000.00 49,680.00
JUMLAH HARGA BAHAN 217,680.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 478,957.07
E Overhead & Profit (10 %) 10% x D (maksimum) 47,895.71
F Harga Satuan Pekerjaan (D+E) 526,852.77

Page 34
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB: 3 Kr dan 40% batu belah
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.400 143,119.40 486,605.96
Tukang Batu L.02 OH 0.850 147,992.00 125,793.20
Kepala tukang L.03 OH 0.085 149,992.00 12,749.32
Mandor L.04 OH 0.170 157,992.00 26,858.64
JUMLAH TENAGA KERJA 652,007.12
B BAHAN
Batu belah m3 0.480 140,000.00 67,200.00
Semen Portland kg 194.000 1,300.00 252,200.00
Pasir beton m3 0.312 230,000.00 71,760.00
kerikil m3 0.468 250,000.00 117,000.00
besi beton kg 126.000 13,000.00 1,638,000.00
kawat beton Kg 1.800 15,000.00 27,000.00
JUMLAH HARGA BAHAN 2,173,160.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,825,167.12
E Overhead & Profit (10 %) 10% x D (maksimum) 282,516.71
F Harga Satuan Pekerjaan (D+E) 3,107,683.83

A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.400 143,119.40 343,486.56
Tukang Batu L.02 OH 0.800 147,992.00 118,393.60
Kepala tukang L.03 OH 0.080 149,992.00 11,999.36
Mandor L.04 OH 0.119 157,992.00 18,801.05
JUMLAH TENAGA KERJA 492,680.57
B BAHAN
Batu belah m3 0.450 140,000.00 63,000.00
Semen Portland kg 194.000 1,300.00 252,200.00
Pasir beton m3 0.312 230,000.00 71,760.00
air m3 0.468 6.50 3.04
JUMLAH HARGA BAHAN 386,963.04
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 879,643.61
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 87,964.36
F Harga Satuan Pekerjaan (D+E) 967,607.97

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang Batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 247.00 1,300.00 321,100.00
pasir beton kg 869.00 230.00 199,870.00
kerikil (maks 30 mm) kg 999.00 208.33 208,121.67
air Liter 215.00 6.50 1,397.50
JUMLAH HARGA BAHAN 730,489.17
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,024,647.09
E Overhead & Profit (10 %) 10% x D (maksimum) 102,464.71
F Harga Satuan Pekerjaan (D+E) 1,127,111.80

Page 35
A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (K-175 )
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang Batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 276.00 1,300.00 358,800.00
pasir beton kg 828.00 230.00 190,440.00
kerikil (maks 30 mm) kg 1,012.00 208.33 210,829.96
air Liter 215.00 6.50 1,397.50
JUMLAH HARGA BAHAN 761,467.46
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,055,625.38
E Overhead & Profit (10 %) 10% x D (maksimum) 105,562.54
F Harga Satuan Pekerjaan (D+E) 1,161,187.92

A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (K-150)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang Batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 299.000 1,300.00 388,700.00
pasir beton kg 799.000 230.00 183,770.00
kerikil (maks 30 mm) kg 1,017.000 208.33 211,871.61
air Liter 215.000 6.50 1,397.50
JUMLAH HARGA BAHAN 785,739.11
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,079,897.03
E Overhead & Profit (10 %) 10% x D (maksimum) 107,989.70
F Harga Satuan Pekerjaan (D+E) 1,187,886.74
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %

A.A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.200 143,119.40 171,743.28
Tukang Batu L.02 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.060 157,992.00 9,479.52
JUMLAH TENAGA KERJA 213,821.04
B BAHAN
semen portland kg 230.000 1,300.00 299,000.00
pasir beton kg 893.000 230.00 205,390.00
kerikil (maks 30 mm) kg 1,027.000 208.33 213,954.91
air Liter 200.000 6.50 1,300.00
JUMLAH HARGA BAHAN 719,644.91
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 933,465.95
E Overhead & Profit (10 %) 10% x D (maksimum) 93,346.60
F Harga Satuan Pekerjaan (D+E) 1,026,812.55

Page 36
A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K-175 )
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang Batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 326.000 1,300.00 423,800.00
pasir beton kg 760.000 230.00 174,800.00
kerikil (maks 30 mm) kg 1,029.000 208.33 214,371.57
air Liter 215.000 6.50 1,397.50
JUMLAH HARGA BAHAN 814,369.07
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,108,526.99
E Overhead & Profit (10%) 10% x D (maksimum) 166,279.05
F Harga Satuan Pekerjaan (D+E) 1,274,806.04

A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (K-200 )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang Batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 352.000 1,300.00 457,600.00
pasir beton kg 731.000 230.00 168,130.00
kerikil (maks 30 mm) kg 1,031.000 208.33 214,788.23
air Liter 215.000 6.50 1,397.50
JUMLAH HARGA BAHAN 841,915.73
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,136,073.65
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 113,607.37
F Harga Satuan Pekerjaan (D+E) 1,249,681.02

A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (K-225 )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang Batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 371.000 1,300.00 482,300.00
pasir beton kg 698.000 230.00 160,540.00
kerikil (maks 30 mm) kg 1,047.000 208.33 218,121.51
air Liter 215.000 6.50 1,397.50
JUMLAH HARGA BAHAN 862,359.01
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,156,516.93
E Overhead & Profit (10 %) 10% x D (maksimum) 115,651.69
F Harga Satuan Pekerjaan (D+E) 1,272,168.63

Page 37
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (K-250 )
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang Batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 384.000 1,300.00 499,200.00
pasir beton kg 692.000 230.00 159,160.00
kerikil (maks 30 mm) kg 1,039.000 208.33 216,454.87
air Liter 215.000 6.50 1,397.50
JUMLAH HARGA BAHAN 876,212.37
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,170,370.29
E Overhead & Profit (10 %) 10% x D (maksimum) 117,037.03
F Harga Satuan Pekerjaan (D+E) 1,287,407.32

A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (K-275 )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang Batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 406.000 1,300.00 527,800.00
pasir beton kg 684.000 230.00 157,320.00
kerikil (maks 30 mm) kg 1,026.000 208.33 213,746.58
air Liter 215.000 6.50 1,397.50
JUMLAH HARGA BAHAN 900,264.08
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,194,422.00
E Overhead & Profit (10 %) 10% x D (maksimum) 119,442.20
F Harga Satuan Pekerjaan (D+E) 1,313,864.20

A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa ( K-300)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang Batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 413.000 1,300.00 536,900.00
pasir beton kg 681.000 230.00 156,630.00
kerikil (maks 30 mm) kg 1,021.000 208.33 212,704.93
air Liter 215.000 6.50 1,397.50
JUMLAH HARGA BAHAN 907,632.43
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,201,790.35
E Overhead & Profit (10 %) 10% x D (maksimum) 120,179.04
F Harga Satuan Pekerjaan (D+E) 1,321,969.39

Page 38
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (K-325)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.100 143,119.40 300,550.74
Tukang Batu L.02 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.105 157,992.00 16,589.16
JUMLAH TENAGA KERJA 374,186.82
B BAHAN
semen portland kg 439.000 1,300.00 570,700.00
pasir beton kg 670.000 230.00 154,100.00
kerikil (maks 30 mm) kg 1,006.000 208.33 209,579.98
air Liter 215.000 6.50 1,397.50
JUMLAH HARGA BAHAN 935,777.48
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,309,964.30
E Overhead & Profit (10 %) 10% x D (maksimum) 130,996.43
F Harga Satuan Pekerjaan (D+E) 1,440,960.73

A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (K-350)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.100 143,119.40 300,550.74
Tukang Batu L.02 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.105 157,992.00 16,589.16
JUMLAH TENAGA KERJA 374,186.82
B BAHAN
semen portland kg 448.000 1,300.00 582,400.00
pasir beton kg 667.000 230.00 153,410.00
kerikil (maks 30 mm) kg 1,000.000 208.33 208,330.00
air Liter 215.000 6.50 1,397.50
JUMLAH HARGA BAHAN 945,537.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,319,724.32
E Overhead & Profit (10 %) 10% x D (maksimum) 131,972.43
F Harga Satuan Pekerjaan (D+E) 1,451,696.75

A.4.1.1.13. Membuat 1 m3 beton mutu f’c = 42,2 MPa, slump (150 ± 20) mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.100 143,119.40 300,550.74
Tukang Batu L.02 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.105 157,992.00 16,589.16
JUMLAH TENAGA KERJA 374,186.82
B BAHAN
semen portland kg 448.000 1,300.00 582,400.00
pasir beton kg 667.000 230.00 153,410.00
kerikil (maks 30 mm) kg 1,000.000 208.33 208,330.00
Bahan tambahan Liter 4.500 45,000.00 202,500.00
kimia
air Liter 210.000 6.50 1,365.00
JUMLAH HARGA BAHAN 1,148,005.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,522,191.82
E Overhead & Profit (10 %) 10% x D (maksimum) 152,219.18
F Harga Satuan Pekerjaan (D+E) 1,674,411.00

Page 39
A.4.1.1.13. 1 m3 Beton menggunakan Ready Mixed dan Pompa Beton
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang Batu L.02 OH 0.250 147,992.00 36,998.00
Kepala tukang L.03 OH 0.025 149,992.00 3,749.80
Mandor L.04 OH 0.100 157,992.00 15,799.20
JUMLAH TENAGA KERJA 199,666.40
B BAHAN *
Beton Ready Mix K-250 M.09.x m3 1.020 63,000.00 64,260.00

JUMLAH HARGA BAHAN 64,260.00


C PERALATAN
1 Pompa dan Conveyor Beton E.24 Sewa-hari 0.120 200,000.00 24,000.00
JUMLAH HARGA ALAT 24,000.00

D Jumlah (A+B+C) 287,926.40


E Overhead & Profit (10 %) 10% x D (maksimum) 28,792.64
F Harga Satuan Pekerjaan (D+E) 316,719.04
* Harga sesuai dengan mutu beton yang digunakan

Penambahan Koefisien tenaga kerja dan / atau peralatan


Mengangkut /menaikan campuran beton dengan jarak > 5 m
A.4.1.1.13.a 1 m3 Beton dicorkan pada jarak < 25 m dengan beda tinggi < 1 m (manual )
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.410 143,119.40 58,678.95
Mandor L.04 OH 0.041 157,992.00 6,477.67
JUMLAH TENAGA KERJA 65,156.63
B BAHAN *

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 65,156.63


E Overhead & Profit (10 %) 10% x D (maksimum) 6,515.66
F Harga Satuan Pekerjaan (D+E) 71,672.29
* Harga sesuai dengan mutu beton yang digunakan

A.4.1.1.13.b 1 m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (Manual)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.500 143,119.40 71,559.70
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 79,459.30
B BAHAN *

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 79,459.30
E Overhead & Profit (10 %) 10% x D (maksimum) 7,945.93
F Harga Satuan Pekerjaan (D+E) 87,405.23
* Harga sesuai dengan mutu beton yang digunakan

A.4.1.1.13.c 1 m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (dengan Pompa Beton)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Mandor L.04 OH 0.020 157,992.00 3,159.84
JUMLAH TENAGA KERJA 31,783.72
B BAHAN *

JUMLAH HARGA BAHAN -


C PERALATAN
Pompa dan Conveyor Beton 0.120 200,000.00 24,000.00
JUMLAH HARGA ALAT 24,000.00
D Jumlah (A+B+C) 55,783.72

Page 40
E Overhead & Profit (10 %) 10% x D (maksimum) 5,578.37
F Harga Satuan Pekerjaan (D+E) 61,362.09
* Harga sesuai dengan mutu beton yang digunakan

Page 41
A.4.1.1.13.d 1 m3 Beton dicorkan pada tapak setiap kenaikan 4 m vertikal (manual)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Mandor L.04 OH 0.025 157,992.00 3,949.80
JUMLAH TENAGA KERJA 39,729.65
B BAHAN *

JUMLAH HARGA BAHAN -


C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 39,729.65
E Overhead & Profit (10 %) 10% x D (maksimum) 3,972.97
F Harga Satuan Pekerjaan (D+E) 43,702.62
* Harga sesuai dengan mutu beton yang digunakan

A.4.1.1.13.d 1 m3 Beton dicorkan pada tapak setiap kenaikan 4 m vertikal (dengan Pompa Beton)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Mandor L.04 OH 0.020 157,992.00 3,159.84
JUMLAH TENAGA KERJA 31,783.72
B BAHAN *

JUMLAH HARGA BAHAN -


C PERALATAN
Pompa dan Conveyor Beton 0.120 200,000.00 24,000.00
JUMLAH HARGA ALAT 24,000.00
D Jumlah (A+B+C) 55,783.72
E Overhead & Profit (10 %) 10% x D (maksimum) 5,578.37
F Harga Satuan Pekerjaan (D+E) 61,362.09
* Harga sesuai dengan mutu beton yang digunakan

A.4.1.1.13.e. 1 m3 Pemadatan Beton pada saat mengecor ( Vibrator )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Mandor L.04 OH 0.025 157,992.00 3,949.80
JUMLAH TENAGA KERJA 39,729.65
B BAHAN *
-
JUMLAH HARGA BAHAN -
C PERALATAN
1 CONCRETE VIBRATOR E.19 Sewa-hari 0.100 79,000.00 7,900.00
JUMLAH HARGA ALAT 7,900.00

D Jumlah (A+B+C) 47,629.65


E Overhead & Profit (10 %) 10% x D (maksimum) 4,762.97
F Harga Satuan Pekerjaan (D+E) 52,392.62
* Harga sesuai dengan mutu beton yang digunakan

A.4.1.1.13.f. 1 m3 Pemadatan Beton pada saat mengecor ( Manual )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.500 143,119.40 71,559.70
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 79,459.30
B BAHAN *
-
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 79,459.30


E Overhead & Profit (10 %) 10% x D (maksimum) 7,945.93
F Harga Satuan Pekerjaan (D+E) 87,405.23
* Harga sesuai dengan mutu beton yang digunakan

Page 42
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai Tabel berikut:

No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)


A TENAGA
Pekerja L.01 OH 2.100 143,119.40 300,550.74
Tukang Batu L.02 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.105 157,992.00 16,589.16
JUMLAH TENAGA KERJA 374,186.82
B BAHAN
semen portland kg 448.000 1,237.50 554,400.00
pasir beton kg 667.000 365.00 243,455.00
kerikil (maks 30 mm) kg 1,000.000 163.70 163,703.70
Bahan tambahan Liter 4.500 19,500.00 87,750.00
kimia
air Liter 210.000 6.50 1,365.00
JUMLAH HARGA BAHAN 1,050,673.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,424,860.52
E Overhead & Profit (10 %) 10% x D (maksimum) 142,486.05
F Harga Satuan Pekerjaan (D+E) 1,567,346.58
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%

A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.100 143,119.40 300,550.74
Tukang Batu L.02 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.105 157,992.00 16,589.16
JUMLAH TENAGA KERJA 374,186.82
B BAHAN
semen portland kg 400.000 1,300.00 520,000.00
pasir beton m3 0.480 230,000.00 110,400.00
Kerikil (2cm/3cm) m3 0.800 250,000.00 200,000.00
Strorox – 100 kg 1.200 -
JUMLAH HARGA BAHAN 830,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,204,586.82
E Overhead & Profit 10 %) 10% x D (maksimum) 120,458.68
F Harga Satuan Pekerjaan (D+E) 1,325,045.50

A.4.1.1.14 Pemasangan 1 m PVC Waterstop lebar 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.600 143,119.40 85,871.64
Tukang Batu/Pipa L.02 OH 0.030 147,992.00 4,439.76
Kepala tukang L.03 OH 0.003 149,992.00 449.98
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 91,235.35
B BAHAN
Waterstop lebar m 1.050 8,000.00
150 mm 8,400.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 91,235.35
E Overhead & Profit (10 %) 10% x D (maksimum) 9,123.54
F Harga Satuan Pekerjaan (D+E) 100,358.89

Page 43
A.4.1.1.15 Pemasangan 1 m PVC Waterstop lebar 200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.070 143,119.40 10,018.36
Tukang Batu/Pipa L.02 OH 0.035 147,992.00 5,179.72
Kepala tukang L.03 OH 0.004 149,992.00 599.97
Mandor L.04 OH 0.007 157,992.00 1,105.94
JUMLAH TENAGA KERJA 16,903.99
B BAHAN
Waterstop lebar 200 mm m 1.050 8,000.00 8,400.00
JUMLAH HARGA BAHAN 8,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 25,303.99
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 2,530.40
F Harga Satuan Pekerjaan (D+E) 27,834.39

A.4.1.1.16 Membuat 1 m PVC Waterstop lebar 230 mm – 320 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.080 143,119.40 11,449.55
Tukang Batu L.02 OH 0.040 147,992.00 5,919.68
Kepala tukang L.03 OH 0.004 149,992.00 599.97
Mandor L.04 OH 0.004 157,992.00 631.97
JUMLAH TENAGA KERJA 18,601.17
B BAHAN
Waterstop lebar m 1.050 8,000.00
230 mm - 320 mm 8,400.00
JUMLAH HARGA BAHAN 8,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 27,001.17
E Overhead & Profit (10 %) 10% x D (maksimum) 2,700.12
F Harga Satuan Pekerjaan (D+E) 29,701.28

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.070 143,119.40 10,018.36
Tukang besi L.02 OH 0.071 147,992.00 10,507.43
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.004 157,992.00 631.97
JUMLAH TENAGA KERJA 22,207.70
B BAHAN
Besi beton Kg 10.500 14,000.00
(polos/ulir) 147,000.00
Kawat beton Kg 0.150 15,000.00 2,250.00
JUMLAH HARGA BAHAN 149,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 171,457.70
E Overhead & Profit (10%) 10% x D (maksimum) 17,145.77
F Harga Satuan Pekerjaan (D+E) 188,603.47

A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.050 143,119.40 7,155.97
Tukang besi L.02 OH 0.505 147,992.00 74,735.96
Kepala tukang L.03 OH 0.005 149,992.00 749.96
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 83,115.87
B BAHAN
Besi beton Kg 10.500 14,000.00
(polos/ulir) 147,000.00
Kawat beton Kg 0.100 15,000.00 1,500.00
JUMLAH HARGA BAHAN 148,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 231,615.87
E Overhead & Profit (10 %) 10% x D (maksimum) 23,161.59

Page 44
F Harga Satuan Pekerjaan (D+E) 254,777.45

Page 45
A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.025 143,119.40 3,577.99
Tukang besi L.02 OH 0.025 147,992.00 3,699.80
Kepala tukang L.03 OH 0.025 149,992.00 3,749.80
Mandor L.04 OH 0.001 157,992.00 157.99
JUMLAH TENAGA KERJA 11,185.58
B BAHAN
Jaring kawat Kg 10.200 35,000.00
baja dilas 357,000.00
Kawat beton Kg 0.050 15,000.00 750.00
JUMLAH HARGA BAHAN 357,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 368,935.58
E Overhead & Profit (10 %) 10% x D (maksimum) 36,893.56
F Harga Satuan Pekerjaan (D+E) 405,829.13

A.4.1.1.19.a Mengangkut /menaikan 100 Kg tulangan setiap kenaikan vertikal 4 m atau jarak horizontal setiap 25 m ke tapak pemasangan
(manual vertikal 4 m)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang besi L.02 OH 0.100 147,992.00 14,799.20
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 62,474.78
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 62,474.78
E Overhead & Profit (10 %) 10% x D (maksimum) 6,247.48
F Harga Satuan Pekerjaan (D+E) 68,722.26

A.4.1.1.19.b Mengangkut /menaikan 100 Kg tulangan setiap kenaikan vertikal 4 m atau jarak horizontal setiap 25 m ke tapak pemasangan
(mekanis penambahan jarak 10 m s/d 25 m)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang besi L.02 OH 0.040 147,992.00 5,919.68
Mandor L.04 OH 0.020 157,992.00 3,159.84
JUMLAH TENAGA KERJA 37,703.40
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Crane E.07 Sewa-hari 0.025 228,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 43,403.40
E Overhead & Profit (10 %) 10% x D (maksimum) 4,340.34
F Harga Satuan Pekerjaan (D+E) 47,743.74

A.4.1.1.19.c Mengangkut /menaikan 100 Kg tulangan setiap kenaikan vertikal 4 m atau jarak horizontal setiap 25 m ke tapak pemasangan
( Setiap penambahan jarak 25 m)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang besi L.02 OH 0.100 147,992.00 14,799.20
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 62,474.78
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Crane E.07 Sewa-hari 0.025 228,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 68,174.78
E Overhead & Profit (10 %) 10% x D (maksimum) 6,817.48
F Harga Satuan Pekerjaan (D+E) 74,992.26

Page 46
A.4.1.1.19.c Mengangkut /menaikan 100 Kg tulangan setiap kenaikan vertikal 4 m atau jarak horizontal setiap 25 m ke tapak pemasangan
(Mekanis setiap kenaikan 4m)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang besi L.02 OH 0.100 147,992.00 14,799.20
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 62,474.78
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Crane E.07 Sewa-hari 0.025 228,000.00 5,700.00
JUMLAH HARGA ALAT 5,700.00
D Jumlah (A+B+C) 68,174.78
E Overhead & Profit (10 %) 10% x D (maksimum) 6,817.48
F Harga Satuan Pekerjaan (D+E) 74,992.26

A.4.1.1.20a (K3) Pemasangan 1 m2 bekisting untuk pondasi ( 1 x pakai )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.520 143,119.40 74,422.09
Tukang kayu L.02 OH 0.260 147,992.00 38,477.92
Kepala tukang L.03 OH 0.026 149,992.00 3,899.79
Mandor L.04 OH 0.026 157,992.00 4,107.79
JUMLAH TENAGA KERJA 120,907.59
B BAHAN
Kayu kelas III m3 0.040 6,215,000.00 248,600.00
Paku 5 – 10 cm Kg 0.300 18,500.00 5,550.00
Minyak bekisting Liter 0.100 30,000.00 3,000.00
JUMLAH HARGA BAHAN 257,150.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 378,057.59
E Overhead & Profit 10 % 10% x D (maksimum) 37,805.76
F Harga Satuan Pekerjaan (D+E) 415,863.35
Catatan : Bahan digunakan berulang kali
yang ke -1, koefisien 0,040 (kayu kelas III)
yang ke -2,koefisien 0,022 (kayu kelas III )
yang ke-3, koefisien 0,015 (kayu kelas III)

A.4.1.1.20b (K3) Pemasangan 1 m2 bekisting untuk pondasi (2 x pakai )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.520 143,119.40 74,422.09
Tukang kayu L.02 OH 0.260 147,992.00 38,477.92
Kepala tukang L.03 OH 0.026 149,992.00 3,899.79
Mandor L.04 OH 0.026 157,992.00 4,107.79
JUMLAH TENAGA KERJA 120,907.59
B BAHAN
Kayu kelas III m3 0.022 6,215,000.00 136,730.00
Paku 5 – 10 cm Kg 0.300 18,500.00 5,550.00
Minyak bekisting Liter 0.100 30,000.00 3,000.00
JUMLAH HARGA BAHAN 145,280.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 266,187.59
E Overhead & Profit 10 % 10% x D (maksimum) 26,618.76
F Harga Satuan Pekerjaan (D+E) 292,806.35
Catatan : Bahan digunakan berulang kali
yang ke -1, koefisien 0,040 (kayu kelas III)
yang ke -2,koefisien 0,022 (kayu kelas III )
yang ke-3, koefisien 0,015 (kayu kelas III)

Page 47
A.4.1.1.21.a (K3) Pemasangan 1 m2 bekisting untuk sloof ( 1x pakai )
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.520 143,119.40 74,422.09
Tukang kayu L.02 OH 0.260 147,992.00 38,477.92
Kepala tukang L.03 OH 0.026 149,992.00 3,899.79
Mandor L.04 OH 0.026 157,992.00 4,107.79
JUMLAH TENAGA KERJA 120,907.59
B BAHAN
Kayu kelas III m3 0.045 6,215,000.00 279,675.00
Paku 5 – 10 cm Kg 0.300 18,500.00 5,550.00
Minyak bekisting Liter 0.100 30,000.00 3,000.00
JUMLAH HARGA BAHAN 288,225.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 409,132.59
E Overhead & Profit 10% 10% x D (maksimum) 40,913.26
F Harga Satuan Pekerjaan (D+E) 450,045.85
Catatan : Bahan digunakan berulang kali
yang ke -1, koefisien 0,045 (kayu kelas III)
yang ke -2,koefisien 0,024 (kayu kelas III )
yang ke-3, koefisien 0,015 (kayu kelas III)

A.4.1.1.21.b (K3) Pemasangan 1 m2 bekisting untuk sloof (2 x pakai )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.520 143,119.40 74,422.09
Tukang kayu L.02 OH 0.260 147,992.00 38,477.92
Kepala tukang L.03 OH 0.026 149,992.00 3,899.79
Mandor L.04 OH 0.026 157,992.00 4,107.79
JUMLAH TENAGA KERJA 120,907.59
B BAHAN
Kayu kelas III m3 0.024 6,215,000.00 149,160.00
Paku 5 – 10 cm Kg 0.300 18,500.00 5,550.00
Minyak bekisting Liter 0.100 30,000.00 3,000.00
JUMLAH HARGA BAHAN 157,710.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 278,617.59
E Overhead & Profit 10% 10% x D (maksimum) 27,861.76
F Harga Satuan Pekerjaan (D+E) 306,479.35
Catatan : Bahan digunakan berulang kali
yang ke -1, koefisien 0,045 (kayu kelas III)
yang ke -2,koefisien 0,024 (kayu kelas III )
yang ke-3, koefisien 0,015 (kayu kelas III)

B.24.a Pemasangan 1 m2 bekisting kolom beton expose menggunakan multiplex 18 mm phenolic ( 1 x pakai )
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 143,119.40 94,458.80
Tukang kayu L.02 OH 0.330 147,992.00 48,837.36
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 153,459.64
B BAHAN
Kayu kelas III m3 0.040 6,215,000.00 248,600.00
Paku 5 cm – 12 cm Kg 0.400 18,500.00 7,400.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas II m3 0.015 7,205,000.00 108,075.00
Multiplex 18 mm Phenolic Lbr 0.350 300,000.00 105,000.00
Dolken kayu ᴓ 8 -10cm – 4 m Batang 2.000 27,000.00 54,000.00
JUMLAH HARGA BAHAN 529,075.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 682,534.64
E Overhead & Profit 10 % 10% x D (maksimum) 68,253.46
F Harga Satuan Pekerjaan (D+E) 750,788.10
Catatan : Bahan digunakan berulang kali
yang ke -1, koefisien 0,350 (multiplex phenolic); 0,040 (kayu kelas II) ; 0,015 (Balok kayu kelas II ) dan 2,00 ( Dolken )
yang ke -2 koefisien 0,193 (multiplex phenolic); 0,022 (kayu kelas II) ; 0,0083 (Balok kayu kelas II ) dan 1,100 (dolken )
yang ke -3, koefisien 0,12 (multiplex phenolic);0,013 (kayu kelas II) dan 0,0049 (Balok kayu kelas II ) dan 0,66 (Dolken )

Page 48
B.24.b Pemasangan 1 m2 bekisting kolom beton expose menggunakan multiplex 18 mm phenolic ( 2 x pakai)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 143,119.40 94,458.80
Tukang kayu L.02 OH 0.330 147,992.00 48,837.36
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 153,459.64
B BAHAN
Kayu kelas III m3 0.022 6,215,000.00 136,730.00
Paku 5 cm – 12 cm Kg 0.400 18,500.00 7,400.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas II m3 0.008 7,205,000.00 59,801.50
Multiplex 18 mm Phenolic Lbr 0.193 300,000.00 57,900.00
Dolken kayu ᴓ 8 -10cm – 4 m Batang 1.100 27,000.00 29,700.00
JUMLAH HARGA BAHAN 297,531.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 450,991.14
E Overhead & Profit 10 % 10% x D (maksimum) 45,099.11
F Harga Satuan Pekerjaan (D+E) 496,090.25
Catatan : Bahan digunakan berulang kali
yang ke -1, koefisien 0,350 (multiplex phenolic); 0,040 (kayu kelas II) ; 0,015 (Balok kayu kelas II ) dan 2,00 ( Dolken )
yang ke -2 koefisien 0,193 (multiplex phenolic); 0,022 (kayu kelas II) ; 0,0083 (Balok kayu kelas II ) dan 1,100 (dolken )
yang ke -3, koefisien 0,12 (multiplex phenolic);0,013 (kayu kelas II) dan 0,0049 (Balok kayu kelas II ) dan 0,66 (Dolken )

A.4.1.1.22a (K3) Pemasangan 1 m2 bekisting untuk kolom ( 1 x pakai )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 143,119.40 94,458.80
Tukang kayu L.02 OH 0.330 147,992.00 48,837.36
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 153,459.64
B BAHAN
Kayu kelas III m3 0.040 6,215,000.00 248,600.00
Paku 5 cm – 12 cm Kg 0.400 18,500.00 7,400.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas II m3 0.015 7,205,000.00 108,075.00
Plywood tebal 9 mm Lbr 0.350 126,500.00 44,275.00
Dolken kayu ᴓ 8 -10cm – 4 m Batang 2.000 27,000.00 54,000.00
JUMLAH HARGA BAHAN 468,350.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 621,809.64
E Overhead & Profit 10 % 10% x D (maksimum) 62,180.96
F Harga Satuan Pekerjaan (D+E) 683,990.60
Catatan : Bahan digunakan berulang kali
yang ke -1, koefisien 0,350 (multiplex ); 0,040 (kayu kelas II) ; 0,015 (Balok kayu kelas II ) dan 2,00 ( Dolken )
yang ke -2 koefisien 0,193 (multiplex ); 0,022 (kayu kelas II) ; 0,0083 (Balok kayu kelas II ) dan 1,100 (dolken )
yang ke -3, koefisien 0,12 (multiplex );0,013 (kayu kelas II) dan 0,0049 (Balok kayu kelas II ) dan 0,66 (Dolken )

Page 49
A.4.1.1.22b (K3) Pemasangan 1 m2 bekisting untuk kolom ( 2 x pakai )
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 143,119.40 94,458.80
Tukang kayu L.02 OH 0.330 147,992.00 48,837.36
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 153,459.64
B BAHAN
Kayu kelas III m3 0.015 6,215,000.00 93,225.00
Paku 5 cm – 12 cm Kg 0.400 18,500.00 7,400.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas II m3 0.008 7,205,000.00 59,801.50
Plywood tebal 9 mm Lbr 0.350 126,500.00 44,275.00
Dolken kayu ᴓ 8 -10cm – 4 m Batang 1.100 27,000.00 29,700.00
JUMLAH HARGA BAHAN 240,401.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 393,861.14
E Overhead & Profit 10 % 10% x D (maksimum) 39,386.11
F Harga Satuan Pekerjaan (D+E) 433,247.25
Catatan : Bahan digunakan berulang kali
yang ke -1, koefisien 0,350 (multiplex ); 0,040 (kayu kelas II) ; 0,015 (Balok kayu kelas II ) dan 2,00 ( Dolken )
yang ke -2 koefisien 0,193 (multiplex ); 0,022 (kayu kelas II) ; 0,0083 (Balok kayu kelas II ) dan 1,100 (dolken )
yang ke -3, koefisien 0,12 (multiplex );0,013 (kayu kelas II) dan 0,0049 (Balok kayu kelas II ) dan 0,66 (Dolken )

B.23 1 m2 bekisting balok beton expose menggunakan multiplex phenolic 18 mm ( 1 x pakai )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 143,119.40 94,458.80
Tukang kayu L.02 OH 0.330 147,992.00 48,837.36
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 153,459.64
B BAHAN
Kayu kelas III m3 0.040 6,215,000.00 248,600.00
Paku 5 cm – 12 cm Kg 0.400 18,500.00 7,400.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas II m3 0.018 7,205,000.00 129,690.00
Multiplex 18 mm Phenolic Lbr 0.350 300,000.00 105,000.00
Dolken kayu ᴓ 8 -10cm –panj 4 Batang 2.000 27,000.00
m 54,000.00
JUMLAH HARGA BAHAN 550,690.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 704,149.64
E Overhead & Profit 10 % 10% x D (maksimum) 70,414.96
F Harga Satuan Pekerjaan (D+E) 774,564.60
Catatan : Bahan digunakan berulang kali
yang ke -1, koefisien 0,350 (multiplex phenolic); 0,040 (kayu kelas II) ; 0,015 (Balok kayu kelas II ) dan 2,00 ( Dolken )
yang ke -2 koefisien 0,193 (multiplex phenolic); 0,022 (kayu kelas II) ; 0,0083 (Balok kayu kelas II ) dan 1,100 (dolken )
yang ke -3, koefisien 0,12 (multiplex phenolic);0,013 (kayu kelas II) dan 0,0049 (Balok kayu kelas II ) dan 0,66 (Dolken )

A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 143,119.40 94,458.80
Tukang kayu L.02 OH 0.330 147,992.00 48,837.36
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 153,459.64
B BAHAN
Kayu kelas III m3 0.040 6,215,000.00 248,600.00
Paku 5 cm – 12 cm Kg 0.400 18,500.00 7,400.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas II m3 0.018 7,205,000.00 129,690.00
Plywood tebal 9 mm Lbr 0.350 126,500.00 44,275.00
Dolken kayu ᴓ 8 -10cm –panj 4 Batang 2.000 27,000.00
m 54,000.00
JUMLAH HARGA BAHAN 489,965.00
C PERALATAN
JUMLAH HARGA ALAT
Page 50
D Jumlah (A+B+C) 643,424.64
E Overhead & Profit 10 % 10% x D (maksimum) 64,342.46
F Harga Satuan Pekerjaan (D+E) 707,767.10

Page 51
A.4.1.1.24a (K3) Pemasangan 1 m2 bekisting untuk lantai (1 x pakai )
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 143,119.40 94,458.80
Tukang kayu L.02 OH 0.330 147,992.00 48,837.36
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 153,459.64
B BAHAN
Kayu kelas III m3 0.040 6,215,000.00 248,600.00
Paku 5 cm – 12 cm Kg 0.400 18,500.00 7,400.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas II m3 0.015 7,205,000.00 108,075.00
Plywood tebal 9 mm Lbr 0.350 126,500.00 44,275.00
Dolken kayu ᴓ 8 -10cm –panj 4 Batang 6.000 27,000.00
m 162,000.00
JUMLAH HARGA BAHAN 576,350.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 729,809.64
E Overhead & Profit 10 %) 10% x D (maksimum) 72,980.96
F Harga Satuan Pekerjaan (D+E) 802,790.60

A.4.1.1.24b (K3) Pemasangan 1 m2 bekisting untuk lantai (2 x pakai )


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 143,119.40 94,458.80
Tukang kayu L.02 OH 0.330 147,992.00 48,837.36
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 153,459.64
B BAHAN
Kayu kelas III m3 0.023 6,215,000.00 142,945.00
Paku 5 cm – 12 cm Kg 0.400 18,500.00 7,400.00
Minyak bekisting Liter 0.200 30,000.00 6,000.00
Balok kayu kelas II m3 0.0086 7,205,000.00 61,963.00
Plywood tebal 9 mm Lbr 0.201 126,500.00 25,426.50
Dolken kayu ᴓ 8 -10cm – Batang 3.300 27,000.00
panjang 4 m 89,100.00
JUMLAH HARGA BAHAN 332,834.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 486,294.14
E Overhead & Profit 10 %) 10% x D (maksimum) 48,629.41
F Harga Satuan Pekerjaan (D+E) 534,923.55
Catatan :
Bahan digunakan berulang kali,
yang ke-1, koefisien 0,350 (plywood) ; 0,040 (Kayu kelas III) ; 0,015 ( Kayu kelas II ) dan Dolken 6 batang
yang ke-2, koefisien 0,201 (plywood) ; 0,023 (Kayu kelas III) dan 0,0086 (Kayu kelas II ) dan dolken 3,30 Batang
yang ke-3, koefisien 0,127 (plywood) ; 0,014 (Kayu kelas III) dan 0,0054 (Kayu kelas II ) dan Dolken 1,951 batang

A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 143,119.40 94,458.80
Tukang kayu L.02 OH 0.330 147,992.00 48,837.36
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 153,459.64
B BAHAN
Kayu kelas III m3 0.030 5,500,000.00 165,000.00
Paku 5 cm – 12 cm Kg 0.400 16,000.00 6,400.00
Minyak bekisting Liter 0.200 38,000.00 7,600.00
Balok kayu kelas II m3 0.020 7,000,000.00 140,000.00
Plywood tebal 9 mm Lbr 0.350 105,000.00 36,750.00
Dolken kayu ᴓ 8 -10cm –panj 4 Batang 3.000 27,000.00 81,000.00
m
Penjaga jarak Buah 4.000 1,300.00 5,200.00
bekisting/spacer
JUMLAH HARGA BAHAN 441,950.00
C PERALATAN
Page 52
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 595,409.64
E Overhead & Profit 10 % 10% x D (maksimum) 59,540.96
F Harga Satuan Pekerjaan (D+E) 654,950.60

Page 53
A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 143,119.40 94,458.80
Tukang kayu L.02 OH 0.330 147,992.00 48,837.36
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 153,459.64
B BAHAN
Kayu kelas III m3 0.030 5,500,000.00 165,000.00
Paku 5 cm – 12 cm Kg 0.400 16,000.00 6,400.00
Minyak bekisting Liter 0.400 38,000.00 15,200.00
Balok kayu kelas II m3 0.015 7,000,000.00 105,000.00
Plywood tebal 9 mm Lbr 0.350 105,000.00 36,750.00
Dolken kayu ᴓ 8 -10cm –panj 4 Batang 2.000 27,000.00
m 54,000.00
JUMLAH HARGA BAHAN 382,350.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 535,809.64
E Overhead & Profit 10% 10% x D (maksimum) 53,580.96
F Harga Satuan Pekerjaan (D+E) 589,390.60

B.22.a 1 m2 Bekisting lantai Floordeck tipe pelat (JAP≤ 0,6 m)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA KERJA Kode
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang Kayu L.02 OH 0.050 147,992.00 7,399.60
Kepala Tukang L.03 OH 0.005 149,992.00 749.96
Mandor L.04 OH 0.010 157,992.00 1,579.92
JUMLAH TENAGA KERJA 24,041.42
B BAHAN
Kaso 5/7 m3 0.0030 3,500,000.00 10,500.00
Balok 8/12 m3 0.0068 5,789,930.56 39,371.53
Paku 7cm - 12 cm Kg 0.270 16,000.00 4,320.00
Floordeck m2 1.080 92,000.00 99,360.00
JUMLAH HARGA BAHAN 153,551.53
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 177,592.95
E Overhead & Profit (10 %) 10% x D (maksimum) 17,759.29
F Harga Satuan Pekerjaan (D+E) 195,352.24

B.22.b 1 m2 Bekisting lantai Floordeck tipe pelat (JAP≤ 0,8 m)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA KERJA Kode
Pekerja L.01 OH 0.080 143,119.40 11,449.55
Tukang Kayu L.02 OH 0.040 147,992.00 5,919.68
Kepala Tukang L.03 OH 0.004 149,992.00 599.97
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 19,233.14
B BAHAN
Kaso 5/7 m3 0.0014 3,500,000.00 4,900.00
Balok 8/12 m3 0.0089 5,789,930.56 51,530.38
Paku 7cm - 12 cm Kg 0.230 16,000.00 3,680.00
Floordeck m2 1.080 92,000.00 99,360.00
JUMLAH HARGA BAHAN 159,470.38
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 178,703.52
E Overhead & Profit (10 %) 10% x D (maksimum) 17,870.35
F Harga Satuan Pekerjaan (D+E) 196,573.87

Page 54
B.22.c 1 m2 Bekisting lantai Floordeck tipe pelat (JAP≤ 1,2 m)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA KERJA Kode
Pekerja L.01 OH 0.0540 143,119.40 7,728.45
Tukang Kayu L.02 OH 0.0270 147,992.00 3,995.78
Kepala Tukang L.03 OH 0.0027 149,992.00 404.98
Mandor L.04 OH 0.0054 157,992.00 853.16
JUMLAH TENAGA KERJA 12,982.37
B BAHAN
Kaso 5/7 m3 0.0014 3,500,000.00 4,900.00
Balok 8/12 m3 0.0078 5,789,930.56 45,161.46
Paku 7cm - 12 cm Kg 0.210 16,000.00 3,360.00
Floordeck m2 1.080 92,000.00 99,360.00
JUMLAH HARGA BAHAN 152,781.46
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 165,763.83
E Overhead & Profit (10 %) 10% x D (maksimum) 16,576.38
F Harga Satuan Pekerjaan (D+E) 182,340.21

B.22.d 1 m2 Bekisting lantai Floordeck tipe pelat (JAP≤ 2 m)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA KERJA Kode
Pekerja L.01 OH 0.0420 143,119.40 6,011.01
Tukang Kayu L.02 OH 0.0210 147,992.00 3,107.83
Kepala Tukang L.03 OH 0.0021 149,992.00 314.98
Mandor L.04 OH 0.0042 157,992.00 663.57
JUMLAH TENAGA KERJA 10,097.40
B BAHAN
Kaso 5/7 m3 0.0010 3,500,000.00 3,500.00
Balok 8/12 m3 0.0078 5,789,930.56 45,161.46
Paku 7cm - 12 cm Kg 0.200 16,000.00 3,200.00
Floordeck m2 1.080 92,000.00 99,360.00
JUMLAH HARGA BAHAN 151,221.46
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 161,318.85
E Overhead & Profit (10 %) 10% x D (maksimum) 16,131.89
F Harga Satuan Pekerjaan (D+E) 177,450.74

A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang kayu L.02 OH 0.050 147,992.00 7,399.60
Kepala tukang L.03 OH 0.005 149,992.00 749.96
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 30,881.41
B BAHAN
Kayu kelas III m3 0.026 5,500,000.00 145,200.00
Paku 5 cm – 12 cm Kg 0.600 16,000.00 9,600.00
Dolken kayu , Batang 0.500 27,000.00
 8–10panjang 4m 13,500.00
JUMLAH HARGA BAHAN 168,300.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 199,181.41
E Overhead & Profit 10 % 10% x D (maksimum) 19,918.14
F Harga Satuan Pekerjaan (D+E) 219,099.55

Page 55
A.4.1.1.35 Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.180 143,119.40 25,761.49
Tukang batu L.02 OH 0.020 147,992.00 2,959.84
Tukang kayu L.02 OH 0.020 147,992.00 2,959.84
Tukang besi L.02 OH 0.020 147,992.00 2,959.84
Kepala tukang L.03 OH 0.006 149,992.00 899.95
Mandor L.04 OH 0.009 157,992.00 1,421.93
JUMLAH TENAGA KERJA 36,962.89
B BAHAN
Kayu kelas III m3 0.002 5,500,000.00 11,000.00
Paku 5 cm – 12 cm Kg 0.010 16,000.00 160.00
Minyak bekisting Liter 0.150 38,000.00 5,700.00
Besi beton polos kg 3.000 13,000.00 39,000.00
Kawat beton kg 0.450 15,000.00 6,750.00
Semen Portland kg 4.000 1,300.00 5,200.00
Pasir Beton m3 0.006 230,000.00 1,380.00
Kerikil m3 0.009 250,000.00 2,250.00
JUMLAH HARGA BAHAN 71,440.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 108,402.89
E Overhead & Profit 10% 10% x D (maksimum) 10,840.29
F Harga Satuan Pekerjaan (D+E) 119,243.18

A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.297 143,119.40 42,506.46
Tukang batu L.02 OH 0.033 147,992.00 4,883.74
Tukang kayu L.02 OH 0.033 147,992.00 4,883.74
Tukang besi L.02 OH 0.033 147,992.00 4,883.74
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,027.47
B BAHAN
Kayu kelas III m3 0.003 5,500,000.00 16,500.00
Paku 5 cm – 12 cm Kg 0.020 16,000.00 320.00
Minyak bekisting Liter 0.150 38,000.00 5,700.00
Besi beton polos kg 3.600 13,000.00 46,800.00
Kawat beton kg 0.050 15,000.00 750.00
Semen Portland kg 5.500 1,300.00 7,150.00
Pasir Beton m3 0.009 230,000.00 2,070.00
Kerikil m3 0.015 250,000.00 3,750.00
JUMLAH HARGA BAHAN 83,040.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 144,067.47
E Overhead & Profit 10%) 10% x D (maksimum) 14,406.75
F Harga Satuan Pekerjaan (D+E) 158,474.22

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK

Untuk produksi pracetak bisa dilakukan di pabrik (cor di plant) atau lapangan (cast in place). Indeks yang ada dalam pedoman ini hanyan
untuk produksi yang dilakukan dilapangan, terutama untuk analisa cetakan ( bekisting) pracetak baik untuk komponen kolom balok dan pelat.
A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.132 143,119.40 18,891.76
Tukang batu L.02 OH 0.022 147,992.00 3,255.82
Kepala tukang L.03 OH 0.002 149,992.00 299.98
Mandor L.04 OH 0.007 157,992.00 1,105.94
JUMLAH TENAGA KERJA 23,553.51
B BAHAN
Semen PC Kg 26.080 1,300.00 33,904.00
Pasir beton Kg 60.800 230.00 13,984.00
Kerikil (maks 30 mm) Kg 82.320 208.33 17,149.73
Air Liter 17.200 6.50 111.80
JUMLAH HARGA BAHAN 65,149.53
C PERALATAN

Page 56
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 88,703.04
E Overhead & Profit 10% 10% x D (maksimum) 8,870.30
F Harga Satuan Pekerjaan (D+E) 97,573.34

Page 57
A.4.1.2.2.(K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.165 143,119.40 23,614.70
Tukang batu L.02 OH 0.028 147,992.00 4,143.78
Kepala tukang L.03 OH 0.003 149,992.00 449.98
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 29,472.39
B BAHAN
Semen PC Kg 32.600 1,300.00 42,380.00
Pasir beton Kg 76.000 230.00 17,480.00
Kerikil (maks 30 mm) Kg 102.000 208.33 21,249.66
Air Liter 21.500 6.50 139.75
JUMLAH HARGA BAHAN 81,249.41
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 110,721.80
E Overhead & Profit 10 % 10% x D (maksimum) 11,072.18
F Harga Satuan Pekerjaan (D+E) 121,793.98

A.4.1.2.3.(K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.198 143,119.40 28,337.64
Tukang batu L.02 OH 0.033 147,992.00 4,883.74
Kepala tukang L.03 OH 0.003 149,992.00 449.98
Mandor L.04 OH 0.010 157,992.00 1,579.92
JUMLAH TENAGA KERJA 35,251.27
B BAHAN
Semen PC Kg 39.120 1,300.00 50,856.00
Pasir beton Kg 91.200 230.00 20,976.00
Kerikil (maks 30 mm) Kg 123.480 208.33 25,724.59
Air Liter 25.800 6.50 167.70
JUMLAH HARGA BAHAN 97,724.29
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 132,975.56
E Overhead & Profit 10 % 10% x D (maksimum) 13,297.56
F Harga Satuan Pekerjaan (D+E) 146,273.12

A.4.1.2.4.(K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5MPa, slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.248 143,119.40 35,493.61
Tukang batu L.02 OH 0.041 147,992.00 6,067.67
Kepala tukang L.03 OH 0.004 149,992.00 599.97
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 44,215.15
B BAHAN
Semen PC Kg 48.900 1,300.00 63,570.00
Pasir beton Kg 114.000 230.00 26,220.00
Kerikil (maks 30 mm) Kg 154.350 208.33 32,155.74
Air Liter 32.250 6.50 209.63
JUMLAH HARGA BAHAN 122,155.36
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 166,370.51
E Overhead & Profit 10 % 10% x D (maksimum) 16,637.05
F Harga Satuan Pekerjaan (D+E) 183,007.56

Page 58
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5MPa, slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.248 143,119.40 35,493.61
Tukang batu L.02 OH 0.041 147,992.00 6,067.67
Kepala tukang L.03 OH 0.004 149,992.00 599.97
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 44,215.15
B BAHAN
Semen PC Kg 48.900 1,300.00 63,570.00
Pasir beton Kg 114.000 230.00 26,220.00
Kerikil (maks 30 mm) Kg 154.350 208.33 32,155.74
Air Liter 32.250 6.50 209.63
JUMLAH HARGA BAHAN 122,155.36
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 166,370.51
E Overhead & Profit 10 % 10% x D (maksimum) 16,637.05
F Harga Satuan Pekerjaan (D+E) 183,007.56

A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kalipakai)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.007 143,119.40 1,001.84
Tukang batu L.02 OH 0.076 147,992.00 11,247.39
Kepala tukang L.03 OH 0.008 149,992.00 1,199.94
Mandor L.04 OH 0.001 157,992.00 157.99
JUMLAH TENAGA KERJA 13,607.16
B BAHAN
Lantai kerja t=10cm m3 0.008 121,793.98 974.35
Besi hollow (50 x 50 x 3) mm
Kg 9.394 38,333.33 360,103.33

Kayu kaso 5/7 (lebar 5 cm, tinggi m3 0.005 5,175,000.00 25,875.00


7cm)
Phenol film 12 mm Lbr 0.080 155,000.00 12,400.00
Minyak cetakan Liter 0.200 38,000.00
(bekisting) 7,600.00
Dinabolt Ø 12mm Buah 3.882 2,500.00
(10 s.d.15 cm) 9,705.00
JUMLAH HARGA BAHAN 416,657.69
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 430,264.84
E Overhead & Profit 10 % 10% x D (maksimum) 43,026.48
F Harga Satuan Pekerjaan (D+E) 473,291.33

A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kalipakai)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.004 143,119.40 572.48
Tukang batu L.02 OH 0.038 147,992.00 5,623.70
Kepala tukang L.03 OH 0.004 149,992.00 599.97
Mandor L.04 OH 0.001 157,992.00 157.99
JUMLAH TENAGA KERJA 6,954.13
B BAHAN
Kayu kaso 5/7 (lebar 5
cm, tinggi 7 cm) M3 0.005 5,175,000.00
25,875.00
Phenol film 12 mm Lbr 0.043 155,000.00 6,665.00
Minyak cetakan
(bekisting) L 0.200 38,000.00
7,600.00
Paku (5 s.d.7) cm Kg 0.046 16,000.00 736.00
Dinabolt Ø 12mm Buah 0.693 2,500.00
(10 s.d.15 cm) 1,732.50
JUMLAH HARGA BAHAN 42,608.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 49,562.63
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 7,434.40
F Harga Satuan Pekerjaan (D+E) 56,997.03

Page 59
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12kali pakai)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.004 143,119.40 572.48
Tukang batu L.02 OH 0.038 147,992.00 5,623.70
Kepala tukang L.03 OH 0.004 149,992.00 599.97
Mandor L.04 OH 0.001 157,992.00 157.99
JUMLAH TENAGA KERJA 6,954.13
B BAHAN
Kayu kaso 5/7 (lebar 5 cm, tinggi
7 cm) M3 0.004 5,175,000.00 20,700.00

Phenol film 12 mm Lbr 0.043 155,000.00 6,665.00


Minyak cetakan
(bekisting) L 0.200 38,000.00
7,600.00
Paku (5 s.d.7) cm Kg 0.046 16,000.00 736.00
Dinabolt Ø 12mm Buah 0.693 2,500.00
(10 s.d.15 cm) 1,732.50
JUMLAH HARGA BAHAN 37,433.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 44,387.63
E Overhead & Profit 10 %) 10% x D (maksimum) 4,438.76
F Harga Satuan Pekerjaan (D+E) 48,826.40

A.4.1.2.8.Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.053 143,119.40 7,585.33
Tukang kayu L.02 OH 0.018 147,992.00 2,663.86
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 11,039.14
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 11,039.14
E Overhead & Profit 10%) 10% x D (maksimum) 1,103.91
F Harga Satuan Pekerjaan (D+E) 12,143.06

A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.089 143,119.40 12,737.63
Tukang kayu L.02 OH 0.030 147,992.00 4,439.76
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 17,967.35
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,967.35
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 2,695.10
F Harga Satuan Pekerjaan (D+E) 20,662.45

A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.071 143,119.40 10,161.48
Tukang kayu L.02 OH 0.024 147,992.00 3,551.81
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 14,503.25
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 14,503.25
E Overhead & Profit 10%) 10% x D (maksimum) 1,450.32
F Harga Satuan Pekerjaan (D+E) 15,953.57

Page 60
A.4.1.2.11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.064 143,119.40 9,159.64
Tukang batu L.02 OH 0.244 147,992.00 36,110.05
Tukang vibrator L.02 OH 0.128 147,992.00 18,942.98
Kepala tukang L.03 OH 0.034 149,992.00 5,099.73
Mandor L.04 OH 0.073 157,992.00 11,533.42
JUMLAH TENAGA KERJA 80,845.81
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 80,845.81
E Overhead & Profit 10% 10% x D (maksimum) 8,084.58
F Harga Satuan Pekerjaan (D+E) 88,930.39

A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.069 143,119.40 9,875.24
Tukang batu L.02 OH 0.242 147,992.00 35,814.06
Tukang vibrator L.02 OH 0.138 147,992.00 20,422.90
Kepala tukang L.03 OH 0.037 149,992.00 5,549.70
Mandor L.04 OH 0.073 157,992.00 11,533.42
JUMLAH TENAGA KERJA 83,195.32
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 83,195.32
E Overhead & Profit 10 % 10% x D (maksimum) 8,319.53
F Harga Satuan Pekerjaan (D+E) 91,514.85

A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.061 143,119.40 8,730.28
Tukang batu L.02 OH 0.213 147,992.00 31,522.30
Tukang vibrator L.02 OH 0.122 147,992.00 18,055.02
Kepala tukang L.03 OH 0.033 149,992.00 4,949.74
Mandor/Supervisor/
Penyelia L.04 OH 0.073 157,992.00 11,533.42

JUMLAH TENAGA KERJA 74,790.76


B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 74,790.76
E Overhead & Profit 10 % 10% x D (maksimum) 7,479.08
F Harga Satuan Pekerjaan (D+E) 82,269.83

A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Operator crane L.08 OH 0.067 25,413.00 1,702.67
Pembantu operator crane
L.09 OH 0.067 22,413.00 1,501.67

Pekerja L.01 OH 0.067 143,119.40 9,589.00


Tukang batu L.02 OH 0.067 147,992.00 9,915.46
Tukang ereksi L.02 OH 0.134 147,992.00 19,830.93
Kepala tukang L.03 OH 0.067 149,992.00 10,049.46
Mandor L.04 OH 0.067 157,992.00 10,585.46
JUMLAH TENAGA KERJA 63,174.66
B BAHAN
Solar L 6.676 9,400.00 62,754.40
JUMLAH HARGA BAHAN 62,754.40
C PERALATAN
Sewa crane Unit hari 0.067 852,500.00 57,117.50
Sewa pipe support Buah hari 1.100 -

Page 61
JUMLAH HARGA ALAT 57,117.50
D Jumlah (A+B+C) 183,046.56
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 27,456.98
F Harga Satuan Pekerjaan (D+E) 210,503.55

Page 62
Indeks kenaikan lantai ereksi komponen untuk pelat pracetak
Indeks kenaikan lan Indeks kenaikan lan
Lantai ereksi pelat Lantai ereksi pelat
1 1 13.000 1.114
2 1 14.000 1.134
3 1 15.000 1.155
4 1 16.000 1.176
5 1 17.000 1.197
6 1 18.000 1.219
7 1 19.000 1.241
8 1.018 20.000 1.264
9 1.037 21.000 1.287
10 1.055 22.000 1.31
11 1.075 23.000 1.334
12 1.094 24.000 1.358

A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Operator crane L.08 OH 0.061 25,413.00 1,550.19
Pembantu operator crane L.09 OH 0.061 22,413.00 1,367.19
Pekerja L.01 OH 0.061 143,119.40 8,730.28
Tukang batu L.02 OH 0.061 147,992.00 9,027.51
Tukang ereksi L.02 OH 0.122 147,992.00 18,055.02
Kepala tukang L.03 OH 0.061 149,992.00 9,149.51
Mandor L.04 OH 0.061 157,992.00 9,637.51
JUMLAH TENAGA KERJA 57,517.23
B BAHAN
Solar L 6.110 9,400.00 57,434.00
JUMLAH HARGA BAHAN 57,434.00
C PERALATAN
Sewa crane Unit hari 0.061 852,500.00 52,002.50
Sewa scaffolding Unit hari 1.100 30,000.00 33,000.00
JUMLAH HARGA ALAT 85,002.50
D Jumlah (A+B+C) 199,953.73
E Overhead & Profit 10 %) 10% x D (maksimum) 19,995.37
F Harga Satuan Pekerjaan (D+E) 219,949.10

Indeks kenaikan lantai ereksi komponen untuk pelat pracetak


Indeks kenaikan lan Indeks kenaikan lan
Lantai ereksi pelat Lantai ereksi pelat
1 1 13.000 1.068
2 1 14.000 1.08
3 1 15.000 1.092
4 1 16.000 1.104
5 1 17.000 1.116
6 1 18.000 1.129
7 1 19.000 1.141
8 1.011 20.000 1.154
9 1.022 21.000 1.166
10 1.034 22.000 1.179
11 1.045 23.000 1.192
12 1.057 24.000 1.206

A.4.1.2.16. Ereksi 1 buah komponen untuk kolom pracetak


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Operator crane L.08 OH 0.083 25,413.00 2,109.28
Pembantu operator crane L.09 OH 0.083 22,413.00 1,860.28
Pekerja L.01 OH 0.083 143,119.40 11,878.91
Tukang batu L.02 OH 0.083 147,992.00 12,283.34
Tukang ereksi L.02 OH 0.166 147,992.00 24,566.67
Kepala tukang L.03 OH 0.083 149,992.00 12,449.34
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 78,261.15
B BAHAN
Solar L 8.277 9,400.00 77,803.80
JUMLAH HARGA BAHAN 77,803.80
C PERALATAN
Sewa crane Unit hari 0.083 852,500.00 70,757.50
Sewa pipe support buah hari 2.200 30,000.00 66,000.00

Page 63
JUMLAH HARGA ALAT 136,757.50
D Jumlah (A+B+C) 292,822.45
E Overhead & Profit10 %) 10% x D (maksimum) 29,282.24
F Harga Satuan Pekerjaan (D+E) 322,104.69

Page 64
Indeks kenaikan lantai ereksi komponen untuk pelat pracetak
Indeks kenaikan lantai Indeks kenaikan lan
Lantai ereksi pelat Lantai ereksi pelat
1 1 13.000 1.162
2 1 14.000 1.191
3 1 15.000 1.221
4 1 16.000 1.252
5 1 17.000 1.284
6 1 18.000 1.317
7 1 19.000 1.35
8 1.025 20.000 1.384
9 1.051 21.000 1.419
10 1.078 22.000 1.455
11 1.105 23.000 1.492
12 1.133 24.000 1.53
A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Operator crane L.08 OH 0.019 25,413.00 482.85
Pembantu operator crane L.09 OH 0.019 22,413.00 425.85
Pekerja L.01 OH 0.019 143,119.40 2,719.27
Tukang batu L.02 OH 0.038 147,992.00 5,623.70
JUMLAH TENAGA KERJA 9,251.66
B BAHAN
Solar L 1.897 9,400.00 17,831.80
JUMLAH HARGA BAHAN 17,831.80
C PERALATAN
Sewa crane Unit hari 0.019 852,500.00 16,197.50
JUMLAH HARGA ALAT 16,197.50
D Jumlah (A+B+C) 43,280.96
E Overhead & Profit 10 %) 10% x D (maksimum) 4,328.10
F Harga Satuan Pekerjaan (D+E) 47,609.05

A.4.1.2.18. Langsir 1 buah komponen untuk balok pracetak ( ± 20 m)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Operator crane L.08 OH 0.019 25,413.00 482.85
Pembantu operator crane L.09 OH 0.019 22,413.00 425.85
Pekerja L.01 OH 0.019 143,119.40 2,719.27
Tukang batu L.02 OH 0.038 147,992.00 5,623.70
JUMLAH TENAGA KERJA 9,251.66
B BAHAN
Solar L 1.897 9,400.00 17,831.80
JUMLAH HARGA BAHAN 17,831.80
C PERALATAN
Sewa crane Unit hari 0.019 852,500.00 16,197.50
JUMLAH HARGA ALAT 16,197.50
D Jumlah (A+B+C) 43,280.96
E Overhead & Profit 10 %) 10% x D (maksimum) 4,328.10
F Harga Satuan Pekerjaan (D+E) 47,609.05

A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Operator crane L.08 OH 0.019 25,413.00 482.85
Pembantu operator crane L.09 OH 0.019 22,413.00 425.85
Pekerja L.01 OH 0.019 143,119.40 2,719.27
Tukang batu L.02 OH 0.038 147,992.00 5,623.70
JUMLAH TENAGA KERJA 9,251.66
B BAHAN
Solar L 1.897 9,400.00 17,831.80
JUMLAH HARGA BAHAN 17,831.80
C PERALATAN
Sewa crane Unit hari 0.019 852,500.00 16,197.50
JUMLAH HARGA ALAT 16,197.50
D Jumlah (A+B+C) 43,280.96
E Overhead & Profit 10% 10% x D (maksimum) 4,328.10
F Harga Satuan Pekerjaan (D+E) 47,609.05

Page 65
A.4.1.2.20. Bahan 1 m3 grout campuran)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,200.00 5,200.00 6,240,000.00
screening Kg 650.00 1,160.00 754,000.00
Air L 350.00 6.50 2,275.00
JUMLAH HARGA BAHAN 6,996,275.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 7,750,275.00
E Overhead & Profit 10 %) 10% x D (maksimum) 775,027.50
F Harga Satuan Pekerjaan (D+E) 8,525,302.50

A.4.1.2.21. Bahan 1 m 3 grout (tidak campuran)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,850.00 5,200.00 9,620,000.00
Air L 400.00 6.50 2,600.00
JUMLAH HARGA BAHAN 9,622,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 9,622,600.00
E Overhead & Profit 10 % 10% x D (maksimum) 962,260.00
F Harga Satuan Pekerjaan (D+E) 10,584,860.00

A.4.1.2.22. Upah 1 titik pekerjaan grout pada joint beton pracetak


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Tukang batu L.02 OH 0.367 147,992.00 54,313.06
Kepala tukang L.03 OH 0.074 149,992.00 11,099.41
Mandor L.04 OH 0.037 157,992.00 5,845.70
JUMLAH TENAGA KERJA 71,258.18
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 71,258.18
E Overhead & Profit 10 %) 10% x D (maksimum) 7,125.82
F Harga Satuan Pekerjaan (D+E) 78,383.99

A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.147 143,119.40 21,038.55
Tukang batu L.02 OH 0.147 147,992.00 21,754.82
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 45,833.22
B BAHAN
Kayu kaso 5/7 (lebar M3 0.012 5,175,000.00 62,100.00
5 cm, tinggi 7 cm)
Papan cor M3 0.004 8,625,000.00 34,500.00
Paku (5 s.d.7) cm Kg 0.264 16,000.00 4,224.00
JUMLAH HARGA BAHAN 100,824.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 146,657.22
E Overhead & Profit 10%) 10% x D (maksimum) 14,665.72
F Harga Satuan Pekerjaan (D+E) 161,322.94

Page 66
A.4.1.2.24. Upah 1 titik joint dengan sling
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.220 143,119.40 31,486.27
Tukang kayu L.02 OH 0.022 147,992.00 3,255.82
Tukang Besi L.02 OH 0.220 147,992.00 32,558.24
Mandor L.04 OH 0.011 157,992.00 1,737.91
JUMLAH TENAGA KERJA 69,038.24
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 69,038.24
E Overhead & Profit 10 %) 10% x D (maksimum) 6,903.82
F Harga Satuan Pekerjaan (D+E) 75,942.07

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


A.4.2.1.1. Pemasangan 1 kg besi profil
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.060 143,119.40 8,587.16
Tukang las L.03 OH 0.060 147,992.00 8,879.52
konstruksi
Kepala tukang L.03 OH 0.006 149,992.00 899.95
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 18,840.61
B BAHAN
Besi Profil Kg 1.150 11,500.00 13,225.00
JUMLAH HARGA BAHAN 13,225.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 32,065.61
E Overhead & Profit 10 %) 10% x D (maksimum) 3,206.56
F Harga Satuan Pekerjaan (D+E) 35,272.17

A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.060 143,119.40 8,587.16
Tukang las L.03 OH 0.060 147,992.00 8,879.52
konstruksi
Kepala tukang L.03 OH 0.006 149,992.00 899.95
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 18,840.61
B BAHAN
Besi baja IWF Kg 1.150 11,500.00 13,225.00
JUMLAH HARGA BAHAN 13,225.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 32,065.61
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 3,206.56
F Harga Satuan Pekerjaan (D+E) 35,272.17

A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang las konstruksi L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.001 149,992.00 149.99
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 30,051.09
B BAHAN
Solar Liter 1.000 9,400.00 9,400.00
Minyak pelumas Liter 0.100 45,000.00 4,500.00
JUMLAH HARGA BAHAN 13,900.00
C PERALATAN
1. Sewa alat Jam 0.800 350,000.00 280,000.00
JUMLAH HARGA ALAT 280,000.00

D Jumlah (A+B+C) 323,951.09


E Overhead & Profit 10 %) 10% x D (maksimum) 32,395.11

Page 67
F Harga Satuan Pekerjaan (D+E) 356,346.20

Page 68
A.4.2.1.4. Pembuatan 1 m 2 pintu besi pelat baja tebal 2 mm rangkap, rangk baja siku
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.050 143,119.40 150,275.37
Tukang las biasa L.03 OH 1.050 147,992.00 155,391.60
Kepala tukang L.03 OH 0.105 149,992.00 15,749.16
Mandor L.04 OH 0.052 157,992.00 8,215.58
JUMLAH TENAGA KERJA 329,631.71
B BAHAN
Besi siku L 30.30.3 Kg 15.000 27,500.00 412,500.00
Besi pelat baja Kg 32.800 14,850.00 487,080.00
Kawat las Kg 0.050 29,000.00 1,450.00
JUMLAH HARGA BAHAN 901,030.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,230,661.71
E Overhead & Profit 10 %) 10% x D (maksimum) 123,066.17
F Harga Satuan Pekerjaan (D+E) 1,353,727.89

A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.040 143,119.40 5,724.78
Tukang las konstruksi L.03 OH 0.020 147,992.00 2,959.84
Kepala tukang L.03 OH 0.002 149,992.00 299.98
Mandor L.04 OH 0.002 157,992.00 315.98
JUMLAH TENAGA KERJA 9,300.58
B BAHAN
Kawat las listrik Kg 0.400 29,000.00 11,600.00
Solar Liter 0.300 9,400.00 2,820.00
Minyak pelumas Liter 0.040 45,000.00 1,800.00
JUMLAH HARGA BAHAN 16,220.00
C PERALATAN
Sewa alat Jam 0.170 350,000.00 59,500.00
JUMLAH HARGA ALAT 59,500.00

D Jumlah (A+B+C) 85,020.58


E Overhead & Profit 10 %) 10% x D (maksimum) 8,502.06
F Harga Satuan Pekerjaan (D+E) 93,522.64
***
Pengelasan per 1 cm 9,352.26

A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.650 143,119.40 93,027.61
Tukang las konstruksi L.03 OH 0.650 147,992.00 96,194.80
Kepala tukang L.03 OH 0.065 149,992.00 9,749.48
Mandor L.04 OH 0.032 157,992.00 5,055.74
JUMLAH TENAGA KERJA 204,027.63
B BAHAN
Besi scuare tube m 4.760 10,000.00 47,600.00
Besi lis kaca (1 x 1)cm m 4.522 5,000.00 22,610.00
Pengelasan Cm 20.000 9,352.26 187,045.28
JUMLAH HARGA BAHAN 257,255.28
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 461,282.92
E Overhead & Profit 10 %) 10% x D (maksimum) 46,128.29
F Harga Satuan Pekerjaan (D+E) 507,411.21

Page 69
A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.200 143,119.40 171,743.28
Tukang las konstruksi L.03 OH 1.200 147,992.00 177,590.40
Kepala tukang L.03 OH 0.120 149,992.00 17,999.04
Mandor L.04 OH 0.006 157,992.00 947.95
JUMLAH TENAGA KERJA 368,280.67
B BAHAN
Pintu gulung besi m2 1.000 500,000.00 500,000.00
JUMLAH HARGA BAHAN 500,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 868,280.67
E Overhead & Profit 10 %) 10% x D (maksimum) 86,828.07
F Harga Satuan Pekerjaan (D+E) 955,108.74

A.4.2.1.8. Pemasangan 1 m 2 pintu lipat (folding door) bahan plastik/PVC


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.440 143,119.40 62,972.54
Tukang L.03 OH 0.440 147,992.00 65,116.48
Kepala tukang L.03 OH 0.044 149,992.00 6,599.65
Mandor L.04 OH 0.022 157,992.00 3,475.82
JUMLAH TENAGA KERJA 138,164.49
B BAHAN
Pintu lipat m2 1.000 550,000.00 550,000.00
JUMLAH HARGA BAHAN 550,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 688,164.49
E Overhead & Profit 10 %) 10% x D (maksimum) 68,816.45
F Harga Satuan Pekerjaan (D+E) 756,980.94

A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.080 143,119.40 11,449.55
Tukang L.03 OH 0.800 147,992.00 118,393.60
Kepala tukang L.03 OH 0.080 149,992.00 11,999.36
Mandor L.04 OH 0.004 157,992.00 631.97
JUMLAH TENAGA KERJA 142,474.48
Sunscreen
B BAHAN
alluminium
m2 1.000 112,000.00 112,000.00
JUMLAH HARGA BAHAN 112,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 254,474.48
E Overhead & Profit 10 %) 10% x D (maksimum) 25,447.45
F Harga Satuan Pekerjaan (D+E) 279,921.93

A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang khusus L.03 OH 1.000 147,992.00 147,992.00
alumunium
Kepala tukang L.03 OH 1.000 149,992.00 149,992.00
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 449,003.00
B BAHAN
Rolling door m2 1.000 550,000.00 550,000.00
alluminium
JUMLAH HARGA BAHAN 550,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 999,003.00
E Overhead & Profit 10 %) 10% x D (maksimum) 99,900.30
F Harga Satuan Pekerjaan (D+E) 1,098,903.30

Page 70
A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.043 143,119.40 6,154.13
Tukang khusus L.03 OH 0.043 147,992.00 6,363.66
alumunium
Kepala tukang L.03 OH 0.043 149,992.00 6,449.66
Mandor L.04 OH 0.002 157,992.00 331.78
JUMLAH TENAGA KERJA 19,299.23
B BAHAN
Profil alluminium m 1.100 85,000.00 93,500.00
Skrup fixer buah 2.000 950.00 1,900.00
Sealant Tube 0.060 36,000.00 2,160.00
JUMLAH HARGA BAHAN 97,560.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 116,859.23
E Overhead & Profit 10 % 10% x D (maksimum) 11,685.92
F Harga Satuan Pekerjaan (D+E) 128,545.15

A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.085 143,119.40 12,165.15
Tukang khusus L.03 OH 0.085 147,992.00 12,579.32
alumunium
Kepala tukang L.03 OH 0.085 149,992.00 12,749.32
Mandor L.04 OH 0.004 157,992.00 663.57
JUMLAH TENAGA KERJA 38,157.36
B BAHAN
Profil alluminium m 4.400 85,000.00 374,000.00
Alluminium strip m 14.600 110,000.00 1,606,000.00
JUMLAH HARGA BAHAN 1,980,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,018,157.36
E Overhead & Profit 10 % 10% x D (maksimum) 201,815.74
F Harga Satuan Pekerjaan (D+E) 2,219,973.09

A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.085 143,119.40 12,165.15
Tukang L.03 OH 0.085 147,992.00 12,579.32
allumunium/kaca
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 26,884.36
B BAHAN
Profil alluminium m 4.400 85,000.00 374,000.00
Profil kaca m2 4.500 180,000.00 810,000.00
Sealant Tube 0.270 36,000.00 9,720.00
JUMLAH HARGA BAHAN 1,193,720.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,220,604.36
E Overhead & Profit 10 % 10% x D (maksimum) 122,060.44
F Harga Satuan Pekerjaan (D+E) 1,342,664.79

A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.350 143,119.40 50,091.79
Tukang L.03 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.018 157,992.00 2,843.86
JUMLAH TENAGA KERJA 109,982.57
B BAHAN
Venetions blinds dan vertical m2 1.000 225,000.00 225,000.00
blinds (tirai)
JUMLAH HARGA BAHAN 225,000.00

Page 71
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 334,982.57
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 33,498.26
F Harga Satuan Pekerjaan (D+E) 368,480.82

Page 72
A.4.2.1.15. Pemasangan 1 m2 teralis besi strip (2 x 3) mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.670 143,119.40 239,009.40
Tukang las L.03 OH 1.670 147,992.00 247,146.64
Kepala tukang L.03 OH 0.167 149,992.00 25,048.66
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 524,318.04
B BAHAN
Besi strip kg 6.177 11,200.00 69,182.40
Pengelasan cm 27.080 9,352.26 253,259.32
JUMLAH HARGA BAHAN 322,441.72
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 846,759.75
E Overhead & Profit 10% 10% x D (maksimum) 84,675.98
F Harga Satuan Pekerjaan (D+E) 931,435.73

A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang Las L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 31,401.02
B BAHAN
Kawat nyamuk m2 1.100 19,500.00 21,450.00
Pengelasan cm 11.110 9,352.26 103,903.66
Baja strip (0,2 x 2) cm kg 1.716 11,200.00 19,219.20
JUMLAH HARGA BAHAN 144,572.86
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 175,973.88
E Overhead & Profit 10% 10% x D (maksimum) 17,597.39
F Harga Satuan Pekerjaan (D+E) 193,571.26

A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.001 157,992.00 157.99
JUMLAH TENAGA KERJA 61,380.11
B BAHAN
Jendela nako (rangka + kaca 5 m2 1.10 16,000.00 17,600.00
mm)
Paku skrup 1 cm – 2,5 cm buah 10.00 15,000.00 150,000.00
Besi strip m 7.00 11,200.00 78,400.00
JUMLAH HARGA BAHAN 246,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 307,380.11
E Overhead & Profit 10%) 10% x D (maksimum) 30,738.01
F Harga Satuan Pekerjaan (D+E) 338,118.12

A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang Kayu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.001 157,992.00 157.99
JUMLAH TENAGA KERJA 61,380.11
B BAHAN
Seng pelat m 1.050 18,000.00 18,900.00
Paku 1 cm - 2,5 cm kg 0.015 16,000.00 240.00

m3 0.019 8,625,000.00 163,875.00


Papan kayu kelas II atau III
JUMLAH HARGA BAHAN 183,015.00

Page 73
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 244,395.11
E Overhead & Profit 10% 10% x D (maksimum) 24,439.51
F Harga Satuan Pekerjaan (D+E) 268,834.62

Page 74
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang Kayu L.03 OH 0.300 147,992.00 44,397.60
Kepala tukang L.03 OH 0.030 149,992.00 4,499.76
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 71,629.21
B BAHAN
Seng pelat m 1.050 18,000.00 18,900.00
Paku 1 cm - 2,5 cm kg 0.010 15,000.00 150.00
Besi strip kg 0.500 11,200.00 5,600.00
JUMLAH HARGA BAHAN 24,650.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 96,279.21
E Overhead & Profit 10% 10% x D (maksimum) 9,627.92
F Harga Satuan Pekerjaan (D+E) 105,907.13

A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x120 cm, untuk partisi
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang L.03 OH 0.250 147,992.00 36,998.00
Kepala tukang L.03 OH 0.025 149,992.00 3,749.80
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 78,581.55
B BAHAN
M1 3.500 15,833.33 55,416.67
Rangka metal hollow 40.40.2mm
Assesoris (perkuatan, las dll) Ls 100% x rangka 15,833.33 15,833.33
JUMLAH HARGA BAHAN 71,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 149,831.55
E Overhead & Profit 10 % 10% x D (maksimum) 14,983.15
F Harga Satuan Pekerjaan (D+E) 164,814.70

A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60cm, untuk plafon
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.350 143,119.40 50,091.79
Tukang besi L.03 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.018 157,992.00 2,843.86
JUMLAH TENAGA KERJA 109,982.57
B BAHAN
M1 4.000 15,833.33 63,333.33
Rangka metal hollow 40.40.2mm
Assesoris (perkuatan, las dll) Ls 100% x rangka 15,833.33 15,833.33
JUMLAH HARGA BAHAN 79,166.67
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 189,149.23
E Overhead & Profit 10 % 10% x D (maksimum) 18,914.92
F Harga Satuan Pekerjaan (D+E) 208,064.16

A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.734 143,119.40 105,049.64
Tukang besi L.03 OH 0.734 147,992.00 108,626.13
Kepala tukang L.03 OH 0.073 149,992.00 10,949.42
Mandor L.04 OH 0.037 157,992.00 5,845.70
JUMLAH TENAGA KERJA 230,470.89
B BAHAN
Baja ringan canal dingin C75
Kg 3.065 16,473.62 50,491.63

JUMLAH HARGA BAHAN 50,491.63


C PERALATAN
peralatan % 10 5,049.16 5,049.16

Page 75
JUMLAH HARGA ALAT 5,049.16

D Jumlah (A+B+C) 286,011.69


E Overhead & Profit 10 % 10% x D (maksimum) 28,601.17
F Harga Satuan Pekerjaan (D+E) 314,612.85

Page 76
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.734 143,119.40 105,049.64
Tukang besi L.03 OH 0.734 147,992.00 108,626.13
Kepala tukang L.03 OH 0.340 149,992.00 50,997.28
Mandor L.04 OH 0.0380 157,992.00 6,003.70
JUMLAH TENAGA KERJA 270,676.74
B BAHAN
Baja ringan canal dingin C75
Kg 4.050 16,473.62 66,718.15

JUMLAH HARGA BAHAN 66,718.15


C PERALATAN
peralatan % 10.000 6,671.81 6,671.81
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 344,066.70
E Overhead & Profit (10 %) 10% x D (maksimum) 34,406.67
F Harga Satuan Pekerjaan (D+E) 378,473.38

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.600 143,119.40 85,871.64
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 123,209.64
B BAHAN
Bata merah Buah 140.000 580.00 81,200.00
Semen Portland Kg 43.500 1,300.00 56,550.00
Pasir pasang m3 0.080 150,000.00 12,000.00
JUMLAH HARGA BAHAN 149,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 272,959.64
E Overhead & Profit (10%) 10% x D (maksimum) 27,295.96
F Harga Satuan Pekerjaan (D+E) 300,255.60

A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.600 143,119.40 85,871.64
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 123,209.64
B BAHAN
Bata merah Buah 140.000 580.00 81,200.00
Semen Portland Kg 32.950 1,300.00 42,835.00
Pasir pasang m3 0.091 150,000.00 13,650.00
JUMLAH HARGA BAHAN 137,685.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 260,894.64
E Overhead & Profit (10%) 10% x D (maksimum) 26,089.46
F Harga Satuan Pekerjaan (D+E) 286,984.10

A. 4.4.1.3. Pemasangan 1m 2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.600 143,119.40 85,871.64
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 123,209.64
B BAHAN
Bata merah Buah 140.000 580.00 81,200.00
Semen Portland Kg 26.550 1,300.00 34,515.00
Pasir pasang m3 0.093 150,000.00 13,950.00
JUMLAH HARGA BAHAN 129,665.00

Page 77
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 252,874.64
E Overhead & Profit(10 %) 10% x D (maksimum) 25,287.46
F Harga Satuan Pekerjaan (D+E) 278,162.10

Page 78
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.600 143,119.40 85,871.64
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 123,209.64
B BAHAN
Bata merah Buah 140.000 580.00 81,200.00
Semen Portland Kg 22.200 1,300.00 28,860.00
Pasir pasang m3 0.102 150,000.00 15,300.00
JUMLAH HARGA BAHAN 125,360.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 248,569.64
E Overhead & Profit (10%) 10% x D (maksimum) 24,856.96
F Harga Satuan Pekerjaan (D+E) 273,426.60

A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.600 143,119.40 85,871.64
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 123,209.64
B BAHAN
Bata merah Buah 140.000 580.00 81,200.00
Semen Portland Kg 18.500 1,300.00 24,050.00
Pasir pasang m3 0.122 150,000.00 18,300.00
JUMLAH HARGA BAHAN 123,550.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 246,759.64
E Overhead & Profit (10 %) 10% x D (maksimum) 24,675.96
F Harga Satuan Pekerjaan (D+E) 271,435.60

A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.600 143,119.40 85,871.64
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 123,209.64
B BAHAN
Bata merah Buah 140.000 580.00 81,200.00
Semen Portland Kg 10.080 1,300.00 13,104.00
Kapur padam m3 0.0275 270,000.00 7,425.00
Pasir pasang m3 0.0925 150,000.00 13,875.00
JUMLAH HARGA BAHAN 115,604.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 238,813.64
E Overhead & Profit (10 %) 10% x D (maksimum) 23,881.36
F Harga Satuan Pekerjaan (D+E) 262,695.00

A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata merah Buah 70.000 580.00 40,600.00
Semen Portland Kg 18.950 1,300.00 24,635.00
Pasir pasang m3 0.038 150,000.00 5,700.00
JUMLAH HARGA BAHAN 70,935.00

Page 79
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 132,539.82
E Overhead & Profit (10%) 10% x D (maksimum) 13,253.98
F Harga Satuan Pekerjaan (D+E) 145,793.80

Page 80
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata merah Buah 70.000 580.00 40,600.00
Semen Portland Kg 14.370 1,300.00 18,681.00
Pasir pasang m3 0.040 150,000.00 6,000.00
JUMLAH HARGA BAHAN 65,281.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 126,885.82
E Overhead & Profit (10 %) 10% x D (maksimum) 12,688.58
F Harga Satuan Pekerjaan (D+E) 139,574.40

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata merah Buah 70.000 580.00 40,600.00
Semen Portland Kg 14.370 1,300.00 18,681.00
Pasir pasang m3 0.040 150,000.00 6,000.00
JUMLAH HARGA BAHAN 65,281.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 126,885.82
E Overhead & Profit 10% x D (maksimum) 12,688.58
F Harga Satuan Pekerjaan (D+E) 139,574.40

A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batucampuran 1SP :5PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata merah Buah 70.000 580.00 40,600.00
Semen Portland Kg 9.680 1,300.00 12,584.00
Pasir pasang m3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 59,934.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 121,538.82
E Overhead & Profit (10 %) 10% x D (maksimum) 12,153.88
F Harga Satuan Pekerjaan (D+E) 133,692.70

A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata merah Buah 70.000 580.00 40,600.00
Semen Portland Kg 8.320 1,300.00 10,816.00
Pasir pasang m3 0.049 150,000.00 7,350.00
JUMLAH HARGA BAHAN 58,766.00
C PERALATAN

Page 81
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 120,370.82
E Overhead & Profit (10 %) 10% x D (maksimum) 12,037.08
F Harga Satuan Pekerjaan (D+E) 132,407.90

Page 82
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batucampuran 1SP :8PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata merah Buah 70.000 580.00 40,600.00
Semen Portland Kg 6.500 1,300.00 8,450.00
Pasir pasang m3 0.050 150,000.00 7,500.00
JUMLAH HARGA BAHAN 56,550.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 118,154.82
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 17,723.22
F Harga Satuan Pekerjaan (D+E) 135,878.04

A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batucampuran 1SP : 3KP :10PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata merah Buah 70.000 580.00 40,600.00
Semen Portland Kg 6.500 1,300.00 8,450.00
Kapur padam m3 0.015 270,000.00 4,050.00
Pasir pasang m3 0.050 150,000.00 7,500.00
JUMLAH HARGA BAHAN 60,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 122,204.82
E Overhead & Profit (10 %) 10% x D (maksimum) 12,220.48
F Harga Satuan Pekerjaan (D+E) 134,425.30

A. 4.4.1.14 Pemasangan 1mdinding bata merah (5x11x22) cm tebal ½ batucampuran 1SM : 1KP :1PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata merah Buah 70.00 580.00 40,600.00
Semen Portland Kg 0.018 1,300.00 23.40
Kapur padam m3 0.018 270,000.00 4,860.00
Pasir pasang m3 0.018 150,000.00 2,700.00
JUMLAH HARGA BAHAN 48,183.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 109,788.22
E Overhead & Profit (10 %) 10% x D (maksimum) 10,978.82
F Harga Satuan Pekerjaan (D+E) 120,767.04

Page 83
A. 4.4.1.15 Pemasangan 1mdinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2P
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata merah Buah 70.000 580.00 40,600.00
Semen Portland Kg 0.014 1,300.00 18.20
Kapur padam m3 0.014 270,000.00 3,780.00
Pasir pasang m3 0.028 150,000.00 4,200.00
JUMLAH HARGA BAHAN 48,598.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 110,203.02
E Overhead & Profit (10 %) 10% x D (maksimum) 11,020.30
F Harga Satuan Pekerjaan (D+E) 121,223.32

A. 4.4.1.16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
HB-20 Buah 12.500 4,500.00 56,250.00
Semen Portland Kg 30.320 1,300.00 39,416.00
Pasir pasang m3 0.728 150,000.00 109,200.00
Besi angker diameter 8 Kg 0.280 15,500.00 4,340.00
JUMLAH HARGA BAHAN 209,206.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 270,810.82
E Overhead & Profit (10%) 10% x D (maksimum) 27,081.08
F Harga Satuan Pekerjaan (D+E) 297,891.90

A. 4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.350 143,119.40 50,091.79
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.018 157,992.00 2,843.86
JUMLAH TENAGA KERJA 77,384.33
B BAHAN
HB-20 Buah 12.500 4,500.00 56,250.00
Semen Portland Kg 24.260 1,300.00 31,538.00
Pasir pasang m3 0.772 150,000.00 115,800.00
Besi angker diameter 8 Kg 0.280 15,500.00 4,340.00
JUMLAH HARGA BAHAN 207,928.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 285,312.33
E Overhead & Profit (10 %) 10% x D (maksimum) 28,531.23
F Harga Satuan Pekerjaan (D+E) 313,843.56

Page 84
A. 4.4.1.18 Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.320 143,119.40 45,798.21
Tukang Batu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.016 157,992.00 2,527.87
JUMLAH TENAGA KERJA 67,885.02
B BAHAN
HB-15 Buah 12.500 4,500.00 56,250.00
Semen Portland Kg 22.740 1,300.00 29,562.00
Pasir pasang m3 0.550 150,000.00 82,500.00
Besi angker diameter 8 Kg 0.280 15,500.00 4,340.00
JUMLAH HARGA BAHAN 172,652.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 240,537.02
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 24,053.70
F Harga Satuan Pekerjaan (D+E) 264,590.73

A. 4.4.1.19 Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.320 143,119.40 45,798.21
Tukang Batu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.016 157,992.00 2,527.87
JUMLAH TENAGA KERJA 67,885.02
B BAHAN
HB-15 Buah 12.500 4,500.00 56,250.00
Semen Portland Kg 18.200 1,300.00 23,660.00
Pasir pasang m3 0.582 150,000.00 87,300.00
Besi angker diameter 8 Kg 0.280 15,500.00 4,340.00
JUMLAH HARGA BAHAN 171,550.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 239,435.02
E Overhead & Profit (10%) 10% x D (maksimum) 23,943.50
F Harga Satuan Pekerjaan (D+E) 263,378.53

A. 4.4.1.20 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 `
JUMLAH TENAGA KERJA 59,234.94
B BAHAN
HB-10 Buah 12.500 4,500.00 56,250.00
Semen Portland Kg 12.130 1,300.00 15,769.00
Pasir pasang m3 0.364 150,000.00 54,600.00
Besi angker diameter 8 Kg 0.280 15,500.00 4,340.00
JUMLAH HARGA BAHAN 130,959.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 190,193.94
E Overhead & Profit (10%) 10% x D (maksimum) 19,019.39
F Harga Satuan Pekerjaan (D+E) 209,213.33

Page 85
A. 4.4.1.21 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
HB-10 Buah 12.500 4,500.00 56,250.00
Semen Portland Kg 12.130 1,300.00 15,769.00
Pasir pasang m3 0.388 150,000.00 58,200.00
Besi angker diameter 8 Kg 0.280 15,500.00 4,340.00
JUMLAH HARGA BAHAN 134,559.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 196,163.82
E Overhead & Profit (10%) 10% x D (maksimum) 19,616.38
F Harga Satuan Pekerjaan (D+E) 215,780.20

A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata rooster Buah 30.000 4,000.00 120,000.00
Semen Portland Kg 11.000 1,300.00 14,300.00
Pasir pasang M3 0.035 150,000.00 5,250.00
JUMLAH HARGA BAHAN 139,550.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 201,154.82
E Overhead & Profit (10%) 10% x D (maksimum) 20,115.48
F Harga Satuan Pekerjaan (D+E) 221,270.30

A. 4.4.1.23 Pemasangan 1 cmdinding terawang (rooster) 12x11x24 campuran 1SP :4PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata rooster Buah 30.000 4,000.00 120,000.00
Semen Portland Kg 11.000 1,300.00 14,300.00
Pasir pasang M3 0.035 150,000.00 5,250.00
JUMLAH HARGA BAHAN 139,550.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 201,154.82
E Overhead & Profit (10%) 10% x D (maksimum) 20,115.48
F Harga Satuan Pekerjaan (D+E) 221,270.30

A. 4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
Bata rooster Buah 30.000 4,000.00 120,000.00
Semen Portland Kg 11.000 1,300.00 14,300.00
Pasir pasang M3 0.035 150,000.00 5,250.00
JUMLAH HARGA BAHAN 139,550.00

Page 86
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 209,304.38
E Overhead & Profit (10%) 10% x D (maksimum) 20,930.44
F Harga Satuan Pekerjaan (D+E) 230,234.82

A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.260 143,119.40 37,211.04
Tukang Batu L.03 OH 0.130 147,992.00 19,238.96
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 58,873.88
B BAHAN
Bata ringan tebal 7,5cm Buah 8.400 5,500.00 46,200.00
Mortar siap pakai Kg 0.473 1,625.00 768.63
JUMLAH HARGA BAHAN 46,968.63
C PERALATAN
Peralatan % 10.000 46,968.63 4,696.86
JUMLAH HARGA ALAT 4,696.86

D Jumlah (A+B+C) 110,539.36


E Overhead & Profit (10%) 10% x D (maksimum) 11,053.94
F Harga Satuan Pekerjaan (D+E) 121,593.30

A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.260 143,119.40 37,211.04
Tukang Batu L.03 OH 0.130 147,992.00 19,238.96
Kepala tukang L.03 OH 0.130 149,992.00 19,498.96
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 76,422.94
B BAHAN
Bata ringan tebal 10cm Buah 8.400 6,500.00 54,600.00
Mortar siap pakai Kg 0.473 1,625.00 768.63
JUMLAH HARGA BAHAN 55,368.63
C PERALATAN
Peralatan % 10.000 55,368.63 5,536.86
JUMLAH HARGA ALAT 5,536.86

D Jumlah (A+B+C) 137,328.43


E Overhead & Profit (10%) 10% x D (maksimum) 13,732.84
F Harga Satuan Pekerjaan (D+E) 151,061.27

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
PC Kg 15.504 1,300.00 20,155.20
PP M3 0.016 150,000.00 2,400.00
JUMLAH HARGA BAHAN 92,309.58
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 162,063.96
E Overhead & Profit (10%) 10% x D (maksimum) 16,206.40
F Harga Satuan Pekerjaan (D+E) 178,270.36

Page 87
A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
PC Kg 10.224 1,300.00 13,291.20
PP M3 0.020 150,000.00 3,000.00
JUMLAH HARGA BAHAN 86,045.58
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 155,799.96
E Overhead & Profit (10%) 10% x D (maksimum) 15,580.00
F Harga Satuan Pekerjaan (D+E) 171,379.96

A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
PC Kg 7.776 1,300.00 10,108.80
PP M3 0.023 150,000.00 3,450.00
JUMLAH HARGA BAHAN 83,313.18
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 153,067.56
E Overhead & Profit (10%) 10% x D (maksimum) 15,306.76
F Harga Satuan Pekerjaan (D+E) 168,374.32

A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
PC Kg 6.240 1,300.00 8,112.00
PP M3 0.024 150,000.00 3,600.00
JUMLAH HARGA BAHAN 81,466.38
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 151,220.76
E Overhead & Profit (10%) 10% x D (maksimum) 15,122.08
F Harga Satuan Pekerjaan (D+E) 166,342.84

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
PC Kg 5.184 1,300.00 6,739.20
PP M3 0.026 150,000.00 3,900.00
JUMLAH HARGA BAHAN 80,393.58
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 150,147.96
E Overhead & Profit (10%) 10% x D (maksimum) 15,014.80
F Harga Satuan Pekerjaan (D+E) 165,162.76

Page 88
A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
PC Kg 4.416 1,300.00 5,740.80
PP M3 0.027 150,000.00 4,050.00
JUMLAH HARGA BAHAN 79,545.18
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 149,299.56
E Overhead & Profit (10%) 10% x D (maksimum) 14,929.96
F Harga Satuan Pekerjaan (D+E) 164,229.52

A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
PC Kg 3.936 1,300.00 5,116.80
PP M3 0.028 150,000.00 4,200.00
JUMLAH HARGA BAHAN 79,071.18
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 148,825.56
E Overhead & Profit (10%) 10% x D (maksimum) 14,882.56
F Harga Satuan Pekerjaan (D+E) 163,708.12

A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
PC Kg 3.456 1,300.00 4,492.80
PP M3 0.029 150,000.00 4,350.00
JUMLAH HARGA BAHAN 78,597.18
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 148,351.56
E Overhead & Profit (10%) 10% x D (maksimum) 14,835.16
F Harga Satuan Pekerjaan (D+E) 163,186.72

A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.360 143,119.40 51,522.98
Tukang Batu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.018 157,992.00 2,843.86
JUMLAH TENAGA KERJA 73,925.78
B BAHAN
PC Kg 5.760 1,300.00 7,488.00
KP M3 0.003 270,000.00 810.00
PP M3 0.013 150,000.00 1,950.00
JUMLAH HARGA BAHAN 10,248.00
C PERALATAN

JUMLAH HARGA ALAT

Page 89
D Jumlah (A+B+C) 84,173.78
E Overhead & Profit (10%) 10% x D (maksimum) 8,417.38
F Harga Satuan Pekerjaan (D+E) 92,591.16

Page 90
A.4.4.2.10. Pemasangan 1 m2 plesteran 1SM : 2KP : 8PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.360 143,119.40 51,522.98
Tukang Batu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.018 157,992.00 2,843.86
JUMLAH TENAGA KERJA 73,925.78
B BAHAN
PC Kg 3.000 1,300.00 3,900.00
KP M3 0.005 270,000.00 1,350.00
PP M3 0.020 150,000.00 3,000.00
JUMLAH HARGA BAHAN 8,250.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 82,175.78
E Overhead & Profit (10%) 10% x D (maksimum) 8,217.58
F Harga Satuan Pekerjaan (D+E) 90,393.36

A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.360 143,119.40 51,522.98
Tukang Batu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.018 157,992.00 2,843.86
JUMLAH TENAGA KERJA 73,925.78
B BAHAN
SM M3 0.009 1,300.00 11.70
KP M3 0.009 270,000.00 2,430.00
PP M3 0.009 150,000.00 1,350.00
JUMLAH HARGA BAHAN 3,791.70
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 77,717.48
E Overhead & Profit 10% x D (maksimum) 7,771.75
F Harga Satuan Pekerjaan (D+E) 85,489.23

A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.360 143,119.40 51,522.98
Tukang Batu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.018 157,992.00 2,843.86
JUMLAH TENAGA KERJA 73,925.78
B BAHAN
SM M3 0.007 1,300.00 9.10
KP M3 0.007 270,000.00 1,890.00
PP M3 0.015 150,000.00 2,250.00
JUMLAH HARGA BAHAN 4,149.10
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 78,074.88
E Overhead & Profit 10% x D (maksimum) 7,807.49
F Harga Satuan Pekerjaan (D+E) 85,882.37

Page 91
A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.022 157,992.00 3,475.82
JUMLAH TENAGA KERJA 93,321.82
B BAHAN
PC Kg 13.632 1,300.00 17,721.60
PP M3 0.027 150,000.00 4,050.00
JUMLAH HARGA BAHAN 21,771.60
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 115,093.42
E Overhead & Profit (10 %) 10% x D (maksimum) 17,264.01
F Harga Satuan Pekerjaan (D+E) 132,357.44

A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.260 143,119.40 37,211.04
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 71,863.18
B BAHAN
PC Kg 10.368 1,300.00 13,478.40
PP M3 0.031 150,000.00 4,650.00
JUMLAH HARGA BAHAN 18,128.40
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 89,991.58
E Overhead & Profit (10 %) 10% x D (maksimum) 8,999.16
F Harga Satuan Pekerjaan (D+E) 98,990.74

A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.022 157,992.00 3,475.82
JUMLAH TENAGA KERJA 93,321.82
B BAHAN
PC Kg 8.320 1,300.00 10,816.00
PP M3 0.032 150,000.00 4,800.00
JUMLAH HARGA BAHAN 15,616.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 108,937.82
E Overhead & Profit (10 %) 10% x D (maksimum) 10,893.78
F Harga Satuan Pekerjaan (D+E) 119,831.61

A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.022 157,992.00 3,475.82
JUMLAH TENAGA KERJA 93,321.82
B BAHAN
PC Kg 6.912 1,300.00 8,985.60
PP M3 0.035 150,000.00 5,250.00
JUMLAH HARGA BAHAN 14,235.60
C PERALATAN

Page 92
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 107,557.42
E Overhead & Profit (10 %) 10% x D (maksimum) 10,755.74
F Harga Satuan Pekerjaan (D+E) 118,313.17

Page 93
A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang Batu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.022 157,992.00 3,475.82
JUMLAH TENAGA KERJA 93,321.82
B BAHAN
PC Kg 5.888 1,300.00 7,654.40
PP M3 0.036 150,000.00 5,400.00
JUMLAH HARGA BAHAN 13,054.40
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 106,376.22
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 10,637.62
F Harga Satuan Pekerjaan (D+E) 117,013.85

A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang Batu L.03 OH 0.220 147,992.00 32,558.24
Kepala tukang L.03 OH 0.022 149,992.00 3,299.82
Mandor L.04 OH 0.022 157,992.00 3,475.82
JUMLAH TENAGA KERJA 96,581.65
B BAHAN
PC M3 0.009 1,300.00 11.70
KP M4 0.009 270,000.00 2,430.00
PP M3 0.018 150,000.00 2,700.00
JUMLAH HARGA BAHAN 5,141.70
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 101,723.35
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 15,258.50
F Harga Satuan Pekerjaan (D+E) 116,981.85

A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang Batu L.03 OH 0.075 147,992.00 11,099.40
Kepala tukang L.03 OH 0.008 149,992.00 1,199.94
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 35,031.18
B BAHAN
PC Kg 5.184 1,300.00 6,739.20
PP M3 0.026 150,000.00 3,900.00
JUMLAH HARGA BAHAN 10,639.20
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 45,670.38
E Overhead & Profit (10%) 10% x D (maksimum) 4,567.04
F Harga Satuan Pekerjaan (D+E) 50,237.42

A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.080 143,119.40 11,449.55
Tukang Batu L.03 OH 0.400 147,992.00 59,196.80
Kepala tukang L.03 OH 0.040 149,992.00 5,999.68
Mandor L.04 OH 0.004 157,992.00 631.97
JUMLAH TENAGA KERJA 77,278.00
B BAHAN
PC Kg 0.500 1,300.00 650.00
Pasir pasang M3 0.013 150,000.00 1,950.00
JUMLAH HARGA BAHAN 2,600.00
C PERALATAN

Page 94
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 79,878.00
E Overhead & Profit (10 %) 10% x D (maksimum) 7,987.80
F Harga Satuan Pekerjaan (D+E) 87,865.80

Page 95
A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.450 143,119.40 64,403.73
Tukang Batu L.03 OH 0.225 147,992.00 33,298.20
Kepala tukang L.03 OH 0.023 149,992.00 3,449.82
Mandor L.04 OH 0.230 157,992.00 36,338.16
JUMLAH TENAGA KERJA 137,489.91
B BAHAN
Semen PC Kg 10.000 1,300.00 13,000.00
Batu granit Kg 15.000 10,000.00 150,000.00
JUMLAH HARGA BAHAN 163,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 300,489.91
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 30,048.99
F Harga Satuan Pekerjaan (D+E) 330,538.90

A.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.450 143,119.40 64,403.73
Tukang Batu L.03 OH 0.225 147,992.00 33,298.20
Kepala tukang L.03 OH 0.023 149,992.00 3,449.82
Mandor L.04 OH 0.230 157,992.00 36,338.16
JUMLAH TENAGA KERJA 137,489.91
B BAHAN
Semen PC Kg 10.000 1,300.00 13,000.00
Batu traso Kg 15.000 10,000.00 150,000.00
JUMLAH HARGA BAHAN 163,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 300,489.91
E Overhead & Profit (10%) 10% x D (maksimum) 30,048.99
F Harga Satuan Pekerjaan (D+E) 330,538.90

A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Semen PC Kg 4.320 1,300.00 5,616.00
Pasir pasang Kg 0.006 150,000.00 900.00
JUMLAH HARGA BAHAN 6,516.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 68,120.82
E Overhead & Profit (10 %) 10% x D (maksimum) 6,812.08
F Harga Satuan Pekerjaan (D+E) 74,932.90

A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang Batu L.03 OH 0.075 147,992.00 11,099.40
Kepala tukang L.03 OH 0.008 149,992.00 1,199.94
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 35,031.18
B BAHAN
Semen PC Kg 3.108 1,300.00 4,040.40
JUMLAH HARGA BAHAN 4,040.40
C PERALATAN

JUMLAH HARGA ALAT

Page 96
D Jumlah (A+B+C) 39,071.58
E Overhead & Profit (10 %) 10% x D (maksimum) 3,907.16
F Harga Satuan Pekerjaan (D+E) 42,978.74

Page 97
A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.070 143,119.40 10,018.36
Tukang Batu L.03 OH 0.035 147,992.00 5,179.72
Kepala tukang L.03 OH 0.004 149,992.00 599.97
Mandor L.04 OH 0.004 157,992.00 631.97
JUMLAH TENAGA KERJA 16,430.01
B BAHAN
Semen PC Kg 1.600 1,300.00 2,080.00
JUMLAH HARGA BAHAN 2,080.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 18,510.01
E Overhead & Profit (10 %) 10% x D (maksimum) 1,851.00
F Harga Satuan Pekerjaan (D+E) 20,361.02

A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
Semen PC Kg 6.340 1,300.00 8,242.00
Pasir pasang m3 0.012 150,000.00 1,800.00
JUMLAH HARGA BAHAN 10,042.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 79,796.38
E Overhead & Profit (10 %) 10% x D (maksimum) 7,979.64
F Harga Satuan Pekerjaan (D+E) 87,776.02

A.4.4.2.27. Pemasangan 1 m2 acian


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang Batu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.010 157,992.00 1,579.92
JUMLAH TENAGA KERJA 46,502.92
B BAHAN
Semen PC Kg 3.250 1,300.00 4,225.00
JUMLAH HARGA BAHAN 4,225.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 50,727.92
E Overhead & Profit (10 %) 10% x D (maksimum) 5,072.79
F Harga Satuan Pekerjaan (D+E) 55,800.71

A.4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang Batu L.03 OH 0.015 147,992.00 2,219.88
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 49,775.46
B BAHAN
MSP Kg 3.250 1,625.00 5,281.25
JUMLAH HARGA BAHAN 5,281.25
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 55,056.71
E Overhead & Profit (10 %) 10% x D (maksimum) 5,505.67

Page 98
F Harga Satuan Pekerjaan (D+E) 60,562.38

Page 99
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.1. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang Batu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 58,282.64
B BAHAN
Ubin abu-abu buah 6.630 13,000.00 86,190.00
Semen Portland kg 9.800 1,300.00 12,740.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 105,680.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 163,962.64
E Overhead & Profit (10 %) 10% x D (maksimum) 24,594.40
F Harga Satuan Pekerjaan (D+E) 188,557.04

A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang Batu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 58,282.64
B BAHAN
Ubin abu-abu buah 11.870 5,000.00 59,350.00
Semen Portland kg 10.000 1,300.00 13,000.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 79,100.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 137,382.64
E Overhead & Profit (10 %) 10% x D (maksimum) 13,738.26
F Harga Satuan Pekerjaan (D+E) 151,120.91

A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.270 143,119.40 38,642.24
Tukang Batu L.03 OH 0.135 147,992.00 19,978.92
Kepala tukang L.03 OH 0.014 149,992.00 2,099.89
Mandor L.04 OH 0.014 157,992.00 2,211.89
JUMLAH TENAGA KERJA 62,932.93
B BAHAN
Ubin abu-abu buah 26.500 3,427.00 90,815.50
Semen Portland kg 10.400 29,000.00 301,600.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 399,165.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 462,098.43
E Overhead & Profit (10 %) 10% x D (maksimum) 46,209.84
F Harga Satuan Pekerjaan (D+E) 508,308.28

Page 100
A.4.4.3.4. Pemasangan 1 m2 lantai ubin warna ukuran 40 cm x 40 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.270 143,119.40 38,642.24
Tukang Batu L.03 OH 0.135 147,992.00 19,978.92
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 62,624.95
B BAHAN
Ubin warna buah 6.630 13,500.00 89,505.00
Semen Portland kg 9.800 1,300.00 12,740.00
Semen warna kg 0.600 12,000.00 7,200.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 116,195.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 178,819.95
E Overhead & Profit (10 %) 10% x D (maksimum) 17,882.00
F Harga Satuan Pekerjaan (D+E) 196,701.95

A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.270 143,119.40 38,642.24
Tukang Batu L.03 OH 0.135 147,992.00 19,978.92
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 62,624.95
B BAHAN
Ubin warna buah 11.870 5,600.00 66,472.00
Semen Portland kg 10.000 1,300.00 13,000.00
Semen warna kg 0.600 12,000.00 7,200.00
Pasir pasang M3 0.045 150,000.00 86,672.00
JUMLAH HARGA BAHAN 173,344.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 235,968.95
E Overhead & Profit (10 %) 10% x D (maksimum) 23,596.90
F Harga Satuan Pekerjaan (D+E) 259,565.85

A.4.4.3.8. Pemasangan 1 m2 lantai ubin teraso ukuran 30 cm x 30 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang Batu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.130 149,992.00 19,498.96
Mandor L.04 OH 0.130 157,992.00 20,538.96
JUMLAH TENAGA KERJA 94,316.77
B BAHAN
Ubin teraso Bh 11.870 7,363.64 87,406.36
Semen Portland kg 10.000 1,300.00 13,000.00
Semen warna kg 1.500 12,000.00 18,000.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 125,156.36
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 219,473.13
E Overhead & Profit (10 %) 10% x D (maksimum) 21,947.31
F Harga Satuan Pekerjaan (D+E) 241,420.45

Page 101
A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang Batu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.130 149,992.00 19,498.96
Mandor L.04 OH 0.130 157,992.00 20,538.96
JUMLAH TENAGA KERJA 94,316.77
B BAHAN
Ubin granit Bh 6.630 31,520.00 208,977.60
Semen Portland kg 9.800 1,300.00 12,740.00
Semen warna kg 1.300 12,000.00 15,600.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 244,067.60
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 338,384.37
E Overhead & Profit (10 %) 10% x D (maksimum) 33,838.44
F Harga Satuan Pekerjaan (D+E) 372,222.81

A.4.4.3.10. Pemasangan 1 m2 lantai ubin granit ukuran 30 cm x 30 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.260 143,119.40 37,211.04
Tukang Batu L.03 OH 0.130 147,992.00 19,238.96
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 60,453.80
B BAHAN
Ubin granit Bh 11.870 12,240.00 145,288.80
Semen Portland kg 10.000 1,300.00 13,000.00
Semen warna kg 1.500 12,000.00 18,000.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 183,038.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 243,492.60
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 24,349.26
F Harga Satuan Pekerjaan (D+E) 267,841.86

A.4.4.3.11. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40 cm x 40cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang Batu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 58,282.64
B BAHAN
Ubin teralux Bh 6.630 30,400.00 201,552.00
Semen Portland kg 9.800 1,300.00 12,740.00
Semen warna kg 1.300 12,000.00 15,600.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 236,642.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 294,924.64
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 29,492.46
F Harga Satuan Pekerjaan (D+E) 324,417.11

Page 102
A.4.4.3.12. Pemasangan 1 m2 lantai ubin teralux ukuran 30 cm x 30 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.260 143,119.40 37,211.04
Tukang Batu L.03 OH 0.130 147,992.00 19,238.96
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 60,453.80
B BAHAN
Ubin teralux Bh 11.870 16,650.00 197,635.50
Semen Portland kg 10.000 1,300.00 13,000.00
Semen warna kg 1.500 12,000.00 18,000.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 235,385.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 295,839.30
E Overhead & Profit (10 %) 10% x D (maksimum) 29,583.93
F Harga Satuan Pekerjaan (D+E) 325,423.23

A.4.4.3.13. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60 cm x 60cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.260 143,119.40 37,211.04
Tukang Batu L.03 OH 0.130 147,992.00 19,238.96
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 60,453.80
B BAHAN
Ubin teralux marmer Bh 3.100 86,400.00 267,840.00
Semen Portland kg 9.600 1,300.00 12,480.00
Semen warna kg 1.500 12,000.00 18,000.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 305,070.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 365,523.80
E Overhead & Profit (10 %) 10% x D (maksimum) 36,552.38
F Harga Satuan Pekerjaan (D+E) 402,076.18

A.4.4.3.14. Pemasangan 1 m’ plint ubin PC abu-abu ukuran 10 cm x 20 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin PC Bh 5.300 1,620.00 8,586.00
Semen Portland kg 1.650 1,300.00 2,145.00
Pasir pasang M3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 17,481.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 45,820.91
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 4,582.09
F Harga Satuan Pekerjaan (D+E) 50,403.01

Page 103
A.4.4.3.15. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10 cm x 30 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin PC Bh 3.530 3,427.00 12,097.31
Semen Portland kg 1.240 1,300.00 1,612.00
Pasir pasang M3 0.003 150,000.00 450.00
JUMLAH HARGA BAHAN 14,159.31
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 42,499.22
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 4,249.92
F Harga Satuan Pekerjaan (D+E) 46,749.15

A.4.4.3.16. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin PC Bh 2.650 4,640.00 12,296.00
Semen Portland kg 1.240 1,300.00 1,612.00
Pasir pasang M3 0.003 150,000.00 450.00
JUMLAH HARGA BAHAN 14,358.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 42,697.91
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 4,269.79
F Harga Satuan Pekerjaan (D+E) 46,967.71

A.4.4.3.17. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin warna Bh 5.300 2,100.00 11,130.00
Semen Portland Kg 1.240 1,300.00 1,612.00
Semen warna Kg 0.150 12,000.00 1,800.00
Pasir pasang M3 0,003 150,000.00 14,542.00
JUMLAH HARGA BAHAN 29,084.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 57,423.91
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 5,742.39
F Harga Satuan Pekerjaan (D+E) 63,166.31

Page 104
A.4.4.3.18. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin warna Bh 3.530 3,727.00 13,156.31
Semen Portland kg 1.140 1,300.00 1,482.00
Semen warna kg 0.100 12,000.00 1,200.00
Pasir pasang M3 0,003 150,000.00 15,838.31
JUMLAH HARGA BAHAN 31,676.62
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 60,016.53
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 6,001.65
F Harga Satuan Pekerjaan (D+E) 66,018.19

A.4.4.3.19.Pemasangan 1 m’ plint ubin warna ukuran 10 cm x 40 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin warna Bh 2.650 4,940.00 13,091.00
Semen Portland kg 1.140 1,300.00 1,482.00
Semen warna kg 0.100 12,000.00 1,200.00
Pasir pasang M3 0,003 150,000.00 15,773.00
JUMLAH HARGA BAHAN 31,546.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 59,885.91
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 5,988.59
F Harga Satuan Pekerjaan (D+E) 65,874.51

A.4.4.3.20.Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin teraso Bh 3.530 3,427.00 12,097.31
Semen Portland kg 1.140 1,300.00 1,482.00
Semen warna kg 0.100 12,000.00 1,200.00
Pasir pasang M3 0,003 150,000.00 14,779.31
JUMLAH HARGA BAHAN 29,558.62
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 57,898.53
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 5,789.85
F Harga Satuan Pekerjaan (D+E) 63,688.39

Page 105
A.4.4.3.21.Pemasangan 1 m’ plint ubin teraso ukuran 10 cm x 40 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin teraso Bh 2.650 4,640.00 12,296.00
Semen Portland kg 1.140 1,300.00 1,482.00
Semen warna kg 0.100 12,000.00 1,200.00
Pasir pasang M3 0,003 150,000.00 14,978.00
JUMLAH HARGA BAHAN 29,956.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 58,295.91
E Overhead & Profit (10 %) 10% x D (maksimum) 5,829.59
F Harga Satuan Pekerjaan (D+E) 64,125.51

A.4.4.3.22.Pemasangan 1 m’ plint ubin granit ukuran 10 cm x 40 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin granit Bh 2.650 49,250.00 120,133.33
Semen Portland kg 1.140 1,300.00 1,482.00
Semen warna kg 0.100 12,000.00 1,200.00
Pasir pasang M3 0,003 150,000.00 122,815.33
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 151,155.25
E Overhead & Profit (10 %) 10% x D (maksimum) 15,115.52
F Harga Satuan Pekerjaan (D+E) 166,270.77

A.4.4.3.23. Pemasangan 1 m’ plint ubin granit ukuran 10 cm x 30 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin granit Bh 3.530 45,333.33 160,026.67
Semen Portland kg 1.140 1,300.00 1,482.00
Semen warna kg 0.100 12,000.00 1,200.00
Pasir pasang M3 0,003 150,000.00 162,708.67
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 191,048.58
E Overhead & Profit (10 %) 10% x D (maksimum) 19,104.86
F Harga Satuan Pekerjaan (D+E) 210,153.44

Page 106
A.4.4.3.24. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint ubin granit Bh 3.530 7,600.00 26,828.00
Semen Portland kg 1.140 1,300.00 1,482.00
Semen warna kg 0.100 12,000.00 1,200.00
Pasir pasang M3 0,003 150,000.00 29,510.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 57,849.91
E Overhead & Profit (10 %) 10% x D (maksimum) 5,784.99
F Harga Satuan Pekerjaan (D+E) 63,634.91

A.4.4.3.25. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10 cm x 30 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint teralux kerang Bh 3.530 5,550.00 19,591.50
Semen Portland kg 1.140 1,300.00 1,482.00
Semen warna kg 0.100 12,000.00 1,200.00
Pasir pasang M3 0,003 150,000.00 22,273.50
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 50,613.41
E Overhead & Profit (10 %) 10% x D (maksimum) 5,061.34
F Harga Satuan Pekerjaan (D+E) 55,674.76

A.4.4.3.26. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10 cm x 60 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang Batu L.03 OH 0.090 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 28,339.91
B BAHAN
Plint teralux marmer Bh 1.700 14,400.00 24,480.00
Semen Portland kg 1.140 1,300.00 1,482.00
Semen warna kg 0.100 12,000.00 1,200.00
Pasir pasang M3 0,003 150,000.00 27,162.00
JUMLAH HARGA BAHAN 54,324.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 82,663.91
E Overhead & Profit (10 %) 10% x D (maksimum) 8,266.39
F Harga Satuan Pekerjaan (D+E) 90,930.31

Page 107
A.4.4.3.27.Pemasangan 1m2 lantai teraso cor di tempat, tebal 3 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.360 143,119.40 51,522.98
Tukang Batu L.03 OH 0.180 147,992.00 26,638.56
Kepala tukang L.03 OH 0.018 149,992.00 2,699.86
Mandor L.04 OH 0.018 157,992.00 2,843.86
JUMLAH TENAGA KERJA 83,705.26
B BAHAN
Teraso cor m2 0.036 81,000.00 2,916.00
Semen warna kg 0.100 12,000.00 1,200.00
JUMLAH HARGA BAHAN 4,116.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 87,821.26
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 8,782.13
F Harga Satuan Pekerjaan (D+E) 96,603.38

A.4.4.3.28.Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Batu L.03 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Ubin keramik Bh 53.000 11,000.00 583,000.00
Semen Portland kg 8.190 1,300.00 10,647.00
Pasir pasang M3 0.045 12,000.00 540.00
Semen warna kg 2.750 150,000.00 412,500.00
JUMLAH HARGA BAHAN 1,006,687.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,169,447.22
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 175,417.08
F Harga Satuan Pekerjaan (D+E) 1,344,864.30

A.4.4.3.29. Pemasangan 1 m2 lantai keramik artistik 10 cm x 10 cm atau 5 cm x 20 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Batu L.03 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Ubin keramik Bh 106.000 9,000.00 954,000.00
Semen Portland kg 8.190 1,300.00 10,647.00
Pasir pasang M3 0.045 12,000.00 540.00
Semen warna kg 2.750 150,000.00 412,500.00
JUMLAH HARGA BAHAN 1,377,687.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,540,447.22
E Overhead & Profit (10%) 10% x D (maksimum) 154,044.72
F Harga Satuan Pekerjaan (D+E) 1,694,491.94

Page 108
A.4.4.3.30. Pemasangan 1 m2 lantai keramik ukuran 33 cm x 33 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Batu L.03 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Ubin keramik Doos 1.050 97,000.00 101,850.00
Semen Portland kg 10.000 1,300.00 13,000.00
Pasir pasang M3 0.045 150,000.00 6,750.00
Semen warna kg 0.050 12,000.00 600.00
JUMLAH HARGA BAHAN 122,200.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 284,960.22
E Overhead & Profit (10%) 10% x D (maksimum) 42,744.03
F Harga Satuan Pekerjaan (D+E) 327,704.25

A.4.4.3.31. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Batu L.03 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Ubin keramik Doos 1.050 65,000.00 68,250.00
Semen Portland kg 10.000 1,300.00 13,000.00
Pasir pasang M3 0.045 150,000.00 6,750.00
Semen warna kg 0.500 12,000.00 6,000.00
JUMLAH HARGA BAHAN 94,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 256,760.22
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 38,514.03
F Harga Satuan Pekerjaan (D+E) 295,274.25

A.4.4.3.32. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Batu L.03 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Ubin keramik Doos 1.050 35,000.00 36,750.00
Semen Portland kg 10.400 1,300.00 13,520.00
Pasir pasang M3 0.045 150,000.00 6,750.00
Semen warna kg 0.500 12,000.00 6,000.00
JUMLAH HARGA BAHAN 63,020.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 225,780.22
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 33,867.03
F Harga Satuan Pekerjaan (D+E) 259,647.25

Page 109
A.4.4.3.33. Pemasangan 1m2 lantai keramik ukuran 10 cm x 33 cm untuk variasi/border
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.050 143,119.40 150,275.37
Tukang Batu L.03 OH 0.525 147,992.00 77,695.80
Kepala tukang L.03 OH 0.053 149,992.00 7,949.58
Mandor L.04 OH 0.053 157,992.00 8,373.58
JUMLAH TENAGA KERJA 244,294.32
B BAHAN
Ubin keramik Bh 33.000 3,230.00 106,590.00
Semen Portland kg 9.800 1,300.00 12,740.00
Pasir pasang M3 0.045 150,000.00 6,750.00
Semen warna kg 0.500 12,000.00 6,000.00
JUMLAH HARGA BAHAN 132,080.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 376,374.32
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 37,637.43
F Harga Satuan Pekerjaan (D+E) 414,011.75

A.4.4.3.34. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Batu L.03 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Ubin keramik Bh 11.870 89,910.00 1,067,231.70
Semen Portland kg 14.150 1,300.00 18,395.00
3
Pasir pasang M 0.039 150,000.00 5,850.00
Semen warna kg 2.000 12,000.00 24,000.00
JUMLAH HARGA BAHAN 1,115,476.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,278,236.92
E Overhead & Profit (10 %) 10% x D (maksimum) 127,823.69
F Harga Satuan Pekerjaan (D+E) 1,406,060.61

A.4.4.3.35.Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.09 143,119.40 12,880.75
Tukang Batu L.02 OH 0.09 147,992.00 13,319.28
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 32,239.71
B BAHAN
Plint keramik buah 5.300 11,000.00 58,300.00
Semen Portland Kg 1.140 1,300.00 1,482.00
Pasir pasang m3 0.003 150,000.00 450.00
Semen warna kg 0.025 12,000.00 300.00
JUMLAH HARGA BAHAN 60,532.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 92,771.71
E Overhead & Profit (10%) 10% x D (maksimum) 9,277.17
F Harga Satuan Pekerjaan (D+E) 102,048.88

Page 110
A.4.4.3.36.Pemasangan 1 m’ plint keramik ukuran 10cm x10cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.09 143,119.40 12,880.75
Tukang Batu L.02 OH 0.09 147,992.00 13,319.28
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 32,239.71
B BAHAN
Plint keramik buah 10.600 9,000.00 95,400.00
Semen Portland Kg 1.140 1,300.00 1,482.00
Pasir pasang m3 0.003 150,000.00 450.00
Semen warna kg 0.050 12,000.00 600.00
JUMLAH HARGA BAHAN 97,932.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 130,171.71
E Overhead & Profit (10%) 10% x D (maksimum) 13,017.17
F Harga Satuan Pekerjaan (D+E) 143,188.88

A.4.4.3.37.Pemasangan 1 m’ plint keramik ukuran 5cm x20cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.09 143,119.40 12,880.75
Tukang Batu L.02 OH 0.09 147,992.00 13,319.28
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 32,239.71
B BAHAN
Plint keramik buah 5.300 8,000.00 42,400.00
Semen Portland Kg 0.570 1,300.00 741.00
Pasir pasang m3 0.0015 150,000.00 225.00
Semen warna kg 0.013 12,000.00 156.00
JUMLAH HARGA BAHAN 43,522.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 75,761.71
E Overhead & Profit (10%) 10% x D (maksimum) 7,576.17
F Harga Satuan Pekerjaan (D+E) 83,337.88

A.4.4.3.38.Pemasangan 1 m’ plint internal cove artistik 5x5x20 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.09 143,119.40 12,880.75
Tukang Batu L.02 OH 0.09 147,992.00 13,319.28
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 32,239.71
B BAHAN
Internal Cove buah 5.300 2,200.00 11,660.00
Semen Portland Kg 0.570 1,300.00 741.00
Pasir pasang m3 0.0015 150,000.00 225.00
Semen warna kg 0.013 12,000.00 156.00
JUMLAH HARGA BAHAN 12,782.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,021.71
E Overhead & Profit (10%) 10% x D (maksimum) 4,502.17
F Harga Satuan Pekerjaan (D+E) 49,523.88

Page 111
A.4.4.3.39.Pemasangan 1m2 lantai marmer 100cm x 100cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Batu L.03 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Marmer Bh 1.060 535,900.00 568,054.00
Semen Portland kg 8.190 1,300.00 10,647.00
Pasir pasang M3 0.045 150,000.00 6,750.00
Semen warna kg 0.134 12,000.00 1,608.00
JUMLAH HARGA BAHAN 587,059.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 749,819.22
E Overhead & Profit (10 %) 10% x D (maksimum) 74,981.92
F Harga Satuan Pekerjaan (D+E) 824,801.14

A.4.4.3.40.Pemasangan 1m2 lantai karpet


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.170 143,119.40 24,330.30
Tukang Kayu L.02 OH 0.170 147,992.00 25,158.64
Kepala tukang L.03 OH 0.017 149,992.00 2,549.86
Mandor L.04 OH 0.009 157,992.00 1,421.93
JUMLAH TENAGA KERJA 53,460.73
B BAHAN
Karpet m2 1.050 160,000.00 168,000.00
Lem kg 0.350 48,000.00 16,800.00
JUMLAH HARGA BAHAN 184,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 238,260.73
E Overhead & Profit (10 %) 10% x D (maksimum) 23,826.07
F Harga Satuan Pekerjaan (D+E) 262,086.80

A.4.4.3.41.Pemasangan 1m2 underlayer (pelapis bawah karpet)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.120 143,119.40 17,174.33
Tukang Kayu L.02 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.006 157,992.00 947.95
JUMLAH TENAGA KERJA 37,681.22
B BAHAN
underlayer m2 1.050 7,250.00 7,612.50
Lem kg 0.350 48,000.00 16,800.00
JUMLAH HARGA BAHAN 24,412.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 62,093.72
E Overhead & Profit (10 %) 10% x D (maksimum) 6,209.37
F Harga Satuan Pekerjaan (D+E) 68,303.10

Page 112
A.4.4.3.42.Pemasangan 1m2 lantai parquet kayu
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Kayu L.02 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Parquet m2 1.050 196,000.00 205,800.00
Lem kg 0.600 48,000.00 28,800.00
JUMLAH HARGA BAHAN 234,600.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 397,360.22
E Overhead & Profit (10 %) 10% x D (maksimum) 39,736.02
F Harga Satuan Pekerjaan (D+E) 437,096.24

A.4.4.3.43.Pemasangan 1m2 lantai gymfloor


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Kayu L.02 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Parquet m2 1.050 196,000.00 205,800.00
Lem kg 0.600 48,000.00 28,800.00
JUMLAH HARGA BAHAN 234,600.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 397,360.22
E Overhead & Profit (10 %) 10% x D (maksimum) 39,736.02
F Harga Satuan Pekerjaan (D+E) 437,096.24

A.4.4.3.44.Pemasangan 1m2 dinding porselen 10 cm x 20 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.900 143,119.40 128,807.46
Tukang Batu L.02 OH 0.450 147,992.00 66,596.40
Kepala tukang L.03 OH 0.045 149,992.00 6,749.64
Mandor L.04 OH 0.045 157,992.00 7,109.64
JUMLAH TENAGA KERJA 209,263.14
B BAHAN
Porselen Buah 53.000 700.00 37,100.00
Semen Portland kg 9.300 1,300.00 12,090.00
Pasir Pasang m3 0.018 150,000.00 2,700.00
Semen Warna kg 2.750 12,000.00 33,000.00
JUMLAH HARGA BAHAN 84,890.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 294,153.14
E Overhead & Profit (10 %) 10% x D (maksimum) 29,415.31
F Harga Satuan Pekerjaan (D+E) 323,568.45

Page 113
A.4.4.3.45.Pemasangan 1m2 dinding porselen 20 cm x 20 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.900 143,119.40 128,807.46
Tukang Batu L.02 OH 0.450 147,992.00 66,596.40
Kepala tukang L.03 OH 0.045 149,992.00 6,749.64
Mandor L.04 OH 0.045 157,992.00 7,109.64
JUMLAH TENAGA KERJA 209,263.14
B BAHAN
Porselen Buah 26.000 1,400.00 36,400.00
Semen Portland kg 9.300 1,300.00 12,090.00
Pasir Pasang m3 0.018 150,000.00 2,700.00
Semen Warna kg 2.750 12,000.00 33,000.00
JUMLAH HARGA BAHAN 84,190.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 293,453.14
E Overhead & Profit (10 %) 10% x D (maksimum) 29,345.31
F Harga Satuan Pekerjaan (D+E) 322,798.45

A.4.4.3.46.Pemasangan 1m2 dinding artistik 10 cm x 20 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.900 143,119.40 128,807.46
Tukang Batu L.02 OH 0.450 147,992.00 66,596.40
Kepala tukang L.03 OH 0.045 149,992.00 6,749.64
Mandor L.04 OH 0.045 157,992.00 7,109.64
JUMLAH TENAGA KERJA 209,263.14
B BAHAN
Porselen Buah 53.000 1,640.00 86,920.00
Semen Portland kg 9.300 1,300.00 12,090.00
Pasir Pasang m3 0.018 150,000.00 2,700.00
Semen Warna kg 2.750 12,000.00 33,000.00
JUMLAH HARGA BAHAN 134,710.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 343,973.14
E Overhead & Profit (10 %) 10% x D (maksimum) 34,397.31
F Harga Satuan Pekerjaan (D+E) 378,370.45

A.4.4.3.47 .Pemasangan 1m2 dinding artistik 5 cm x 20 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.900 143,119.40 128,807.46
Tukang Batu L.02 OH 0.450 147,992.00 66,596.40
Kepala tukang L.03 OH 0.045 149,992.00 6,749.64
Mandor L.04 OH 0.045 157,992.00 7,109.64
JUMLAH TENAGA KERJA 209,263.14
B BAHAN
Porselen Buah 106.000 1,850.00 196,100.00
Semen Portland kg 9.300 1,300.00 12,090.00
Pasir Pasang m3 0.018 150,000.00 2,700.00
Semen Warna kg 2.900 12,000.00 34,800.00
JUMLAH HARGA BAHAN 245,690.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 454,953.14
E Overhead & Profit (10 %) 10% x D (maksimum) 45,495.31
F Harga Satuan Pekerjaan (D+E) 500,448.45

Page 114
A.4.4.3.48. Pemasangan 1m2 dinding bata pelapis 3 cm x 7 cm x 24 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang Batu L.02 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 232,514.60
B BAHAN
Semen Portland kg 12.440 1,300.00 16,172.00
Pasir Pasang m3 0.025 150,000.00 3,750.00
Semen Warna kg 2.750 12,000.00 33,000.00
JUMLAH HARGA BAHAN 52,922.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 285,436.60
E Overhead & Profit (10 %) 10% x D (maksimum) 28,543.66
F Harga Satuan Pekerjaan (D+E) 313,980.26

A.4.4.3.49. Pemasangan 1m2 dinding batu paras


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Batu L.02 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Batu Paras m2 1.100 120,000.00 132,000.00
Semen Portland kg 11.750 1,300.00 15,275.00
Pasir Pasang m3 0.035 150,000.00 5,250.00

JUMLAH HARGA BAHAN 152,525.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 315,285.22
E Overhead & Profit (10 %) 10% x D (maksimum) 31,528.52
F Harga Satuan Pekerjaan (D+E) 346,813.74

A.4.4.3.50. Pemasangan 1m2 dinding batu tempel hitam


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang Batu L.02 OH 0.350 147,992.00 51,797.20
Kepala tukang L.03 OH 0.035 149,992.00 5,249.72
Mandor L.04 OH 0.035 157,992.00 5,529.72
JUMLAH TENAGA KERJA 162,760.22
B BAHAN
Batu Tempel Hitam m2 1.100 120,000.00 132,000.00
Semen Portland kg 11.750 1,300.00 15,275.00
Pasir Pasang m3 0.035 150,000.00 5,250.00

JUMLAH HARGA BAHAN 152,525.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 315,285.22
E Overhead & Profit (10 %) 10% x D (maksimum) 31,528.52
F Harga Satuan Pekerjaan (D+E) 346,813.74

Page 115
A.4.4.3.51. Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang Batu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 47,180.53
B BAHAN
Vynil buah 11.870 21,000.00 249,270.00
Lem kg 0.350 48,000.00 16,800.00
JUMLAH HARGA BAHAN 266,070.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 313,250.53
E Overhead & Profit (10 %) 10% x D (maksimum) 31,325.05
F Harga Satuan Pekerjaan (D+E) 344,575.58

A.4.4.3.52. Pemasangan 1 m2 wallpaper lebar 50 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.350 143,119.40 50,091.79
Tukang Batu L.03 OH 0.175 147,992.00 25,898.60
Kepala tukang L.03 OH 0.017 149,992.00 2,549.86
Mandor L.04 OH 0.002 157,992.00 315.98
JUMLAH TENAGA KERJA 78,856.24
B BAHAN
Wallpaper m 2.200 89,000.00 195,800.00
Lem kg 0.250 48,000.00 12,000.00
JUMLAH HARGA BAHAN 207,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 286,656.24
E Overhead & Profit (10 %) 10% x D (maksimum) 28,665.62
F Harga Satuan Pekerjaan (D+E) 315,321.86

A.4.4.3.53. Pemasangan 1m2 floor harderner


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.120 143,119.40 17,174.33
Tukang Batu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.006 157,992.00 947.95

JUMLAH TENAGA KERJA 37,681.22


B BAHAN
Floor harderner kg 5.000 17,600.00 88,000.00

JUMLAH HARGA BAHAN 125,681.22


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 163,362.45
E Overhead & Profit (10 %) 10% x D (maksimum) 16,336.24
F Harga Satuan Pekerjaan (D+E) 179,698.69

Page 116
A.4.4.3.54.Pemasangan 1 m’ plint vynil 15cm x 30cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.080 143,119.40 11,449.55
Tukang Batu L.03 OH 0.080 147,992.00 11,839.36
Kepala tukang L.03 OH 0.008 149,992.00 1,199.94
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 25,120.82


B BAHAN
Vynil buah 1.760 18,750.00 33,000.00
Lem kg 0.080 48,000.00 3,840.00

JUMLAH HARGA BAHAN 36,840.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 61,960.82
E Overhead & Profit (10 %) 10% x D (maksimum) 6,196.08
F Harga Satuan Pekerjaan (D+E) 68,156.90

A.4.4.3.55. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.120 143,119.40 17,174.33
Tukang Batu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.006 157,992.00 947.95
JUMLAH TENAGA KERJA 37,681.22
B BAHAN
Papan kayu kelas 1 m3 0.003 9,000,000.00 27,000.00
paku/skrup 5 cm kg 0.050 16,000.00 800.00

JUMLAH HARGA BAHAN 27,800.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 65,481.22
E Overhead & Profit (10 %) 10% x D (maksimum) 6,548.12
F Harga Satuan Pekerjaan (D+E) 72,029.35

A.4.4.3.56. Pemasangan 1 m2 paving block natural tebal 6 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang Batu L.03 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.0013 157,992.00 205.39
JUMLAH TENAGA KERJA 117,480.84
B BAHAN
Paving block 6 cm m2 1.010 45,000.00 45,450.00
Pasir beton m3 0.050 230,000.00 11,500.00
JUMLAH HARGA BAHAN 56,950.00
C PERALATAN
% 10.000 56,950.00 5,695.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 180,125.84
E Overhead & Profit (10 %) 10% x D (maksimum) 18,012.58
F Harga Satuan Pekerjaan (D+E) 198,138.42

Page 117
A.4.4.3.57. Pemasangan 1 m2 paving block natural tebal 8 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.500 143,119.40 71,559.70
Tukang Batu L.03 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.001 157,992.00 205.39
JUMLAH TENAGA KERJA 153,260.69
B BAHAN
Paving block 8 cm m2 1.010 65,000.00 65,650.00
Pasir beton m3 0.050 230,000.00 11,500.00
JUMLAH HARGA BAHAN 77,150.00
C PERALATAN
% 10.000 77,150.00 7,715.00
JUMLAH HARGA ALAT 7,715.00

D Jumlah (A+B+C) 238,125.69


E Overhead & Profit (10 %) 10% x D (maksimum) 23,812.57
F Harga Satuan Pekerjaan (D+E) 261,938.26

A.4.4.3.58. Pemasangan 1 m2 paving block berwarna tebal 6 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang Batu L.03 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.0013 157,992.00 205.39
JUMLAH TENAGA KERJA 117,480.84
B BAHAN
Paving block 6cm berwarna m2 1.010 48,000.00 48,480.00
Pasir beton m3 0.050 230,000.00 11,500.00
JUMLAH HARGA BAHAN 59,980.00
C PERALATAN
% 10.000 59,980.00 5,998.00
JUMLAH HARGA ALAT 5,998.00

D Jumlah (A+B+C) 183,458.84


E Overhead & Profit (10 %) 10% x D (maksimum) 18,345.88
F Harga Satuan Pekerjaan (D+E) 201,804.72

A.4.4.3.59. Pemasangan 1 m2 paving block berwarna tebal 8 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.500 143,119.40 71,559.70
Tukang Batu L.03 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.0013 157,992.00 205.39
JUMLAH TENAGA KERJA 153,260.69
B BAHAN
Paving block 8 cm berwarna m2 1.010 78,000.00 78,780.00
Pasir beton m3 0.050 230,000.00 11,500.00
JUMLAH HARGA BAHAN 90,280.00
C PERALATAN
% 10.000 90,280.00 9,028.00
JUMLAH HARGA ALAT 9,028.00

D Jumlah (A+B+C) 252,568.69


E Overhead & Profit (10 %) 10% x D (maksimum) 25,256.87
F Harga Satuan Pekerjaan (D+E) 277,825.56

Page 118
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.030 143,119.40 4,293.58
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.004 157,992.00 631.97
JUMLAH TENAGA KERJA 16,334.93
B BAHAN
Asbes semen m2 1.100 41,500.00 45,650.00
Paku tripleks kg 0.010 16,000.00 160.00
JUMLAH HARGA BAHAN 45,810.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 62,144.93


E Overhead & Profit (10 %) 10% x D (maksimum) 6,214.49
F Harga Satuan Pekerjaan (D+E) 68,359.43

A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.120 143,119.40 17,174.33
Tukang kayu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.006 157,992.00 947.95
JUMLAH TENAGA KERJA 37,681.22
B BAHAN
Akustik Lembar 12.000 17,000.00 204,000.00
Paku tripleks kg 0.050 16,000.00 800.00
JUMLAH HARGA BAHAN 204,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 242,481.22
E Overhead & Profit (10 %) 10% x D (maksimum) 24,248.12
F Harga Satuan Pekerjaan (D+E) 266,729.35

A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.120 143,119.40 17,174.33
Tukang kayu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.006 157,992.00 947.95
JUMLAH TENAGA KERJA 37,681.22
B BAHAN
Akustik Lembar 5.800 17,000.00 98,600.00
Paku tripleks kg 0.050 16,000.00 800.00

JUMLAH HARGA BAHAN 99,400.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 137,081.22
E Overhead & Profit (10 %) 10% x D (maksimum) 13,708.12
F Harga Satuan Pekerjaan (D+E) 150,789.35

Page 119
A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.005 157,992.00 789.96

JUMLAH TENAGA KERJA 31,401.02


B BAHAN
Akustik Lembar 1.500 17,000.00 25,500.00
Paku tripleks kg 0.050 16,000.00 800.00

JUMLAH HARGA BAHAN 26,300.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 57,701.02
E Overhead & Profit (10 %) 10% x D (maksimum) 5,770.10
F Harga Satuan Pekerjaan (D+E) 63,471.12

A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 31,401.02
B BAHAN
Tripleks Lembar 0.375 55,000.00 20,625.00
Paku tripleks kg 0.050 16,000.00 800.00
JUMLAH HARGA BAHAN 21,425.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 52,826.02
E Overhead & Profit (10 %) 10% x D (maksimum) 5,282.60
F Harga Satuan Pekerjaan (D+E) 58,108.62

A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.800 143,119.40 114,495.52
Tukang kayu L.03 OH 0.800 147,992.00 118,393.60
Kepala tukang L.03 OH 0.080 149,992.00 11,999.36
Mandor L.04 OH 0.040 157,992.00 6,319.68
JUMLAH TENAGA KERJA 251,208.16
B BAHAN
Kayu papan m3 0.015 8,625,000.00 129,375.00
Paku tripleks kg 0.010 16,000.00 160.00
JUMLAH HARGA BAHAN 129,535.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 380,743.16
E Overhead & Profit (10 %) 10% x D (maksimum) 38,074.32
F Harga Satuan Pekerjaan (D+E) 418,817.48

Page 120
A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.050 147,992.00 7,399.60
Kepala tukang L.03 OH 0.005 149,992.00 749.96
Mandor L.04 OH 0.005 157,992.00 789.96

JUMLAH TENAGA KERJA 23,251.46


B BAHAN
Gypsum board Lembar 0.364 55,000.00 20,020.00
Paku skrup kg 0.110 700.00 77.00

JUMLAH HARGA BAHAN 20,097.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 43,348.46
E Overhead & Profit (10 %) 10% x D (maksimum) 4,334.85
F Harga Satuan Pekerjaan (D+E) 47,683.31

A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.500 143,119.40 71,559.70
Tukang kayu L.03 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.025 157,992.00 3,949.80

JUMLAH TENAGA KERJA 157,005.10


B BAHAN
Profil Allum "T" m 3.600 12,000.00 43,200.00
Kawat Ø 4 mm Kg 0.150 17,600.00 2,640.00
Ramset Buah 1.050 1,800.00 1,890.00
Akustik 60 x 120 Lembar 1.500 17,000.00 25,500.00

JUMLAH HARGA BAHAN 73,230.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 230,235.10
E Overhead & Profit (10 %) 10% x D (maksimum) 23,023.51
F Harga Satuan Pekerjaan (D+E) 253,258.61

A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.050 143,119.40 7,155.97
Tukang kayu L.03 OH 0.050 147,992.00 7,399.60
Kepala tukang L.03 OH 0.005 149,992.00 749.96
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 20,045.29
B BAHAN
List kayu profil m 1.050 21,000.00 22,050.00
Paku Kg 0.010 16,000.00 160.00
JUMLAH HARGA BAHAN 22,210.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 42,255.29
E Overhead & Profit (10 %) 10% x D (maksimum) 4,225.53
F Harga Satuan Pekerjaan (D+E) 46,480.82

A.4.5.1.10 Pemasangan 1 m2 rangka langit-langit besi hollow 40.40


Lihat pada kelompok Pekerjaan Besi dan Alumunium (A.9.21)

Page 121
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang kayu L.03 OH 0.075 147,992.00 11,099.40
Kepala tukang L.03 OH 0.008 149,992.00 1,124.94
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 34,956.19


B BAHAN
Genteng palentong Buah 25.000 1,750.00 43,750.00
JUMLAH HARGA BAHAN 43,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 78,706.19
E Overhead & Profit (10 %) 10% x D (maksimum) 7,870.62
F Harga Satuan Pekerjaan (D+E) 86,576.80

A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang kayu L.03 OH 0.075 147,992.00 11,099.40
Kepala tukang L.03 OH 0.008 149,992.00 1,199.94
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 35,031.18


B BAHAN
Genteng kodok Buah 25.000 6,500.00 162,500.00

JUMLAH HARGA BAHAN 162,500.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 197,531.18
E Overhead & Profit (10 %) 10% x D (maksimum) 19,753.12
F Harga Satuan Pekerjaan (D+E) 217,284.30

A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang kayu L.03 OH 0.075 147,992.00 11,099.40
Kepala tukang L.03 OH 0.008 149,992.00 1,199.94
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 35,031.18
B BAHAN
Genteng palentong Buah 12.000 1,750.00 21,000.00

JUMLAH HARGA BAHAN 21,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 56,031.18
E Overhead & Profit (10 %) 10% x D (maksimum) 5,603.12
F Harga Satuan Pekerjaan (D+E) 61,634.30

Page 122
A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang kayu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.002 157,992.00 315.98

JUMLAH TENAGA KERJA 90,161.98


B BAHAN
Genteng bubung Buah 5.000
Semen Portland Kg 8.000 1,300.00 10,400.00
Pasir pasang M3 0.032 150,000.00 4,800.00

JUMLAH HARGA BAHAN 15,200.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 105,361.98
E Overhead & Profit (10 %) 10% x D (maksimum) 10,536.20
F Harga Satuan Pekerjaan (D+E) 115,898.18

A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang kayu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.002 157,992.00 315.98

JUMLAH TENAGA KERJA 90,161.98


B BAHAN
Genteng bubung Buah 5.000 9,700.00 48,500.00
Semen Portland Kg 8.000 1,300.00 10,400.00
Pasir pasang M3 0.032 150,000.00 4,800.00

JUMLAH HARGA BAHAN 63,700.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 153,861.98
E Overhead & Profit (10 %) 10% x D (maksimum) 15,386.20
F Harga Satuan Pekerjaan (D+E) 169,248.18

A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang kayu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.002 157,992.00 315.98

JUMLAH TENAGA KERJA 90,161.98


B BAHAN
Genteng bubung Buah 4.000 8,500.00 34,000.00
Semen Portland Kg 8.000 1,300.00 10,400.00
Pasir pasang M3 0.032 150,000.00 4,800.00

JUMLAH HARGA BAHAN 49,200.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 139,361.98
E Overhead & Profit (10 %) 10% x D (maksimum) 13,936.20
F Harga Satuan Pekerjaan (D+E) 153,298.18

Page 123
A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90 x 180
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.067 147,992.00 9,915.46
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94
JUMLAH TENAGA KERJA 32,108.07
B BAHAN
Rooflight 90 x 180 Lbr 0.600 54,000.00 32,400.00
Paku biasa ½”-1” Kg 0.050 15,000.00 750.00
JUMLAH HARGA BAHAN 33,150.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 65,258.07
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 6,525.81
F Harga Satuan Pekerjaan (D+E) 71,783.87

A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.075 147,992.00 11,099.40
Kepala tukang L.03 OH 0.008 149,992.00 1,199.94
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 33,599.99


B BAHAN
Asbes gel 92 x 250 Lbr 0.500 110,000.00 55,000.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00
JUMLAH HARGA BAHAN 57,052.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 90,651.99
E Overhead & Profit (10 %) 10% x D (maksimum) 9,065.20
F Harga Satuan Pekerjaan (D+E) 99,717.19

A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.075 147,992.00 11,099.40
Kepala tukang L.03 OH 0.008 149,992.00 1,199.94
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 33,599.99


B BAHAN
Asbes gel 92 x 250 Lbr 0.600 110,000.00 66,000.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00

JUMLAH HARGA BAHAN 68,052.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 101,651.99
E Overhead & Profit (10 %) 10% x D (maksimum) 10,165.20
F Harga Satuan Pekerjaan (D+E) 111,817.19

Page 124
A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 92 x 250 Lbr 0.600 110,000.00 66,000.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00

JUMLAH HARGA BAHAN 68,052.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 100,604.04
E Overhead & Profit (10 %) 10% x D (maksimum) 10,060.40
F Harga Satuan Pekerjaan (D+E) 110,664.45

A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 92 x 250 Lbr 0.750 110,000.00 82,500.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00

JUMLAH HARGA BAHAN 84,552.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 117,104.04
E Overhead & Profit (10 %) 10% x D (maksimum) 11,710.40
F Harga Satuan Pekerjaan (D+E) 128,814.45

A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm (gelombang kecil)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 92 x 300 Lbr 0.350 110,000.00 38,500.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00
JUMLAH HARGA BAHAN 40,552.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 73,104.04
E Overhead & Profit (10 %) 10% x D (maksimum) 7,310.40
F Harga Satuan Pekerjaan (D+E) 80,414.45

Page 125
A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm (gel. Kecil )
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 92 x 300 Lbr 0.420 110,000.00 46,200.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00

JUMLAH HARGA BAHAN 48,252.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 80,804.04
E Overhead & Profit (10 %) 10% x D (maksimum) 8,080.40
F Harga Satuan Pekerjaan (D+E) 88,884.45

A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 92 x 250 Lbr 0.440 110,000.00 48,400.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00

JUMLAH HARGA BAHAN 50,452.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 83,004.04
E Overhead & Profit (10 %) 10% x D (maksimum) 8,300.40
F Harga Satuan Pekerjaan (D+E) 91,304.45

A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 92 x 250 Lbr 0.800 110,000.00 88,000.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00

JUMLAH HARGA BAHAN 90,052.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 122,604.04
E Overhead & Profit (10 %) 10% x D (maksimum) 12,260.40
F Harga Satuan Pekerjaan (D+E) 134,864.45

Page 126
A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 92 x 250 Lbr 0.510 110,000.00 56,100.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00
JUMLAH HARGA BAHAN 58,152.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 90,704.04
E Overhead & Profit (10 %) 10% x D (maksimum) 9,070.40
F Harga Satuan Pekerjaan (D+E) 99,774.45

A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 105 x 300 Lbr 0.370 82,000.00 30,340.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00

JUMLAH HARGA BAHAN 32,392.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 64,944.04
E Overhead & Profit (10 %) 10% x D (maksimum) 6,494.40
F Harga Satuan Pekerjaan (D+E) 71,438.45

A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 105 x 300 Lbr 0.380 82,000.00 31,160.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00

JUMLAH HARGA BAHAN 33,212.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 65,764.04
E Overhead & Profit (10 %) 10% x D (maksimum) 6,576.40
F Harga Satuan Pekerjaan (D+E) 72,340.45

Page 127
A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 105x 250 Lbr 0.460 105,000.00 48,300.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00

JUMLAH HARGA BAHAN 50,352.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 82,904.04
E Overhead & Profit (10 %) 10% x D (maksimum) 8,290.40
F Harga Satuan Pekerjaan (D+E) 91,194.45

A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 105x 250 Lbr 0.490 105,000.00 51,450.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00
JUMLAH HARGA BAHAN 53,502.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 86,054.04
E Overhead & Profit (10 %) 10% x D (maksimum) 8,605.40
F Harga Satuan Pekerjaan (D+E) 94,659.45

A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.140 143,119.40 20,036.72
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 32,552.04


B BAHAN
Asbes gel 105x 250 Lbr 0.570 105,000.00 59,850.00
Paku pancing 6 x 23 Kg 0.120 17,100.00 2,052.00

JUMLAH HARGA BAHAN 61,902.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 94,454.04
E Overhead & Profit (10 %) 10% x D (maksimum) 9,445.40
F Harga Satuan Pekerjaan (D+E) 103,899.45

Page 128
A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92 m
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.084 143,119.40 12,022.03
Tukang kayu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 33,102.89


B BAHAN
Bubung stel gel. Lbr 2.400 45,000.00 108,000.00
Paku skrup 3,5” buah 6.000 700.00 4,200.00

JUMLAH HARGA BAHAN 112,200.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 145,302.89
E Overhead & Profit (10 %) 10% x D (maksimum) 14,530.29
F Harga Satuan Pekerjaan (D+E) 159,833.18

A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.084 143,119.40 12,022.03
Tukang kayu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 33,102.89


B BAHAN
Bubung stel gel. Lbr 2.100 45,000.00 94,500.00
Paku skrup 3,5” buah 6.000 700.00 4,200.00

JUMLAH HARGA BAHAN 98,700.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 131,802.89
E Overhead & Profit (10 %) 10% x D (maksimum) 13,180.29
F Harga Satuan Pekerjaan (D+E) 144,983.18

A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08 m


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.084 143,119.40 12,022.03
Tukang kayu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 33,102.89


B BAHAN
Bubung stel gel. Lbr 2.050 45,000.00 92,250.00
Paku skrup 3,5” buah 6.000 700.00 4,200.00
JUMLAH HARGA BAHAN 96,450.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 129,552.89
E Overhead & Profit (10 %) 10% x D (maksimum) 12,955.29
F Harga Satuan Pekerjaan (D+E) 142,508.18

Page 129
A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92 m
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.084 143,119.40 12,022.03
Tukang kayu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 33,102.89


B BAHAN
Nok paten 92 cm Lbr 1.200 45,000.00 54,000.00
Paku skrup 3,5” buah 6.000 700.00 4,200.00

JUMLAH HARGA BAHAN 58,200.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 91,302.89
E Overhead & Profit (10 %) 10% x D (maksimum) 9,130.29
F Harga Satuan Pekerjaan (D+E) 100,433.18

A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.084 143,119.40 12,022.03
Tukang kayu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 33,102.89


B BAHAN
Nok paten 1,05 cm Lbr 1.200 45,000.00 54,000.00
Paku skrup 3,5” buah 6.000 700.00 4,200.00

JUMLAH HARGA BAHAN 58,200.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 91,302.89
E Overhead & Profit (10 %) 10% x D (maksimum) 9,130.29
F Harga Satuan Pekerjaan (D+E) 100,433.18

A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08 m


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.084 143,119.40 12,022.03
Tukang kayu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 33,102.89


B BAHAN
Nok paten 1,08 Lbr 1.200 45,000.00 54,000.00
Paku skrup 3,5” buah 6.000 700.00 4,200.00

JUMLAH HARGA BAHAN 58,200.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 91,302.89
E Overhead & Profit (10 %) 10% x D (maksimum) 9,130.29
F Harga Satuan Pekerjaan (D+E) 100,433.18

Page 130
A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92 m
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 39,092.60


B BAHAN
Nok Stel rata 0,92 m Lbr 1.200 104,000.00 124,800.00
Paku skrup 3,5” buah 6.000 700.00 4,200.00
JUMLAH HARGA BAHAN 129,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 168,092.60
E Overhead & Profit (10 %) 10% x D (maksimum) 16,809.26
F Harga Satuan Pekerjaan (D+E) 184,901.86

A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.084 143,119.40 12,022.03
Tukang kayu L.03 OH 0.125 147,992.00 18,499.00
Kepala tukang L.03 OH 0.013 149,992.00 1,949.90
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 33,102.89


B BAHAN
Nok paten 1,05 m Lbr 1.100 45,000.00 49,500.00
Paku skrup 3,5” buah 6.000 700.00 4,200.00

JUMLAH HARGA BAHAN 53,700.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 86,802.89
E Overhead & Profit (10 %) 10% x D (maksimum) 13,020.43
F Harga Satuan Pekerjaan (D+E) 99,823.33

A.4.5.2.30. Pemasangan 1 m2 genteng beton


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang kayu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.010 157,992.00 1,579.92

JUMLAH TENAGA KERJA 46,502.92


B BAHAN
Genteng beton buah 11.000 7,500.00 82,500.00
Paku skrup 3,5” buah 0.030 700.00 21.00

JUMLAH HARGA BAHAN 82,521.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 129,023.92
E Overhead & Profit (10 %) 10% x D (maksimum) 12,902.39
F Harga Satuan Pekerjaan (D+E) 141,926.31

Page 131
A.4.5.2.31. Pemasangan 1 m2 genteng aspal
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang kayu L.03 OH 0.300 147,992.00 44,397.60
Kepala tukang L.03 OH 0.003 149,992.00 449.98
Mandor L.04 OH 0.010 157,992.00 1,579.92

JUMLAH TENAGA KERJA 75,051.38


B BAHAN
Genteng aspal buah 6.900 120,000.00 828,000.00
Plywood 6 mm Lbr 0.350 90,000.00 31,500.00
Paku biasa ½”-1” Kg 0.030 15,000.00 450.00
Plastic aerator lbr 0.050 12,000.00 600.00
JUMLAH HARGA BAHAN 860,550.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 935,601.38
E Overhead & Profit (10 %) 10% x D (maksimum) 93,560.14
F Harga Satuan Pekerjaan (D+E) 1,029,161.51

A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang kayu L.03 OH 0.010 147,992.00 1,479.92
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.010 15,000.00 150.00
JUMLAH TENAGA KERJA 31,753.72
B BAHAN
Genteng metal buah 1.300 85,000.00 110,500.00
Paku biasa ½”-1” Kg 0.200 15,000.00 3,000.00
JUMLAH HARGA BAHAN 113,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 145,253.72
E Overhead & Profit (10 %) 10% x D (maksimum) 14,525.37
F Harga Satuan Pekerjaan (D+E) 159,779.09

A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang kayu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.001 157,992.00 157.99
JUMLAH TENAGA KERJA 45,080.99
B BAHAN
Genteng metal buah 0.200 85,000.00 17,000.00
Paku biasa ½”-1” Kg 0.200 15,000.00 3,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 65,080.99
E Overhead & Profit (10 %) 10% x D (maksimum) 6,508.10
F Harga Satuan Pekerjaan (D+E) 71,589.09

Page 132
A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.166 143,119.40 23,757.82
Tukang kayu L.03 OH 0.250 147,992.00 36,998.00
Kepala tukang L.03 OH 0.025 149,992.00 3,749.80
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 65,769.56


B BAHAN
Sirap kayu buah 30.000 5,000.00 150,000.00
Paku biasa ½”-1” Kg 0.200 15,000.00 3,000.00
JUMLAH HARGA BAHAN 153,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 218,769.56
E Overhead & Profit (10 %) 10% x D (maksimum) 21,876.96
F Harga Satuan Pekerjaan (D+E) 240,646.51

A.4.5.2.35. Pemasangan 1 m’ nok genteng beton


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang kayu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.020 157,992.00 3,159.84

JUMLAH TENAGA KERJA 93,005.84


B BAHAN
Nok genteng beton buah 3.500 25,000.00 87,500.00
Paku biasa ½”-1” Kg 0.050 15,000.00 750.00
Semen PC Kg 10.800 1,300.00 14,040.00
Pasir pasang M3 0.032 150,000.00 4,800.00
Semen warna Kg 1.000 12,000.00 12,000.00
JUMLAH HARGA BAHAN 119,090.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 212,095.84
E Overhead & Profit (10 %) 10% x D (maksimum) 21,209.58
F Harga Satuan Pekerjaan (D+E) 233,305.42

A.4.5.2.36. Pemasangan 1 m’ nok genteng aspal


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.125 143,119.40 17,889.93
Tukang kayu L.03 OH 0.250 147,992.00 36,998.00
Kepala tukang L.03 OH 0.025 149,992.00 3,749.80
Mandor L.04 OH 0.006 157,992.00 947.95

JUMLAH TENAGA KERJA 59,585.68


B BAHAN
Nok genteng aspal buah 2.000 80,000.00 160,000.00
Paku biasa ½”-1” Kg 0.050 15,000.00 750.00
Kayu balok borneo M3 0.004 5,789,930.56 20,264.76
JUMLAH HARGA BAHAN 181,014.76
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 240,600.43
E Overhead & Profit (10 %) 10% x D (maksimum) 24,060.04
F Harga Satuan Pekerjaan (D+E) 264,660.48

Page 133
A.4.5.2.37. Pemasangan 1 m’ nok genteng metal
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang kayu L.03 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 62,282.43
B BAHAN
Nok genteng metal buah 1.100 27,000.00 29,700.00
Paku biasa ½”-1” Kg 0.050 15,000.00 750.00
JUMLAH HARGA BAHAN 30,450.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 92,732.43
E Overhead & Profit (10 %) 10% x D (maksimum) 9,273.24
F Harga Satuan Pekerjaan (D+E) 102,005.67

A.4.5.2.38. Pemasangan 1 m’ nok sirap


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.125 143,119.40 17,889.93
Tukang kayu L.03 OH 0.250 147,992.00 36,998.00
Kepala tukang L.03 OH 0.025 149,992.00 3,749.80
Mandor L.04 OH 0.006 157,992.00 947.95

JUMLAH TENAGA KERJA 59,585.68


B BAHAN
Seng pelat 3" x 6” Lbr 0.400 18,000.00 7,200.00
Paku biasa ½”-1” Kg 0.050 15,000.00 750.00
Paku biasa 2”-5” Kg 0.050 15,000.00 750.00

JUMLAH HARGA BAHAN 8,700.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 68,285.68
E Overhead & Profit (10 %) 10% x D (maksimum) 6,828.57
F Harga Satuan Pekerjaan (D+E) 75,114.24

A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.120 143,119.40 17,174.33
Tukang kayu L.03 OH 0.060 147,992.00 8,879.52
Kepala tukang L.03 OH 0.006 149,992.00 899.95
Mandor L.04 OH 0.006 157,992.00 947.95

JUMLAH TENAGA KERJA 27,901.75


B BAHAN
Seng gel 3”x6” Lbr 0.700 18,000.00 12,600.00
Paku biasa ½”-1” Kg 0.020 15,000.00 300.00

JUMLAH HARGA BAHAN 12,900.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 40,801.75
E Overhead & Profit (10 %) 10% x D (maksimum) 4,080.18
F Harga Satuan Pekerjaan (D+E) 44,881.93

Page 134
A.4.5.2.40. Pemasangan 1 m’nok atap seng
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang kayu L.03 OH 0.070 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.006 157,992.00 947.95

JUMLAH TENAGA KERJA 33,825.25


B BAHAN
Seng pelat 3”x6” bjls 28 Lbr 0.030 18,000.00 540.00
Paku biasa ½”-1” Kg 0.040 15,000.00 600.00

JUMLAH HARGA BAHAN 1,140.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 34,965.25
E Overhead & Profit (10 %) 10% x D (maksimum) 3,496.52
F Harga Satuan Pekerjaan (D+E) 38,461.77

A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang kayu L.03 OH 0.050 147,992.00 7,399.60
Kepala tukang L.03 OH 0.005 149,992.00 749.96
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 30,881.41
B BAHAN
Aluminium foil M2 1.050 6,500.00 6,825.00
JUMLAH HARGA BAHAN 6,825.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 37,706.41
E Overhead & Profit (10%) 10% x D (maksimum) 3,770.64
F Harga Satuan Pekerjaan (D+E) 41,477.05

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 7.000 143,119.40 1,001,835.80
Tukang kayu L.03 OH 21.000 147,992.00 3,107,832.00
Kepala tukang L.03 OH 2.100 149,992.00 314,983.20
Mandor L.04 OH 0.350 157,992.00 55,297.20
JUMLAH TENAGA KERJA 4,479,948.20
B BAHAN
Balok kayu M3 1.100 9,000,000.00 9,900,000.00
Paku 10 cm Kg 1.250 16,000.00 20,000.00
Lem kayu Kg 1.050 15,000.00 15,750.00
JUMLAH HARGA BAHAN 9,935,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 9,935,750.00
E Overhead & Profit (10%) 10% x D (maksimum) 993,575.00
F Harga Satuan Pekerjaan (D+E) 10,929,325.00

Page 135
A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 6.000 143,119.40 858,716.40
Tukang kayu L.03 OH 18.000 147,992.00 2,663,856.00
Kepala tukang L.03 OH 1.800 149,992.00 269,985.60
Mandor L.04 OH 0.300 157,992.00 47,397.60

JUMLAH TENAGA KERJA 3,839,955.60


B BAHAN
Balok kayu M3 1.200 5,500,000.00 6,600,000.00
Paku 10 cm Kg 1.250 16,000.00 20,000.00
Lem kayu Kg 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 6,635,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 10,474,955.60
E Overhead & Profit (10%) 10% x D (maksimum) 1,047,495.56
F Harga Satuan Pekerjaan (D+E) 11,522,451.16

A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.350 143,119.40 50,091.79
Tukang kayu L.03 OH 1.050 147,992.00 155,391.60
Kepala tukang L.03 OH 0.105 149,992.00 15,749.16
Mandor L.04 OH 0.018 157,992.00 2,843.86

JUMLAH TENAGA KERJA 224,076.41


B BAHAN
Papan Kayu M3 0.400 8,625,000.00 3,450,000.00
Paku 5 – 7 cm Kg 0.050 15,000.00 750.00
JUMLAH HARGA BAHAN 3,450,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 3,674,826.41
E Overhead & Profit (10%) 10% x D (maksimum) 367,482.64
F Harga Satuan Pekerjaan (D+E) 4,042,309.05

A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.350 143,119.40 50,091.79
Tukang kayu L.03 OH 1.050 147,992.00 155,391.60
Kepala tukang L.03 OH 0.105 149,992.00 15,749.16
Mandor L.04 OH 0.018 157,992.00 2,843.86

JUMLAH TENAGA KERJA 224,076.41


B BAHAN
Papan Kayu M3 0.400 8,625,000.00 3,450,000.00
Paku 5 – 7 cm Kg 0.050 15,000.00 750.00
JUMLAH HARGA BAHAN 3,450,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 3,674,826.41
E Overhead & Profit (10%) 10% x D (maksimum) 367,482.64
F Harga Satuan Pekerjaan (D+E) 4,042,309.05

Page 136
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang kayu L.03 OH 3.000 147,992.00 443,976.00
Kepala tukang L.03 OH 0.300 149,992.00 44,997.60
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 639,992.60
B BAHAN
Papan Kayu M3 0.400 8,625,000.00 3,450,000.00
Lem Kayu Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 3,457,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 4,097,492.60
E Overhead & Profit (10%) 10% x D (maksimum) 614,623.89
F Harga Satuan Pekerjaan (D+E) 4,712,116.49

A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.800 143,119.40 114,495.52
Tukang kayu L.03 OH 2.400 147,992.00 355,180.80
Kepala tukang L.03 OH 0.240 149,992.00 35,998.08
Mandor L.04 OH 0.040 157,992.00 6,319.68
JUMLAH TENAGA KERJA 511,994.08
B BAHAN
Papan kayu M3 0.240 8,625,000.00 2,070,000.00
Lem kayu Kg 0.300 15,000.00 4,500.00
JUMLAH HARGA BAHAN 2,074,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,586,494.08
E Overhead & Profit (10%) 10% x D (maksimum) 258,649.41
F Harga Satuan Pekerjaan (D+E) 2,845,143.49

A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang kayu L.03 OH 3.000 147,992.00 443,976.00
Kepala tukang L.03 OH 0.300 149,992.00 44,997.60
Mandor L.04 OH 0.050 157,992.00 7,899.60

JUMLAH TENAGA KERJA 639,992.60


B BAHAN
Papan kayu M3 0.064 8,625,000.00 552,000.00
Lem kayu Kg 0.500 15,000.00 7,500.00

JUMLAH HARGA BAHAN 559,500.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,199,492.60
E Overhead & Profit (10%) 10% x D (maksimum) 119,949.26
F Harga Satuan Pekerjaan (D+E) 1,319,441.86

Page 137
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang kayu L.03 OH 2.100 147,992.00 310,783.20
Kepala tukang L.03 OH 0.210 149,992.00 31,498.32
Mandor L.04 OH 0.035 157,992.00 5,529.72

JUMLAH TENAGA KERJA 447,994.82


B BAHAN
Papan kayu M3 0.064 8,625,000.00 552,000.00
Paku 1 cm – 2,5 cm Kg 0.030 15,000.00 450.00
Lem kayu Kg 0.500 15,000.00 7,500.00
Plywood tebal 4 mm Lembar 1.000 62,000.00 62,000.00
Ukuran (90 x 220) cm

JUMLAH HARGA BAHAN 621,950.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,069,944.82
E Overhead & Profit (10%) 10% x D (maksimum) 106,994.48
F Harga Satuan Pekerjaan (D+E) 1,176,939.30

A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.800 143,119.40 114,495.52
Tukang kayu L.03 OH 2.400 147,992.00 355,180.80
Kepala tukang L.03 OH 0.240 149,992.00 35,998.08
Mandor L.04 OH 0.040 157,992.00 6,319.68
JUMLAH TENAGA KERJA 511,994.08
B BAHAN
Papan kayu M3 0.026 8,625,000.00 220,800.00
Paku 1 cm – 2,5 cm Kg 0.030 15,000.00 450.00
Lem kayu Kg 0.500 15,000.00 7,500.00
Plywood tebal 4 mm Lembar 1.000 62,000.00 62,000.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 290,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 802,744.08
E Overhead & Profit (10%) 10% x D (maksimum) 80,274.41
F Harga Satuan Pekerjaan (D+E) 883,018.49

A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.670 143,119.40 95,890.00
Tukang kayu L.03 OH 2.000 147,992.00 295,984.00
Kepala tukang L.03 OH 0.200 149,992.00 29,998.40
Mandor L.04 OH 0.335 157,992.00 52,927.32
JUMLAH TENAGA KERJA 474,799.72
B BAHAN
Papan kayu M3 0.060 8,625,000.00 517,500.00
Paku 1 cm – 2,5 cm Kg 0.150 15,000.00 2,250.00
JUMLAH HARGA BAHAN 519,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 994,549.72
E Overhead & Profit (10%) 10% x D (maksimum) 99,454.97
F Harga Satuan Pekerjaan (D+E) 1,094,004.69

Page 138
A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.800 143,119.40 114,495.52
Tukang kayu L.03 OH 2.400 147,992.00 355,180.80
Kepala tukang L.03 OH 0.240 149,992.00 35,998.08
Mandor L.04 OH 0.040 157,992.00 6,319.68
JUMLAH TENAGA KERJA 511,994.08
B BAHAN
Papan kayu M3 0.025 8,625,000.00 215,625.00
Paku 1 cm – 2,5 cm Kg 0.030 15,000.00 450.00
Lem kayu Kg 0.300 15,000.00 4,500.00
Plywood tebal 4 mm Lembar 1.000 62,000.00 62,000.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 282,575.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 794,569.08
E Overhead & Profit (10%) 10% x D (maksimum) 79,456.91
F Harga Satuan Pekerjaan (D+E) 874,025.99

A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.800 143,119.40 114,495.52
Tukang kayu L.03 OH 2.400 147,992.00 355,180.80
Kepala tukang L.03 OH 0.240 149,992.00 35,998.08
Mandor L.04 OH 0.040 157,992.00 6,319.68
JUMLAH TENAGA KERJA 511,994.08
B BAHAN
Papan kayu M3 0.025 8,625,000.00 215,625.00
Paku 1 cm – 2,5 cm Kg 0.030 15,000.00 450.00
Lem kayu Kg 0.800 15,000.00 12,000.00
Plywood tebal 4 mm Lembar 1.000 62,000.00 62,000.00
Ukuran (90 x 220) cm
Formika Lembar 0.500 45,000.00 22,500.00
JUMLAH HARGA BAHAN 312,575.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 824,569.08
E Overhead & Profit (10%) 10% x D (maksimum) 82,456.91
F Harga Satuan Pekerjaan (D+E) 907,025.99

A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.000 143,119.40 572,477.60
Tukang kayu L.03 OH 12.000 147,992.00 1,775,904.00
Kepala tukang L.03 OH 1.200 149,992.00 179,990.40
Mandor L.04 OH 0.200 157,992.00 31,598.40
JUMLAH TENAGA KERJA 2,559,970.40
B BAHAN
Balok kayu M3 1.100 8,625,000.00 9,487,500.00
Besi strip tebal 5 mm Kg 15.000 11,200.00 168,000.00
Paku 12 cm Kg 5.600 16,000.00 89,600.00
JUMLAH HARGA BAHAN 9,745,100.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 12,305,070.40
E Overhead & Profit (10%) 10% x D (maksimum) 1,845,760.56
F Harga Satuan Pekerjaan (D+E) 14,150,830.96

Page 139
A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 6.700 143,119.40 958,899.98
Tukang kayu L.03 OH 20.100 147,992.00 2,974,639.20
Kepala tukang L.03 OH 2.010 149,992.00 301,483.92
Mandor L.04 OH 0.335 157,992.00 52,927.32
JUMLAH TENAGA KERJA 4,287,950.42
B BAHAN
Balok kayu M3 1.200 8,625,000.00 10,350,000.00
Besi strip tebal 5 mm Kg 15.000 11,200.00 168,000.00
Paku 12 cm Kg 5.600 32,800.00 183,680.00
JUMLAH HARGA BAHAN 10,701,680.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 14,989,630.42
E Overhead & Profit (10%) 10% x D (maksimum) 2,248,444.56
F Harga Satuan Pekerjaan (D+E) 17,238,074.98

A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 6.700 143,119.40 958,899.98
Tukang kayu L.03 OH 20.100 147,992.00 2,974,639.20
Kepala tukang L.03 OH 2.010 149,992.00 301,483.92
Mandor L.04 OH 0.335 157,992.00 52,927.32
JUMLAH TENAGA KERJA 4,287,950.42
B BAHAN
Balok kayu M3 1.100 8,625,000.00 9,487,500.00
Besi strip tebal 5 mm Kg 15.000 11,200.00 168,000.00
Paku 12 cm Kg 3.000 525,000.00 1,575,000.00

JUMLAH HARGA BAHAN 11,230,500.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 15,518,450.42
E Overhead & Profit (10%) 10% x D (maksimum) 1,551,845.04
F Harga Satuan Pekerjaan (D+E) 17,070,295.46

A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.005 157,992.00 789.96

JUMLAH TENAGA KERJA 31,401.02


B BAHAN
Kaso-kaso 5 x 7cm M3 0.014 3,500,000.00 49,000.00
Reng 2 x 3 cm M3 0.036 6,708,333.33 241,500.00
Paku 5 dan 10 cm Kg 0.250 16,000.00 4,000.00

JUMLAH HARGA BAHAN 294,500.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 325,901.02
E Overhead & Profit (10%) 10% x D (maksimum) 32,590.10
F Harga Satuan Pekerjaan (D+E) 358,491.12

Page 140
A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 31,401.02
B BAHAN
Kaso-kaso 5 x 7cm M3 0.014 3,500,000.00 49,000.00
Reng (3 x 4) cm M3 0.057 6,708,333.33 382,375.00
Paku 5 dan 10 cm Kg 0.250 16,000.00 4,000.00
JUMLAH HARGA BAHAN 435,375.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 466,776.02
E Overhead & Profit (10%) 10% x D (maksimum) 46,677.60
F Harga Satuan Pekerjaan (D+E) 513,453.62

A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.120 143,119.40 17,174.33
Tukang kayu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.006 157,992.00 947.95
JUMLAH TENAGA KERJA 37,681.22
B BAHAN
Kayu kelas II M3 0.014 7,000,000.00 98,000.00
Paku 5 - 10 cm M3 0.057 16,000.00 912.00
JUMLAH HARGA BAHAN 98,912.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 136,593.22
E Overhead & Profit (10%) 10% x D (maksimum) 13,659.32
F Harga Satuan Pekerjaan (D+E) 150,252.55

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 7.000 143,119.40 1,001,835.80
Tukang kayu L.03 OH 21.000 147,992.00 3,107,832.00
Kepala tukang L.03 OH 2.100 149,992.00 314,983.20
Mandor L.04 OH 0.350 157,992.00 55,297.20
JUMLAH TENAGA KERJA 4,479,948.20
B BAHAN
Balok kayu M3 1.100 9,000,000.00 9,900,000.00
Paku 10 cm Kg 1.250 16,000.00 20,000.00
Lem kayu Kg 1.050 15,000.00 15,750.00
JUMLAH HARGA BAHAN 9,935,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 9,935,750.00
E Overhead & Profit (10%) 10% x D (maksimum) 993,575.00
F Harga Satuan Pekerjaan (D+E) 10,929,325.00

Page 141
A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 6.000 143,119.40 858,716.40
Tukang kayu L.03 OH 18.000 147,992.00 2,663,856.00
Kepala tukang L.03 OH 1.800 149,992.00 269,985.60
Mandor L.04 OH 0.300 157,992.00 47,397.60
JUMLAH TENAGA KERJA 3,839,955.60
B BAHAN
Balok kayu M3 1.200 7,000,000.00 8,400,000.00
Paku 10 cm Kg 1.250 16,000.00 20,000.00
Lem kayu Kg 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 8,435,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 12,274,955.60
E Overhead & Profit 10% 10% x D (maksimum) 1,227,495.56
F Harga Satuan Pekerjaan (D+E) 13,502,451.16

A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.350 143,119.40 50,091.79
Tukang kayu L.03 OH 1.050 147,992.00 155,391.60
Kepala tukang L.03 OH 0.105 149,992.00 15,749.16
Mandor L.04 OH 0.018 157,992.00 2,843.86

JUMLAH TENAGA KERJA 224,076.41


B BAHAN
Balok kayu M3 0.400 7,000,000.00 2,800,000.00
Paku 5 – 7 cm Kg 0.050 16,000.00 800.00
JUMLAH HARGA BAHAN 2,800,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 3,024,876.41
E Overhead & Profit 10% 10% x D (maksimum) 302,487.64
F Harga Satuan Pekerjaan (D+E) 3,327,364.05

A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.350 143,119.40 50,091.79
Tukang kayu L.03 OH 1.050 147,992.00 155,391.60
Kepala tukang L.03 OH 0.105 149,992.00 15,749.16
Mandor L.04 OH 0.018 157,992.00 2,843.86

JUMLAH TENAGA KERJA 224,076.41


B BAHAN
Balok kayu M3 0.400 5,500,000.00 2,200,000.00
Paku 5 – 7 cm Kg 0.050 16,000.00 800.00

JUMLAH HARGA BAHAN 2,200,800.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,424,876.41
E Overhead & Profit 10% 10% x D (maksimum) 242,487.64
F Harga Satuan Pekerjaan (D+E) 2,667,364.05

Page 142
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang kayu L.03 OH 3.000 147,992.00 443,976.00
Kepala tukang L.03 OH 0.300 149,992.00 44,997.60
Mandor L.04 OH 0.050 157,992.00 7,899.60

JUMLAH TENAGA KERJA 639,992.60


B BAHAN
Papan Kayu M3 0.400 8,625,000.00 3,450,000.00
Lem Kayu Kg 0.050 15,000.00 750.00

JUMLAH HARGA BAHAN 3,450,750.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 4,090,742.60
E Overhead & Profit 10% 10% x D (maksimum) 409,074.26
F Harga Satuan Pekerjaan (D+E) 4,499,816.86

A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.800 143,119.40 114,495.52
Tukang kayu L.03 OH 2.400 147,992.00 355,180.80
Kepala tukang L.03 OH 0.240 149,992.00 35,998.08
Mandor L.04 OH 0.040 157,992.00 6,319.68

JUMLAH TENAGA KERJA 511,994.08


B BAHAN
Papan kayu M3 0.240 8,625,000.00 2,070,000.00
Lem kayu Kg 0.300 15,000.00 4,500.00
JUMLAH HARGA BAHAN 2,074,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,586,494.08
E Overhead & Profit 10% 10% x D (maksimum) 258,649.41
F Harga Satuan Pekerjaan (D+E) 2,845,143.49

A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Tukang kayu L.03 OH 3.000 147,992.00 443,976.00
Kepala tukang L.03 OH 0.300 149,992.00 44,997.60
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 639,992.60
B BAHAN
Papan kayu M3 0.064 8,625,000.00 552,000.00
Lem kayu Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 559,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,199,492.60
E Overhead & Profit 10% 10% x D (maksimum) 119,949.26
F Harga Satuan Pekerjaan (D+E) 1,319,441.86

Page 143
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.700 143,119.40 100,183.58
Tukang kayu L.03 OH 2.100 147,992.00 310,783.20
Kepala tukang L.03 OH 0.210 149,992.00 31,498.32
Mandor L.04 OH 0.035 157,992.00 5,529.72

JUMLAH TENAGA KERJA 447,994.82


B BAHAN
Papan kayu M3 0.064 8,625,000.00 552,000.00
Paku 1 cm – 2,5 cm Kg 0.030 16,929.00 507.87
Lem kayu Kg 0.500 15,000.00 7,500.00
Plywood tebal 4 mm Lembar 1.000 62,000.00 62,000.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 622,007.87
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,070,002.69
E Overhead & Profit 10% 10% x D (maksimum) 160,500.40
F Harga Satuan Pekerjaan (D+E) 1,230,503.09

A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.800 143,119.40 114,495.52
Tukang kayu L.03 OH 2.400 147,992.00 355,180.80
Kepala tukang L.03 OH 0.240 149,992.00 35,998.08
Mandor L.04 OH 0.040 157,992.00 6,319.68
JUMLAH TENAGA KERJA 511,994.08
B BAHAN
Papan kayu M3 0.026 8,625,000.00 220,800.00
Paku 1 cm – 2,5 cm Kg 0.030 15,000.00 450.00
Lem kayu Kg 0.500 15,000.00 7,500.00
Plywood tebal 4 mm Lembar 1.000 62,000.00 62,000.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 290,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 802,744.08
E Overhead & Profit 10% 10% x D (maksimum) 80,274.41
F Harga Satuan Pekerjaan (D+E) 883,018.49

A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.670 143,119.40 95,890.00
Tukang kayu L.03 OH 2.000 147,992.00 295,984.00
Kepala tukang L.03 OH 0.200 149,992.00 29,998.40
Mandor L.04 OH 0.335 157,992.00 52,927.32
JUMLAH TENAGA KERJA 474,799.72
B BAHAN
Papan kayu M3 0.060 8,625,000.00 517,500.00
Paku 1 cm – 2,5 cm Kg 0.150 15,000.00 2,250.00
JUMLAH HARGA BAHAN 519,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 994,549.72
E Overhead & Profit 10% 10% x D (maksimum) 99,454.97
F Harga Satuan Pekerjaan (D+E) 1,094,004.69

Page 144
A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.800 143,119.40 114,495.52
Tukang kayu L.03 OH 2.400 147,992.00 355,180.80
Kepala tukang L.03 OH 0.240 149,992.00 35,998.08
Mandor L.04 OH 0.040 157,992.00 6,319.68
JUMLAH TENAGA KERJA 511,994.08
B BAHAN
Papan kayu M3 0.025 8,625,000.00 215,625.00
Paku 1 cm – 2,5 cm Kg 0.030 15,000.00 450.00
Lem kayu Kg 0.300 15,000.00 4,500.00
Plywood tebal 4 mm Lembar 1.000 62,000.00 62,000.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 282,575.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 794,569.08
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 79,456.91
F Harga Satuan Pekerjaan (D+E) 874,025.99

A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.800 143,119.40 114,495.52
Tukang kayu L.03 OH 2.400 147,992.00 355,180.80
Kepala tukang L.03 OH 0.240 149,992.00 35,998.08
Mandor L.04 OH 0.040 157,992.00 6,319.68
JUMLAH TENAGA KERJA 511,994.08
B BAHAN
Papan kayu M3 0.025 8,625,000.00 215,625.00
Paku 1 cm – 2,5 cm Kg 0.030 15,000.00 450.00
Lem kayu Kg 0.800 15,000.00 12,000.00
Plywood tebal 4 mm Lembar 1.000 62,000.00 62,000.00
Ukuran (90 x 220) cm
Formika Lembar 0.500 45,000.00 22,500.00
JUMLAH HARGA BAHAN 312,575.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 824,569.08
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 82,456.91
F Harga Satuan Pekerjaan (D+E) 907,025.99

A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.000 143,119.40 572,477.60
Tukang kayu L.03 OH 12.000 147,992.00 1,775,904.00
Kepala tukang L.03 OH 1.200 149,992.00 179,990.40
Mandor L.04 OH 0.200 157,992.00 31,598.40
JUMLAH TENAGA KERJA 2,559,970.40
B BAHAN
Balok kayu M3 1.100 8,625,000.00 9,487,500.00
Besi strip tebal 5 mm Kg 15.000 11,200.00 168,000.00
Paku 12 cm Kg 5.600 16,000.00 89,600.00
JUMLAH HARGA BAHAN 9,745,100.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 12,305,070.40
E Overhead & Profit (10 %) 10% x D (maksimum) 1,230,507.04
F Harga Satuan Pekerjaan (D+E) 13,535,577.44

Page 145
A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 6.700 143,119.40 958,899.98
Tukang kayu L.03 OH 20.100 147,992.00 2,974,639.20
Kepala tukang L.03 OH 2.010 149,992.00 301,483.92
Mandor L.04 OH 0.335 157,992.00 52,927.32
JUMLAH TENAGA KERJA 4,287,950.42
B BAHAN
Balok kayu M3 1.200 8,625,000.00 10,350,000.00
Besi strip tebal 5 mm Kg 15.000 11,200.00 168,000.00
Paku 12 cm Kg 5.600 16,000.00 89,600.00
JUMLAH HARGA BAHAN 10,607,600.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 14,895,550.42
E Overhead & Profit (10 %) 10% x D (maksimum) 1,489,555.04
F Harga Satuan Pekerjaan (D+E) 16,385,105.46

A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 6.700 143,119.40 958,899.98
Tukang kayu L.03 OH 20.100 147,992.00 2,974,639.20
Kepala tukang L.03 OH 2.010 149,992.00 301,483.92
Mandor L.04 OH 0.335 157,992.00 52,927.32

JUMLAH TENAGA KERJA 4,287,950.42


B BAHAN
Balok kayu M3 1.100 5,789,930.56 6,368,923.61
Besi strip tebal 5 mm Kg 15.000 11,200.00 168,000.00
Paku 12 cm Kg 3.000 16,000.00 48,000.00
JUMLAH HARGA BAHAN 6,584,923.61
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 10,872,874.03
E Overhead & Profit (10 %) 10% x D (maksimum) 1,087,287.40
F Harga Satuan Pekerjaan (D+E) 11,960,161.43

A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.005 157,992.00 789.96

JUMLAH TENAGA KERJA 31,401.02


B BAHAN
Kaso-kaso 5 x 7cm M3 0.014 5,175,000.00 72,450.00
Reng 2 x 3 cm M3 0.036 6,708,333.33 241,500.00
Paku 5 dan 10 cm Kg 0.250 16,000.00 4,000.00

JUMLAH HARGA BAHAN 317,950.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 349,351.02
E Overhead & Profit (10%) 10% x D (maksimum) 34,935.10
F Harga Satuan Pekerjaan (D+E) 384,286.12

Page 146
A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 31,401.02
B BAHAN
Kaso-kaso 5 x 7cm M3 0.014 5,175,000.00 72,450.00
Reng (3 x 4) cm M3 0.057 6,708,333.33 382,375.00
Paku 5 dan 10 cm Kg 0.250 16,000.00 4,000.00
JUMLAH HARGA BAHAN 458,825.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 490,226.02
E Overhead & Profit (10%) 10% x D (maksimum) 49,022.60
F Harga Satuan Pekerjaan (D+E) 539,248.62

A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.120 143,119.40 17,174.33
Tukang kayu L.03 OH 0.120 147,992.00 17,759.04
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.006 157,992.00 947.95

JUMLAH TENAGA KERJA 37,681.22


B BAHAN
Kayu kelas II M3 0.014 7,000,000.00 98,000.00
Paku 5 - 10 cm M3 0.057 16,000.00 912.00

JUMLAH HARGA BAHAN 98,912.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 136,593.22
E Overhead & Profit (10%) 10% x D (maksimum) 13,659.32
F Harga Satuan Pekerjaan (D+E) 150,252.55

A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang kayu L.03 OH 0.300 147,992.00 44,397.60
Kepala tukang L.03 OH 0.030 149,992.00 4,499.76
Mandor L.04 OH 0.075 157,992.00 11,849.40

JUMLAH TENAGA KERJA 82,214.67


B BAHAN
Kaso-kaso 5 x 7cm M3 0.015 5,175,000.00 79,695.00
Paku 7 cm – 10 cm Kg 0.200 16,000.00 3,200.00

JUMLAH HARGA BAHAN 82,895.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 165,109.67
E Overhead & Profit (10%) 10% x D (maksimum) 16,510.97
F Harga Satuan Pekerjaan (D+E) 181,620.64

Page 147
A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang kayu L.03 OH 0.300 147,992.00 44,397.60
Kepala tukang L.03 OH 0.030 149,992.00 4,499.76
Mandor L.04 OH 0.010 157,992.00 1,579.92

JUMLAH TENAGA KERJA 79,101.16


B BAHAN
Kaso-kaso 5 x 7cm M3 0.016 5,175,000.00 84,352.50
Paku 7 cm – 10 cm Kg 0.250 16,000.00 4,000.00

JUMLAH HARGA BAHAN 88,352.50


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 167,453.66
E Overhead & Profit (10%) 10% x D (maksimum) 16,745.37
F Harga Satuan Pekerjaan (D+E) 184,199.03

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 47,700.14
B BAHAN
Papan kayu M3 0.011 8,625,000.00 93,150.00
Paku 5 dan 7 cm Kg 0.100 16,000.00 1,600.00
JUMLAH HARGA BAHAN 94,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 142,450.14
E Overhead & Profit (10%) 10% x D (maksimum) 14,245.01
F Harga Satuan Pekerjaan (D+E) 156,695.15

A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 47,700.14
B BAHAN
Papan kayu M3 0.011 8,625,000.00 94,875.00
Paku 5 dan 7 cm Kg 0.050 16,000.00 800.00
JUMLAH HARGA BAHAN 95,675.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 143,375.14
E Overhead & Profit (10%) 10% x D (maksimum) 14,337.51
F Harga Satuan Pekerjaan (D+E) 157,712.65

Page 148
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Tukang kayu L.03 OH 0.450 147,992.00 66,596.40
Kepala tukang L.03 OH 0.045 149,992.00 6,749.64
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 96,077.89


B BAHAN
Papan kayu M3 0.028 8,625,000.00 241,500.00
Paku 5 dan 7 cm Kg 0.150 16,000.00 2,400.00

JUMLAH HARGA BAHAN 243,900.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 339,977.89
E Overhead & Profit (10%) 10% x D (maksimum) 33,997.79
F Harga Satuan Pekerjaan (D+E) 373,975.67

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119.40 28,623.88
Tukang kayu L.03 OH 0.600 147,992.00 88,795.20
Kepala tukang L.03 OH 0.060 149,992.00 8,999.52
Mandor L.04 OH 0.010 157,992.00 1,579.92

JUMLAH TENAGA KERJA 127,998.52


B BAHAN
Balok kayu, 6 x 12 M3 0.028 7,000,000.00 196,000.00
Paku 5 dan 10 Kg 0.150 16,000.00 2,400.00
Plywood tebal 4 mm Lembar 0.860 62,000.00 53,320.00
Ukuran (90 x 220) cm
Lem kayu Kg 0.560 15,000.00 8,400.00

JUMLAH HARGA BAHAN 260,120.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 388,118.52
E Overhead & Profit (10%) 10% x D (maksimum) 38,811.85
F Harga Satuan Pekerjaan (D+E) 426,930.37

A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.600 143,119.40 85,871.64
Tukang kayu L.03 OH 1.800 147,992.00 266,385.60
Kepala tukang L.03 OH 0.180 149,992.00 26,998.56
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 383,995.56
B BAHAN
Papan kayu M3 0.007 8,625,000.00 60,375.00
Paku 5 dan 10 Kg 0.100 16,000.00 1,600.00
Paku skrup 10 cm Kg 0.150 700.00 105.00
JUMLAH HARGA BAHAN 62,080.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 446,075.56
E Overhead & Profit (10%) 10% x D (maksimum) 44,607.56
F Harga Satuan Pekerjaan (D+E) 490,683.12

Page 149
A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.025 143,119.40 3,577.99
Tukang kayu L.03 OH 0.075 147,992.00 11,099.40
Kepala tukang L.03 OH 0.008 149,992.00 1,199.94
Mandor L.04 OH 0.001 157,992.00 157.99
JUMLAH TENAGA KERJA 16,035.31
B BAHAN
Plywood 4 mm M3 0.400 62,000.00 24,800.00
Paku 1 dan 2,5 biji 0.050 15,000.00 750.00
JUMLAH HARGA BAHAN 25,550.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 41,585.31
E Overhead & Profit (10%) 10% x D (maksimum) 4,158.53
F Harga Satuan Pekerjaan (D+E) 45,743.84

A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.03 OH 0.050 147,992.00 7,399.60
Kepala tukang L.03 OH 0.005 149,992.00 749.96
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 23,251.46
B BAHAN
Bilik bambu M2 1.500 -
Kaso-kaso 5 x 7 M3 0.012 5,175,000.00 62,100.00
Paku Kg 0.003 15,000.00 45.00
List kayu 2/4 M3 0.012 -
JUMLAH HARGA BAHAN 62,145.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 85,396.46
E Overhead & Profit (10%) 10% x D (maksimum) 8,539.65
F Harga Satuan Pekerjaan (D+E) 93,936.11

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A.4.6.2.1. Pemasangan 1 buah kunci tanam antik
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.060 143,119.40 8,587.16
Tukang kayu L.02 OH 0.600 147,992.00 88,795.20
Kepala tukang L.03 OH 0.060 149,992.00 8,999.52
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 106,855.86


B BAHAN
Kunci tanam antik buah 1.000 175,600.00 175,600.00

JUMLAH HARGA BAHAN 175,600.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 282,455.86
E Overhead & Profit (10%) 10% x D (maksimum) 28,245.59
F Harga Satuan Pekerjaan (D+E) 310,701.45

Page 150
A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.010 143,119.40 1,431.19
Tukang kayu L.02 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.005 157,992.00 789.96

JUMLAH TENAGA KERJA 83,716.75


B BAHAN
Kunci tanam biasa buah 1.000 69,000.00 69,000.00

JUMLAH HARGA BAHAN 69,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 152,716.75
E Overhead & Profit (10%) 10% x D (maksimum) 15,271.68
F Harga Satuan Pekerjaan (D+E) 167,988.43

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.005 143,119.40 715.60
Tukang kayu L.02 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 82,685.17


B BAHAN
Kunci tanam KM buah 1.000 55,000.00 55,000.00

JUMLAH HARGA BAHAN 55,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 137,685.17
E Overhead & Profit (10%) 10% x D (maksimum) 13,768.52
F Harga Satuan Pekerjaan (D+E) 151,453.69

A.4.6.2.4. Pemasangan 1 buah kunci silinder


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.005 143,119.40 715.60
Tukang kayu L.02 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 82,685.17


B BAHAN
Kunci silinder buah 1.000 60,000.00 60,000.00

JUMLAH HARGA BAHAN 60,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 142,685.17
E Overhead & Profit (10%) 10% x D (maksimum) 14,268.52
F Harga Satuan Pekerjaan (D+E) 156,953.69

Page 151
A.4.6.2.5. Pemasangan 1 buah engsel pintu
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.015 143,119.40 2,146.79
Tukang kayu L.02 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.001 157,992.00 126.39

JUMLAH TENAGA KERJA 26,721.86


B BAHAN
Engsel pintu buah 1.000 54,625.00 54,625.00

JUMLAH HARGA BAHAN 54,625.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 81,346.86
E Overhead & Profit (10%) 10% x D (maksimum) 8,134.69
F Harga Satuan Pekerjaan (D+E) 89,481.55

A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.010 143,119.40 1,431.19
Tukang kayu L.02 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.001 157,992.00 79.00

JUMLAH TENAGA KERJA 17,809.31


B BAHAN
Engsel kupu-kupu buah 1.000 50,000.00 50,000.00

JUMLAH HARGA BAHAN 50,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 67,809.31
E Overhead & Profit (10%) 10% x D (maksimum) 6,780.93
F Harga Satuan Pekerjaan (D+E) 74,590.24

A.4.6.2.7. Pemasangan 1 buah engsel angin


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang kayu L.02 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.001 157,992.00 79.00

JUMLAH TENAGA KERJA 46,989.18


B BAHAN
Engsel angin buah 1.000 50,000.00 50,000.00

JUMLAH HARGA BAHAN 50,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 96,989.18
E Overhead & Profit (10%) 10% x D (maksimum) 9,698.92
F Harga Satuan Pekerjaan (D+E) 106,688.09

Page 152
A.4.6.2.8. Pemasangan 1 buah spring knip
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.015 143,119.40 2,146.79
Tukang kayu L.02 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 27,859.41


B BAHAN
Spring knip buah 1.000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 25,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 52,859.41
E Overhead & Profit (10%) 10% x D (maksimum) 5,285.94
F Harga Satuan Pekerjaan (D+E) 58,145.35

A.4.6.2.9. Pemasangan 1 buah kait angin


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.015 143,119.40 2,146.79
Tukang kayu L.02 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 27,859.41


B BAHAN
Kait angin buah 1.000 28,000.00 28,000.00

JUMLAH HARGA BAHAN 28,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 55,859.41
E Overhead & Profit (10%) 10% x D (maksimum) 5,585.94
F Harga Satuan Pekerjaan (D+E) 61,445.35

A.4.6.2.10. Pemasangan 1 buah door closer


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.050 143,119.40 7,155.97
Tukang kayu L.02 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 89,125.55


B BAHAN
Door closer Set 1.000 40,000.00 40,000.00

JUMLAH HARGA BAHAN 40,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 129,125.55
E Overhead & Profit (10%) 10% x D (maksimum) 12,912.55
F Harga Satuan Pekerjaan (D+E) 142,038.10

Page 153
A.4.6.2.11. Pemasangan 1 buah kunci slot
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.020 143,119.40 2,862.39
Tukang kayu L.02 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.001 157,992.00 157.99

JUMLAH TENAGA KERJA 35,618.62


B BAHAN
Kunci slot buah 1.000 12,500.00 12,500.00

JUMLAH HARGA BAHAN 12,500.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 48,118.62
E Overhead & Profit (10%) 10% x D (maksimum) 4,811.86
F Harga Satuan Pekerjaan (D+E) 52,930.48

A.4.6.2.12. Pemasangan 1 buah door holder


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.050 143,119.40 7,155.97
Tukang kayu L.02 OH 0.500 147,992.00 73,996.00
Kepala tukang L.03 OH 0.050 149,992.00 7,499.60
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 89,125.55


B BAHAN
Door holder buah 1.000 145,000.00 145,000.00

JUMLAH HARGA BAHAN 145,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 234,125.55
E Overhead & Profit (10%) 10% x D (maksimum) 23,412.55
F Harga Satuan Pekerjaan (D+E) 257,538.10

A.4.6.2.13. Pemasangan 1 buah door stop


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.010 143,119.40 1,431.19
Tukang kayu L.02 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.005 157,992.00 789.96

JUMLAH TENAGA KERJA 18,520.27


B BAHAN
Door stop buah 1.000 18,000.00 18,000.00

JUMLAH HARGA BAHAN 18,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 36,520.27
E Overhead & Profit (10%) 10% x D (maksimum) 3,652.03
F Harga Satuan Pekerjaan (D+E) 40,172.30

Page 154
A.4.6.2.14. Pemasangan 1 buah rel pintu sorong
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.060 143,119.40 8,587.16
Tukang kayu L.02 OH 0.600 147,992.00 88,795.20
Kepala tukang L.03 OH 0.060 149,992.00 8,999.52
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 106,855.86


B BAHAN
Rel pintu sorong Set 1.000 438,000.00 438,000.00

JUMLAH HARGA BAHAN 438,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 544,855.86
E Overhead & Profit (10%) 10% x D (maksimum) 54,485.59
F Harga Satuan Pekerjaan (D+E) 599,341.45

A.4.6.2.15. Pemasangan 1 buah kunci lemari


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.025 143,119.40 3,577.99
Tukang kayu L.02 OH 0.250 147,992.00 36,998.00
Kepala tukang L.03 OH 0.025 149,992.00 3,749.80
Mandor L.04 OH 0.001 157,992.00 205.39

JUMLAH TENAGA KERJA 44,531.17


B BAHAN
Kunci lemari Set 1.000 12,500.00 12,500.00

JUMLAH HARGA BAHAN 12,500.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 57,031.17
E Overhead & Profit (10%) 10% x D (maksimum) 5,703.12
F Harga Satuan Pekerjaan (D+E) 62,734.29

A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.015 143,119.40 2,146.79
Tukang kayu L.02 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 27,859.41


B BAHAN
Kaca tebal 3 mm m2 1.100 70,000.00 77,000.00
Sealant Kg 0.050 36,000.00 1,800.00

JUMLAH HARGA BAHAN 78,800.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 106,659.41
E Overhead & Profit (10 %) 10% x D (maksimum) 10,665.94
F Harga Satuan Pekerjaan (D+E) 117,325.35

Page 155
A.4.6.2.17. Pengecatan 1 m2 kaca tebal 5 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.015 143,119.40 2,146.79
Tukang kayu L.02 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 27,859.41


B BAHAN
Kaca tebal 5 mm m2 1.100 180,000.00 198,000.00
Sealant Kg 0.050 36,000.00 1,800.00

JUMLAH HARGA BAHAN 199,800.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 227,659.41
E Overhead & Profit (10 %) 10% x D (maksimum) 22,765.94
F Harga Satuan Pekerjaan (D+E) 250,425.35

A.4.6.2.18. Pengecatan 1 m2 kaca tebal 8 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.017 143,119.40 2,433.03
Tukang kayu L.02 OH 0.170 147,992.00 25,158.64
Kepala tukang L.03 OH 0.017 149,992.00 2,549.86
Mandor L.04 OH 0.009 157,992.00 1,421.93

JUMLAH TENAGA KERJA 31,563.46


B BAHAN
Kaca tebal 8 mm m2 1.100 220,000.00 242,000.00
Sealant Kg 0.070 36,000.00 2,520.00

JUMLAH HARGA BAHAN 244,520.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 276,083.46
E Overhead & Profit (10 %) 10% x D (maksimum) 27,608.35
F Harga Satuan Pekerjaan (D+E) 303,691.81

A.4.6.2.19. Pengecatan 1 m2 kaca buram tebal 12 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.025 143,119.40 3,577.99
Tukang kayu L.02 OH 0.250 147,992.00 36,998.00
Kepala tukang L.03 OH 0.025 149,992.00 3,749.80
Mandor L.04 OH 0.001 157,992.00 205.39

JUMLAH TENAGA KERJA 44,531.17


B BAHAN
Kaca buram 12 mm m2 1.100 460,000.00 506,000.00
Sealant Kg 0.070 36,000.00 2,520.00

JUMLAH HARGA BAHAN 508,520.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 553,051.17
E Overhead & Profit (10 %) 10% x D (maksimum) 55,305.12
F Harga Satuan Pekerjaan (D+E) 608,356.29

Page 156
A.4.6.2.20. Pengecatan 1 m2 kaca cermin tebal 5 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.015 143,119.40 2,146.79
Tukang kayu L.02 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 27,859.41


B BAHAN
Kaca cermin 5 mm m2 1.100 125,000.00 137,500.00
JUMLAH HARGA BAHAN 137,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 165,359.41
E Overhead & Profit (10 %) 10% x D (maksimum) 16,535.94
F Harga Satuan Pekerjaan (D+E) 181,895.35

A.4.6.2.21. Pengecatan 1 m2 kaca cermin tebal 8 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.017 143,119.40 2,433.03
Tukang kayu L.02 OH 0.170 147,992.00 25,158.64
Kepala tukang L.03 OH 0.017 149,992.00 2,549.86
Mandor L.04 OH 0.009 157,992.00 1,421.93
JUMLAH TENAGA KERJA 31,563.46
B BAHAN
Kaca cermin 8 mm m2 1.100 150,000.00 165,000.00
JUMLAH HARGA BAHAN 165,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 196,563.46
E Overhead & Profit (10 %) 10% x D (maksimum) 19,656.35
F Harga Satuan Pekerjaan (D+E) 216,219.81

A.4.6.2.22. Pengecatan 1 m2 kaca wireglassed tebal 5 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.015 143,119.40 2,146.79
Tukang kayu L.02 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 27,859.41
B BAHAN
Kaca wireglassed 5 mm m2 1.100 99,000.00 108,900.00
JUMLAH HARGA BAHAN 108,900.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 136,759.41
E Overhead & Profit (10 %) 10% x D (maksimum) 13,675.94
F Harga Satuan Pekerjaan (D+E) 150,435.35

A.4.6.2.23. Pengecatan 1 m2 kaca patri tebal 5 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.075 143,119.40 10,733.96
Tukang kayu L.02 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.004 157,992.00 631.97
JUMLAH TENAGA KERJA 35,814.60
B BAHAN
Kaca patri 5mm m2 1.100 2,000,000.00 2,200,000.00
Sealant Kg 0.050 36,000.00 1,800.00
JUMLAH HARGA BAHAN 2,201,800.00
C PERALATAN

JUMLAH HARGA ALAT

Page 157
D Jumlah (A+B+C) 2,237,614.60
E Overhead & Profit (10 %) 10% x D (maksimum) 223,761.46
F Harga Satuan Pekerjaan (D+E) 2,461,376.06

Page 158
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. Pengecatan 1 m2 Pengikisan/pengerokan permukaan cat lama
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 21,941.89
B BAHAN
Sabun Kg 0.050 12,000.00 600.00
JUMLAH HARGA BAHAN 600.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 22,541.89
E Overhead & Profit (10 %) 10% x D (maksimum) 3,381.28
F Harga Satuan Pekerjaan (D+E) 25,923.17

A.4.7.1.3. Pengecatan 1 m2 Pengerokan karat pada permukaan baja cara manual


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.150 143,119.40 21,467.91
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 22,731.85
B BAHAN
Sabun Kg 0.050 12,000.00 600.00
JUMLAH HARGA BAHAN 600.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 23,331.85
E Overhead & Profit (10 %) 10% x D (maksimum) 2,333.18
F Harga Satuan Pekerjaan (D+E) 25,665.03

A.4.7.1.4. Pengecatan 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.070 143,119.40 10,018.36
Tukang cat L.02 OH 0.009 147,992.00 1,331.93
Kepala tukang L.03 OH 0.006 149,992.00 899.95
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 12,724.21
B BAHAN
Cat menie Kg 0.200 24,500.00 4,900.00
Plamir Kg 0.150 30,000.00 4,500.00
Cat dasar Kg 0.170 11,800.00 2,006.00
Cat penutup Kg 0.260 11,800.00 3,068.00
Kuas buah 0.010 12,000.00 120.00
Pengencer Kg 0.030 25,000.00 750.00
Ampelas Lbr 0.200 5,000.00 1,000.00
JUMLAH HARGA BAHAN 16,344.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 29,068.21
E Overhead & Profit (10 %) 10% x D (maksimum) 2,906.82
F Harga Satuan Pekerjaan (D+E) 31,975.04

Page 159
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.070 143,119.40 10,018.36
Tukang cat L.02 OH 0.105 147,992.00 15,539.16
Kepala tukang L.03 OH 0.004 149,992.00 599.97
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 26,631.46
B BAHAN
Cat menie Kg 0.200 24,500.00 4,900.00
Plamuur Kg 0.150 15,000.00 2,250.00
Cat dasar Kg 0.170 11,800.00 2,006.00
Cat penutup Kg 0.350 11,800.00 4,130.00
Kuas buah 0.010 12,000.00 120.00
Pengencer Kg 0.030 25,000.00 750.00
Ampelas Lbr 0.200 5,000.00 1,000.00

JUMLAH HARGA BAHAN 15,156.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 41,787.46
E Overhead & Profit (10 %) 10% x D (maksimum) 4,178.75
F Harga Satuan Pekerjaan (D+E) 45,966.21

A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.040 143,119.40 5,724.78
Tukang cat L.02 OH 0.063 147,992.00 9,323.50
Kepala tukang L.03 OH 0.063 149,992.00 9,449.50
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 24,971.74


B BAHAN
Teak oil L 0.360 80,000.00 28,800.00

JUMLAH HARGA BAHAN 28,800.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 53,771.74
E Overhead & Profit (10 %) 10% x D (maksimum) 5,377.17
F Harga Satuan Pekerjaan (D+E) 59,148.92

A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.040 143,119.40 5,724.78
Tukang cat L.02 OH 0.060 147,992.00 8,879.52
Kepala tukang L.03 OH 0.016 149,992.00 2,399.87
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 17,478.14


B BAHAN
Politur L 0.150 71,000.00 10,650.00
Politur jadi L 0.372 71,000.00 26,412.00
Ampelas Lbr 2.000 5,000.00 10,000.00

JUMLAH HARGA BAHAN 47,062.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 64,540.14
E Overhead & Profit (10 %) 10% x D (maksimum) 6,454.01
F Harga Satuan Pekerjaan (D+E) 70,994.16

Page 160
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Mandor L.04 OH 0.006 157,992.00 947.95

JUMLAH TENAGA KERJA 15,259.89


B BAHAN
Residu atau ter L 0.350 2,900.00 1,015.00

JUMLAH HARGA BAHAN 1,015.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 16,274.89
E Overhead & Profit ( 10 %) 10% x D (maksimum) 1,627.49
F Harga Satuan Pekerjaan (D+E) 17,902.38

A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.160 143,119.40 22,899.10
Tukang cat L.02 OH 0.160 147,992.00 23,678.72
Kepala tukang L.03 OH 0.016 149,992.00 2,399.87
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 49,451.67


B BAHAN
Vernis L 0.150 35,800.00 5,370.00
Dempul Kg 0.050 50,000.00 2,500.00
Ampelas Lbr 0.100 5,000.00 500.00

JUMLAH HARGA BAHAN 8,370.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 57,821.67
E Overhead & Profit (10 %) 10% x D (maksimum) 8,673.25
F Harga Satuan Pekerjaan (D+E) 66,494.92

A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.020 143,119.40 2,862.39
Tukang cat L.02 OH 0.063 147,992.00 9,323.50
Kepala tukang L.03 OH 0.006 149,992.00 944.95
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 13,604.81
B BAHAN
Plamir Kg 0.100 30,000.00 3,000.00
Cat dasar Kg 0.100 20,000.00 2,000.00
Cat penutup Kg 0.260 35,000.00 9,100.00
JUMLAH HARGA BAHAN 14,100.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 27,704.81
E Overhead & Profit (10 %) 10% x D (maksimum) 2,770.48
F Harga Satuan Pekerjaan (D+E) 30,475.29

Page 161
A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.028 143,119.40 4,007.34
Tukang cat L.02 OH 0.042 147,992.00 6,215.66
Kepala tukang L.03 OH 0.004 149,992.00 629.97
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 11,326.95
B BAHAN
Kalkarium Kg 0.100 20,000.00 2,000.00
JUMLAH HARGA BAHAN 2,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 13,326.95
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 1,999.04
F Harga Satuan Pekerjaan (D+E) 15,325.99

A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119.40 14,311.94
Tukang cat L.02 OH 0.010 147,992.00 1,479.92
Kepala tukang L.03 OH 0.001 149,992.00 149.99
Mandor L.04 OH 0.001 157,992.00 157.99

JUMLAH TENAGA KERJA 16,099.84


B BAHAN
Kapur sirih Kg 0.150 2,500.00 375.00
Ampelas Lbr 0.100 3,000.00 300.00
Alang-alang Ikat 0.250 1,000.00 250.00
JUMLAH HARGA BAHAN 925.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 17,024.84
E Overhead & Profit (10 %) 10% x D (maksimum) 1,702.48
F Harga Satuan Pekerjaan (D+E) 18,727.33

A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.040 143,119.40 5,724.78
Tukang cat L.02 OH 0.005 147,992.00 739.96
Kepala tukang L.03 OH 0.001 149,992.00 75.00
Mandor L.04 OH 0.003 157,992.00 394.98

JUMLAH TENAGA KERJA 6,934.71


B BAHAN
Kapur sirih Kg 0.300 2,500.00 750.00
Ampelas Lbr 0.200 3,000.00 600.00
Alang-alang Ikat 0.250 1,000.00 250.00
JUMLAH HARGA BAHAN 1,600.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 8,534.71
E Overhead & Profit (10 %) 10% x D (maksimum) 853.47
F Harga Satuan Pekerjaan (D+E) 9,388.18

Page 162
A.4.7.1.15. Pemasangan 1 m2 wallpaper
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.020 143,119.40 2,862.39
Tukang cat L.02 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.003 157,992.00 394.98

JUMLAH TENAGA KERJA 35,855.61


B BAHAN
Wall paper m2 1.200 89,000.00 106,800.00
Lem Kg 0.200 48,000.00 9,600.00
JUMLAH HARGA BAHAN 116,400.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 152,255.61
E Overhead & Profit (10 %) 10% x D (maksimum) 15,225.56
F Harga Satuan Pekerjaan (D+E) 167,481.17

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.020 143,119.40 2,862.39
Tukang cat L.02 OH 0.200 147,992.00 29,598.40
Kepala tukang L.03 OH 0.020 149,992.00 2,999.84
Mandor L.04 OH 0.003 157,992.00 394.98
JUMLAH TENAGA KERJA 35,855.61
B BAHAN
Menie besi Kg 0.100 31,500.00 3,150.00
Kwas buah 0.010 12,000.00 120.00
JUMLAH HARGA BAHAN 3,270.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 39,125.61
E Overhead & Profit (10 %) 10% x D (maksimum) 3,912.56
F Harga Satuan Pekerjaan (D+E) 43,038.17

A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang cat L.02 OH 0.225 147,992.00 33,298.20
Kepala tukang L.03 OH 0.225 149,992.00 33,748.20
Mandor L.04 OH 0.008 157,992.00 1,184.94
JUMLAH TENAGA KERJA 104,011.19
B BAHAN
Menie besi Kg 0.100 31,500.00 3,150.00
Pengencer L 0.010 25,000.00 250.00
Kwas buah 0.010 12,000.00 120.00
Perancah kayu m2 0.002 851,449.94 1,702.90
JUMLAH HARGA BAHAN 5,222.90
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 109,234.09
E Overhead & Profit (10 %) 10% x D (maksimum) 10,923.41
F Harga Satuan Pekerjaan (D+E) 120,157.50

Page 163
A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.250 143,119.40 35,779.85
Tukang cat L.02 OH 0.250 147,992.00 36,998.00
Kepala tukang L.03 OH 0.025 149,992.00 3,749.80
Mandor L.04 OH 0.001 157,992.00 205.39
JUMLAH TENAGA KERJA 76,733.04
B BAHAN
Menie A Kg 0.100 31,500.00 3,150.00
Menie B Kg 0.100 24,500.00 2,450.00
Cat Kg 0.080 11,800.00 944.00
Kwas buah 0.010 12,000.00 120.00
Pengencer L 0.010 25,000.00 250.00
JUMLAH HARGA BAHAN 6,914.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 83,647.04
E Overhead & Profit (10 %) 10% x D (maksimum) 8,364.70
F Harga Satuan Pekerjaan (D+E) 92,011.74

A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.060 143,119.40 8,587.16
Tukang cat L.02 OH 0.060 147,992.00 8,879.52
Kepala tukang L.03 OH 0.012 149,992.00 1,799.90
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 19,740.56
B BAHAN
Cat Kg 0.300 11,800.00 3,540.00
Kwas buah 0.010 12,000.00 120.00
Pengencer L 0.010 25,000.00 250.00
JUMLAH HARGA BAHAN 3,910.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 23,650.56
E Overhead & Profit (10 %) 10% x D (maksimum) 3,547.58
F Harga Satuan Pekerjaan (D+E) 27,198.15

A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang cat L.02 OH 0.800 147,992.00 118,393.60
Kepala tukang L.03 OH 0.080 149,992.00 11,999.36
Mandor L.04 OH 0.020 157,992.00 3,159.84
JUMLAH TENAGA KERJA 190,800.56
B BAHAN
Cat dasar Kg 0.110 8,000.00 880.00
Cat antara Kg 0.170 8,000.00 1,360.00
Cat penutup Kg 0.080 11,800.00 944.00
Kwas buah 0.010 12,000.00 120.00
Pengencer L 0.010 25,000.00 250.00
JUMLAH HARGA BAHAN 3,554.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 194,354.56
E Overhead & Profit (10 %) 10% x D (maksimum) 19,435.46
F Harga Satuan Pekerjaan (D+E) 213,790.02

Page 164
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang cat L.02 OH 0.700 147,992.00 103,594.40
Kepala tukang L.03 OH 0.070 149,992.00 10,499.44
Mandor L.04 OH 0.020 157,992.00 3,159.84
JUMLAH TENAGA KERJA 174,501.44
B BAHAN
Cat dasar Kg 0.300 8,000.00 2,400.00
Pengencer L 0.010 25,000.00 250.00
JUMLAH HARGA BAHAN 2,650.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 177,151.44
E Overhead & Profit (10 %) 10% x D (maksimum) 17,715.14
F Harga Satuan Pekerjaan (D+E) 194,866.58

A.4.7.1.22. Plituran 10 m2 dengan plitur melamic


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.000 143,119.40 286,238.80
Tukang cat L.02 OH 12.000 147,992.00 1,775,904.00
Kepala tukang L.03 OH 1.200 149,992.00 179,990.40
Mandor L.04 OH 0.100 157,992.00 15,799.20
JUMLAH TENAGA KERJA 2,257,932.40
B BAHAN
Wood filler Kg 1.500 79,000.00 118,500.00
Woodstain Kg 1.500 70,000.00 105,000.00
Sanding Kg 1.500 65,000.00 97,500.00
Melamic Kg 2.400 74,600.00 179,040.00
Thinner L 2.000 25,000.00 50,000.00
Ampelas Lbr 6.000 5,000.00 30,000.00
JUMLAH HARGA BAHAN 580,040.00
C PERALATAN
Compressor Jam
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,837,972.40
E Overhead & Profit (10 %) 10% x D (maksimum) 283,797.24
F Harga Satuan Pekerjaan (D+E) 3,121,769.64

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.30 143,119.40 472,294.02
Tukang batu L.02 OH 1.10 147,992.00 162,791.20
Kepala tukang L.03 OH 0.01 149,992.00 1,499.92
Mandor L.04 OH 0.16 157,992.00 25,278.72

JUMLAH TENAGA KERJA 661,863.86


B BAHAN
Closet duduk Unit 1.00 650,000.00 650,000.00
Perlengkapan Ls 6% x closet 9,754.00 585.24

JUMLAH HARGA BAHAN 650,585.24


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,312,449.10
E Overhead & Profit (10 %) 10% x D (maksimum) 131,244.91
F Harga Satuan Pekerjaan (D+E) 1,443,694.01

Page 165
A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.00 143,119.40 143,119.40
Tukang batu L.02 OH 1.50 147,992.00 221,988.00
Kepala tukang L.03 OH 0.15 149,992.00 22,498.80
Mandor L.04 OH 0.16 157,992.00 25,278.72
JUMLAH TENAGA KERJA 412,884.92
B BAHAN
Closet jongkok Unit 1.00 210,000.00 210,000.00
Semen Portland Kg 6.00 1,300.00 7,800.00
Pasir pasang M3 0.01 150,000.00 1,500.00

JUMLAH HARGA BAHAN 219,300.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 632,184.92
E Overhead & Profit (10 %) 10% x D (maksimum) 63,218.49
F Harga Satuan Pekerjaan (D+E) 695,403.41

A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.00 143,119.40 143,119.40
Tukang batu L.02 OH 1.50 147,992.00 221,988.00
Kepala tukang L.03 OH 0.15 149,992.00 22,498.80
Mandor L.04 OH 0.05 157,992.00 7,899.60
JUMLAH TENAGA KERJA 395,505.80
B BAHAN
Closet jongkok Unit 1.00 210,000.00 210,000.00
Semen Portland Kg 6.00 1,300.00 7,800.00
Pasir pasang M3 0.01 150,000.00 1,500.00
Bata merah buah 7.00 580.00 4,060.00
JUMLAH HARGA BAHAN 223,360.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 618,865.80
E Overhead & Profit (10 %) 10% x D (maksimum) 61,886.58
F Harga Satuan Pekerjaan (D+E) 680,752.38

A.5.1.1 4. (K3) Pemasangan 1 buah urinoir


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.00 143,119.40 143,119.40
Tukang batu L.02 OH 1.00 147,992.00 147,992.00
Kepala tukang L.03 OH 0.10 149,992.00 14,999.20
Mandor L.04 OH 0.05 157,992.00 7,899.60
JUMLAH TENAGA KERJA 314,010.20
B BAHAN
Urinoir Unit 1.00 180,000.00 180,000.00
Semen Portland Kg 6.00 1,300.00 7,800.00
Pasir pasang M3 0.01 150,000.00 1,500.00
Perlengkapan % 30.00 180,000.00 54,000.00
JUMLAH HARGA BAHAN 243,300.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 557,310.20
E Overhead & Profit (10 %) 10% x D (maksimum) 55,731.02
F Harga Satuan Pekerjaan (D+E) 613,041.22

Page 166
A.5.1.1 5. (K3) Pemasangan 1 buah wastafel
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.00 143,119.40 143,119.40
Tukang batu L.02 OH 1.45 147,992.00 214,588.40
Kepala tukang L.03 OH 0.15 149,992.00 22,498.80
Mandor L.04 OH 0.10 157,992.00 15,799.20

JUMLAH TENAGA KERJA 396,005.80


B BAHAN
Wastafel Unit 1.20 180,000.00 216,000.00
Semen Portland Kg 6.00 1,300.00 7,800.00
Pasir pasang M3 0.01 150,000.00 1,500.00
Perlengkapan % 12.00 180,000.00 21,600.00

JUMLAH HARGA BAHAN 246,900.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 642,905.80
E Overhead & Profit (10 %) 10% x D (maksimum) 64,290.58
F Harga Satuan Pekerjaan (D+E) 707,196.38

A.5.1.1 6. (K3) Pemasangan 1 buah bathube porselen


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.075 143,119.40 10,733.96
Tukang batu L.02 OH 0.75 147,992.00 110,994.00
Kepala tukang L.03 OH 0.075 149,992.00 11,249.40
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 133,451.33
B BAHAN
Bathube Unit 1.00 8,500,000.00 8,500,000.00
Perlengkapan % 20.00 8,500,000.00 1,700,000.00

JUMLAH HARGA BAHAN 10,200,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 10,333,451.33
E Overhead & Profit (10 %) 10% x D (maksimum) 1,033,345.13
F Harga Satuan Pekerjaan (D+E) 11,366,796.46

A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m 3


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.80 143,119.40 257,614.92
Tukang batu L.02 OH 2.70 147,992.00 399,578.40
Kepala tukang L.03 OH 0.54 149,992.00 80,995.68
Mandor L.04 OH 0.11 157,992.00 17,379.12
JUMLAH TENAGA KERJA 755,568.12
B BAHAN
Bak fiberglass Unit 1.00 1,125,000.00 1,125,000.00
Perlengkapan % 12% x bak 1,125,000.00 135,000.00

JUMLAH HARGA BAHAN 1,260,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,015,568.12
E Overhead & Profit (10 %) 10% x D (maksimum) 201,556.81
F Harga Satuan Pekerjaan (D+E) 2,217,124.93

Page 167
A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m 3
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 6.00 143,119.40 858,716.40
Tukang batu L.02 OH 3.00 147,992.00 443,976.00
Kepala tukang L.03 OH 0.30 149,992.00 44,997.60
Mandor L.04 OH 0.30 157,992.00 47,397.60
JUMLAH TENAGA KERJA 1,395,087.60
B BAHAN
Bata merah M3 150.00 580.00 87,000.00
Semen portlan Kg 120.00 1,300.00 156,000.00
Pasir pasang M3 0.30 150,000.00 45,000.00
Porselen 11x11 buah 360.00 568.00 204,480.00
Semen warna Kg 6.00 12,000.00 72,000.00
JUMLAH HARGA BAHAN 564,480.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,959,567.60
E Overhead & Profit (10 %) 10% x D (maksimum) 195,956.76
F Harga Satuan Pekerjaan (D+E) 2,155,524.36

A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m 3


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.30 143,119.40 42,935.82
Tukang batu L.02 OH 0.45 147,992.00 66,596.40
Kepala tukang L.03 OH 0.045 149,992.00 6,749.64
Mandor L.04 OH 0.015 157,992.00 2,369.88

JUMLAH TENAGA KERJA 118,651.74


B BAHAN
Bak Teraso Unit 1.00 675,000.00 675,000.00
Perlengkapan % 12% x bak 675,000.00 81,000.00

JUMLAH HARGA BAHAN 756,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 874,651.74
E Overhead & Profit (10 %) 10% x D (maksimum) 87,465.17
F Harga Satuan Pekerjaan (D+E) 962,116.91

A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m 3


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.30 143,119.40 42,935.82
Tukang batu L.02 OH 0.45 147,992.00 66,596.40
Kepala tukang L.03 OH 0.045 149,992.00 6,749.64
Mandor L.04 OH 0.015 157,992.00 2,369.88

JUMLAH TENAGA KERJA 118,651.74


B BAHAN
Bak air fiberglass Unit 1.00 275,000.00 275,000.00
Perlengkapan % 12.00 275,000.00 33,000.00

JUMLAH HARGA BAHAN 308,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 426,651.74
E Overhead & Profit (10 %) 10% x D (maksimum) 42,665.17
F Harga Satuan Pekerjaan (D+E) 469,316.91

Page 168
A.5.1.1 11. (K3) Pemasangan 1 buah bak beton volume 1 m 3
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.50 143,119.40 500,917.90
Tukang batu L.02 OH 4.50 147,992.00 665,964.00
Kepala tukang L.03 OH 0.05 149,992.00 7,499.60
Mandor L.04 OH 0.018 157,992.00 2,843.86
JUMLAH TENAGA KERJA 1,177,225.36
B BAHAN
Beton 1:2:3 M3 0.90 -
Baja tulangan Kg 180.00 13,000.00 2,340,000.00
Kayu bekisting M2 8.00 802,790.60 6,422,324.80
Ubin porselen 11x11 buah 500.00 568.00 284,000.00
Perlengkapan % 10.000 284,000.00 28,400.00
JUMLAH HARGA BAHAN 9,074,724.80
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 10,251,950.15
E Overhead & Profit (10 %) 10% x D (maksimum) 1,025,195.02
F Harga Satuan Pekerjaan (D+E) 11,277,145.17

A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.03 143,119.40 4,293.58
Tukang batu L.02 OH 0.30 147,992.00 44,397.60
Kepala tukang L.03 OH 0.03 149,992.00 4,499.76
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 55,560.82
B BAHAN
Bak cuci piring Unit 1.00 185,000.00 185,000.00
Waterdrain buah 1.00 38,500.00 38,500.00

JUMLAH HARGA BAHAN 223,500.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 279,060.82
E Overhead & Profit (10 %) 10% x D (maksimum) 27,906.08
F Harga Satuan Pekerjaan (D+E) 306,966.90

A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.05 143,119.40 7,155.97
Tukang batu L.02 OH 0.50 147,992.00 73,996.00
Kepala tukang L.03 OH 0.05 149,992.00 7,499.60
Mandor L.04 OH 0.025 157,992.00 3,949.80
JUMLAH TENAGA KERJA 92,601.37
B BAHAN
Bak cuci piring Unit 1.00 643,500.00 643,500.00
Waterdrain buah 1.00 38,500.00 38,500.00
Semen portland Kg 20.00 1,300.00 26,000.00
Pasir pasang M3 0.05 150,000.00 7,500.00

JUMLAH HARGA BAHAN 715,500.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 808,101.37
E Overhead & Profit (10 %) 10% x D (maksimum) 80,810.14
F Harga Satuan Pekerjaan (D+E) 888,911.51

Page 169
A.5.1.1 14. Pemasangan 1 buah floor drain
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.01 143,119.40 1,431.19
Tukang batu L.02 OH 0.10 147,992.00 14,799.20
Kepala tukang L.03 OH 0.01 149,992.00 1,499.92
Mandor L.04 OH 0.005 157,992.00 789.96
JUMLAH TENAGA KERJA 18,520.27
B BAHAN
Floor drain Unit 1.00 75,000.00 75,000.00
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 93,520.27
E Overhead & Profit (10 %) 10% x D (maksimum) 9,352.03
F Harga Satuan Pekerjaan (D+E) 102,872.30

A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.16 143,119.40 309,137.90
Tukang batu L.02 OH 0.72 147,992.00 106,554.24
Kepala tukang L.03 OH 0.072 149,992.00 10,799.42
Mandor L.04 OH 0.011 157,992.00 1,737.91
JUMLAH TENAGA KERJA 428,229.48
B BAHAN
Bata merah buah 40.00 580.00 23,200.00
Semen portland Kg 44.00 1,300.00 57,200.00
Pasir pasang M3 0.07 150,000.00 10,500.00
Pasir beton M 3 0.06 230,000.00 13,800.00
Kerikil M 3 0.07 250,000.00 17,500.00
Baja tulangan Kg 1.60 13,000.00 20,800.00
JUMLAH HARGA BAHAN 143,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 571,229.48
E Overhead & Profit (10 %) 10% x D (maksimum) 57,122.95
F Harga Satuan Pekerjaan (D+E) 628,352.43

A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.20 143,119.40 457,982.08
Tukang batu L.02 OH 1.15 147,992.00 170,190.80
Kepala tukang L.03 OH 0.011 149,992.00 1,649.91
Mandor L.04 OH 0.016 157,992.00 2,527.87
JUMLAH TENAGA KERJA 632,350.66
B BAHAN
Bata merah buah 70.0 580.00 40,600.00
Semen portland Kg 77.00 1,300.00 100,100.00
Pasir pasang M3 0.13 150,000.00 19,500.00
Pasir beton M 3 0.09 230,000.00 20,700.00
Kerikil M 3 0.02 250,000.00 5,000.00
Baja tulangan Kg 2.60 13,000.00 33,800.00
JUMLAH HARGA BAHAN 219,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 852,050.66
E Overhead & Profit (10 %) 10% x D (maksimum) 85,205.07
F Harga Satuan Pekerjaan (D+E) 937,255.73

Page 170
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cmtinggi 65 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.20 143,119.40 457,982.08
Tukang batu L.02 OH 1.150 147,992.00 170,190.80
Kepala tukang L.03 OH 0.011 149,992.00 1,649.91
Mandor L.04 OH 0.016 157,992.00 2,527.87
JUMLAH TENAGA KERJA 632,350.66
B BAHAN
Bata merah buah 123.000 580.00 71,340.00
Semen portland Kg 114.000 1,300.00 148,200.00
Pasir pasang M3 0.184 150,000.00 27,600.00
Pasir beton M 3 0.120 230,000.00 27,600.00
Kerikil M 3 0.033 250,000.00 8,250.00
Baja tulangan Kg 4.850 13,000.00 63,050.00
JUMLAH HARGA BAHAN 346,040.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 978,390.66
E Overhead & Profit (10 %) 10% x D (maksimum) 97,839.07
F Harga Satuan Pekerjaan (D+E) 1,076,229.73

A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.054 143,119.40 7,728.45
Tukang batu L.02 OH 0.09 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.027 157,992.00 4,265.78
JUMLAH TENAGA KERJA 26,663.44
B BAHAN
Pipa galvanis ½” M 1.20 48,760.00 58,512.00
Perlengkapan Ls 35% x pipa 58,512.00 20,479.20
JUMLAH HARGA BAHAN 78,991.20
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 105,654.64
E Overhead & Profit (10 %) 10% x D (maksimum) 10,565.46
F Harga Satuan Pekerjaan (D+E) 116,220.10

A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ”


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.01 143,119.40 1,431.19
Tukang batu L.02 OH 0.4 147,992.00 59,196.80
Kepala tukang L.03 OH 0.04 149,992.00 5,999.68
Mandor L.04 OH 0.005 157,992.00 789.96

JUMLAH TENAGA KERJA 67,417.63


B BAHAN
Kran air M 1.00 42,125.00 42,125.00
Sealtape Buah 0.025 3,000.00 75.00
JUMLAH HARGA BAHAN 42,200.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 109,617.63
E Overhead & Profit (10 %) 10% x D (maksimum) 10,961.76
F Harga Satuan Pekerjaan (D+E) 120,579.40

Page 171
A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ”
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.054 143,119.40 7,728.45
Tukang batu L.02 OH 0.09 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.027 157,992.00 4,265.78

JUMLAH TENAGA KERJA 26,663.44


B BAHAN
Pipa galvanis 3/4” M 1.20 64,250.00 77,100.00
Perlengkapan % 35.00 77,100.00 26,985.00

JUMLAH HARGA BAHAN 104,085.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 130,748.44
E Overhead & Profit (10 %) 10% x D (maksimum) 13,074.84
F Harga Satuan Pekerjaan (D+E) 143,823.28

A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.054 143,119.40 7,728.45
Tukang batu L.02 OH 0.09 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.027 157,992.00 4,265.78

JUMLAH TENAGA KERJA 26,663.44


B BAHAN
Pipa galvanis 1” M 1.20 67,540.00 81,048.00
Perlengkapan % 35.00 81,048.00 28,366.80

JUMLAH HARGA BAHAN 109,414.80


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 136,078.24
E Overhead & Profit (10 %) 10% x D (maksimum) 13,607.82
F Harga Satuan Pekerjaan (D+E) 149,686.06

A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.108 143,119.40 15,456.90
Tukang batu L.02 OH 0.18 147,992.00 26,638.56
Kepala tukang L.03 OH 0.018 149,992.00 2,699.86
Mandor L.04 OH 0.005 157,992.00 789.96

JUMLAH TENAGA KERJA 45,585.27


B BAHAN
Pipa galvanis 1 1/2” M 1.20 92,500.00 111,000.00
Perlengkapan % 35.00 111,000.00 27,750.00

JUMLAH HARGA BAHAN 138,750.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 184,335.27
E Overhead & Profit (10 %) 10% x D (maksimum) 18,433.53
F Harga Satuan Pekerjaan (D+E) 202,768.80

Page 172
A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3”
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.135 143,119.40 19,321.12
Tukang batu L.02 OH 0.225 147,992.00 33,298.20
Kepala tukang L.03 OH 0.023 149,992.00 3,449.82
Mandor L.04 OH 0.007 157,992.00 1,105.94

JUMLAH TENAGA KERJA 57,175.08


B BAHAN
Pipa galvanis 3” M 1.20 64,250.00 77,100.00
Perlengkapan % 35.00 64,250.00 22,487.50

JUMLAH HARGA BAHAN 99,587.50


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 156,762.58
E Overhead & Profit (10 %) 10% x D (maksimum) 15,676.26
F Harga Satuan Pekerjaan (D+E) 172,438.84

A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4”


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.135 143,119.40 19,321.12
Tukang batu L.02 OH 0.225 147,992.00 33,298.20
Kepala tukang L.03 OH 0.023 149,992.00 3,449.82
Mandor L.04 OH 0.007 157,992.00 1,105.94
JUMLAH TENAGA KERJA 57,175.08
B BAHAN
Pipa galvanis 4” M 1.20 64,250.00 77,100.00
Perlengkapan % 35.00 64,250.00 22,487.50

JUMLAH HARGA BAHAN 99,587.50


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 156,762.58
E Overhead & Profit (10 %) 10% x D (maksimum) 15,676.26
F Harga Satuan Pekerjaan (D+E) 172,438.84

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ”


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.036 143,119.40 5,152.30
Tukang batu L.02 OH 0.06 147,992.00 8,879.52
Kepala tukang L.03 OH 0.006 149,992.00 899.95
Mandor L.04 OH 0.002 157,992.00 315.98
JUMLAH TENAGA KERJA 15,247.75
B BAHAN
Pipa PVC 1/2” M 1.20 24,000.00 28,800.00
Perlengkapan % 35.00 28,800.00 10,080.00

JUMLAH HARGA BAHAN 38,880.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 54,127.75
E Overhead & Profit (10 %) 10% x D (maksimum) 5,412.78
F Harga Satuan Pekerjaan (D+E) 59,540.53

Page 173
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ”
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.036 143,119.40 5,152.30
Tukang batu L.02 OH 0.06 147,992.00 8,879.52
Kepala tukang L.03 OH 0.006 149,992.00 899.95
Mandor L.04 OH 0.002 157,992.00 315.98
JUMLAH TENAGA KERJA 15,247.75
B BAHAN
Pipa PVC 3/4” M 1.20 32,000.00 38,400.00
Perlengkapan % 35.00 38,400.00 13,440.00

JUMLAH HARGA BAHAN 51,840.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 67,087.75
E Overhead & Profit (10 %) 10% x D (maksimum) 6,708.78
F Harga Satuan Pekerjaan (D+E) 73,796.53

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.036 143,119.40 5,152.30
Tukang batu L.02 OH 0.06 147,992.00 8,879.52
Kepala tukang L.03 OH 0.006 149,992.00 899.95
Mandor L.04 OH 0.002 157,992.00 315.98

JUMLAH TENAGA KERJA 15,247.75


B BAHAN
Pipa PVC 1” M 1.20 40,000.00 48,000.00
Perlengkapan % 35.00 48,000.00 16,800.00

JUMLAH HARGA BAHAN 64,800.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 80,047.75
E Overhead & Profit (10 %) 10% x D (maksimum) 8,004.78
F Harga Satuan Pekerjaan (D+E) 88,052.53

A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ”


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.054 143,119.40 7,728.45
Tukang batu L.02 OH 0.09 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 22,871.63
B BAHAN
Pipa PVC 11/2” M 1.20 44,000.00 52,800.00
Perlengkapan % 35.00 52,800.00 18,480.00
JUMLAH HARGA BAHAN 71,280.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 94,151.63
E Overhead & Profit (10 %) 10% x D (maksimum) 9,415.16
F Harga Satuan Pekerjaan (D+E) 103,566.79

Page 174
A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.054 143,119.40 7,728.45
Tukang batu L.02 OH 0.09 147,992.00 13,319.28
Kepala tukang L.03 OH 0.009 149,992.00 1,349.93
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 22,871.63


B BAHAN
Pipa PVC 2” M 1.20 56,000.00 67,200.00
Perlengkapan % 35.00 67,200.00 23,520.00

JUMLAH HARGA BAHAN 90,720.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 113,591.63
E Overhead & Profit (10 %) 10% x D (maksimum) 11,359.16
F Harga Satuan Pekerjaan (D+E) 124,950.79

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ”


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.081 143,119.40 11,592.67
Tukang batu L.02 OH 0.135 147,992.00 19,978.92
Kepala tukang L.03 OH 0.0135 149,992.00 2,024.89
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 34,228.45


B BAHAN
Pipa PVC 21/2” M 1.20 78,000.00 93,600.00
Perlengkapan % 35.00 93,600.00 32,760.00

JUMLAH HARGA BAHAN 126,360.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 160,588.45
E Overhead & Profit (10 %) 10% x D (maksimum) 16,058.85
F Harga Satuan Pekerjaan (D+E) 176,647.30

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.081 143,119.40 11,592.67
Tukang batu L.02 OH 0.135 147,992.00 19,978.92
Kepala tukang L.03 OH 0.0135 149,992.00 2,024.89
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 34,228.45


B BAHAN
Pipa PVC 3” M 1.20 92,000.00 110,400.00
Perlengkapan % 35.00 110,400.00 38,640.00

JUMLAH HARGA BAHAN 149,040.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 183,268.45
E Overhead & Profit (10 %) 10% x D (maksimum) 18,326.85
F Harga Satuan Pekerjaan (D+E) 201,595.30

Page 175
A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.081 143,119.40 11,592.67
Tukang batu L.02 OH 0.135 147,992.00 19,978.92
Kepala tukang L.03 OH 0.0135 149,992.00 2,024.89
Mandor L.04 OH 0.004 157,992.00 631.97
JUMLAH TENAGA KERJA 34,228.45
B BAHAN
Pipa PVC 3” M 1.20 92,000.00 110,400.00
Perlengkapan % 35.00 110,400.00 38,640.00
JUMLAH HARGA BAHAN 149,040.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 183,268.45
E Overhead & Profit (10 %) 10% x D (maksimum) 18,326.85
F Harga Satuan Pekerjaan (D+E) 201,595.30

A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.08 143,119.40 11,449.55
Tukang batu L.02 OH 0.04 147,992.00 5,919.68
Kepala tukang L.03 OH 0.004 149,992.00 599.97
Mandor L.04 OH 0.004 157,992.00 631.97
JUMLAH TENAGA KERJA 18,601.17
B BAHAN
Pipa tanah M1 1.20 56,000.00 67,200.00
Semen portlan Kg 35.00 1,300.00 45,500.00
Pasir pasang M3 0.014 150,000.00 2,100.00
Pasir urug M3 0.014 115,000.00 1,610.00
JUMLAH HARGA BAHAN 116,410.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 135,011.17
E Overhead & Profit (10 %) 10% x D (maksimum) 13,501.12
F Harga Satuan Pekerjaan (D+E) 148,512.28

A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.06 143,119.40 8,587.16
Tukang batu L.02 OH 0.03 147,992.00 4,439.76
Kepala tukang L.03 OH 0.003 149,992.00 449.98
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 13,950.88
B BAHAN
Pipa tanah dia 15 M1 1.20 21,600.00 25,920.00
Semen portlan Kg 0.68 1,300.00 884.00
Pasir pasang M 3 0.013 150,000.00 1,950.00
Pasir urug M3 0.011 115,000.00 1,265.00
JUMLAH HARGA BAHAN 30,019.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 43,969.88
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 4,396.99
F Harga Satuan Pekerjaan (D+E) 48,366.86

Page 176
A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.14 143,119.40 20,036.72
Tukang batu L.02 OH 0.07 147,992.00 10,359.44
Kepala tukang L.03 OH 0.007 149,992.00 1,049.94
Mandor L.04 OH 0.007 157,992.00 1,105.94
JUMLAH TENAGA KERJA 32,552.04
B BAHAN
Pipa Beton dia 15 buah 1.10 21,600.00 23,760.00
Bata merah M3 0.027 580.00 15.66
Semen portlan Kg 3.92 1,300.00 5,096.00
Pasir pasang M3 0.056 150,000.00 8,400.00
Pasir urug M3 0.024 115,000.00 2,760.00
JUMLAH HARGA BAHAN 40,031.66
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 72,583.70
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 10,887.56
F Harga Satuan Pekerjaan (D+E) 83,471.26

A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.38 143,119.40 54,385.37
Tukang batu L.02 OH 0.19 147,992.00 28,118.48
Kepala tukang L.03 OH 0.019 149,992.00 2,849.85
Mandor L.04 OH 0.019 157,992.00 3,001.85
JUMLAH TENAGA KERJA 88,355.55
B BAHAN
Pipa Beton dia 100 buah 1.10 124,200.00 136,620.00
Bata merah M3 0.55 580.00 319.00
Semen portlan Kg 10.30 1,300.00 13,390.00
Pasir pasang M3 0.061 150,000.00 9,150.00
Pasir urug M3 0.069 115,000.00 7,935.00
JUMLAH HARGA BAHAN 167,414.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 255,769.55
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 25,576.95
F Harga Satuan Pekerjaan (D+E) 281,346.50

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG


A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC Ø 63 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.081 143,119.40 11,592.67
Tukang pipa L.02 OH 0.041 147,992.00 6,067.67
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 18,924.28


B BAHAN
Pipa PVC Ø 63 mm m 1.000 14,000.00 14,000.00

JUMLAH HARGA BAHAN 14,000.00


C PERALATAN
Sewa Tripot/Tackel & handle hari 0.006 625,000.00 3,750.00
crane 2 T

JUMLAH HARGA ALAT 3,750.00


D Jumlah (A+B+C) 36,674.28
E Overhead & Profit (10 %) 10% x D (maksimum) 3,667.43
F Harga Satuan Pekerjaan (D+E) 40,341.71

Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel. Apabila ada tambahan peralatan yang digunakan,
harus disesuaikan dengan spesifikasi dan gambar kerja.

Page 177
A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC Ø 90 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.094 143,119.40 13,453.22
Tukang pipa L.02 OH 0.047 147,992.00 6,955.62
Mandor L.04 OH 0.009 157,992.00 1,421.93
JUMLAH TENAGA KERJA 21,830.78
B BAHAN
Pipa PVC Ø 90 mm m 1.000 23,000.00 23,000.00

JUMLAH HARGA BAHAN 23,000.00


C PERALATAN
Sewa Tripot/Tackel & handle hari 0.008 625,000.00 5,000.00
crane 2 T

JUMLAH HARGA ALAT 5,000.00


D Jumlah (A+B+C) 49,830.78
E Overhead & Profit (10 %) 10% x D (maksimum) 4,983.08
F Harga Satuan Pekerjaan (D+E) 54,813.85

A.8.4.1.3 (K3) Pemasangan 1 m pipa PVC Ø 110 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.105 143,119.40 15,027.54
Tukang pipa L.02 OH 0.053 147,992.00 7,843.58
Mandor L.04 OH 0.011 157,992.00 1,737.91
JUMLAH TENAGA KERJA 24,609.03
B BAHAN
Pipa PVC Ø 110 mm m 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 34,500.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.010 625,000.00 6,250.00
crane 2 T
JUMLAH HARGA ALAT 6,250.00
D Jumlah (A+B+C) 65,359.03
E Overhead & Profit (10 %) 10% x D (maksimum) 6,535.90
F Harga Satuan Pekerjaan (D+E) 71,894.93

A.8.4.1.4 (K3) Pemasangan 1 m pipa PVC Ø 125 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.118 143,119.40 16,888.09
Tukang pipa L.02 OH 0.059 147,992.00 8,731.53
Mandor L.04 OH 0.012 157,992.00 1,895.90
JUMLAH TENAGA KERJA 27,515.52
B BAHAN
Pipa PVC Ø 125 mm m 1.000 48,000.00 48,000.00
JUMLAH HARGA BAHAN 48,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.012 625,000.00 7,500.00
crane 2 T
JUMLAH HARGA ALAT 7,500.00
D Jumlah (A+B+C) 83,015.52
E Overhead & Profit (10 %) 10% x D (maksimum) 8,301.55
F Harga Satuan Pekerjaan (D+E) 91,317.07

A.8.4.1.4 (K3) Pemasangan 1 m pipa PVC Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.118 143,119.40 16,888.09
Tukang pipa L.02 OH 0.059 147,992.00 8,731.53
Mandor L.04 OH 0.012 157,992.00 1,895.90

JUMLAH TENAGA KERJA 27,515.52


B BAHAN
Pipa PVC Ø 150 mm m 1.000 91,250.00 91,250.00
JUMLAH HARGA BAHAN 91,250.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.012 625,000.00 7,500.00
crane 2 T

Page 178
JUMLAH HARGA ALAT 7,500.00
D Jumlah (A+B+C) 126,265.52
E Overhead & Profit (10 %) 10% x D (maksimum) 12,626.55
F Harga Satuan Pekerjaan (D+E) 138,892.07

Page 179
A.8.4.1.5 (K3) Pemasngan 1 m pipa PVC Ø 200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.189 143,119.40 27,049.57
Tukang pipa L.02 OH 0.095 147,992.00 14,059.24
Mandor L.04 OH 0.019 157,992.00 3,001.85

JUMLAH TENAGA KERJA 44,110.65


B BAHAN
Pipa PVC Ø 200 mm m 1.000 65,000.00 65,000.00

JUMLAH HARGA BAHAN 65,000.00


C PERALATAN
Sewa Tripot/Tackel & handle hari 0.024 625,000.00 15,000.00
crane 2 T
JUMLAH HARGA ALAT 15,000.00
D Jumlah (A+B+C) 124,110.65
E Overhead & Profit (10 %) 10% x D (maksimum) 12,411.07
F Harga Satuan Pekerjaan (D+E) 136,521.72

A.8.4.1.6 (K3) Pemasangan 1 m pipa PVC Ø 250 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.256 143,119.40 36,638.57
Tukang pipa L.02 OH 0.128 147,992.00 18,942.98
Mandor L.04 OH 0.026 157,992.00 4,107.79

JUMLAH TENAGA KERJA 59,689.33


B BAHAN
Pipa PVC Ø 250 mm m 1.000 246,350.00 246,350.00

JUMLAH HARGA BAHAN 246,350.00


C PERALATAN
Sewa Tripot/Tackel & handle hari 0.034 625,000.00 21,250.00
crane 2 T
JUMLAH HARGA ALAT 21,250.00
D Jumlah (A+B+C) 327,289.33
E Overhead & Profit (10 %) 10% x D (maksimum) 32,728.93
F Harga Satuan Pekerjaan (D+E) 360,018.27

A.8.4.1.7 (K3) Pemasangan 1 m pipa PVC Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.294 143,119.40 42,077.10
Tukang pipa L.02 OH 0.147 147,992.00 21,754.82
Mandor L.04 OH 0.029 157,992.00 4,581.77

JUMLAH TENAGA KERJA 68,413.70


B BAHAN
Pipa PVC Ø 300 mm m 1.000 350,000.00 350,000.00

JUMLAH HARGA BAHAN 350,000.00


C PERALATAN
Sewa Tripot/Tackel & handle hari 0.040 625,000.00 25,000.00
crane 2 T
JUMLAH HARGA ALAT 25,000.00
D Jumlah (A+B+C) 443,413.70
E Overhead & Profit (10 %) 10% x D (maksimum) 44,341.37
F Harga Satuan Pekerjaan (D+E) 487,755.07

Page 180
A.8.4.1.8 (K3) Pemasangan 1 m pipa PVC Ø 400 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.544 143,119.40 77,856.95
Tukang pipa L.02 OH 0.272 147,992.00 40,253.82
Mandor L.04 OH 0.054 157,992.00 8,531.57

JUMLAH TENAGA KERJA 126,642.35


B BAHAN
Pipa PVC Ø 400 mm m 1.000 500,120.00 500,120.00

JUMLAH HARGA BAHAN 500,120.00


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.080 625,000.00 50,000.00

JUMLAH HARGA ALAT 50,000.00


D Jumlah (A+B+C) 676,762.35
E Overhead & Profit (10 %) 10% x D (maksimum) 67,676.23
F Harga Satuan Pekerjaan (D+E) 744,438.58

A.8.4.1.9 (K3) Pemasangan 1 m pipa PVC Ø 450 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.669 143,119.40 95,746.88
Tukang pipa L.02 OH 0.335 147,992.00 49,577.32
Mandor L.04 OH 0.067 157,992.00 10,585.46
JUMLAH TENAGA KERJA 155,909.66
B BAHAN
Pipa PVC Ø 450 mm m 1.000 703,640.00 703,640.00
JUMLAH HARGA BAHAN 703,640.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.100 625,000.00 62,500.00
crane 2 T
JUMLAH HARGA ALAT 62,500.00
D Jumlah (A+B+C) 922,049.66
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 92,204.97
F Harga Satuan Pekerjaan (D+E) 1,014,254.63

A.8.4.1.10 (K3) Pemasangan 1 m pipa PVC Ø 500 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.809 143,119.40 115,783.59
Tukang pipa L.02 OH 0.405 147,992.00 59,936.76
Mandor L.04 OH 0.081 157,992.00 12,797.35

JUMLAH TENAGA KERJA 188,517.71


B BAHAN
Pipa PVC Ø 500 mm m 1.000 879,530.00 879,530.00

JUMLAH HARGA BAHAN 879,530.00


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.122 625,000.00 76,250.00

JUMLAH HARGA ALAT 76,250.00


D Jumlah (A+B+C) 1,144,297.71
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 114,429.77
F Harga Satuan Pekerjaan (D+E) 1,258,727.48

Page 181
A.8.4.1.11 (K3) Pemasangan 1 m pipa PVC Ø 600 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.957 143,119.40 136,965.27
Tukang pipa L.02 OH 0.479 147,992.00 70,888.17
Mandor L.04 OH 0.096 157,992.00 15,167.23
JUMLAH TENAGA KERJA 223,020.67
B BAHAN
Pipa PVC Ø 600 mm m 1.000 1,055,420.00 1,055,420.00
JUMLAH HARGA BAHAN 1,055,420.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.145 625,000.00 90,625.00
crane 2 T
JUMLAH HARGA ALAT 90,625.00
D Jumlah (A+B+C) 1,369,065.67
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 136,906.57
F Harga Satuan Pekerjaan (D+E) 1,505,972.23

A.8.4.1.12 (K3) Pemasangan 1 m pipa PVC Ø 800 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.618 143,119.40 231,567.19
Tukang pipa L.02 OH 0.809 147,992.00 119,725.53
Mandor L.04 OH 0.162 157,992.00 25,594.70
JUMLAH TENAGA KERJA 376,887.42
B BAHAN
Pipa PVC Ø 800 mm m 1.000 1,231,332.50 1,231,332.50
JUMLAH HARGA BAHAN 1,231,332.50
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.250 625,000.00 156,250.00
crane 2 T
JUMLAH HARGA ALAT 156,250.00
D Jumlah (A+B+C) 1,764,469.92
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 176,446.99
F Harga Satuan Pekerjaan (D+E) 1,940,916.91

A.8.4.1.13 (K3) Pemasangan 1 m pipa PVC Ø 900 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.691 143,119.40 242,014.91
Tukang pipa L.02 OH 0.846 147,992.00 125,201.23
Mandor L.04 OH 0.169 157,992.00 26,700.65
JUMLAH TENAGA KERJA 393,916.79
B BAHAN
Pipa PVC Ø 900 mm m 1.000 1,407,222.50 1,407,222.50
JUMLAH HARGA BAHAN 1,407,222.50
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.262 625,000.00 163,750.00
crane 2 T
JUMLAH HARGA ALAT 163,750.00
D Jumlah (A+B+C) 1,964,889.29
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 196,488.93
F Harga Satuan Pekerjaan (D+E) 2,161,378.21

A.8.4.1.14 (K3) Pemasangan 1 m pipa PVC Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.895 143,119.40 271,211.26
Tukang pipa L.02 OH 0.948 147,992.00 140,296.42
Mandor L.04 OH 0.190 157,992.00 30,018.48
JUMLAH TENAGA KERJA 441,526.16
B BAHAN
Pipa PVC Ø 1000 mm m 1.000 1,583,112.50 1,583,112.50
JUMLAH HARGA BAHAN 1,583,112.50
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.294 625,000.00 183,750.00
crane 2 T
JUMLAH HARGA ALAT 183,750.00
D Jumlah (A+B+C) 2,208,388.66
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 220,838.87
F Harga Satuan Pekerjaan (D+E) 2,429,227.52

Page 182
A.8.4.1.15 (K3) Pemasangan 1 m pipa PVC Ø 1100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.099 143,119.40 300,407.62
Tukang pipa L.02 OH 1.050 147,992.00 155,391.60
Mandor L.04 OH 0.210 157,992.00 33,178.32
JUMLAH TENAGA KERJA 488,977.54
B BAHAN
Pipa PVC Ø 1100 mm m 1.000 1,759,002.50 1,759,002.50
JUMLAH HARGA BAHAN 1,759,002.50
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.327 625,000.00 204,375.00
crane 2 T
JUMLAH HARGA ALAT 204,375.00
D Jumlah (A+B+C) 2,452,355.04
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 245,235.50
F Harga Satuan Pekerjaan (D+E) 2,697,590.54

A.8.4.1.16 (K3) Pemasangan 1 m pipa PVC Ø 1200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.303 143,119.40 329,603.98
Tukang pipa L.02 OH 1.152 147,992.00 170,486.78
Mandor L.04 OH 0.230 157,992.00 36,338.16
JUMLAH TENAGA KERJA 536,428.92
B BAHAN
Pipa PVC Ø 1200 mm m 1.000 1,934,892.50 1,934,892.50
JUMLAH HARGA BAHAN 1,934,892.50
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.359 625,000.00 224,375.00
crane 2 T
JUMLAH HARGA ALAT 224,375.00
D Jumlah (A+B+C) 2,695,696.42
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 269,569.64
F Harga Satuan Pekerjaan (D+E) 2,965,266.06

A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.035 143,119.40 5,009.18
Tukang pipa L.02 OH 0.017 147,992.00 2,515.86
Mandor L.04 OH 0.003 157,992.00 473.98

JUMLAH TENAGA KERJA 7,999.02


B BAHAN
Pipa HDPE Ø 63 mm m 1.000 -

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.019 625,000.00 11,875.00

JUMLAH HARGA ALAT 11,875.00


D Jumlah (A+B+C) 19,874.02
E Overhead & Profit (10 %) 10% x D (maksimum) 1,987.40
F Harga Satuan Pekerjaan (D+E) 21,861.42

Page 183
A.8.4.1.18 (K3) Pemasangan 1 m pipa HDPE Ø 100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.040 143,119.40 5,724.78
Tukang pipa L.02 OH 0.020 147,992.00 2,959.84
Mandor L.04 OH 0.004 157,992.00 631.97

JUMLAH TENAGA KERJA 9,316.58


B BAHAN
Pipa HDPE Ø 100 mm m 1.000 77,150.00 77,150.00

JUMLAH HARGA BAHAN 77,150.00


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.019 625,000.00 11,875.00

JUMLAH HARGA ALAT 11,875.00


D Jumlah (A+B+C) 98,341.58
E Overhead & Profit (10 %) 10% x D (maksimum) 9,834.16
F Harga Satuan Pekerjaan (D+E) 108,175.74

A.8.4.1.19 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.045 143,119.40 6,440.37
Tukang pipa L.02 OH 0.023 147,992.00 3,403.82
Mandor L.04 OH 0.005 157,992.00 789.96

JUMLAH TENAGA KERJA 10,634.15


B BAHAN
Pipa HDPE Ø 125 mm m 1.000 97,450.00 97,450.00

JUMLAH HARGA BAHAN 97,450.00


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.019 625,000.00 11,875.00

JUMLAH HARGA ALAT 11,875.00


D Jumlah (A+B+C) 119,959.15
E Overhead & Profit (10 %) 10% x D (maksimum) 11,995.91
F Harga Satuan Pekerjaan (D+E) 131,955.06

A.8.4.1.20 (K3) Pemasangan 1 m pipa HDPE Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.062 143,119.40 8,873.40
Tukang pipa L.02 OH 0.031 147,992.00 4,587.75
Mandor L.04 OH 0.006 157,992.00 947.95

JUMLAH TENAGA KERJA 14,409.11


B BAHAN
Pipa HDPE Ø 150 mm m 1.000 160,000.00 160,000.00

JUMLAH HARGA BAHAN 160,000.00


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.019 625,000.00 11,875.00

JUMLAH HARGA ALAT 11,875.00


D Jumlah (A+B+C) 186,284.11
E Overhead & Profit (10 %) 10% x D (maksimum) 18,628.41
F Harga Satuan Pekerjaan (D+E) 204,912.52

Page 184
A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.102 143,119.40 14,598.18
Tukang pipa L.02 OH 0.051 147,992.00 7,547.59
Mandor L.04 OH 0.010 157,992.00 1,579.92

JUMLAH TENAGA KERJA 23,725.69


B BAHAN
Pipa HDPE Ø 200 mm m 1.000 248,500.00 248,500.00

JUMLAH HARGA BAHAN 248,500.00


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.019 625,000.00 11,875.00

JUMLAH HARGA ALAT 11,875.00


D Jumlah (A+B+C) 284,100.69
E Overhead & Profit (10 %) 10% x D (maksimum) 28,410.07
F Harga Satuan Pekerjaan (D+E) 312,510.76

A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.133 143,119.40 19,034.88
Tukang pipa L.02 OH 0.067 147,992.00 9,915.46
Mandor L.04 OH 0.013 157,992.00 2,053.90

JUMLAH TENAGA KERJA 31,004.24


B BAHAN
Pipa HDPE Ø 250 mm m 1.000 387,850.00 387,850.00

JUMLAH HARGA BAHAN 387,850.00


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.042 625,000.00 26,250.00

JUMLAH HARGA ALAT 26,250.00


D Jumlah (A+B+C) 445,104.24
E Overhead & Profit (10 %) 10% x D (maksimum) 44,510.42
F Harga Satuan Pekerjaan (D+E) 489,614.66

A.8.4.1.23 (K3) Pemasangan 1 m pipa HDPE Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.170 143,119.40 24,330.30
Tukang pipa L.02 OH 0.085 147,992.00 12,579.32
Mandor L.04 OH 0.017 157,992.00 2,685.86

JUMLAH TENAGA KERJA 39,595.48


B BAHAN
Pipa HDPE Ø 300 mm m 1.000 616,050.00 616,050.00

JUMLAH HARGA BAHAN 616,050.00


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.065 625,000.00 40,625.00

JUMLAH HARGA ALAT 40,625.00


D Jumlah (A+B+C) 696,270.48
E Overhead & Profit (10 %) 10% x D (maksimum) 69,627.05
F Harga Satuan Pekerjaan (D+E) 765,897.53

Page 185
A.8.4.1.24 (K3) Pemasangan 1 m pipa HDPE Ø 400 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.290 143,119.40 41,504.63
Tukang pipa L.02 OH 0.145 147,992.00 21,458.84
Mandor L.04 OH 0.029 157,992.00 4,581.77
JUMLAH TENAGA KERJA 67,545.23
B BAHAN
Pipa HDPE Ø 400 mm m 1.000 986,050.00 986,050.00

JUMLAH HARGA BAHAN 986,050.00


C PERALATAN
Sewa Tripot/Tackel & handle hari 0.152 625,000.00 95,000.00
crane 2 T

JUMLAH HARGA ALAT 95,000.00


D Jumlah (A+B+C) 1,148,595.23
E Overhead & Profit (10 %) 10% x D (maksimum) 114,859.52
F Harga Satuan Pekerjaan (D+E) 1,263,454.76

A.8.4.1.25 (K3) Pemasangan 1 m pipa HDPE Ø 450 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.359 143,119.40 51,379.86
Tukang pipa L.02 OH 0.180 147,992.00 26,638.56
Mandor L.04 OH 0.036 157,992.00 5,687.71

JUMLAH TENAGA KERJA 83,706.14


B BAHAN
Pipa HDPE Ø 450 mm m 1.000 1,246,800.00 1,246,800.00

JUMLAH HARGA BAHAN 1,246,800.00


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.200 625,000.00 125,000.00

JUMLAH HARGA ALAT 125,000.00


D Jumlah (A+B+C) 1,455,506.14
E Overhead & Profit (10 %) 10% x D (maksimum) 145,550.61
F Harga Satuan Pekerjaan (D+E) 1,601,056.75

A.8.4.1.26 (K3) Pemasangan 1 m pipa HDPE Ø 500 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.433 143,119.40 61,970.70
Tukang pipa L.02 OH 0.216 147,992.00 31,966.27
Mandor L.04 OH 0.043 157,992.00 6,793.66

JUMLAH TENAGA KERJA 100,730.63


B BAHAN
Pipa HDPE Ø 500 mm m 1.000 1,537,950.00 1,537,950.00

JUMLAH HARGA BAHAN 1,537,950.00


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.251 625,000.00 156,875.00

JUMLAH HARGA ALAT 156,875.00


D Jumlah (A+B+C) 1,795,555.63
E Overhead & Profit (10 %) 10% x D (maksimum) 179,555.56
F Harga Satuan Pekerjaan (D+E) 1,975,111.19

Page 186
A.8.4.1.27 (K3) Pemasangan 1 m pipa HDPE Ø 600 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.512 143,119.40 73,277.13
Tukang pipa L.02 OH 0.256 147,992.00 37,885.95
Mandor L.04 OH 0.051 157,992.00 8,057.59
JUMLAH TENAGA KERJA 119,220.68
B BAHAN
Pipa HDPE Ø 600 mm m 1.00 3,442,750.00 3,442,750.00
JUMLAH HARGA BAHAN 3,442,750.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.307 625,000.00 191,875.00
crane 2 T
JUMLAH HARGA ALAT 191,875.00
D Jumlah (A+B+C) 3,753,845.68
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 375,384.57
F Harga Satuan Pekerjaan (D+E) 4,129,230.24

A.8.4.1.28 (K3) Pemasangan 1 m pipa HDPE Ø 800 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.893 143,119.40 127,805.62
Tukang pipa L.02 OH 0.446 147,992.00 66,004.43
Mandor L.04 OH 0.089 157,992.00 14,061.29
JUMLAH TENAGA KERJA 207,871.34
B BAHAN
Pipa HDPE Ø 800 mm m 1.000 3,704,700.00 3,704,700.00
JUMLAH HARGA BAHAN 3,704,700.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.573 625,000.00 358,125.00
crane 2 T
JUMLAH HARGA ALAT 358,125.00
D Jumlah (A+B+C) 4,270,696.34
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 427,069.63
F Harga Satuan Pekerjaan (D+E) 4,697,765.98

A.8.4.1.29 (K3) Pemasangan 1 m pipa HDPE Ø 900 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.353 143,119.40 193,640.55
Tukang pipa L.02 OH 0.677 147,992.00 100,190.58
Mandor L.04 OH 0.135 157,992.00 21,328.92
JUMLAH TENAGA KERJA 315,160.05
B BAHAN
Pipa HDPE Ø 900 mm m 1.000 3,854,700.00 3,854,700.00
JUMLAH HARGA BAHAN 3,854,700.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.883 625,000.00 551,875.00
crane 2 T
JUMLAH HARGA ALAT 551,875.00
D Jumlah (A+B+C) 4,721,735.05
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 472,173.51
F Harga Satuan Pekerjaan (D+E) 5,193,908.56

A.8.4.1.30 (K3) Pemasangan 1 m pipa HDPE Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.659 143,119.40 237,435.08
Tukang pipa L.02 OH 0.830 147,992.00 122,833.36
Mandor L.04 OH 0.166 157,992.00 26,226.67
JUMLAH TENAGA KERJA 386,495.12
B BAHAN
Pipa HDPE Ø 1000 mm m 1.000 4,204,700.00 4,204,700.00
JUMLAH HARGA BAHAN 4,204,700.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.093 625,000.00 683,125.00
crane 2 T
JUMLAH HARGA ALAT 683,125.00
D Jumlah (A+B+C) 68,312.50
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 6,831.25
F Harga Satuan Pekerjaan (D+E) 75,143.75

Page 187
A.8.4.1.31 (K3) Pemasangan 1 m pipa HDPE Ø 1100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.818 143,119.40 260,191.07
Tukang pipa L.02 OH 0.909 147,992.00 134,524.73
Mandor L.04 OH 0.182 157,992.00 28,754.54
JUMLAH TENAGA KERJA 423,470.34
B BAHAN
Pipa HDPE Ø 1100 mm m 1.00 4,654,700.00 4,654,700.00
JUMLAH HARGA BAHAN 4,654,700.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.205 625,000.00 753,125.00
crane 2 T
JUMLAH HARGA ALAT 753,125.00
D Jumlah (A+B+C) 5,831,295.34
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 583,129.53
F Harga Satuan Pekerjaan (D+E) 6,414,424.88

A.8.4.1.32 (K3) Pemasangan 1 m pipa HDPE Ø 1200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.370 143,119.40 339,192.98
Tukang pipa L.02 OH 1.185 147,992.00 175,370.52
Mandor L.04 OH 0.237 157,992.00 37,444.10
JUMLAH TENAGA KERJA 552,007.60
B BAHAN
Pipa HDPE Ø 1200 mm m 1.000 6,204,700.00 6,204,700.00
JUMLAH HARGA BAHAN 6,204,700.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 7,746,707.60
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 774,670.76
F Harga Satuan Pekerjaan (D+E) 8,521,378.36

A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.345 143,119.40 49,376.19
Tukang pipa L.02 OH 0.172 147,992.00 25,454.62
Mandor L.04 OH 0.034 157,992.00 5,371.73

JUMLAH TENAGA KERJA 80,202.55


B BAHAN
Pipa GIP Ø 63 mm m 1.000 118,071.75 118,071.75

JUMLAH HARGA BAHAN 118,071.75


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T % 35 % harga bahan 118,071.75 41,325.11

JUMLAH HARGA ALAT 41,325.11


D Jumlah (A+B+C) 239,599.41
E Overhead & Profit (10 %) 10% x D (maksimum) 23,959.94
F Harga Satuan Pekerjaan (D+E) 263,559.35

Page 188
A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP Ø 100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.400 143,119.40 57,247.76
Tukang pipa L.02 OH 0.200 147,992.00 29,598.40
Mandor L.04 OH 0.040 157,992.00 6,319.68

JUMLAH TENAGA KERJA 93,165.84


B BAHAN
Pipa GIP Ø 100 mm m 1.000 243,420.25 243,420.25

JUMLAH HARGA BAHAN 243,420.25


C PERALATAN
Sewa Tripot/Tackel & handle % 35 % harga bahan 243,420.25 85,197.09
crane 2 T

JUMLAH HARGA ALAT 85,197.09


D Jumlah (A+B+C) 421,783.18
E Overhead & Profit (10 %) 10% x D (maksimum) 42,178.32
F Harga Satuan Pekerjaan (D+E) 463,961.50

A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 125 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.448 143,119.40 64,117.49
Tukang pipa L.02 OH 0.224 147,992.00 33,150.21
Mandor L.04 OH 0.045 157,992.00 7,109.64

JUMLAH TENAGA KERJA 104,377.34


B BAHAN
Pipa GIP Ø 125 mm m 1.000 358,200.25 358,200.25

JUMLAH HARGA BAHAN 358,200.25


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T % 35 % harga bahan 358,200.25 125,370.09

JUMLAH HARGA ALAT 125,370.09


D Jumlah (A+B+C) 587,947.68
E Overhead & Profit (10 %) 10% x D (maksimum) 58,794.77
F Harga Satuan Pekerjaan (D+E) 646,742.44

A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.506 143,119.40 72,418.42
Tukang pipa L.02 OH 0.253 147,992.00 37,441.98
Mandor L.04 OH 0.051 157,992.00 8,057.59

JUMLAH TENAGA KERJA 117,917.98


B BAHAN
Pipa GIP Ø 150 mm m 1.000 446,245.75 446,245.75

JUMLAH HARGA BAHAN 446,245.75


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T % 35 % harga bahan 446,245.75 156,186.01

JUMLAH HARGA ALAT 156,186.01


D Jumlah (A+B+C) 720,349.75
E Overhead & Profit (10 %) 10% x D (maksimum) 72,034.97
F Harga Satuan Pekerjaan (D+E) 792,384.72

Page 189
A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.796 143,119.40 113,923.04
Tukang pipa L.02 OH 0.398 147,992.00 58,900.82
Mandor L.04 OH 0.080 157,992.00 12,639.36

JUMLAH TENAGA KERJA 185,463.22


B BAHAN
Pipa GIP Ø 200 mm m 1.00 629,915.50 629,915.50

JUMLAH HARGA BAHAN 629,915.50


C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T % 35 % harga bahan 629,915.50 220,470.43

JUMLAH HARGA ALAT 220,470.43


D Jumlah (A+B+C) 1,035,849.14
E Overhead & Profit (10 %) 10% x D (maksimum) 103,584.91
F Harga Satuan Pekerjaan (D+E) 1,139,434.06

A.8.4.1.38 (K3) Pemasangan 1 m pipa GIP Ø 250 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.949 143,119.40 135,820.31
Tukang pipa L.02 OH 0.475 147,992.00 70,296.20
Mandor L.04 OH 0.095 157,992.00 15,009.24
JUMLAH TENAGA KERJA 221,125.75
B BAHAN
Pipa GIP Ø 250 mm m 1.000 948,439.50 948,439.50
JUMLAH HARGA BAHAN 948,439.50
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 2,159,565.25
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 215,956.53
F Harga Satuan Pekerjaan (D+E) 2,375,521.78

A.8.4.1.39 (K3) Pemasangan 1 m pipa GIP Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.958 143,119.40 137,108.39
Tukang pipa L.02 OH 0.479 147,992.00 70,888.17
Mandor L.04 OH 0.096 157,992.00 15,167.23
JUMLAH TENAGA KERJA 223,163.79
B BAHAN
Pipa GIP Ø 300 mm m 1.000 1,344,310.00 1,344,310.00
JUMLAH HARGA BAHAN 1,344,310.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 2,557,473.79
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 255,747.38
F Harga Satuan Pekerjaan (D+E) 2,813,221.16

A.8.4.1.40 (K3) Pemasangan 1 m pipa GIP Ø 400 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.212 143,119.40 173,460.71
Tukang pipa L.02 OH 0.606 147,992.00 89,683.15
Mandor L.04 OH 0.121 157,992.00 19,117.03
JUMLAH TENAGA KERJA 282,260.90
B BAHAN
Pipa GIP Ø 400 mm m 1.000 1,777,181.75 1,777,181.75
JUMLAH HARGA BAHAN 1,777,181.75
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00

Page 190
D Jumlah (A+B+C) 3,049,442.65
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 304,944.26
F Harga Satuan Pekerjaan (D+E) 3,354,386.91

Page 191
A.8.4.1.41 (K3) Pemasangan 1 m pipa GIP Ø 450 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.353 143,119.40 193,640.55
Tukang pipa L.02 OH 0.676 147,992.00 100,042.59
Mandor L.04 OH 0.135 157,992.00 21,328.92
JUMLAH TENAGA KERJA 315,012.06
B BAHAN
Pipa GIP Ø 450 mm m 1.000 2,107,519.50 2,107,519.50
JUMLAH HARGA BAHAN 2,107,519.50
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 3,412,531.56
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 341,253.16
F Harga Satuan Pekerjaan (D+E) 3,753,784.72

A.8.4.1.42 (K3) Pemasangan 1 m pipa GIP Ø 500 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.469 143,119.40 210,242.40
Tukang pipa L.02 OH 0.735 147,992.00 108,774.12
Mandor L.04 OH 0.147 157,992.00 23,224.82
JUMLAH TENAGA KERJA 342,241.34
B BAHAN
Pipa GIP Ø 500 mm m 1.000 2,748,357.00 2,748,357.00
JUMLAH HARGA BAHAN 2,748,357.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 4,080,598.34
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 408,059.83
F Harga Satuan Pekerjaan (D+E) 4,488,658.18

A.8.4.1.43 (K3) Pemasangan 1 m pipa GIP Ø 600 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.327 143,119.40 189,919.44
Tukang pipa L.02 OH 0.664 147,992.00 98,266.69
Mandor L.04 OH 0.133 157,992.00 21,012.94
JUMLAH TENAGA KERJA 309,199.07
B BAHAN
Pipa GIP Ø 600 mm m 1.000 3,474,342.25 3,474,342.25
JUMLAH HARGA BAHAN 3,474,342.25
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 4,773,541.32
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 477,354.13
F Harga Satuan Pekerjaan (D+E) 5,250,895.45

A.8.4.1.44 (K3) Pemasangan 1 m pipa GIP Ø 800 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.327 143,119.40 333,038.84
Tukang pipa L.02 OH 1.163 147,992.00 172,114.70
Mandor L.04 OH 0.233 157,992.00 36,812.14
JUMLAH TENAGA KERJA 541,965.68
B BAHAN
Pipa GIP Ø 800 mm m 1.000 4,088,431.75 4,088,431.75
JUMLAH HARGA BAHAN 4,088,431.75
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 5,620,397.43
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 562,039.74
F Harga Satuan Pekerjaan (D+E) 6,182,437.17

Page 192
A.8.4.1.45 (K3) Pemasangan 1 m pipa GIP Ø 900 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.623 143,119.40 375,402.19
Tukang pipa L.02 OH 1.312 147,992.00 194,165.50
Mandor L.04 OH 0.262 157,992.00 41,393.90
JUMLAH TENAGA KERJA 610,961.59
B BAHAN
Pipa GIP Ø 900 mm m 1.000 4,702,521.25 4,702,521.25
JUMLAH HARGA BAHAN 4,702,521.25
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 6,303,482.84
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 630,348.28
F Harga Satuan Pekerjaan (D+E) 6,933,831.13

A.8.4.1.46 (K3) Pemasangan 1 m pipa GIP Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.911 143,119.40 416,620.57
Tukang pipa L.02 OH 1.456 147,992.00 215,476.35
Mandor L.04 OH 0.291 157,992.00 45,975.67
JUMLAH TENAGA KERJA 678,072.60
B BAHAN
Pipa GIP Ø 1000 mm m 1.000 5,316,610.75 5,316,610.75
JUMLAH HARGA BAHAN 5,316,610.75
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 6,984,683.35
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 698,468.33
F Harga Satuan Pekerjaan (D+E) 7,683,151.68

A.8.4.1.47 (K3) Pemasangan 1 m pipa GIP Ø 1100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.200 143,119.40 457,982.08
Tukang pipa L.02 OH 1.600 147,992.00 236,787.20
Mandor L.04 OH 0.320 157,992.00 50,557.44
JUMLAH TENAGA KERJA 745,326.72
B BAHAN
Pipa GIP Ø 1100 mm m 1.000 5,930,700.25 5,930,700.25
JUMLAH HARGA BAHAN 5,930,700.25
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 7,666,026.97
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 766,602.70
F Harga Satuan Pekerjaan (D+E) 8,432,629.67

A.8.4.1.48 (K3) Pemasangan 1 m pipa GIP Ø 1200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.488 143,119.40 499,200.47
Tukang pipa L.02 OH 1.744 147,992.00 258,098.05
Mandor L.04 OH 0.349 157,992.00 55,139.21
JUMLAH TENAGA KERJA 812,437.72
B BAHAN
Pipa GIP Ø 1200 mm m 1.000 6,544,789.75 6,544,789.75
JUMLAH HARGA BAHAN 6,544,789.75
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.584 625,000.00 990,000.00
crane 2 T
JUMLAH HARGA ALAT 990,000.00
D Jumlah (A+B+C) 8,347,227.47
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 834,722.75
F Harga Satuan Pekerjaan (D+E) 9,181,950.22

Page 193
A.8.4.1.49 (K3) Pemasangan 1 m pipa DCI Ø 100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.489 143,119.40 69,985.39
Tukang pipa L.02 OH 0.098 147,992.00 14,503.22
Mandor L.04 OH 0.049 157,992.00 7,741.61
JUMLAH TENAGA KERJA 92,230.21
B BAHAN
Pipa DCI Ø 100 mm m 1.000 122,000.00 122,000.00
JUMLAH HARGA BAHAN 122,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.380 625,000.00 237,500.00
crane 2 T
JUMLAH HARGA ALAT 237,500.00
D Jumlah (A+B+C) 451,730.21
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 45,173.02
F Harga Satuan Pekerjaan (D+E) 496,903.23

A.8.4.1.50 (K3) Pemasangan 1 m pipa DCI Ø 125 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.547 143,119.40 78,286.31
Tukang pipa L.02 OH 0.109 147,992.00 16,131.13
Mandor L.04 OH 0.055 157,992.00 8,689.56
JUMLAH TENAGA KERJA 103,107.00
B BAHAN
Pipa DCI Ø 125 mm m 1.000 274,400.00 274,400.00
JUMLAH HARGA BAHAN 274,400.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.380 625,000.00 237,500.00
crane 2 T
JUMLAH HARGA ALAT 237,500.00
D Jumlah (A+B+C) 615,007.00
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 61,500.70
F Harga Satuan Pekerjaan (D+E) 676,507.70

A.8.4.1.51 (K3) Pemasangan 1 m pipa DCI Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.613 143,119.40 87,732.19
Tukang pipa L.02 OH 0.123 147,992.00 18,203.02
Mandor L.04 OH 0.061 157,992.00 9,637.51
JUMLAH TENAGA KERJA 115,572.72
B BAHAN
Pipa DCI Ø 125 mm m 1.000 488,300.00 488,300.00
JUMLAH HARGA BAHAN 488,300.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.380 625,000.00 237,500.00
crane 2 T
JUMLAH HARGA ALAT 237,500.00
D Jumlah (A+B+C) 841,372.72
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 84,137.27
F Harga Satuan Pekerjaan (D+E) 925,509.99

A.8.4.1.52 (K3) Pemasangan 1 m pipa DCI Ø 200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.855 143,119.40 122,367.09
Tukang pipa L.02 OH 0.171 147,992.00 25,306.63
Mandor L.04 OH 0.085 157,992.00 13,429.32
JUMLAH TENAGA KERJA 161,103.04
B BAHAN
Pipa DCI Ø 200 mm m 1.000 687,500.00 687,500.00
JUMLAH HARGA BAHAN 687,500.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.380 625,000.00 237,500.00
crane 2 T
JUMLAH HARGA ALAT 237,500.00
D Jumlah (A+B+C) 1,086,103.04
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 108,610.30
F Harga Satuan Pekerjaan (D+E) 1,194,713.34

Page 194
A.8.4.1.53 (K3) Pemasangan 1 m pipa DCI Ø 250 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.951 143,119.40 136,106.55
Tukang pipa L.02 OH 0.190 147,992.00 28,118.48
Mandor L.04 OH 0.095 157,992.00 15,009.24
JUMLAH TENAGA KERJA 179,234.27
B BAHAN
Pipa DCI Ø 250 mm m 1.000 915,000.00 915,000.00
JUMLAH HARGA BAHAN 915,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.050 625,000.00 31,250.00
crane 2 T
JUMLAH HARGA ALAT 31,250.00
D Jumlah (A+B+C) 1,125,484.27
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 112,548.43
F Harga Satuan Pekerjaan (D+E) 1,238,032.70

A.8.4.1.54 (K3) Pemasangan 1 m pipa DCI Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.973 143,119.40 139,255.18
Tukang pipa L.02 OH 0.195 147,992.00 28,858.44
Mandor L.04 OH 0.097 157,992.00 15,325.22
JUMLAH TENAGA KERJA 183,438.84
B BAHAN
Pipa DCI Ø 300 mm m 1.000 1,175,000.00 1,175,000.00
JUMLAH HARGA BAHAN 1,175,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.071 625,000.00 44,375.00
crane 2 T
JUMLAH HARGA ALAT 44,375.00
D Jumlah (A+B+C) 1,402,813.84
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 140,281.38
F Harga Satuan Pekerjaan (D+E) 1,543,095.22

A.8.4.1.55 (K3) Pemasangan 1 m pipa DCI Ø 400 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.545 143,119.40 221,119.47
Tukang pipa L.02 OH 0.309 147,992.00 45,729.53
Operator alat berat L.08 OH 0.093 25,413.00 2,363.41
Mandor L.04 OH 0.154 157,992.00 24,330.77
JUMLAH TENAGA KERJA 293,543.18
B BAHAN
Pipa DCI Ø 400 mm m 1.000 2,162,500.00 2,162,500.00
JUMLAH HARGA BAHAN 2,162,500.00
C PERALATAN
Sewa excavator type 225 hari 0.023 160,000.00 3,680.00
kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel & handle hari 0.031 625,000.00 19,375.00
crane 2 T
JUMLAH HARGA ALAT 23,055.00
D Jumlah (A+B+C) 2,479,098.18
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 247,909.82
F Harga Satuan Pekerjaan (D+E) 2,727,008.00

Page 195
A.8.4.1.56 (K3) Pemasangan 1 m pipa DCI Ø 450 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.813 143,119.40 259,475.47
Tukang pipa L.02 OH 0.363 147,992.00 53,721.10
Operator alat berat L.08 OH 0.143 25,413.00 3,634.06
Mandor L.04 OH 0.181 157,992.00 28,596.55
JUMLAH TENAGA KERJA 345,427.18
B BAHAN
Pipa DCI Ø 450 mm m 1.000 2,412,500.00 2,412,500.00
JUMLAH HARGA BAHAN 2,412,500.00
C PERALATAN
Sewa excavator type 225 hari 0.029 160,000.00 4,640.00
kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel & handle hari 0.039 625,000.00 24,375.00
crane 2 T
JUMLAH HARGA ALAT 29,015.00
D Jumlah (A+B+C) 2,786,942.18
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 278,694.22
F Harga Satuan Pekerjaan (D+E) 3,065,636.40

A.8.4.1.57 (K3) Pemasangan 1 m pipa DCI Ø 500 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.047 143,119.40 292,965.41
Tukang pipa L.02 OH 0.409 147,992.00 60,528.73
Operator alat berat L.08 OH 0.193 25,413.00 4,904.71
Mandor L.04 OH 0.205 157,992.00 32,388.36
JUMLAH TENAGA KERJA 390,787.21
B BAHAN
Pipa DCI Ø 500 mm m 1.000 2,662,500.00 2,662,500.00
JUMLAH HARGA BAHAN 2,662,500.00
C PERALATAN
Sewa excavator type 225 hari 0.034 160,000.00 5,440.00
kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel & handle hari 0.045 625,000.00 28,125.00
crane 2 T
JUMLAH HARGA ALAT 33,565.00
D Jumlah (A+B+C) 3,086,852.21
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 308,685.22
F Harga Satuan Pekerjaan (D+E) 3,395,537.43

A.8.4.1.58 (K3) Pemasangan pipa 1 m DCI Ø 600 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.011 143,119.40 287,813.11
Tukang pipa L.02 OH 0.402 147,992.00 59,492.78
Operator alat berat L.08 OH 0.293 25,413.00 7,446.01
Mandor L.04 OH 0.201 157,992.00 31,756.39
JUMLAH TENAGA KERJA 386,508.30
B BAHAN
Pipa DCI Ø 600 mm m 1.000 3,231,300.00 3,231,300.00
JUMLAH HARGA BAHAN 3,231,300.00
C PERALATAN
Sewa excavator type 225 hari 0.058 160,000.00 9,280.00
kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel & handle hari 0.077 625,000.00 48,125.00
crane 2 T
JUMLAH HARGA ALAT 57,405.00
D Jumlah (A+B+C) 3,675,213.30
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 367,521.33
F Harga Satuan Pekerjaan (D+E) 4,042,734.63

Page 196
A.8.4.1.59 (K3) Pemasangan 1 m pipa DCI Ø 800 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.859 143,119.40 552,297.76
Tukang pipa L.02 OH 0.772 147,992.00 114,249.82
Operator alat berat L.08 OH 0.493 25,413.00 12,528.61
Mandor L.04 OH 0.386 157,992.00 60,984.91
JUMLAH TENAGA KERJA 740,061.11
B BAHAN
Pipa DCI Ø 800 mm m 1.000 4,325,000.00 4,325,000.00
JUMLAH HARGA BAHAN 4,325,000.00
C PERALATAN
Sewa excavator type 225 hari 0.084 160,000.00 13,440.00
kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel & handle hari 0.225 625,000.00 140,625.00
crane 2 T
JUMLAH HARGA ALAT 154,065.00
D Jumlah (A+B+C) 5,219,126.11
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 521,912.61
F Harga Satuan Pekerjaan (D+E) 5,741,038.72

A.8.4.1.60 (K3) Pemasangan 1 m pipa DCI Ø900 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.995 143,119.40 714,881.40
Tukang pipa L.02 OH 0.999 147,992.00 147,844.01
Operator alat berat L.08 OH 0.593 25,413.00 15,069.91
Mandor L.04 OH 0.499 157,992.00 78,838.01
JUMLAH TENAGA KERJA 956,633.33
B BAHAN
Pipa DCI Ø 900 mm m 1.000 4,575,000.00 4,575,000.00
JUMLAH HARGA BAHAN 4,575,000.00
C PERALATAN
Sewa excavator type 225 hari 0.093 160,000.00 14,880.00
kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel & handle hari 0.248 625,000.00 155,000.00
crane 2 T
JUMLAH HARGA ALAT 169,880.00
D Jumlah (A+B+C) 5,701,513.33
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 570,151.33
F Harga Satuan Pekerjaan (D+E) 6,271,664.66

A.8.4.1.61 (K3) Pemasangan 1 m pipa DCI Ø1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 5.931 143,119.40 848,841.16
Tukang pipa L.02 OH 1.186 147,992.00 175,518.51
Operator alat berat L.08 OH 0.793 25,413.00 20,152.51
Mandor L.04 OH 0.693 157,992.00 109,488.46
JUMLAH TENAGA KERJA 1,154,000.64
B BAHAN
Pipa DCI Ø 1000 m 1.000 5,400,000.00 5,400,000.00
mm
JUMLAH HARGA BAHAN 5,400,000.00
C PERALATAN
Sewa excavator type 225 hari 0.112 160,000.00 17,920.00
kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel & handle hari 0.298 625,000.00 186,250.00
crane 2 T
JUMLAH HARGA ALAT 204,170.00
D Jumlah (A+B+C) 6,758,170.64
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 675,817.06
F Harga Satuan Pekerjaan (D+E) 7,433,987.70

Page 197
A.8.4.1.62 (K3) Pemasangan 1 m pipa DCI Ø1100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 6.949 143,119.40 994,536.71
Tukang pipa L.02 OH 1.390 147,992.00 205,708.88
Operator alat berat L.08 OH 0.793 25,413.00 20,152.51
Mandor L.04 OH 0.695 157,992.00 109,804.44
JUMLAH TENAGA KERJA 1,330,202.54
B BAHAN
Pipa DCI Ø 1100 m 1.000 5,650,000.00 5,650,000.00
mm
JUMLAH HARGA BAHAN 5,650,000.00
C PERALATAN
Sewa excavator type 225 hari 0.152 160,000.00 24,320.00
kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel & handle hari 0.304 625,000.00 190,000.00
crane 2 T
JUMLAH HARGA ALAT 214,320.00
D Jumlah (A+B+C) 7,194,522.54
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 719,452.25
F Harga Satuan Pekerjaan (D+E) 7,913,974.79

A.8.4.1.63 (K3) Pemasangan 1 m pipa DCI Ø1200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 8.056 143,119.40 1,152,969.89
Tukang pipa L.02 OH 1.611 147,992.00 238,415.11
Operator alat berat L.08 OH 0.893 25,413.00 22,693.81
Mandor L.04 OH 0.806 157,992.00 127,341.55
JUMLAH TENAGA KERJA 1,541,420.36
B BAHAN
Pipa DCI Ø 1200 m 1.000 5,900,000.00 5,900,000.00
mm
JUMLAH HARGA BAHAN 5,900,000.00
C PERALATAN
Sewa excavator type 225 hari 0.180 160,000.00 28,800.00
kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel & handle hari 0.360 625,000.00 225,000.00
crane 2 T
JUMLAH HARGA ALAT 253,800.00
D Jumlah (A+B+C) 7,695,220.36
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 769,522.04
F Harga Satuan Pekerjaan (D+E) 8,464,742.40

A.8.4.1.64 (K3) Pemasangan 1 m Pipa baja Ø 63 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.499 143,119.40 71,416.58
Tukang pipa L.02 OH 0.100 147,992.00 14,799.20
Mandor L.04 OH 0.050 157,992.00 7,899.60

JUMLAH TENAGA KERJA 94,115.38


B BAHAN
Pipa baja Ø 63 mm m 1.000 77,770.00 77,770.00

JUMLAH HARGA BAHAN 77,770.00


C PERALATAN
Sewa Tripot/Tackel & handle hari 0.004 625,000.00 2,500.00
crane 2 T

JUMLAH HARGA ALAT 2,500.00


D Jumlah (A+B+C) 174,385.38
E Overhead & Profit (10 %) 10% x D (maksimum) 17,438.54
F Harga Satuan Pekerjaan (D+E) 191,823.92

Page 198
A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.579 143,119.40 82,866.13
Tukang pipa L.02 OH 0.116 147,992.00 17,167.07
Mandor L.04 OH 0.058 157,992.00 9,163.54

JUMLAH TENAGA KERJA 109,196.74


B BAHAN
Pipa baja Ø 100 mm m 1.000 227,997.50 227,997.50

JUMLAH HARGA BAHAN 227,997.50


C PERALATAN
Sewa Tripot/Tackel & handle hari 0.004 625,000.00 2,500.00
crane 2 T

JUMLAH HARGA ALAT 2,500.00


D Jumlah (A+B+C) 339,694.24
E Overhead & Profit (10 %) 10% x D (maksimum) 33,969.42
F Harga Satuan Pekerjaan (D+E) 373,663.66

A.8.4.1.66 (K3) Pemasangan 1 m pipa baja Ø 125 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.648 143,119.40 92,741.37
Tukang pipa L.02 OH 0.130 147,992.00 19,238.96
Mandor L.04 OH 0.065 157,992.00 10,269.48

JUMLAH TENAGA KERJA 122,249.81


B BAHAN
Pipa baja Ø 125 mm m 1.000 310,472.50 310,472.50
JUMLAH HARGA BAHAN 310,472.50
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.004 625,000.00 2,500.00

JUMLAH HARGA ALAT 2,500.00


D Jumlah (A+B+C) 435,222.31
E Overhead & Profit (10 %) 10% x D (maksimum) 43,522.23
F Harga Satuan Pekerjaan (D+E) 478,744.54

A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.708 143,119.40 101,328.54
Tukang pipa L.02 OH 0.142 147,992.00 21,014.86
Mandor L.04 OH 0.071 157,992.00 11,217.43
JUMLAH TENAGA KERJA 133,560.83
B BAHAN
Pipa baja Ø 150 mm m 1.000 402,955.00 402,955.00
JUMLAH HARGA BAHAN 402,955.00
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.004 625,000.00 2,500.00

JUMLAH HARGA ALAT 2,500.00


D Jumlah (A+B+C) 539,015.83
E Overhead & Profit (10 %) 10% x D (maksimum) 53,901.58
F Harga Satuan Pekerjaan (D+E) 592,917.41

A.8.4.1.68 (K3) Pemasangan 1 m pipa baja Ø 200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.113 143,119.40 159,291.89
Tukang pipa L.02 OH 0.223 147,992.00 33,002.22
Mandor L.04 OH 0.111 157,992.00 17,537.11
JUMLAH TENAGA KERJA 209,831.22
B BAHAN
Pipa baja Ø 200 mm m 1.000 605,337.50 605,337.50
JUMLAH HARGA BAHAN 605,337.50
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.004 625,000.00 2,500.00

Page 199
JUMLAH HARGA ALAT 2,500.00
D Jumlah (A+B+C) 817,668.72
E Overhead & Profit (10 %) 10% x D (maksimum) 81,766.87
F Harga Satuan Pekerjaan (D+E) 899,435.59

Page 200
A.8.4.1.69 (K3) Pemasangan pipa baja Ø 250 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.325 143,119.40 189,633.21
Tukang pipa L.02 OH 0.265 147,992.00 39,217.88
Mandor L.04 OH 0.133 157,992.00 21,012.94
JUMLAH TENAGA KERJA 249,864.02
B BAHAN
Pipa baja Ø 250 mm m 1.000 857,917.50 857,917.50
JUMLAH HARGA BAHAN 857,917.50
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.004 625,000.00 2,500.00
crane 2 T
JUMLAH HARGA ALAT 2,500.00
D Jumlah (A+B+C) 1,110,281.52
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 111,028.15
F Harga Satuan Pekerjaan (D+E) 1,221,309.67

A.8.4.1.70 (K3) Pemasangan 1 m pipa baja Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.415 143,119.40 202,513.95
Tukang pipa L.02 OH 0.283 147,992.00 41,881.74
Mandor L.04 OH 0.141 157,992.00 22,276.87
JUMLAH TENAGA KERJA 266,672.56
B BAHAN
Pipa baja Ø 300 mm m 1.000 1,135,402.50 1,135,402.50
JUMLAH HARGA BAHAN 1,135,402.50
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.004 625,000.00 2,500.00
crane 2 T
JUMLAH HARGA ALAT 2,500.00
D Jumlah (A+B+C) 1,404,575.06
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 140,457.51
F Harga Satuan Pekerjaan (D+E) 1,545,032.56

A.8.4.1.71 (K3) Pemasangan 1 m pipa baja Ø 400 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.366 143,119.40 338,620.50
Tukang pipa L.02 OH 0.473 147,992.00 70,000.22
Mandor L.04 OH 0.237 157,992.00 37,444.10
JUMLAH TENAGA KERJA 446,064.82
B BAHAN
Pipa baja Ø 400 mm m 1.000 7,028,100.00 7,028,100.00
JUMLAH HARGA BAHAN 7,028,100.00
C PERALATAN
Sewa excavator type
225 kapasitas 0,5 1,0 hari 0.027 160,000.00 4,320.00
m3
Sewa Tripot/Tackel & handle hari 0.039 625,000.00 24,375.00
crane 2 T
JUMLAH HARGA ALAT 28,695.00
D Jumlah (A+B+C) 7,502,859.82
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 750,285.98
F Harga Satuan Pekerjaan (D+E) 8,253,145.80

Page 201
A.8.4.1.72 (K3) Pemasangan 1 m pipa baja Ø 450 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.231 143,119.40 319,299.38
Tukang pipa L.02 OH 0.446 147,992.00 66,004.43
Mandor L.04 OH 0.223 157,992.00 35,232.22
JUMLAH TENAGA KERJA 420,536.03
B BAHAN
Pipa baja Ø 400 mm m 1.000 1,757,025.00 1,757,025.00
JUMLAH HARGA BAHAN 1,757,025.00
C PERALATAN
Sewa excavator type
225 kapasitas 0,5 1,0 hari 0.026 160,000.00 4,160.00
m3
Sewa Tripot/Tackel & handle hari 0.037 625,000.00 23,125.00
crane 2 T
JUMLAH HARGA ALAT 27,285.00
D Jumlah (A+B+C) 2,204,846.03
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 220,484.60
F Harga Satuan Pekerjaan (D+E) 2,425,330.63

A.8.4.1.73 (K3) Pemasangan 1 m pipa baja Ø 500 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.432 143,119.40 348,066.38
Tukang pipa L.02 OH 0.486 147,992.00 71,924.11
Mandor L.04 OH 0.243 157,992.00 38,392.06
JUMLAH TENAGA KERJA 458,382.55
B BAHAN
Pipa baja Ø 500 mm m 1.000 2,612,985.00 2,612,985.00
JUMLAH HARGA BAHAN 2,612,985.00
C PERALATAN
Sewa excavator type
225 kapasitas 0,5 1,0 hari 0.029 160,000.00 4,640.00
m3
Sewa Tripot/Tackel & handle hari 0.045 625,000.00 28,125.00
crane 2 T
JUMLAH HARGA ALAT 32,765.00
D Jumlah (A+B+C) 3,104,132.55
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 310,413.25
F Harga Satuan Pekerjaan (D+E) 3,414,545.80

A.8.4.1.74 (K3) Pemasangan 1 m pipa baja Ø 600 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.208 143,119.40 316,007.64
Tukang pipa L.02 OH 0.442 147,992.00 65,412.46
Mandor L.04 OH 0.221 157,992.00 34,916.23
JUMLAH TENAGA KERJA 416,336.33
B BAHAN
Pipa baja Ø 600 mm m 1.000 2,712,985.00 2,712,985.00
JUMLAH HARGA BAHAN 2,712,985.00
C PERALATAN
Sewa excavator type
225 kapasitas 0,5 1,0 hari 0.027 160,000.00 4,320.00
m3
Sewa Tripot/Tackel & handle hari 0.039 625,000.00 24,375.00
crane 2 T
JUMLAH HARGA ALAT 28,695.00
D Jumlah (A+B+C) 3,158,016.33
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 315,801.63
F Harga Satuan Pekerjaan (D+E) 3,473,817.96

Page 202
A.8.4.1.75 (K3) Pemasangan 1 m pipa baja Ø 800 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.897 143,119.40 557,736.30
Tukang pipa L.02 OH 0.779 147,992.00 115,285.77
Mandor L.04 OH 0.390 157,992.00 61,616.88
JUMLAH TENAGA KERJA 734,638.95
B BAHAN
Pipa baja Ø 800 mm m 1.000 3,639,592.50 3,639,592.50
JUMLAH HARGA BAHAN 3,639,592.50
C PERALATAN
Sewa excavator type
225 kapasitas 0,5 1,0 hari 0.046 160,000.00 7,360.00
m3
Sewa Tripot/Tackel & handle hari 0.098 625,000.00 61,250.00
crane 2 T
JUMLAH HARGA ALAT 68,610.00
D Jumlah (A+B+C) 4,442,841.45
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 444,284.14
F Harga Satuan Pekerjaan (D+E) 4,887,125.59

A.8.4.1.76 (K3) Pemasangan 1 m pipa baja Ø 900 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.403 143,119.40 630,154.72
Tukang pipa L.02 OH 0.081 147,992.00 11,987.35
Mandor L.04 OH 0.440 157,992.00 69,516.48
JUMLAH TENAGA KERJA 711,658.55
B BAHAN
Pipa baja Ø 900 mm m 1.000 3,752,092.50 3,752,092.50
JUMLAH HARGA BAHAN 3,752,092.50
C PERALATAN
Sewa excavator type
225 kapasitas 0,5 1,0 hari 0.052 160,000.00 8,320.00
m3
Sewa Tripot/Tackel & handle hari 0.115 625,000.00 71,875.00
crane 2 T
JUMLAH HARGA ALAT 80,195.00
D Jumlah (A+B+C) 4,543,946.05
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 454,394.61
F Harga Satuan Pekerjaan (D+E) 4,998,340.66

A.8.4.1.77 (K3) Pemasangan 1 m pipa baja Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.895 143,119.40 700,569.46
Tukang pipa L.02 OH 0.979 147,992.00 144,884.17
Mandor L.04 OH 0.489 157,992.00 77,258.09
JUMLAH TENAGA KERJA 922,711.72
B BAHAN
Pipa baja Ø 1000 m 1.000 3,864,592.50 3,864,592.50
mm
JUMLAH HARGA BAHAN 3,864,592.50
C PERALATAN
Sewa excavator type
225 kapasitas 0,5 1,0 hari 0.489 160,000.00 78,240.00
m3
Sewa Tripot/Tackel & handle hari 0.133 625,000.00 83,125.00
crane 2 T
JUMLAH HARGA ALAT 161,365.00
D Jumlah (A+B+C) 4,948,669.22
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 494,866.92
F Harga Satuan Pekerjaan (D+E) 5,443,536.14

Page 203
A.8.4.1.78 (K3) Pemasangan 1 m pipa baja Ø 1100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 5.387 143,119.40 770,984.21
Tukang pipa L.02 OH 1.077 147,992.00 159,387.38
Mandor L.04 OH 0.539 157,992.00 85,157.69
JUMLAH TENAGA KERJA 1,015,529.28
B BAHAN
Pipa baja Ø 1100 m 1.000 3,989,592.50 3,989,592.50
mm
JUMLAH HARGA BAHAN 3,989,592.50
C PERALATAN
Sewa excavator type
225 kapasitas 0,5 1,0 hari 0.064 160,000.00 10,240.00
m3
Sewa Tripot/Tackel & handle hari 0.150 625,000.00 93,750.00
crane 2 T
JUMLAH HARGA ALAT 103,990.00
D Jumlah (A+B+C) 5,109,111.78
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 510,911.18
F Harga Satuan Pekerjaan (D+E) 5,620,022.96

A.8.4.1.79 (K3) Pemasangan 1 m pipa baja Ø 1200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 5.897 143,119.40 843,975.10
Tukang pipa L.02 OH 1.176 147,992.00 174,038.59
Mandor L.04 OH 0.588 157,992.00 92,899.30
JUMLAH TENAGA KERJA 1,110,912.99
B BAHAN
Pipa baja Ø 1200 m 1.000 4,114,592.50 4,114,592.50
mm
JUMLAH HARGA BAHAN 4,114,592.50
C PERALATAN
Sewa excavator type
225 kapasitas 0,5 1,0 hari 0.070 160,000.00 11,200.00
m3
Sewa Tripot/Tackel & handle hari 0.167 625,000.00 104,375.00
crane 2 T
JUMLAH HARGA ALAT 115,575.00
D Jumlah (A+B+C) 5,341,080.49
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 534,108.05
F Harga Satuan Pekerjaan (D+E) 5,875,188.54

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


A.8.4.2.1 (K3) Pemotongan 1 buah pipa PVC Ø 63 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.01 143,119.40 715.60
Tukang pipa L.02 OH 0.00 147,992.00 295.98
Mandor L.04 OH 0.00 157,992.00 79.00

JUMLAH TENAGA KERJA 1,090.58


B BAHAN
Pipa PVC Ø 63 mm buah 1.000 56,000.00 56,000.00

JUMLAH HARGA BAHAN 56,000.00


C PERALATAN
Peralatan potong pipa hari 0.003 25,000.00 75.00
T1/manual (gergaji) /saw

JUMLAH HARGA ALAT 75.00


D Jumlah (A+B+C) 57,165.58
E Overhead & Profit (10 %) 10% x D (maksimum) 5,716.56
F Harga Satuan Pekerjaan (D+E) 62,882.13

Page 204
A.8.4.2.2 (K3) Pemotongan 1 m pipa PVC Ø 90 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.01 143,119.40 2,003.67
Tukang pipa L.02 OH 0.01 147,992.00 1,035.94
Mandor L.04 OH 0.00 157,992.00 157.99

JUMLAH TENAGA KERJA 3,197.61


B BAHAN
Pipa PVC Ø 90 mm buah 1.000 92,000.00 92,000.00

JUMLAH HARGA BAHAN 92,000.00


C PERALATAN
Peralatan potong pipa hari 0.003 25,000.00 75.00
T1/manual (gergaji) /saw

JUMLAH HARGA ALAT 75.00


D Jumlah (A+B+C) 95,272.61
E Overhead & Profit (10 %) 10% x D (maksimum) 9,527.26
F Harga Satuan Pekerjaan (D+E) 104,799.87

A.8.4.2.3 (K3) Pemotongan 1 buah pipa PVC Ø 110 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.022 143,119.40 3,148.63
Tukang pipa L.02 OH 0.011 147,992.00 1,627.91
Mandor L.04 OH 0.002 157,992.00 315.98

JUMLAH TENAGA KERJA 5,092.52


B BAHAN
Pipa PVC Ø 110 mm buah 1.000 138,000.00 138,000.00

JUMLAH HARGA BAHAN 138,000.00


C PERALATAN
Peralatan potong pipa hari 0.003 25,000.00 75.00
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT 75.00
D Jumlah (A+B+C) 143,167.52
E Overhead & Profit (10 %) 10% x D (maksimum) 14,316.75
F Harga Satuan Pekerjaan (D+E) 157,484.28

A.8.4.2.4 (K3) Pemotongan 1 buah pipa PVC Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.031 143,119.40 4,436.70
Tukang pipa L.02 OH 0.015 147,992.00 2,219.88
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 7,130.56
B BAHAN
Pipa PVC Ø 150 mm buah 1.000 192,000.00 192,000.00
JUMLAH HARGA BAHAN 192,000.00
C PERALATAN
Peralatan potong pipa hari 0.003 25,000.00 75.00
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT 75.00
D Jumlah (A+B+C) 199,205.56
E Overhead & Profit (10 %) 10% x D (maksimum) 19,920.56
F Harga Satuan Pekerjaan (D+E) 219,126.11

Page 205
A.8.4.2.5 (K3) Pemotongan 1 buah pipa PVC Ø 200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.081 143,119.40 11,592.67
Tukang pipa L.02 OH 0.040 147,992.00 5,919.68
Mandor L.04 OH 0.008 157,992.00 1,263.94

JUMLAH TENAGA KERJA 18,776.29


B BAHAN
Pipa PVC Ø 200 mm buah 1.000 260,000.00 260,000.00

JUMLAH HARGA BAHAN 260,000.00


C PERALATAN
Peralatan potong pipa hari 0.017 25,000.00 425.00
T1/manual (gergaji) /saw

JUMLAH HARGA ALAT 425.00


D Jumlah (A+B+C) 279,201.29
E Overhead & Profit (10 %) 10% x D (maksimum) 27,920.13
F Harga Satuan Pekerjaan (D+E) 307,121.42

A.8.4.2.6 (K3) Pemotongan 1 buah pipa PVC Ø 250 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.128 143,119.40 18,319.28
Tukang pipa L.02 OH 0.064 147,992.00 9,471.49
Mandor L.04 OH 0.013 157,992.00 2,053.90

JUMLAH TENAGA KERJA 29,844.67


B BAHAN
Pipa PVC Ø 250 mm buah 1.000 985,400.00 985,400.00

JUMLAH HARGA BAHAN 985,400.00


C PERALATAN
Peralatan potong pipa hari 0.030 25,000.00 750.00
T1/manual (gergaji) /saw

JUMLAH HARGA ALAT 750.00


D Jumlah (A+B+C) 1,015,994.67
E Overhead & Profit (10 %) 10% x D (maksimum) 101,599.47
F Harga Satuan Pekerjaan (D+E) 1,117,594.13

A.8.4.2.7 (K3) Pemotongan 1 buah pipa PVC Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.155 143,119.40 22,183.51
Tukang pipa L.02 OH 0.077 147,992.00 11,395.38
Mandor L.04 OH 0.015 157,992.00 2,369.88

JUMLAH TENAGA KERJA 35,948.77


B BAHAN
Pipa PVC Ø 300 mm buah 1.000 1,400,000.00 1,400,000.00

JUMLAH HARGA BAHAN 1,400,000.00


C PERALATAN
Peralatan potong pipa hari 0.037 25,000.00 925.00
T1/manual (gergaji) /saw

JUMLAH HARGA ALAT 925.00


D Jumlah (A+B+C) 1,436,873.77
E Overhead & Profit (10 %) 10% x D (maksimum) 143,687.38
F Harga Satuan Pekerjaan (D+E) 1,580,561.15

Page 206
A.8.4.2.8 (K3) Pemotongan 1 buah pipa PVC Ø 400 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.331 143,119.40 47,372.52
Tukang pipa L.02 OH 0.166 147,992.00 24,566.67
Mandor L.04 OH 0.033 157,992.00 5,213.74

JUMLAH TENAGA KERJA 77,152.93


B BAHAN
Pipa PVC Ø 400 mm buah 1.000 2,000,480.00 2,000,480.00
JUMLAH HARGA BAHAN 2,000,480.00
C PERALATAN
Peralatan potong pipa hari 0.086 25,000.00 2,150.00
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT 2,150.00
D Jumlah (A+B+C) 2,079,782.93
E Overhead & Profit (10 %) 10% x D (maksimum) 207,978.29
F Harga Satuan Pekerjaan (D+E) 2,287,761.22

A.8.4.2.9 (K3) Pemotongan 1 buah pipa PVC Ø 450 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.420 143,119.40 60,110.15
Tukang pipa L.02 OH 0.210 147,992.00 31,078.32
Mandor L.04 OH 0.042 157,992.00 6,635.66

JUMLAH TENAGA KERJA 97,824.13


B BAHAN
Pipa PVC Ø 450 mm buah 1.000 2,814,560.00 2,814,560.00

JUMLAH HARGA BAHAN 2,814,560.00


C PERALATAN
Peralatan potong pipa hari 0.054 25,000.00 1,350.00
T2/mekanik circular saw

JUMLAH HARGA ALAT 1,350.00


D Jumlah (A+B+C) 2,913,734.13
E Overhead & Profit (10 %) 10% x D (maksimum) 291,373.41
F Harga Satuan Pekerjaan (D+E) 3,205,107.55

A.8.4.2.10 (K3) Pemotongan 1 buah pipa PVC Ø 500 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.518 143,119.40 74,135.85
Tukang pipa L.02 OH 0.259 147,992.00 38,329.93
Mandor L.04 OH 0.052 157,992.00 8,215.58

JUMLAH TENAGA KERJA 120,681.36


B BAHAN
Pipa PVC Ø 500 mm buah 1.000 3,518,120.00 3,518,120.00

JUMLAH HARGA BAHAN 3,518,120.00


C PERALATAN
Peralatan potong pipa hari 0.069 50,000.00 3,450.00
T2/mekanik circular saw

JUMLAH HARGA ALAT 3,450.00


D Jumlah (A+B+C) 3,642,251.36
E Overhead & Profit (10 %) 10% x D (maksimum) 364,225.14
F Harga Satuan Pekerjaan (D+E) 4,006,476.50

Page 207
A.8.4.2.11 (K3) Pemotongan 1 buah pipa PVC Ø 600 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.623 143,119.40 89,163.39
Tukang pipa L.02 OH 0.311 147,992.00 46,025.51
Mandor L.04 OH 0.062 157,992.00 9,795.50

JUMLAH TENAGA KERJA 144,984.40


B BAHAN
Pipa PVC Ø 600 mm buah 1.000 4,221,680.00 4,221,680.00
JUMLAH HARGA BAHAN 4,221,680.00
C PERALATAN
Peralatan potong pipa hari 0.086 50,000.00 4,300.00
T2/mekanik circular saw

JUMLAH HARGA ALAT 4,300.00


D Jumlah (A+B+C) 4,370,964.40
E Overhead & Profit (10 %) 10% x D (maksimum) 437,096.44
F Harga Satuan Pekerjaan (D+E) 4,808,060.84

A.8.4.2.12 (K3) Pemotongan 1 buah pipa PVC Ø 800 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.089 143,119.40 155,857.03
Tukang pipa L.02 OH 0.545 147,992.00 80,655.64
Mandor L.04 OH 0.109 157,992.00 17,221.13

JUMLAH TENAGA KERJA 253,733.79


B BAHAN
Pipa PVC Ø 800 mm buah 1.000 4,925,330.00 4,925,330.00

JUMLAH HARGA BAHAN 4,925,330.00


C PERALATAN
Peralatan potong pipa hari 0.160 50,000.00 8,000.00
T2/mekanik circular saw

JUMLAH HARGA ALAT 8,000.00


D Jumlah (A+B+C) 5,187,063.79
E Overhead & Profit (10 %) 10% x D (maksimum) 518,706.38
F Harga Satuan Pekerjaan (D+E) 5,705,770.17

A.8.4.2.13 (K3) Pemotongan 1 buah pipa PVC Ø 900 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.141 143,119.40 163,299.24
Tukang pipa L.02 OH 0.571 147,992.00 84,503.43
Mandor L.04 OH 0.114 157,992.00 18,011.09
JUMLAH TENAGA KERJA 265,813.76
B BAHAN
Pipa PVC Ø 900 mm buah 1.000 5,628,890.00 5,628,890.00
JUMLAH HARGA BAHAN 5,628,890.00
C PERALATAN
Peralatan potong pipa hari 0.168 50,000.00 8,400.00
T2/mekanik circular saw
JUMLAH HARGA ALAT 8,400.00
D Jumlah (A+B+C) 5,903,103.76
E Overhead & Profit (10 %) 10% x D (maksimum) 590,310.38
F Harga Satuan Pekerjaan (D+E) 6,493,414.13

A.8.4.2.14 (K3) Pemotongan 1 buah pipa PVC Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.285 143,119.40 183,908.43
Tukang pipa L.02 OH 0.643 147,992.00 95,158.86
Mandor L.04 OH 0.129 157,992.00 20,380.97
JUMLAH TENAGA KERJA 299,448.25
B BAHAN
Pipa PVC Ø 1000 mm buah 1.000 6,332,450.00 6,332,450.00
JUMLAH HARGA BAHAN 6,332,450.00
C PERALATAN

Page 208
Peralatan potong pipa hari 0.191 50,000.00 9,550.00
T2/mekanik circular saw
JUMLAH HARGA ALAT 9,550.00
D Jumlah (A+B+C) 6,641,448.25
E Overhead & Profit (10 %) 10% x D (maksimum) 664,144.83
F Harga Satuan Pekerjaan (D+E) 7,305,593.08

Page 209
A.8.4.2.15 (K3) Pemotongan 1 buah pipa PVC Ø 1100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.429 143,119.40 204,517.62
Tukang pipa L.02 OH 0.715 147,992.00 105,814.28
Mandor L.04 OH 0.143 157,992.00 22,592.86
JUMLAH TENAGA KERJA 332,924.76
B BAHAN
Pipa PVC Ø 1100 mm buah 1.000 7,036,010.00 7,036,010.00
JUMLAH HARGA BAHAN 7,036,010.00
C PERALATAN
Peralatan potong pipa hari 0.213 50,000.00 10,650.00
T2/mekanik circular saw
JUMLAH HARGA ALAT 10,650.00
D Jumlah (A+B+C) 7,379,584.76
E Overhead & Profit (10 %) 10% x D (maksimum) 737,958.48
F Harga Satuan Pekerjaan (D+E) 8,117,543.23

A.8.4.2.16 (K3) Pemotongan 1 buah pipa PVC Ø 1200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.573 143,119.40 225,126.82
Tukang pipa L.02 OH 0.787 147,992.00 116,469.70
Mandor L.04 OH 0.157 157,992.00 24,804.74
JUMLAH TENAGA KERJA 366,401.26
B BAHAN
Pipa PVC Ø 1200 mm buah 1.000 7,739,570.00 7,739,570.00
JUMLAH HARGA BAHAN 7,739,570.00
C PERALATAN
Peralatan potong pipa hari 0.236 -
T2/mekanik circular saw
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 8,105,971.26
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 810,597.13
F Harga Satuan Pekerjaan (D+E) 8,916,568.39

A.8.4.2.17 (K3) Pemotongan 1 buah pipa HDPE Ø 63 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.002 143,119.40 286.24
Tukang pipa L.02 OH 0.001 147,992.00 147.99
Mandor L.04 OH 0.000 157,992.00 31.60
Operator L.08 OH 0.034 25,413.00 864.04
JUMLAH TENAGA KERJA 1,329.87
B BAHAN
Pipa HDPE Ø 63 mm buah 1.000 77,150.00 77,150.00
JUMLAH HARGA BAHAN 77,150.00
C PERALATAN
Peralatan potong pipa hari 0.004 50,000.00 200.00
T2/mekanik circular saw
JUMLAH HARGA ALAT 200.00
D Jumlah (A+B+C) 78,679.87
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 7,867.99
F Harga Satuan Pekerjaan (D+E) 86,547.86

A.8.4.2.18 (K3) Pemotongan 1 buah pipa HDPE Ø 100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.006 143,119.40 858.72
Tukang pipa L.02 OH 0.003 147,992.00 443.98
Mandor L.04 OH 0.001 157,992.00 157.99
Operator L.08 OH 0.071 25,413.00 1,804.32
JUMLAH TENAGA KERJA 3,265.01

B BAHAN
Pipa HDPE Ø 100 mm buah 1.000 97,450.00 97,450.00
JUMLAH HARGA BAHAN 97,450.00

C PERALATAN

Page 210
Peralatan potong pipa hari 0.005 50,000.00 250.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 250.00
D Jumlah (A+B+C) 100,965.01
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 10,096.50
F Harga Satuan Pekerjaan (D+E) 111,061.51

Page 211
A.8.4.2.19 (K3) Pemotongan 1 buah pipa HDPE Ø 125 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.009 143,119.40 1,288.07
Tukang pipa L.02 OH 0.005 147,992.00 739.96
Mandor L.04 OH 0.001 157,992.00 157.99
Operator L.08 OH 0.096 25,413.00 2,439.65
JUMLAH TENAGA KERJA 4,625.67
B BAHAN
Pipa HDPE Ø 125 mm buah 1.000 160,000.00 160,000.00
JUMLAH HARGA BAHAN 160,000.00
C PERALATAN
Peralatan potong pipa hari 0.006 50,000.00 300.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 300.00
D Jumlah (A+B+C) 164,925.67
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 16,492.57
F Harga Satuan Pekerjaan (D+E) 181,418.24

A.8.4.2.20 (K3) Pemotongan 1 buah pipa HDPE Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.016 143,119.40 2,289.91
Tukang pipa L.02 OH 0.008 147,992.00 1,183.94
Mandor L.04 OH 0.002 157,992.00 315.98
Operator L.08 OH 0.121 25,413.00 3,074.97
JUMLAH TENAGA KERJA 6,864.80

B BAHAN
Pipa HDPE Ø 150 mm buah 1.000 248,500.00 248,500.00
JUMLAH HARGA BAHAN 248,500.00

C PERALATAN
Peralatan potong pipa hari 0.009 50,000.00 450.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 450.00
D Jumlah (A+B+C) 255,814.80
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 25,581.48
F Harga Satuan Pekerjaan (D+E) 281,396.28

A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.044 143,119.40 6,297.25
Tukang pipa L.02 OH 0.022 147,992.00 3,255.82
Mandor L.04 OH 0.004 157,992.00 631.97
Operator L.08 OH 0.171 25,413.00 4,345.62
JUMLAH TENAGA KERJA 14,530.67
B BAHAN
Pipa HDPE Ø 200 mm buah 1.000 387,850.00 387,850.00
JUMLAH HARGA BAHAN 387,850.00
C PERALATAN
Peralatan potong pipa hari 0.017 50,000.00 850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 850.00
D Jumlah (A+B+C) 403,230.67
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 40,323.07
F Harga Satuan Pekerjaan (D+E) 443,553.74

A.8.4.2.22 (K3) Pemotongan 1 buah pipaHDPE Ø 250 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.067 143,119.40 9,589.00
Tukang pipa L.02 OH 0.033 147,992.00 4,883.74
Mandor L.04 OH 0.007 157,992.00 1,105.94
Operator L.08 OH 0.221 25,413.00 5,616.27
JUMLAH TENAGA KERJA 21,194.95
B BAHAN
Pipa HDPE Ø 250 mm buah 1.000 616,050.00 616,050.00
JUMLAH HARGA BAHAN 616,050.00
C PERALATAN

Page 212
Peralatan potong pipa hari 0.023 50,000.00 1,150.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 1,150.00
D Jumlah (A+B+C) 638,394.95
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 63,839.50
F Harga Satuan Pekerjaan (D+E) 702,234.45

A.8.4.2.23 (K3) Pemotongan 1 buah pipa HDPE Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.090 143,119.40 12,880.75
Tukang pipa L.02 OH 0.045 147,992.00 6,659.64
Mandor L.04 OH 0.009 157,992.00 1,421.93
Operator L.08 OH 0.271 25,413.00 6,886.92

JUMLAH TENAGA KERJA 27,849.24


B BAHAN
Pipa HDPE Ø 300 mm buah 1.000 986,050.00 986,050.00

JUMLAH HARGA BAHAN 986,050.00


C PERALATAN
Peralatan potong pipa hari 0.030 50,000.00 1,500.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 1,500.00
D Jumlah (A+B+C) 1,015,399.24
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 101,539.92
F Harga Satuan Pekerjaan (D+E) 1,116,939.16

A.8.4.2.24 (K3) Pemotongan 1 buah pipa HDPE Ø 400 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.177 143,119.40 25,332.13
Tukang pipa L.02 OH 0.088 147,992.00 13,023.30
Mandor L.04 OH 0.018 157,992.00 2,843.86
Operator L.08 OH 0.371 25,413.00 9,428.22
JUMLAH TENAGA KERJA 50,627.51

B BAHAN
Pipa HDPE Ø 400 mm buah 1.000 1,246,800.00 1,246,800.00
JUMLAH HARGA BAHAN 1,246,800.00
C PERALATAN
Peralatan potong pipa hari 0.055 50,000.00 2,750.00
T2/manual (gergaji) /saw

JUMLAH HARGA ALAT 2,750.00


D Jumlah (A+B+C) 1,300,177.51
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 130,017.75
F Harga Satuan Pekerjaan (D+E) 1,430,195.26

A.8.4.2.25 (K3) Pemotongan 1 buah pipa HDPE Ø 450 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.225 143,119.40 32,201.87
Tukang pipa L.02 OH 0.113 147,992.00 16,723.10
Mandor L.04 OH 0.023 157,992.00 3,633.82
Operator L.08 OH 0.421 25,413.00 10,698.87

JUMLAH TENAGA KERJA 63,257.65


B BAHAN
Pipa HDPE Ø 450 mm buah 1.000 1,537,950.00 1,537,950.00
JUMLAH HARGA BAHAN 1,537,950.00
C PERALATAN
Peralatan potong pipa hari 0.070 50,000.00 3,500.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 3,500.00
D Jumlah (A+B+C) 1,604,707.65
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 160,470.77
F Harga Satuan Pekerjaan (D+E) 1,765,178.42

Page 213
A.8.4.2.26 (K3) Pemotongan 1 buah pipa HDPE Ø 500 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.277 143,119.40 l
Tukang pipa L.02 OH 0.139 147,992.00 20,570.89
Mandor L.04 OH 0.028 157,992.00 4,423.78
Operator L.08 OH 0.471 25,413.00 11,969.52
JUMLAH TENAGA KERJA 36,964.19
B BAHAN
Pipa HDPE Ø 500 mm buah 1.000 2,662,500.00 2,662,500.00
JUMLAH HARGA BAHAN 2,662,500.00
C PERALATAN
Peralatan potong pipa hari 0.085 50,000.00 4,250.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 4,250.00
D Jumlah (A+B+C) 2,703,714.19
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 270,371.42
F Harga Satuan Pekerjaan (D+E) 2,974,085.61

A.8.4.2.27 (K3) Pemotongan 1 buah pipa HDPE Ø 600 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.333 143,119.40 47,658.76
Tukang pipa L.02 OH 0.167 147,992.00 24,714.66
Mandor L.04 OH 0.033 157,992.00 5,213.74
Operator L.08 OH 0.571 25,413.00 14,510.82
JUMLAH TENAGA KERJA 92,097.98
B BAHAN
Pipa HDPE Ø 600 mm buah 1.000 3,231,300.00 3,231,300.00
JUMLAH HARGA BAHAN 3,231,300.00
C PERALATAN
Peralatan potong pipa hari 0.101 50,000.00 5,050.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 5,050.00
D Jumlah (A+B+C) 3,328,447.98
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 332,844.80
F Harga Satuan Pekerjaan (D+E) 3,661,292.78

A.8.4.2.28 (K3) Pemotongan 1 buah pipa HDPE Ø 800 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.601 143,119.40 86,014.76
Tukang pipa L.02 OH 0.301 147,992.00 44,545.59
Mandor L.04 OH 0.060 157,992.00 9,479.52
Operator L.08 OH 0.771 25,413.00 19,593.42
JUMLAH TENAGA KERJA 159,633.29

B BAHAN
Pipa HDPE Ø 800 mm buah 1.000 3,442,750.00 3,442,750.00
JUMLAH HARGA BAHAN 3,442,750.00

C PERALATAN
Peralatan potong pipa hari 0.179 50,000.00 8,950.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 8,950.00
D Jumlah (A+B+C) 3,611,333.29
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 361,133.33
F Harga Satuan Pekerjaan (D+E) 3,972,466.62

Page 214
A.8.4.2.29 (K3) Pemotongan 1 buah pipa HDPE Ø 900 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.913 143,119.40 130,668.01
Tukang pipa L.02 OH 0.456 147,992.00 67,484.35
Mandor L.04 OH 0.091 157,992.00 14,377.27
Operator L.08 OH 0.871 25,413.00 22,134.72
JUMLAH TENAGA KERJA 234,664.36

B BAHAN
Pipa HDPE Ø 900 mm buah 1.000 3,704,700.00 3,704,700.00
JUMLAH HARGA BAHAN 3,704,700.00

C PERALATAN
Peralatan potong pipa hari 0.270 50,000.00 13,500.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 13,500.00
D Jumlah (A+B+C) 3,952,864.36
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 395,286.44
F Harga Satuan Pekerjaan (D+E) 4,348,150.80

A.8.4.2.30 (K3) Pemotongan 1 buah pipa HDPE Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.125 143,119.40 161,009.33
Tukang pipa L.02 OH 0.562 147,992.00 83,171.50
Mandor L.04 OH 0.112 157,992.00 17,695.10
Operator L.08 OH 0.971 25,413.00 24,676.02
JUMLAH TENAGA KERJA 286,551.96

B BAHAN
Pipa HDPE Ø 1000 mm buah 1.000 3,854,700.00 3,854,700.00
JUMLAH HARGA BAHAN 3,854,700.00

C PERALATAN
Peralatan potong pipa hari 0.332 50,000.00 16,600.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 16,600.00
D Jumlah (A+B+C) 4,157,851.96
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 415,785.20
F Harga Satuan Pekerjaan (D+E) 4,573,637.15

A.8.4.2.31 (K3) Pemotongan 1 buah pipa HDPE Ø 1100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.238 143,119.40 177,181.82
Tukang pipa L.02 OH 0.619 147,992.00 91,607.05
Mandor L.04 OH 0.124 157,992.00 19,591.01
Operator L.08 OH 1.071 25,413.00 27,217.32
JUMLAH TENAGA KERJA 315,597.20
B BAHAN
Pipa HDPE Ø 1100 mm buah 1.000 4,204,700.00 4,204,700.00
JUMLAH HARGA BAHAN 4,204,700.00
C PERALATAN
Peralatan potong pipa hari 0.365 50,000.00 18,250.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 18,250.00
D Jumlah (A+B+C) 4,538,547.20
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 453,854.72
F Harga Satuan Pekerjaan (D+E) 4,992,401.92

Page 215
A.8.4.2.32 (K3) Pemotongan 1 buah pipa HDPE Ø 1200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.619 143,119.40 231,710.31
Tukang pipa L.02 OH 0.809 147,992.00 119,725.53
Mandor L.04 OH 0.162 157,992.00 25,594.70
Operator L.08 OH 1.171 25,413.00 29,758.62
JUMLAH TENAGA KERJA 406,789.16

B BAHAN
Pipa HDPE Ø 1200 mm buah 1.000 4,654,700.00 4,654,700.00
JUMLAH HARGA BAHAN 4,654,700.00

C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 5,085,339.16
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 508,533.92
F Harga Satuan Pekerjaan (D+E) 5,593,873.08

A.8.4.2.33 (K3) Pemotongan 1 buah pipa GIP Ø 63 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.019 143,119.40 2,719.27
Tukang pipa L.02 OH 0.010 147,992.00 1,479.92
Mandor L.04 OH 0.002 157,992.00 315.98
JUMLAH TENAGA KERJA 4,515.17
B BAHAN
Pipa GIP Ø 63 mm buah 1.000 472,287.00 472,287.00
JUMLAH HARGA BAHAN 472,287.00
C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 500,652.17
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 50,065.22
F Harga Satuan Pekerjaan (D+E) 550,717.39

A.8.4.2.34 (K3) Pemotongan 1 buah pipa GIP Ø 100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.058 143,119.40 8,300.93
Tukang pipa L.02 OH 0.029 147,992.00 4,291.77
Mandor L.04 OH 0.006 157,992.00 947.95
JUMLAH TENAGA KERJA 13,540.65

B BAHAN
Pipa GIP Ø 100 mm buah 1.000 973,681.00 973,681.00
JUMLAH HARGA BAHAN 973,681.00
C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 1,011,071.65
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 101,107.16
F Harga Satuan Pekerjaan (D+E) 1,112,178.81

Page 216
A.8.4.2.35 (K3) Pemotongan 1 buah pipa GIP Ø 125 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.092 143,119.40 13,166.98
Tukang pipa L.02 OH 0.046 147,992.00 6,807.63
Mandor L.04 OH 0.009 157,992.00 1,421.93
JUMLAH TENAGA KERJA 21,396.54

B BAHAN
Pipa GIP Ø 125 mm buah 1.000 1,432,801.00 1,432,801.00
JUMLAH HARGA BAHAN 1,432,801.00

C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw

JUMLAH HARGA ALAT 23,850.00


D Jumlah (A+B+C) 1,478,047.54
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 147,804.75
F Harga Satuan Pekerjaan (D+E) 1,625,852.30

A.8.4.2.36 (K3) Pemotongan 1 buah pipa GIP Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.131 143,119.40 18,748.64
Tukang pipa L.02 OH 0.066 147,992.00 9,767.47
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 30,570.01

B BAHAN
Pipa GIP Ø 150 mm buah 1.000 1,784,983.00 1,784,983.00
JUMLAH HARGA BAHAN 1,784,983.00

C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw

JUMLAH HARGA ALAT 23,850.00


D Jumlah (A+B+C) 1,839,403.01
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 183,940.30
F Harga Satuan Pekerjaan (D+E) 2,023,343.31

A.8.4.2.37 (K3) Pemotongan 1 buah pipa GIP Ø 200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.340 143,119.40 48,660.60
Tukang pipa L.02 OH 0.170 147,992.00 25,158.64
Mandor L.04 OH 0.034 157,992.00 5,371.73

JUMLAH TENAGA KERJA 79,190.96


B BAHAN
Pipa GIP Ø 200 mm buah 1.000 2,519,662.00 2,519,662.00

JUMLAH HARGA BAHAN 2,519,662.00


C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw

JUMLAH HARGA ALAT 23,850.00


D Jumlah (A+B+C) 2,622,702.96
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 262,270.30
F Harga Satuan Pekerjaan (D+E) 2,884,973.26

Page 217
A.8.4.2.38 (K3) Pemotongan 1 buah pipa GIP Ø 250 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.475 143,119.40 67,981.72
Tukang pipa L.02 OH 0.237 147,992.00 35,074.10
Mandor L.04 OH 0.047 157,992.00 7,425.62

JUMLAH TENAGA KERJA 110,481.44


B BAHAN
Pipa GIP Ø 250 mm buah 1.000 3,793,758.00 3,793,758.00

JUMLAH HARGA BAHAN 3,793,758.00


C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw

JUMLAH HARGA ALAT 23,850.00


D Jumlah (A+B+C) 3,928,089.44
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 392,808.94
F Harga Satuan Pekerjaan (D+E) 4,320,898.39

A.8.4.2.39 (K3) Pemotongan 1 buah pipa GIP Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.504 143,119.40 72,132.18
Tukang pipa L.02 OH 0.252 147,992.00 37,293.98
Mandor L.04 OH 0.050 157,992.00 7,899.60
JUMLAH TENAGA KERJA 117,325.76
B BAHAN
Pipa GIP Ø 300 mm buah 1.000 5,377,240.00 5,377,240.00
JUMLAH HARGA BAHAN 5,377,240.00
C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 5,518,415.76
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 551,841.58
F Harga Satuan Pekerjaan (D+E) 6,070,257.34

A.8.4.2.40 (K3) Pemotongan 1 buah pipa GIP Ø 400 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.738 143,119.40 105,622.12
Tukang pipa L.02 OH 0.369 147,992.00 54,609.05
Mandor L.04 OH 0.074 157,992.00 11,691.41

JUMLAH TENAGA KERJA 171,922.57


B BAHAN
Pipa GIP Ø 400 mm buah 1.000 7,108,727.00 7,108,727.00
JUMLAH HARGA BAHAN 7,108,727.00
C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw

JUMLAH HARGA ALAT 23,850.00


D Jumlah (A+B+C) 7,304,499.57
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 730,449.96
F Harga Satuan Pekerjaan (D+E) 8,034,949.53

Page 218
A.8.4.2.41 (K3) Pemotongan 1 buah pipa GIP Ø 450 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.848 143,119.40 121,365.25
Tukang pipa L.02 OH 0.424 147,992.00 62,748.61
Mandor L.04 OH 0.085 157,992.00 13,429.32
JUMLAH TENAGA KERJA 197,543.18

B BAHAN
Pipa GIP Ø 450 mm buah 1.000 8,430,078.00 8,430,078.00
JUMLAH HARGA BAHAN 8,430,078.00

C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 8,651,471.18
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 865,147.12
F Harga Satuan Pekerjaan (D+E) 9,516,618.30

A.8.4.2.42 (K3) Pemotongan 1 buah pipa GIP Ø 500 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.941 143,119.40 134,675.36
Tukang pipa L.02 OH 0.471 147,992.00 69,704.23
Mandor L.04 OH 0.094 157,992.00 14,851.25
JUMLAH TENAGA KERJA 219,230.84

B BAHAN
Pipa GIP Ø 500 mm buah 1.000 10,993,428.00 10,993,428.00
JUMLAH HARGA BAHAN 10,993,428.00

C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 11,236,508.84
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 1,123,650.88
F Harga Satuan Pekerjaan (D+E) 12,360,159.72

A.8.4.2.43 (K3) Pemotongan1 buah pipa GIP Ø 600 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.864 143,119.40 123,655.16
Tukang pipa L.02 OH 0.432 147,992.00 63,932.54
Mandor L.04 OH 0.086 157,992.00 13,587.31

JUMLAH TENAGA KERJA 201,175.02

B BAHAN
Pipa GIP Ø 600 mm buah 1.000 13,897,369.00 13,897,369.00
JUMLAH HARGA BAHAN 13,897,369.00

C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 14,122,394.02
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 1,412,239.40
F Harga Satuan Pekerjaan (D+E) 15,534,633.42

Page 219
A.8.4.2.44 (K3) Pemotongan 1 buah pipa GIP Ø 800 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.567 143,119.40 224,268.10
Tukang pipa L.02 OH 0.783 147,992.00 115,877.74
Mandor L.04 OH 0.157 157,992.00 24,804.74

JUMLAH TENAGA KERJA 364,950.58

B BAHAN
Pipa GIP Ø 800 mm buah 1.000 16,353,727.00 16,353,727.00
JUMLAH HARGA BAHAN 16,353,727.00
C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 16,742,527.58
E Overhead & Profit (10 %) 10% x D (maksimum) 1,674,252.76
F Harga Satuan Pekerjaan (D+E) 18,416,780.34

A.8.4.2.45 (K3) Pemotongan 1 buah pipa GIP Ø 900 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.770 143,119.40 253,321.34
Tukang pipa L.02 OH 0.885 147,992.00 130,972.92
Mandor L.04 OH 0.177 157,992.00 27,964.58
JUMLAH TENAGA KERJA 412,258.84

B BAHAN
Pipa GIP Ø 900 mm buah 1.000 18,810,085.00 18,810,085.00
JUMLAH HARGA BAHAN 18,810,085.00
C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 19,246,193.84
E Overhead & Profit (10 %) 10% x D (maksimum) 1,924,619.38
F Harga Satuan Pekerjaan (D+E) 21,170,813.23

A.8.4.2.46 (K3) Pemotongan 1 buah pipa GIP Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.974 143,119.40 282,517.70
Tukang pipa L.02 OH 0.987 147,992.00 146,068.10
Mandor L.04 OH 0.197 157,992.00 31,124.42
JUMLAH TENAGA KERJA 459,710.22
B BAHAN
Pipa GIP Ø 1000 mm buah 1.000 21,266,443.00 21,266,443.00
JUMLAH HARGA BAHAN 21,266,443.00
C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 21,750,003.22
E Overhead & Profit (10 %) 10% x D (maksimum) 2,175,000.32
F Harga Satuan Pekerjaan (D+E) 23,925,003.55

A.8.4.2.47 (K3) Pemotongan 1 buah pipa GIP Ø 1100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.178 143,119.40 311,714.05
Tukang pipa L.02 OH 1.089 147,992.00 161,163.29
Mandor L.04 OH 0.218 157,992.00 34,442.26
JUMLAH TENAGA KERJA 507,319.60

B BAHAN
Pipa GIP Ø 1100 mm buah 1.000 23,722,801.00 23,722,801.00
JUMLAH HARGA BAHAN 23,722,801.00

C PERALATAN

Page 220
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 24,253,970.60
E Overhead & Profit (10 %) 10% x D (maksimum) 2,425,397.06
F Harga Satuan Pekerjaan (D+E) 26,679,367.66

Page 221
A.8.4.2.48 (K3) Pemotongan 1 buah pipa GIP Ø 1200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.382 143,119.40 340,910.41
Tukang pipa L.02 OH 1.191 147,992.00 176,258.47
Mandor L.04 OH 0.238 157,992.00 37,602.10
JUMLAH TENAGA KERJA 554,770.98

B BAHAN
Pipa GIP Ø 1200 mm buah 1.000 26,179,159.00 26,179,159.00
JUMLAH HARGA BAHAN 26,179,159.00
C PERALATAN
Peralatan potong pipa hari 0.477 50,000.00 23,850.00
T2/manual (gergaji) /saw
JUMLAH HARGA ALAT 23,850.00
D Jumlah (A+B+C) 26,757,779.98
E Overhead & Profit (10 %) 10% x D (maksimum) 2,675,778.00
F Harga Satuan Pekerjaan (D+E) 29,433,557.98

A.8.4.2.49 (K3) Pemotongan 1 buah pipa DCI Ø 100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.071 143,119.40 10,161.48
Tukang pipa L.02 OH 0.014 147,992.00 2,071.89
Mandor L.04 OH 0.007 157,992.00 1,105.94
JUMLAH TENAGA KERJA 13,339.31
B BAHAN
Pipa DCI Ø 100 mm buah 1.000 122,000.00 122,000.00
JUMLAH HARGA BAHAN 122,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.003 625,000.00 1,875.00
crane 2 T
JUMLAH HARGA ALAT 1,875.00
D Jumlah (A+B+C) 137,214.31
E Overhead & Profit (10 %) 10% x D (maksimum) 13,721.43
F Harga Satuan Pekerjaan (D+E) 150,935.74

A.8.4.2.50 (K3) Pemotongan 1 buah pipa DCI Ø 125 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.112 143,119.40 16,029.37
Tukang pipa L.02 OH 0.022 147,992.00 3,255.82
Mandor L.04 OH 0.011 157,992.00 1,737.91
JUMLAH TENAGA KERJA 21,023.11
B BAHAN
Pipa DCI Ø 125 mm buah 1.000 274,400.00 274,400.00
JUMLAH HARGA BAHAN 274,400.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.010 625,000.00 6,250.00
crane 2 T
JUMLAH HARGA ALAT 6,250.00
D Jumlah (A+B+C) 301,673.11
E Overhead & Profit (10 %) 10% x D (maksimum) 30,167.31
F Harga Satuan Pekerjaan (D+E) 331,840.42

A.8.4.2.51 (K3) Pemotongan 1 buah pipa DCI Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.159 143,119.40 22,755.98
Tukang pipa L.02 OH 0.032 147,992.00 4,735.74
Mandor L.04 OH 0.016 157,992.00 2,527.87
JUMLAH TENAGA KERJA 30,019.60
B BAHAN
Pipa DCI Ø 150 mm buah 1.000 488,300.00 488,300.00
JUMLAH HARGA BAHAN 488,300.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.018 625,000.00 11,250.00
crane 2 T
JUMLAH HARGA ALAT 11,250.00
D Jumlah (A+B+C) 529,569.60
E Overhead & Profit (10 %) 10% x D (maksimum) 52,956.96

Page 222
F Harga Satuan Pekerjaan (D+E) 582,526.56

Page 223
A.8.4.2.52 (K3) Pemotongan 1 buah pipa DCI Ø 200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.366 143,119.40 52,381.70
Tukang pipa L.02 OH 0.073 147,992.00 10,803.42
Mandor L.04 OH 0.037 157,992.00 5,845.70
JUMLAH TENAGA KERJA 69,030.82
B BAHAN
Pipa DCI Ø 200 mm buah 1.000 687,500.00 687,500.00
JUMLAH HARGA BAHAN 687,500.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.054 625,000.00 33,750.00
crane 2 T
JUMLAH HARGA ALAT 33,750.00
D Jumlah (A+B+C) 790,280.82
E Overhead & Profit (10 %) 10% x D (maksimum) 79,028.08
F Harga Satuan Pekerjaan (D+E) 869,308.90

A.8.4.2.53 (K3) Pemotongan 1 buah pipa DCI Ø 250 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.476 143,119.40 68,124.83
Tukang pipa L.02 OH 0.095 147,992.00 14,059.24
Mandor L.04 OH 0.048 157,992.00 7,583.62
JUMLAH TENAGA KERJA 89,767.69
B BAHAN
Pipa DCI Ø 250 mm buah 1.000 915,000.00 915,000.00
JUMLAH HARGA BAHAN 915,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.073 625,000.00 45,625.00
crane 2 T
JUMLAH HARGA ALAT 45,625.00
D Jumlah (A+B+C) 1,050,392.69
E Overhead & Profit (10 %) 10% x D (maksimum) 105,039.27
F Harga Satuan Pekerjaan (D+E) 1,155,431.96

A.8.4.2.54 (K3) Pemotongan 1 buah pipa DCI Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.512 143,119.40 73,277.13
Tukang pipa L.02 OH 0.102 147,992.00 15,095.18
Mandor L.04 OH 0.051 157,992.00 8,057.59
JUMLAH TENAGA KERJA 96,429.91
B BAHAN
Pipa DCI Ø 300 mm buah 1.000 1,175,000.00 1,175,000.00
JUMLAH HARGA BAHAN 1,175,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.079 625,000.00 49,375.00
crane 2 T
JUMLAH HARGA ALAT 49,375.00
D Jumlah (A+B+C) 1,320,804.91
E Overhead & Profit (10 %) 10% x D (maksimum) 132,080.49
F Harga Satuan Pekerjaan (D+E) 1,452,885.40

A.8.4.2.55 (K3) Pemotongan 1 buah pipa DCI Ø 400 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.941 143,119.40 134,675.36
Tukang pipa L.02 OH 0.188 147,992.00 27,822.50
Mandor L.04 OH 0.094 157,992.00 14,851.25
JUMLAH TENAGA KERJA 177,349.10
B BAHAN
Pipa DCI Ø 400 mm buah 1.000 2,162,500.00 2,162,500.00
JUMLAH HARGA BAHAN 2,162,500.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.158 625,000.00 98,750.00
crane 2 T
JUMLAH HARGA ALAT 98,750.00
D Jumlah (A+B+C) 2,438,599.10
E Overhead & Profit (10 %) 10% x D (maksimum) 243,859.91
F Harga Satuan Pekerjaan (D+E) 2,682,459.01

Page 224
A.8.4.2.56 (K3) Pemotongan 1 buah pipa DCI Ø 450 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.137 143,119.40 162,726.76
Tukang pipa L.02 OH 0.227 147,992.00 33,594.18
Mandor L.04 OH 0.114 157,992.00 18,011.09
JUMLAH TENAGA KERJA 214,332.03
B BAHAN
Pipa DCI Ø 450 mm buah 1.000 2,412,500.00 2,412,500.00
JUMLAH HARGA BAHAN 2,412,500.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.176 625,000.00 110,000.00
crane 2 T
JUMLAH HARGA ALAT 110,000.00
D Jumlah (A+B+C) 2,736,832.03
E Overhead & Profit (10 %) 10% x D (maksimum) 273,683.20
F Harga Satuan Pekerjaan (D+E) 3,010,515.23

A.8.4.2.57 (K3) Pemotongan 1 buah pipa DCI Ø 500 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.312 143,119.40 187,772.65
Tukang pipa L.02 OH 0.262 147,992.00 38,773.90
Mandor L.04 OH 0.131 157,992.00 20,696.95
JUMLAH TENAGA KERJA 247,243.51
B BAHAN
Pipa DCI Ø 500 mm buah 1.000 2,662,500.00 2,662,500.00
JUMLAH HARGA BAHAN 2,662,500.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.192 625,000.00 120,000.00
crane 2 T
JUMLAH HARGA ALAT 120,000.00
D Jumlah (A+B+C) 3,029,743.51
E Overhead & Profit (10 %) 10% x D (maksimum) 302,974.35
F Harga Satuan Pekerjaan (D+E) 3,332,717.86

A.8.4.2.58 (K3) Pemotongan 1 buah pipa DCI Ø 600 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.309 143,119.40 187,343.29
Tukang pipa L.02 OH 0.262 147,992.00 38,773.90
Mandor L.04 OH 0.131 157,992.00 20,696.95
JUMLAH TENAGA KERJA 246,814.15
B BAHAN
Pipa DCI Ø 600 mm buah 1.000 3,231,300.00 3,231,300.00
JUMLAH HARGA BAHAN 3,231,300.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.192 625,000.00 120,000.00
crane 2 T
JUMLAH HARGA ALAT 120,000.00
D Jumlah (A+B+C) 3,598,114.15
E Overhead & Profit (10 %) 10% x D (maksimum) 359,811.42
F Harga Satuan Pekerjaan (D+E) 3,957,925.57

A.8.4.2.59 (K3) Pemotongan 1 buah pipa DCI Ø 800 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.598 143,119.40 371,824.20
Tukang pipa L.02 OH 0.520 147,992.00 76,955.84
Mandor L.04 OH 0.260 157,992.00 41,077.92
JUMLAH TENAGA KERJA 489,857.96
B BAHAN
Pipa DCI Ø 800 mm buah 1.000 4,325,000.00 4,325,000.00
JUMLAH HARGA BAHAN 4,325,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.310 625,000.00 193,750.00
crane 2 T
JUMLAH HARGA ALAT 193,750.00
D Jumlah (A+B+C) 5,008,607.96
E Overhead & Profit (10 %) 10% x D (maksimum) 500,860.80
F Harga Satuan Pekerjaan (D+E) 5,509,468.76

Page 225
A.8.4.2.60 (K3) Pemotongan 1 buah pipa DCI Ø 900 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.370 143,119.40 482,312.38
Tukang pipa L.02 OH 0.674 147,992.00 99,746.61
Mandor L.04 OH 0.337 157,992.00 53,243.30
JUMLAH TENAGA KERJA 635,302.29
B BAHAN
Pipa DCI Ø 900 mm buah 1.000 4,575,000.00 4,575,000.00
JUMLAH HARGA BAHAN 4,575,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.381 625,000.00 238,125.00
crane 2 T
JUMLAH HARGA ALAT 238,125.00
D Jumlah (A+B+C) 5,448,427.29
E Overhead & Profit (10 %) 10% x D (maksimum) 544,842.73
F Harga Satuan Pekerjaan (D+E) 5,993,270.02

A.8.4.2.61 (K3) Pemotongan 1 buah pipa DCI Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.021 143,119.40 575,483.11
Tukang pipa L.02 OH 0.804 147,992.00 118,985.57
Mandor L.04 OH 0.402 157,992.00 63,512.78
JUMLAH TENAGA KERJA 757,981.46
B BAHAN
Pipa DCI Ø 1000 mm buah 1.000 5,400,000.00 5,400,000.00
JUMLAH HARGA BAHAN 5,400,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.441 625,000.00 275,625.00
crane 2 T
JUMLAH HARGA ALAT 275,625.00
D Jumlah (A+B+C) 6,433,606.46
E Overhead & Profit (10 %) 10% x D (maksimum) 643,360.65
F Harga Satuan Pekerjaan (D+E) 7,076,967.11

A.8.4.2.62 (K3) Pemotongan 1 buah pipa DCI Ø 1100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.731 143,119.40 677,097.88
Tukang pipa L.02 OH 0.946 147,992.00 140,000.43
Mandor L.04 OH 0.473 157,992.00 74,730.22
JUMLAH TENAGA KERJA 891,828.53
B BAHAN
Pipa DCI Ø 1100 mm buah 1.000 5,650,000.00 5,650,000.00
JUMLAH HARGA BAHAN 5,650,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.506 625,000.00 316,250.00
crane 2 T
JUMLAH HARGA ALAT 316,250.00
D Jumlah (A+B+C) 6,858,078.53
E Overhead & Profit (10 %) 10% x D (maksimum) 685,807.85
F Harga Satuan Pekerjaan (D+E) 7,543,886.38

A.8.4.2.63 (K3) Pemotongan 1 buah pipa DCI Ø 1200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 5.502 143,119.40 787,442.94
Tukang pipa L.02 OH 1.100 147,992.00 162,791.20
Mandor L.04 OH 0.550 157,992.00 86,895.60
JUMLAH TENAGA KERJA 1,037,129.74
B BAHAN
Pipa DCI Ø 1200 mm buah 1.000 5,900,000.00 5,900,000.00
JUMLAH HARGA BAHAN 5,900,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.576 625,000.00 360,000.00
crane 2 T
JUMLAH HARGA ALAT 360,000.00
D Jumlah (A+B+C) 7,297,129.74
E Overhead & Profit (10 %) 10% x D (maksimum) 729,712.97
F Harga Satuan Pekerjaan (D+E) 8,026,842.71

Page 226
A.8.4.2.64 (K3) Pemotongan 1 buah pipa baja Ø 63 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.028 143,119.40 4,007.34
Tukang pipa L.02 OH 0.006 147,992.00 887.95
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 5,369.27
B BAHAN
Pipa baja Ø 63 mm buah 1.000 311,080.00 311,080.00
JUMLAH HARGA BAHAN 311,080.00
C PERALATAN
Peralatan potong pipa hari 0.037 50,000.00 1,850.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 1,850.00
D Jumlah (A+B+C) 318,299.27
E Overhead & Profit (10 %) 10% x D (maksimum) 31,829.93
F Harga Satuan Pekerjaan (D+E) 350,129.20

A.8.4.2.65 (K3) Pemotongan 1 buah pipa baja Ø 100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.085 143,119.40 12,165.15
Tukang pipa L.02 OH 0.017 147,992.00 2,515.86
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 15,944.95
B BAHAN
Pipa baja Ø 100 mm buah 1.000 911,990.00 911,990.00
JUMLAH HARGA BAHAN 911,990.00
C PERALATAN
Peralatan potong pipa hari 0.040 50,000.00 2,000.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 2,000.00
D Jumlah (A+B+C) 929,934.95
E Overhead & Profit (10 %) 10% x D (maksimum) 92,993.49
F Harga Satuan Pekerjaan (D+E) 1,022,928.44

A.8.4.2.66 (K3) Pemotongan 1 buah pipa baja Ø 125 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.133 143,119.40 19,034.88
Tukang pipa L.02 OH 0.027 147,992.00 3,995.78
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 25,084.56
B BAHAN
Pipa baja Ø 125 mm buah 1.000 1,241,890.00 1,241,890.00
JUMLAH HARGA BAHAN 1,241,890.00
C PERALATAN
Peralatan potong pipa hari 0.042 50,000.00 2,100.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 2,100.00
D Jumlah (A+B+C) 1,269,074.56
E Overhead & Profit (10 %) 10% x D (maksimum) 126,907.46
F Harga Satuan Pekerjaan (D+E) 1,395,982.02

A.8.4.2.67 (K3) Pemotongan 1 buah pipa baja Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.184 143,119.40 26,333.97
Tukang pipa L.02 OH 0.037 147,992.00 5,475.70
Mandor L.04 OH 0.018 157,992.00 2,843.86
JUMLAH TENAGA KERJA 34,653.53
B BAHAN
Pipa baja Ø 150 mm buah 1.000 1,611,820.00 1,611,820.00
JUMLAH HARGA BAHAN 1,611,820.00
C PERALATAN
Peralatan potong pipa hari 0.045 50,000.00 2,250.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 2,250.00
D Jumlah (A+B+C) 1,648,723.53
E Overhead & Profit (10 %) 10% x D (maksimum) 164,872.35
F Harga Satuan Pekerjaan (D+E) 1,813,595.88

Page 227
A.8.4.2.68 (K3) Pemotongan 1 buah pipa baja Ø 200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.476 143,119.40 68,124.83
Tukang pipa L.02 OH 0.095 147,992.00 14,059.24
Mandor L.04 OH 0.048 157,992.00 7,583.62
JUMLAH TENAGA KERJA 89,767.69
B BAHAN
Pipa baja Ø 200 mm buah 1.000 2,421,350.00 2,421,350.00
JUMLAH HARGA BAHAN 2,421,350.00
C PERALATAN
Peralatan potong pipa hari 0.060 50,000.00 3,000.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 3,000.00
D Jumlah (A+B+C) 2,514,117.69
E Overhead & Profit (10 %) 10% x D (maksimum) 251,411.77
F Harga Satuan Pekerjaan (D+E) 2,765,529.46

A.8.4.2.69 (K3) Pemotongan 1 buah pipa baja Ø 250 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.663 143,119.40 94,888.16
Tukang pipa L.02 OH 0.133 147,992.00 19,682.94
Mandor L.04 OH 0.066 157,992.00 10,427.47
JUMLAH TENAGA KERJA 124,998.57
B BAHAN
Pipa baja Ø 250 mm buah 1.000 3,431,670.00 3,431,670.00
JUMLAH HARGA BAHAN 3,431,670.00
C PERALATAN
Peralatan potong pipa hari 0.068 50,000.00 3,400.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 3,400.00
D Jumlah (A+B+C) 3,560,068.57
E Overhead & Profit (10 %) 10% x D (maksimum) 356,006.86
F Harga Satuan Pekerjaan (D+E) 3,916,075.43

A.8.4.2.70 (K3) Pemotongan 1 buah pipa baja Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.745 143,119.40 106,623.95
Tukang pipa L.02 OH 0.149 147,992.00 22,050.81
Mandor L.04 OH 0.074 157,992.00 11,691.41
JUMLAH TENAGA KERJA 140,366.17
B BAHAN
Pipa baja Ø 300 mm buah 1.000 4,541,610.00 4,541,610.00
JUMLAH HARGA BAHAN 4,541,610.00
C PERALATAN
Peralatan potong pipa hari 0.072 50,000.00 3,600.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 3,600.00
D Jumlah (A+B+C) 4,685,576.17
E Overhead & Profit (10 %) 10% x D (maksimum) 468,557.62
F Harga Satuan Pekerjaan (D+E) 5,154,133.79

A.8.4.2.71 (K3) Pemotongan 1 buah pipa baja Ø 400 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.440 143,119.40 206,091.94
Tukang pipa L.02 OH 0.288 147,992.00 42,621.70
Mandor L.04 OH 0.144 157,992.00 22,750.85
JUMLAH TENAGA KERJA 271,464.48
B BAHAN
Pipa baja Ø 400 mm buah 1.000 7,028,100.00 7,028,100.00
JUMLAH HARGA BAHAN 7,028,100.00
C PERALATAN
Peralatan potong pipa hari 0.105 50,000.00 5,250.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 5,250.00
D Jumlah (A+B+C) 7,304,814.48
E Overhead & Profit (10 %) 10% x D (maksimum) 730,481.45
F Harga Satuan Pekerjaan (D+E) 8,035,295.93

Page 228
A.8.4.2.72 (K3) Pemotongan 1 buah pipa baja Ø 450 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.399 143,119.40 200,224.04
Tukang pipa L.02 OH 0.280 147,992.00 41,437.76
Mandor L.04 OH 0.140 157,992.00 22,118.88
JUMLAH TENAGA KERJA 263,780.68
B BAHAN
Pipa baja Ø 450 mm buah 1.000 8,881,600.00 8,881,600.00
JUMLAH HARGA BAHAN 8,881,600.00
C PERALATAN
Peralatan potong pipa hari 0.107 50,000.00 5,350.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 5,350.00
D Jumlah (A+B+C) 9,150,730.68
E Overhead & Profit (10 %) 10% x D (maksimum) 915,073.07
F Harga Satuan Pekerjaan (D+E) 10,065,803.75

A.8.4.2.73 (K3) Pemotongan 1 buah pipa baja Ø 500 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.558 143,119.40 222,980.03
Tukang pipa L.02 OH 0.312 147,992.00 46,173.50
Mandor L.04 OH 0.156 157,992.00 24,646.75
JUMLAH TENAGA KERJA 293,800.28
B BAHAN
Pipa baja Ø 500 mm buah 1.000 10,451,940.00 10,451,940.00
JUMLAH HARGA BAHAN 10,451,940.00
C PERALATAN
Peralatan potong pipa hari 0.107 50,000.00 5,350.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 5,350.00
D Jumlah (A+B+C) 10,751,090.28
E Overhead & Profit (10 %) 10% x D (maksimum) 1,075,109.03
F Harga Satuan Pekerjaan (D+E) 11,826,199.31

A.8.4.2.74 (K3) Pemotongan 1 buah pipa baja Ø 600 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.437 143,119.40 205,662.58
Tukang pipa L.02 OH 0.287 147,992.00 42,473.70
Mandor L.04 OH 0.144 157,992.00 22,750.85
JUMLAH TENAGA KERJA 270,887.13
B BAHAN
Pipa baja Ø 600 mm buah 1.000 10,851,940.00 10,851,940.00
JUMLAH HARGA BAHAN 10,851,940.00
C PERALATAN
Peralatan potong pipa hari 0.144 50,000.00 7,200.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 7,200.00
D Jumlah (A+B+C) 11,130,027.13
E Overhead & Profit (10 %) 10% x D (maksimum) 1,113,002.71
F Harga Satuan Pekerjaan (D+E) 12,243,029.84

A.8.4.2.75 (K3) Pemotongan 1 buah pipa baja Ø 800 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.624 143,119.40 375,545.31
Tukang pipa L.02 OH 0.525 147,992.00 77,695.80
Mandor L.04 OH 0.262 157,992.00 41,393.90
JUMLAH TENAGA KERJA 494,635.01
B BAHAN
Pipa baja Ø 800 mm buah 1.000 14,558,370.00 14,558,370.00
JUMLAH HARGA BAHAN 14,558,370.00
C PERALATAN
Peralatan potong pipa hari 0.166 50,000.00 8,300.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 8,300.00
D Jumlah (A+B+C) 15,061,305.01
E Overhead & Profit (10 %) 10% x D (maksimum) 1,506,130.50
F Harga Satuan Pekerjaan (D+E) 16,567,435.51

Page 229
A.8.4.2.76 (K3) Pemotongan 1 buah pipa baja Ø 900 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.971 143,119.40 425,207.74
Tukang pipa L.02 OH 0.594 147,992.00 87,907.25
Mandor L.04 OH 0.297 157,992.00 46,923.62
JUMLAH TENAGA KERJA 560,038.61
B BAHAN
Pipa baja Ø 900 mm buah 1.000 15,008,370.00 15,008,370.00
JUMLAH HARGA BAHAN 15,008,370.00
C PERALATAN
Peralatan potong pipa hari 0.183 50,000.00 9,150.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 9,150.00
D Jumlah (A+B+C) 15,577,558.61
E Overhead & Profit (10 %) 10% x D (maksimum) 1,557,755.86
F Harga Satuan Pekerjaan (D+E) 17,135,314.47

A.8.4.2.77 (K3) Pemotongan 1 buah pipa baja Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.319 143,119.40 475,013.29
Tukang pipa L.02 OH 0.664 147,992.00 98,266.69
Mandor L.04 OH 0.332 157,992.00 52,453.34
JUMLAH TENAGA KERJA 625,733.32
B BAHAN
Pipa baja Ø 1000 mm buah 1.000 15,458,370.00 15,458,370.00
JUMLAH HARGA BAHAN 15,458,370.00
C PERALATAN
Peralatan potong pipa hari 0.201 50,000.00 10,050.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 10,050.00
D Jumlah (A+B+C) 16,094,153.32
E Overhead & Profit (10 %) 10% x D (maksimum) 1,609,415.33
F Harga Satuan Pekerjaan (D+E) 17,703,568.65

A.8.4.2.78 (K3) Pemotongan 1 buah pipa baja Ø 1100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.667 143,119.40 524,818.84
Tukang pipa L.02 OH 0.733 147,992.00 108,478.14
Mandor L.04 OH 0.367 157,992.00 57,983.06
JUMLAH TENAGA KERJA 691,280.04
B BAHAN
Pipa baja Ø 1100 mm buah 1.000 15,958,370.00 15,958,370.00
JUMLAH HARGA BAHAN 15,958,370.00
C PERALATAN
Peralatan potong pipa hari 0.218 50,000.00 10,900.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 10,900.00
D Jumlah (A+B+C) 16,660,550.04
E Overhead & Profit (10 %) 10% x D (maksimum) 1,666,055.00
F Harga Satuan Pekerjaan (D+E) 18,326,605.04

A.8.4.2.79 (K3) Pemotongan 1 buah pipa baja Ø 1200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.015 143,119.40 574,624.39
Tukang pipa L.02 OH 0.803 147,992.00 118,837.58
Mandor L.04 OH 0.402 157,992.00 63,512.78
JUMLAH TENAGA KERJA 756,974.75
B BAHAN
Pipa baja Ø 1200 mm buah 1.000 16,458,370.00 16,458,370.00
JUMLAH HARGA BAHAN 16,458,370.00
C PERALATAN
Peralatan potong pipa hari 0.236 50,000.00 11,800.00
T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 11,800.00
D Jumlah (A+B+C) 17,227,144.75
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 1,722,714.48
F Harga Satuan Pekerjaan (D+E) 18,949,859.23

Page 230
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA
A.8.4.3.1 (K3) Pemasangan 1 buah Valve Ø 150 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.429 143,119.40 204,517.62
Tukang pipa L.02 OH 0.715 147,992.00 105,814.28
Mandor L.04 OH 0.143 157,992.00 22,592.86
JUMLAH TENAGA KERJA 332,924.76
B BAHAN
Valve Ø 150 mm buah 1.000 12,000.00 12,000.00
JUMLAH HARGA BAHAN 12,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.100 625,000.00 62,500.00
crane 2 T
JUMLAH HARGA ALAT 62,500.00
D Jumlah (A+B+C) 407,424.76
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 40,742.48
F Harga Satuan Pekerjaan (D+E) 448,167.23

A.8.4.3.2 (K3) Pemasangan 1 buah Valve Ø 200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.714 143,119.40 245,306.65
Tukang pipa L.02 OH 0.857 147,992.00 126,829.14
Mandor L.04 OH 0.171 157,992.00 27,016.63
JUMLAH TENAGA KERJA 399,152.43
B BAHAN
Valve Ø 200 mm buah 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 15,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.300 625,000.00 187,500.00
crane 2 T
JUMLAH HARGA ALAT 187,500.00
D Jumlah (A+B+C) 601,652.43
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 60,165.24
F Harga Satuan Pekerjaan (D+E) 661,817.67

A.8.4.3.3 (K3) Pemasangan 1 buah Valve Ø 250 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.714 143,119.40 245,306.65
Tukang pipa L.02 OH 0.857 147,992.00 126,829.14
Mandor L.04 OH 0.171 157,992.00 27,016.63
JUMLAH TENAGA KERJA 399,152.43
B BAHAN
Valve Ø 250 mm buah 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.400 625,000.00 250,000.00
crane 2 T
JUMLAH HARGA ALAT 250,000.00
D Jumlah (A+B+C) 669,152.43
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 66,915.24
F Harga Satuan Pekerjaan (D+E) 736,067.67

A.8.4.3.4 (K3) Pemasangan 1 buah Valve Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.000 143,119.40 286,238.80
Tukang pipa L.02 OH 1.000 147,992.00 147,992.00
Mandor L.04 OH 0.200 157,992.00 31,598.40
JUMLAH TENAGA KERJA 465,829.20
B BAHAN
Valve Ø 300 mm buah 1.000 26,000.00 26,000.00
JUMLAH HARGA BAHAN 26,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.500 625,000.00 312,500.00
crane 2 T
JUMLAH HARGA ALAT 312,500.00
D Jumlah (A+B+C) 804,329.20
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 80,432.92

Page 231
F Harga Satuan Pekerjaan (D+E) 884,762.12

Page 232
A.8.4.3.5 (K3) Pemasangan 1 buah Valve Ø 400 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.429 143,119.40 490,756.42
Tukang pipa L.02 OH 1.715 147,992.00 253,806.28
Mandor L.04 OH 0.343 157,992.00 54,191.26
JUMLAH TENAGA KERJA 798,753.96
B BAHAN
Valve Ø 400 mm buah 1.000 32,000.00 32,000.00
JUMLAH HARGA BAHAN 32,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.000 625,000.00 625,000.00
crane 2 T
JUMLAH HARGA ALAT 625,000.00
D Jumlah (A+B+C) 1,455,753.96
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 145,575.40
F Harga Satuan Pekerjaan (D+E) 1,601,329.35

A.8.4.3.6 (K3) Pemasangan 1 buah Valve Ø 450 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.429 143,119.40 490,756.42
Tukang pipa L.02 OH 1.715 147,992.00 253,806.28
Mandor L.04 OH 0.343 157,992.00 54,191.26
JUMLAH TENAGA KERJA 798,753.96
B BAHAN
Valve Ø 450 mm buah 1.000 19,170,000.00 19,170,000.00
JUMLAH HARGA BAHAN 19,170,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.000 625,000.00 625,000.00
crane 2 T
JUMLAH HARGA ALAT 625,000.00
D Jumlah (A+B+C) 20,593,753.96
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 2,059,375.40
F Harga Satuan Pekerjaan (D+E) 22,653,129.35

A.8.4.3.7 (K3) Pemasangan 1 buah Valve Ø 500 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.000 143,119.40 572,477.60
Tukang pipa L.02 OH 2.000 147,992.00 295,984.00
Mandor L.04 OH 0.400 157,992.00 63,196.80
JUMLAH TENAGA KERJA 931,658.40
B BAHAN
Valve Ø 500 mm buah 1.000 22,497,000.00 22,497,000.00
JUMLAH HARGA BAHAN 22,497,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.000 625,000.00 625,000.00
crane 2 T
JUMLAH HARGA ALAT 625,000.00
D Jumlah (A+B+C) 24,053,658.40
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 2,405,365.84
F Harga Satuan Pekerjaan (D+E) 26,459,024.24

A.8.4.3.8 (K3) Pemasangan 1 buah Valve Ø 600 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.421 143,119.40 203,372.67
Tukang pipa L.02 OH 0.711 147,992.00 105,222.31
Mandor L.04 OH 0.142 157,992.00 22,434.86
JUMLAH TENAGA KERJA 331,029.84
B BAHAN
Valve Ø 600 mm buah 1.000 26,157,000.00 26,157,000.00
JUMLAH HARGA BAHAN 26,157,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.600 625,000.00 375,000.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.300 140,000.00 42,000.00
JUMLAH HARGA ALAT 417,000.00
D Jumlah (A+B+C) 26,905,029.84
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 2,690,502.98

Page 233
F Harga Satuan Pekerjaan (D+E) 29,595,532.83

Page 234
A.8.4.3.9 (K3) Pemasangan 1 buah Valve Ø 700 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.429 143,119.40 204,517.62
Tukang pipa L.02 OH 0.715 147,992.00 105,814.28
Mandor L.04 OH 0.143 157,992.00 22,592.86
JUMLAH TENAGA KERJA 332,924.76
B BAHAN
Valve Ø 700 mm buah 1.000 30,540,000.00 30,540,000.00
JUMLAH HARGA BAHAN 30,540,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.500 625,000.00 312,500.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.500 140,000.00 70,000.00
JUMLAH HARGA ALAT 382,500.00
D Jumlah (A+B+C) 31,255,424.76
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 3,125,542.48
F Harga Satuan Pekerjaan (D+E) 34,380,967.23

A.8.4.3.10 (K3) Pemasangan 1 buah Valve Ø 800 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.786 143,119.40 255,611.25
Tukang pipa L.02 OH 0.893 147,992.00 132,156.86
Mandor L.04 OH 0.179 157,992.00 28,280.57
JUMLAH TENAGA KERJA 416,048.67
B BAHAN
Valve Ø 800 mm buah 1.000 32,940,000.00 32,940,000.00
JUMLAH HARGA BAHAN 32,940,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.500 625,000.00 312,500.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.500 140,000.00 70,000.00
JUMLAH HARGA ALAT 382,500.00
D Jumlah (A+B+C) 33,738,548.67
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 3,373,854.87
F Harga Satuan Pekerjaan (D+E) 37,112,403.54

A.8.4.3.11 (K3) Pemasangan 1 buah Valve Ø 900 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.714 143,119.40 245,306.65
Tukang pipa L.02 OH 0.857 147,992.00 126,829.14
Mandor L.04 OH 0.171 157,992.00 27,016.63
JUMLAH TENAGA KERJA 399,152.43
B BAHAN
Valve Ø 900 mm buah 1.000 36,267,000.00 36,267,000.00
JUMLAH HARGA BAHAN 36,267,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.750 625,000.00 468,750.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.750 140,000.00 105,000.00
JUMLAH HARGA ALAT 573,750.00
D Jumlah (A+B+C) 37,239,902.43
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 3,723,990.24
F Harga Satuan Pekerjaan (D+E) 40,963,892.67

A.8.4.3.12 (K3) Pemasangan 1 buah Valve Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.571 143,119.40 367,959.98
Tukang pipa L.02 OH 1.286 147,992.00 190,317.71
Mandor L.04 OH 0.257 157,992.00 40,603.94
JUMLAH TENAGA KERJA 598,881.63
B BAHAN
Valve Ø 1000 mm buah 1.000 39,927,000.00 39,927,000.00
JUMLAH HARGA BAHAN 39,927,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.000 625,000.00 625,000.00
crane 2 T
Mobile crane ≤ 3 ton hari 1.000 140,000.00 140,000.00

Page 235
JUMLAH HARGA ALAT 765,000.00
D Jumlah (A+B+C) 41,290,881.63
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 4,129,088.16
F Harga Satuan Pekerjaan (D+E) 45,419,969.80

Page 236
A.8.4.3.13 (K3) Pemasangan 1 buah Valve Ø 1100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.000 143,119.40 429,358.20
Tukang pipa L.02 OH 1.500 147,992.00 221,988.00
Mandor L.04 OH 0.300 157,992.00 47,397.60
JUMLAH TENAGA KERJA 698,743.80
B BAHAN
Valve Ø 1100 mm buah 1.000 44,310,000.00 44,310,000.00
JUMLAH HARGA BAHAN 44,310,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.000 625,000.00 625,000.00
crane 2 T
Mobile crane ≤ 3 ton hari 1.000 140,000.00 140,000.00
JUMLAH HARGA ALAT 765,000.00
D Jumlah (A+B+C) 45,773,743.80
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 4,577,374.38
F Harga Satuan Pekerjaan (D+E) 50,351,118.18

A.8.4.3.14 (K3) Pemasangan 1 buah Valve Ø 1200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.000 143,119.40 429,358.20
Tukang pipa L.02 OH 1.500 147,992.00 221,988.00
Mandor L.04 OH 0.300 157,992.00 47,397.60
JUMLAH TENAGA KERJA 698,743.80
B BAHAN
Valve Ø 1200 mm buah 1.000 46,710,000.00 46,710,000.00
JUMLAH HARGA BAHAN 46,710,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.000 625,000.00 625,000.00
crane 2 T
Mobile crane ≤ 3 ton hari 1.000 140,000.00 140,000.00
JUMLAH HARGA ALAT 765,000.00
D Jumlah (A+B+C) 48,173,743.80
E Overhead & Profit (10 %) 10% x D (maksimum) 4,817,374.38
F Harga Satuan Pekerjaan (D+E) 52,991,118.18

A.8.4.3.15 (K3) Pemasangan 1 buah Tee Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.106 143,119.40 15,170.66
Tukang pipa L.02 OH 0.053 147,992.00 7,843.58
Mandor L.04 OH 0.011 157,992.00 1,737.91
JUMLAH TENAGA KERJA 24,752.14
B BAHAN
Tee Ø 150 mm buah 1.000 18,000.00 18,000.00
JUMLAH HARGA BAHAN 18,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.028 625,000.00 17,500.00
crane 2 T
JUMLAH HARGA ALAT 17,500.00
D Jumlah (A+B+C) 60,252.14
E Overhead & Profit (10 %) 10% x D (maksimum) 6,025.21
F Harga Satuan Pekerjaan (D+E) 66,277.36

A.8.4.3.16 (K3) Pemasangan 1 buah Tee Ø 200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.216 143,119.40 30,913.79
Tukang pipa L.02 OH 0.108 147,992.00 15,983.14
Mandor L.04 OH 0.022 157,992.00 3,475.82
JUMLAH TENAGA KERJA 50,372.75
B BAHAN
Tee Ø 200 mm buah 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.029 625,000.00 18,125.00
crane 2 T
JUMLAH HARGA ALAT 18,125.00
D Jumlah (A+B+C) 93,497.75

Page 237
E Overhead & Profit (10 %) 10% x D (maksimum) 9,349.78
F Harga Satuan Pekerjaan (D+E) 102,847.53

Page 238
A.8.4.3.17 (K3) Pemasangan 1 buah Tee Ø 250 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.326 143,119.40 46,656.92
Tukang pipa L.02 OH 0.163 147,992.00 24,122.70
Mandor L.04 OH 0.033 157,992.00 5,213.74
JUMLAH TENAGA KERJA 75,993.36
B BAHAN
Tee Ø 250 mm buah 1.000 36,000.00 36,000.00
JUMLAH HARGA BAHAN 36,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.039 625,000.00 24,375.00
crane 2 T
JUMLAH HARGA ALAT 24,375.00
D Jumlah (A+B+C) 136,368.36
E Overhead & Profit (10 %) 10% x D (maksimum) 13,636.84
F Harga Satuan Pekerjaan (D+E) 150,005.19

A.8.4.3.18 (K3) Pemasangan 1 buah Tee Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.436 143,119.40 62,400.06
Tukang pipa L.02 OH 0.218 147,992.00 32,262.26
Mandor L.04 OH 0.044 157,992.00 6,951.65
JUMLAH TENAGA KERJA 101,613.96
B BAHAN
Tee Ø 300 mm buah 1.000 54,000.00 54,000.00
JUMLAH HARGA BAHAN 54,000.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.500 625,000.00 312,500.00
crane 2 T
JUMLAH HARGA ALAT 312,500.00
D Jumlah (A+B+C) 468,113.96
E Overhead & Profit (10 %) 10% x D (maksimum) 46,811.40
F Harga Satuan Pekerjaan (D+E) 514,925.36

A.8.4.3.19 (K3) Pemasangan 1 buah Tee Ø 400 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.656 143,119.40 93,886.33
Tukang pipa L.02 OH 0.328 147,992.00 48,541.38
Mandor L.04 OH 0.066 157,992.00 10,427.47
JUMLAH TENAGA KERJA 152,855.17
B BAHAN
Tee Ø 400 mm buah 1.000 1,244,300.00 1,244,300.00
JUMLAH HARGA BAHAN 1,244,300.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.500 625,000.00 312,500.00
crane 2 T
JUMLAH HARGA ALAT 312,500.00
D Jumlah (A+B+C) 1,709,655.17
E Overhead & Profit (10 %) 10% x D (maksimum) 170,965.52
F Harga Satuan Pekerjaan (D+E) 1,880,620.69

A.8.4.3.20 (K3) Pemasangan 1 buah Tee Ø 450 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.766 143,119.40 109,629.46
Tukang pipa L.02 OH 0.383 147,992.00 56,680.94
Mandor L.04 OH 0.077 157,992.00 12,165.38
JUMLAH TENAGA KERJA 178,475.78
B BAHAN
Tee Ø 450 mm buah 1.000 1,496,500.00 1,496,500.00
JUMLAH HARGA BAHAN 1,496,500.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.500 625,000.00 312,500.00
crane 2 T
JUMLAH HARGA ALAT 312,500.00
D Jumlah (A+B+C) 1,987,475.78
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 198,747.58
F Harga Satuan Pekerjaan (D+E) 2,186,223.36

Page 239
A.8.4.3.21 (K3) Pemasangan 1 buah Tee Ø 500 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.876 143,119.40 125,372.59
Tukang pipa L.02 OH 0.438 147,992.00 64,820.50
Mandor L.04 OH 0.088 157,992.00 13,903.30
JUMLAH TENAGA KERJA 204,096.39
B BAHAN
Tee Ø 500 mm buah 1.000 1,748,700.00 1,748,700.00
JUMLAH HARGA BAHAN 1,748,700.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.600 625,000.00 375,000.00
crane 2 T
JUMLAH HARGA ALAT 375,000.00
D Jumlah (A+B+C) 2,327,796.39
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 232,779.64
F Harga Satuan Pekerjaan (D+E) 2,560,576.03

A.8.4.3.22 (K3) Pemasangan 1 buah Tee Ø 600 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.096 143,119.40 156,858.86
Tukang pipa L.02 OH 0.548 147,992.00 81,099.62
Mandor L.04 OH 0.110 157,992.00 17,379.12
JUMLAH TENAGA KERJA 255,337.60
B BAHAN
Tee Ø 600 mm buah 1.000 2,000,900.00 2,000,900.00
JUMLAH HARGA BAHAN 2,000,900.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.193 625,000.00 120,625.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.096 140,000.00 13,440.00
JUMLAH HARGA ALAT 134,065.00
D Jumlah (A+B+C) 2,390,302.60
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 239,030.26
F Harga Satuan Pekerjaan (D+E) 2,629,332.86

A.8.4.3.23 (K3) Pemasangan 1 buah Tee Ø 700 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.316 143,119.40 188,345.13
Tukang pipa L.02 OH 0.658 147,992.00 97,378.74
Mandor L.04 OH 0.132 157,992.00 20,854.94
JUMLAH TENAGA KERJA 306,578.81
B BAHAN
Tee Ø 700 mm buah 1.000 2,253,100.00 2,253,100.00
JUMLAH HARGA BAHAN 2,253,100.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.225 625,000.00 140,625.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.113 140,000.00 15,820.00
JUMLAH HARGA ALAT 156,445.00
D Jumlah (A+B+C) 2,716,123.81
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 271,612.38
F Harga Satuan Pekerjaan (D+E) 2,987,736.19

A.8.4.3.24 (K3) Pemasangan 1 buah Tee Ø 800 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.536 143,119.40 219,831.40
Tukang pipa L.02 OH 0.768 147,992.00 113,657.86
Mandor L.04 OH 0.154 157,992.00 24,330.77
JUMLAH TENAGA KERJA 357,820.02
B BAHAN
Tee Ø 800 mm buah 1.000 2,505,300.00 2,505,300.00
JUMLAH HARGA BAHAN 2,505,300.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.257 625,000.00 160,625.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.129 140,000.00 18,060.00
JUMLAH HARGA ALAT 178,685.00

Page 240
D Jumlah (A+B+C) 3,041,805.02
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 456,270.75
F Harga Satuan Pekerjaan (D+E) 3,498,075.78

Page 241
A.8.4.3.25 (K3) Pemasangan 1 buah Tee Ø 900 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.756 143,119.40 251,317.67
Tukang pipa L.02 OH 0.878 147,992.00 129,936.98
Mandor L.04 OH 0.176 157,992.00 27,806.59
JUMLAH TENAGA KERJA 409,061.23
B BAHAN
Tee Ø 900 mm buah 1.000 2,757,500.00 2,757,500.00
JUMLAH HARGA BAHAN 2,757,500.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.321 625,000.00 200,625.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.161 140,000.00 22,540.00
JUMLAH HARGA ALAT 223,165.00
D Jumlah (A+B+C) 3,389,726.23
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 338,972.62
F Harga Satuan Pekerjaan (D+E) 3,728,698.86

A.8.4.3.26 (K3) Pemasangan 1 buah Tee Ø 1000 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.976 143,119.40 282,803.93
Tukang pipa L.02 OH 0.988 147,992.00 146,216.10
Mandor L.04 OH 0.198 157,992.00 31,282.42
JUMLAH TENAGA KERJA 460,302.45
B BAHAN
Tee Ø 1000 mm buah 1.000 3,009,700.00 3,009,700.00
JUMLAH HARGA BAHAN 3,009,700.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.366 625,000.00 228,750.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.183 140,000.00 25,620.00
JUMLAH HARGA ALAT 254,370.00
D Jumlah (A+B+C) 3,724,372.45
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 372,437.24
F Harga Satuan Pekerjaan (D+E) 4,096,809.69

A.8.4.3.27 (K3) Pemasangan 1 buah Tee Ø 1100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.196 143,119.40 314,290.20
Tukang pipa L.02 OH 1.098 147,992.00 162,495.22
Mandor L.04 OH 0.220 157,992.00 34,758.24
JUMLAH TENAGA KERJA 511,543.66
B BAHAN
Tee Ø 1100 mm buah 1.000 3,261,900.00 3,261,900.00
JUMLAH HARGA BAHAN 3,261,900.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.386 625,000.00 241,250.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.193 140,000.00 27,020.00
JUMLAH HARGA ALAT 268,270.00
D Jumlah (A+B+C) 4,041,713.66
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 404,171.37
F Harga Satuan Pekerjaan (D+E) 4,445,885.02

A.8.4.3.28 (K3) Pemasangan 1 buah Tee Ø 1200 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.416 143,119.40 345,776.47
Tukang pipa L.02 OH 1.208 147,992.00 178,774.34
Mandor L.04 OH 0.242 157,992.00 38,234.06
JUMLAH TENAGA KERJA 562,784.87
B BAHAN
Tee Ø 1200 mm buah 1.000 3,514,100.00 3,514,100.00
JUMLAH HARGA BAHAN 3,514,100.00
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.450 625,000.00 281,250.00
crane 2 T
Mobile crane ≤ 3 ton hari 0.225 140,000.00 31,500.00

Page 242
JUMLAH HARGA ALAT 312,750.00
D Jumlah (A+B+C) 4,389,634.87
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 438,963.49
F Harga Satuan Pekerjaan (D+E) 4,828,598.36

Page 243
A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA
A.8.4.4.1 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.466 143,119.40 209,813.04
Tukang pipa L.02 OH 0.733 147,992.00 108,478.14
Mandor L.04 OH 0.147 157,992.00 23,224.82
JUMLAH TENAGA KERJA 341,516.00
B BAHAN
Pipa Ø 80 mm buah 1.000 78,000.00 78,000.00
JUMLAH HARGA BAHAN 78,000.00
C PERALATAN
Peralatan potong pipa hari 0.606 68,250.00 41,359.50
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 0.075 150,000.00 11,250.00

hari 0.968 36,875.00 35,695.00


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 0.865 625,000.00 540,625.00
crane 2 T
JUMLAH HARGA ALAT 628,929.50
D Jumlah (A+B+C) 1,048,445.50
E Overhead & Profit (10 %) 10% x D (maksimum) 104,844.55
F Harga Satuan Pekerjaan (D+E) 1,153,290.05

A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.646 143,119.40 235,574.53
Tukang pipa L.02 OH 0.823 147,992.00 121,797.42
Mandor L.04 OH 0.165 157,992.00 26,068.68
JUMLAH TENAGA KERJA 383,440.63
B BAHAN
Pipa Ø 100 mm buah 1.000 92,000.00 92,000.00
JUMLAH HARGA BAHAN 92,000.00
C PERALATAN
Peralatan potong pipa hari 0.650 68,250.00 44,362.50
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 0.159 150,000.00 23,850.00

hari 1.078 36,875.00 39,751.25


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 0.911 625,000.00 569,375.00
crane 2 T
JUMLAH HARGA ALAT 677,338.75
D Jumlah (A+B+C) 1,152,779.38
E Overhead & Profit (10 %) 10% x D (maksimum) 115,277.94
F Harga Satuan Pekerjaan (D+E) 1,268,057.32

A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.096 143,119.40 299,978.26
Tukang pipa L.02 OH 1.048 147,992.00 155,095.62
Mandor L.04 OH 0.210 157,992.00 33,178.32
JUMLAH TENAGA KERJA 488,252.20
B BAHAN
Pipa Ø 150 mm buah 1.000 138,000.00 138,000.00
JUMLAH HARGA BAHAN 138,000.00
C PERALATAN
Peralatan potong pipa hari 0.760 68,250.00 51,870.00
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 0.369 150,000.00 55,350.00

hari 1.353 36,875.00 49,891.88


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 1.026 625,000.00 641,250.00
crane 2 T
JUMLAH HARGA ALAT 798,361.88
D Jumlah (A+B+C) 1,424,614.07
E Overhead & Profit (10 %) 10% x D (maksimum) 142,461.41
F Harga Satuan Pekerjaan (D+E) 1,567,075.48

Page 244
A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.546 143,119.40 364,381.99
Tukang pipa L.02 OH 1.273 147,992.00 188,393.82
Mandor L.04 OH 0.255 157,992.00 40,287.96
JUMLAH TENAGA KERJA 593,063.77
B BAHAN
Pipa Ø 200 mm buah 1.000 192,000.00 192,000.00
JUMLAH HARGA BAHAN 192,000.00
C PERALATAN
Peralatan potong pipa hari 0.870 68,250.00 59,377.50
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 0.579 150,000.00 86,850.00

hari 1.628 36,875.00 60,032.50


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 1.141 625,000.00 713,125.00
crane 2 T
JUMLAH HARGA ALAT 919,385.00
D Jumlah (A+B+C) 1,704,448.77
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 170,444.88
F Harga Satuan Pekerjaan (D+E) 1,874,893.65

A.8.4.4.5 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.996 143,119.40 428,785.72
Tukang pipa L.02 OH 1.498 147,992.00 221,692.02
Mandor L.04 OH 0.300 157,992.00 47,397.60
JUMLAH TENAGA KERJA 697,875.34
B BAHAN
Pipa Ø 250 mm buah 1.000 260,000.00 260,000.00
JUMLAH HARGA BAHAN 260,000.00
C PERALATAN
Peralatan potong pipa hari 0.980 68,250.00 66,885.00
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 0.789 150,000.00 118,350.00

hari 1.903 36,875.00 70,173.13


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 1.256 625,000.00 785,000.00
crane 2 T
JUMLAH HARGA ALAT 1,040,408.13
D Jumlah (A+B+C) 1,998,283.46
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 199,828.35
F Harga Satuan Pekerjaan (D+E) 2,198,111.81

A.8.4.4.6 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 3.446 143,119.40 493,189.45
Tukang pipa L.02 OH 1.723 147,992.00 254,990.22
Mandor L.04 OH 0.345 157,992.00 54,507.24
JUMLAH TENAGA KERJA 802,686.91
B BAHAN
Pipa Ø 300 mm buah 1.000 985,400.00 985,400.00
JUMLAH HARGA BAHAN 985,400.00
C PERALATAN
Peralatan potong pipa hari 1.090 68,250.00 74,392.50
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 0.999 150,000.00 149,850.00

hari 2.178 36,875.00 80,313.75


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 1.371 625,000.00 856,875.00
crane 2 T
JUMLAH HARGA ALAT 1,161,431.25
D Jumlah (A+B+C) 2,949,518.16
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 294,951.82
F Harga Satuan Pekerjaan (D+E) 3,244,469.97

Page 245
A.8.4.4.7 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.346 143,119.40 621,996.91
Tukang pipa L.02 OH 2.173 147,992.00 321,586.62
Mandor L.04 OH 0.435 157,992.00 68,726.52
JUMLAH TENAGA KERJA 1,012,310.05
B BAHAN
Pipa Ø 400 mm buah 1.000 1,400,000.00 1,400,000.00
JUMLAH HARGA BAHAN 1,400,000.00
C PERALATAN
Peralatan potong pipa hari 1.310 68,250.00 89,407.50
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 1.419 150,000.00 212,850.00

hari 2.728 36,875.00 100,595.00


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 1.601 625,000.00 1,000,625.00
crane 2 T
JUMLAH HARGA ALAT 1,403,477.50
D Jumlah (A+B+C) 3,815,787.55
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 381,578.75
F Harga Satuan Pekerjaan (D+E) 4,197,366.30

A.8.4.4.8 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 4.796 143,119.40 686,400.64
Tukang pipa L.02 OH 2.398 147,992.00 354,884.82
Mandor L.04 OH 0.480 157,992.00 75,836.16
JUMLAH TENAGA KERJA 1,117,121.62
B BAHAN
Pipa Ø 450 mm buah 1.000 2,000,480.00 2,000,480.00
JUMLAH HARGA BAHAN 2,000,480.00
C PERALATAN
Peralatan potong pipa hari 1.420 68,250.00 96,915.00
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 1.629 150,000.00 244,350.00

hari 3.003 36,875.00 110,735.63


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 1.716 625,000.00 1,072,500.00
crane 2 T
JUMLAH HARGA ALAT 1,524,500.63
D Jumlah (A+B+C) 4,642,102.24
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 464,210.22
F Harga Satuan Pekerjaan (D+E) 5,106,312.47

A.8.4.4.9 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 5.246 143,119.40 750,804.37
Tukang pipa L.02 OH 2.623 147,992.00 388,183.02
Mandor L.04 OH 0.525 157,992.00 82,945.80
JUMLAH TENAGA KERJA 1,221,933.19
B BAHAN
Pipa Ø 500 mm buah 1.000 2,814,560.00 2,814,560.00
JUMLAH HARGA BAHAN 2,814,560.00
C PERALATAN
Peralatan potong pipa hari 1.530 68,250.00 104,422.50
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 1.839 150,000.00 275,850.00

hari 3.278 36,875.00 120,876.25


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 1.831 625,000.00 1,144,375.00
crane 2 T
JUMLAH HARGA ALAT 1,645,523.75
D Jumlah (A+B+C) 5,682,016.94
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 568,201.69
F Harga Satuan Pekerjaan (D+E) 6,250,218.63

Page 246
A.8.4.4.10 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 6.146 143,119.40 879,611.83
Tukang pipa L.02 OH 3.073 147,992.00 454,779.42
Mandor L.04 OH 0.615 157,992.00 97,165.08
JUMLAH TENAGA KERJA 1,431,556.33
B BAHAN
Pipa Ø 600 mm buah 1.000 2,814,560.00 2,814,560.00
JUMLAH HARGA BAHAN 2,814,560.00
C PERALATAN
Peralatan potong pipa hari 1.750 68,250.00 119,437.50
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 2.259 150,000.00 338,850.00

hari 3.828 36,875.00 141,157.50


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 2.061 625,000.00 1,288,125.00
crane 2 T
JUMLAH HARGA ALAT 1,887,570.00
D Jumlah (A+B+C) 6,133,686.33
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 613,368.63
F Harga Satuan Pekerjaan (D+E) 6,747,054.96

A.8.4.4.11 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 7.046 143,119.40 1,008,419.29
Tukang pipa L.02 OH 3.523 147,992.00 521,375.82
Mandor L.04 OH 0.705 157,992.00 111,384.36
JUMLAH TENAGA KERJA 1,641,179.47
B BAHAN
Pipa Ø 700 mm buah 1.000 3,518,120.00 3,518,120.00
JUMLAH HARGA BAHAN 3,518,120.00
C PERALATAN
Peralatan potong pipa hari 1.970 68,250.00 134,452.50
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 2.679 150,000.00 401,850.00

hari 4.378 36,875.00 161,438.75


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 2.291 625,000.00 1,431,875.00
crane 2 T
JUMLAH HARGA ALAT 2,129,616.25
D Jumlah (A+B+C) 7,288,915.72
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 728,891.57
F Harga Satuan Pekerjaan (D+E) 8,017,807.29

A.8.4.4.12 (K3) Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 7.946 143,119.40 1,137,226.75
Tukang pipa L.02 OH 3.973 147,992.00 587,972.22
Mandor L.04 OH 0.795 157,992.00 125,603.64
JUMLAH TENAGA KERJA 1,850,802.61
B BAHAN
Pipa Ø 800 mm buah 1.000 4,221,680.00 4,221,680.00
JUMLAH HARGA BAHAN 4,221,680.00
C PERALATAN
Peralatan potong pipa hari 2.190 68,250.00 149,467.50
T2/mekanik/cilinder saw
Sewa Genset 1500 watt hari 3.099 150,000.00 464,850.00

hari 4.928 36,875.00 181,720.00


Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle hari 2.521 625,000.00 1,575,625.00
crane 2 T
JUMLAH HARGA ALAT 2,371,662.50
D Jumlah (A+B+C) 8,444,145.11
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum) 844,414.51
F Harga Satuan Pekerjaan (D+E) 9,288,559.62

Page 247
A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA
A.8.4.5.1 (K3) Pengetesan 1 m pipa Ø 50 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.008 143,119.40 1,144.96
Mandor L.04 OH 0.0008 157,992.00 126.39
JUMLAH TENAGA KERJA 1,271.35
B BAHAN
Air test (air bersih) m3 0.002 6.50 0.01
Bahan bakar liter 0.060 9,400.00 564.00
Oli liter 0.002 45,000.00 90.00
JUMLAH HARGA BAHAN 654.01
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,925.36
E Overhead & Profit (10 %) 10% x D (maksimum) 192.54
F Harga Satuan Pekerjaan (D+E) 2,117.90

A.8.4.5.2 (K3) Pengetesan 1 m pipa Ø 75 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.008 143,119.40 1,144.96
Mandor L.04 OH 0.0008 157,992.00 126.39
JUMLAH TENAGA KERJA 1,271.35
B BAHAN
Air test (air bersih) m3 0.004 6.50 0.03
Bahan bakar liter 0.060 9,400.00 564.00
Oli liter 0.002 45,000.00 90.00
JUMLAH HARGA BAHAN 654.03
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,925.37
E Overhead & Profit (10 %) 10% x D (maksimum) 192.54
F Harga Satuan Pekerjaan (D+E) 2,117.91

A.8.4.5.3 (K3) Pengetesan 1 m pipa Ø 100 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.008 143,119.40 1,144.96
Mandor L.04 OH 0.0008 157,992.00 126.39
JUMLAH TENAGA KERJA 1,271.35
B BAHAN
Air test (air bersih) m3 0.008 6.50 0.05
Bahan bakar liter 0.060 9,400.00 564.00
Oli liter 0.002 45,000.00 90.00
JUMLAH HARGA BAHAN 654.05
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,925.40
E Overhead & Profit (10 %) 10% x D (maksimum) 192.54
F Harga Satuan Pekerjaan (D+E) 2,117.94

A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.008 143,119.40 1,144.96
Mandor L.04 OH 0.0008 157,992.00 126.39
JUMLAH TENAGA KERJA 1,271.35
B BAHAN
Air test (air bersih) m3 0.018 6.50 0.12
Bahan bakar liter 0.060 9,400.00 564.00
Oli liter 0.002 45,000.00 90.00
JUMLAH HARGA BAHAN 654.12
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,925.47
E Overhead & Profit (10 %) 10% x D (maksimum) 192.55

Page 248
F Harga Satuan Pekerjaan (D+E) 2,118.01

Page 249
A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.008 143,119.40 1,144.96
Mandor L.04 OH 0.0008 157,992.00 126.39
JUMLAH TENAGA KERJA 1,271.35
B BAHAN
Air test (air bersih) m3 0.031 6.50 0.20
Bahan bakar liter 0.060 9,400.00 564.00
Oli liter 0.002 45,000.00 90.00
JUMLAH HARGA BAHAN 654.20
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,925.55
E Overhead & Profit (10 %) 10% x D (maksimum) 192.56
F Harga Satuan Pekerjaan (D+E) 2,118.11

A.8.4.5.6 (K3) Pengetesan 1 m pipa Ø 250 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.008 143,119.40 1,144.96
Mandor L.04 OH 0.0008 157,992.00 126.39
JUMLAH TENAGA KERJA 1,271.35
B BAHAN
Air test (air bersih) m3 0.049 6.50 0.32
Bahan bakar liter 0.060 9,400.00 564.00
Oli liter 0.002 45,000.00 90.00
JUMLAH HARGA BAHAN 654.32
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,925.67
E Overhead & Profit (10 %) 10% x D (maksimum) 192.57
F Harga Satuan Pekerjaan (D+E) 2,118.23

A.8.4.5.7 (K3) Pengetesan 1 m pipa Ø 300 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.008 143,119.40 1,144.96
Mandor L.04 OH 0.0008 157,992.00 126.39
JUMLAH TENAGA KERJA 1,271.35
B BAHAN
Air test (air bersih) m3 0.071 6.50 0.46
Bahan bakar liter 0.060 9,400.00 564.00
Oli liter 0.002 45,000.00 90.00
JUMLAH HARGA BAHAN 654.46
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,925.81
E Overhead & Profit (10 %) 10% x D (maksimum) 192.58
F Harga Satuan Pekerjaan (D+E) 2,118.39

A.8.4.5.8 (K3) Pengetesan 1 m pipa Ø 400 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.008 143,119.40 1,144.96
Mandor L.04 OH 0.0008 157,992.00 126.39
JUMLAH TENAGA KERJA 1,271.35
B BAHAN
Air test (air bersih) m3 0.126 6.50 0.82
Bahan bakar liter 0.060 9,400.00 564.00
Oli liter 0.002 45,000.00 90.00
JUMLAH HARGA BAHAN 654.82
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,926.17
E Overhead & Profit (10 %) 10% x D (maksimum) 192.62
F Harga Satuan Pekerjaan (D+E) 2,118.78

Page 250
A.8.4.5.9 (K3) Pengetesan 1 m pipa Ø 500 mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.008 143,119.40 1,144.96
Mandor L.04 OH 0.0008 157,992.00 126.39
JUMLAH TENAGA KERJA 1,271.35
B BAHAN
Air test (air bersih) m3 0.158 6.50 1.03
Bahan bakar liter 0.060 9,400.00 564.00
Oli liter 0.002 45,000.00 90.00
655.03
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,926.38
E Overhead & Profit (10 %) 10% x D (maksimum) 192.64
F Harga Satuan Pekerjaan (D+E) 2,119.01

A.8.4.5.10 (K3) Pengetesan 1 m pipa Ø 600 mm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.008 143,119.40 1,144.96
Mandor L.04 OH 0.0008 157,992.00 126.39
JUMLAH TENAGA KERJA 1,271.35
B BAHAN
Air test (air bersih) m3 0.283 6.50 1.84
Bahan bakar liter 0.060 9,400.00 564.00
Oli liter 0.002 45,000.00 90.00
JUMLAH HARGA BAHAN 655.84
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,927.19
E Overhead & Profit (10 %) 10% x D (maksimum) 192.72
F Harga Satuan Pekerjaan (D+E) 2,119.91

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL


A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Upah % 100.000 143,119.40 143,119.40
JUMLAH TENAGA KERJA 143,119.40
B BAHAN
Pipa listrik 5/8” btg 3.000 11,500.00 34,500.00
Kabel m 24.000 6,000.00 144,000.00
T Dus buah 3.000 3,450.00 10,350.00
L Bow buah 4.000 1,000.00 4,000.00
Las Dop buah 3.000 1,000.00 3,000.00
Klem buah 24.000 260.00 6,240.00
Mongkok buah 1.000 2,500.00 2,500.00
Saklar buah 1.000 13,000.00 13,000.00
Fitting buah 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 232,590.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 375,709.40
E Overhead & Profit (10 %) 10% x D (maksimum) 37,570.94
F Harga Satuan Pekerjaan (D+E) 413,280.34

Page 251
A.8.4.6.1 (K3) Pemasangan 1 buah MCB
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA Kode
Upah % 100.000 143,119.40 143,119.40
JUMLAH TENAGA KERJA 143,119.40
B BAHAN
Pipa listrik 5/8” btg 3.000 11,500.00 34,500.00
Kabel m 15.000 6,000.00 90,000.00
T Dus buah 1.000 3,450.00 3,450.00
L Bow buah 2.000 1,000.00 2,000.00
Klem biasa buah 24.000 260.00 6,240.00
MCB buah 1.000 42,000.00 42,000.00
JUMLAH HARGA BAHAN 178,190.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 321,309.40
E Overhead & Profit (10 %) 10% x D (maksimum) 32,130.94
F Harga Satuan Pekerjaan (D+E) 353,440.34

A.8.4.7 ANALISA PEKERJAAN U-DITH


A.8.4.7.1 Papan Nama Proyek
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(RP) (RP)
A TENAGA
Pekerja L.01 OH 1.000 143,119.40 143,119.40
Mandor L.04 OH 1.000 157,992.00 157,992.00
JUMLAH TENAGA KERJA 301,111.40
B BAHAN
Multiplex 9 mm lembar 0.416 105,000.00 43,680.00
Print out lapis Vinil m² 1.200 50,000.00 60,000.00
Kayu meranti 5/7 m³ 0.0175 5,500,000.00 96,250.00
JUMLAH HARGA BAHAN 199,930.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 501,041.40
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 50,104.14
F Harga Satuan Pekerjaan (D+E) 551,145.54

A.8.4.7.2 Pembongkaran 1 m3 pasangan batu

No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga (RP)

A TENAGA
Pekerja L.01 OH 2.567 143,119 367,387
Mandor L.04 OH 0.233 157,992 36,812
JUMLAH TENAGA KERJA 404,200
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 404,200
E Overhead & Profit 10% x D (maksimum) 40,419.96
F Harga Satuan Pekerjaan (D+E) 444,619.60

Page 252
A.8.4.7.3 Pengukuran dan pemasangan 1 m’ Bouwplank

No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga (RP)

A TENAGA
Pekerja L.01 OH 0.100 143,119 14,312
Tukang batu L.02 OH 0.100 147,992 14,799
Kepala tukang L.03 OH 0.010 149,992 1,500
Mandor L.04 OH 0.005 157,992 790
JUMLAH TENAGA KERJA 31,401
B BAHAN
Kayu balok 5/7 m3 0.012 4,861,111 58,333.333
Paku 2”-3” Kg 0.020 15,000 300.000
Kayu papan 3/20 m3 0.007 4,861,111 34,027.778
JUMLAH HARGA BAHAN 92,661.111
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 124,062
E Overhead & Profit 10% x D (maksimum) 12,406.21
F Harga Satuan Pekerjaan (D+E) 136,468.34

A.8.4.7.4 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga satuan (RP)
(RP)
A TENAGA
Pekerja L.01 OH 1.500 143,119.40 214,679.10
Tukang batu L.02 OH 0.750 147,992.00 110,994.00
Kepala tukang L.03 OH 0.075 149,992.00 11,249.40
Mandor L.04 OH 0.075 157,992.00 11,849.40
JUMLAH TENAGA KERJA 348,771.90
B BAHAN
Batu belah m3 1.200 140,000.00 168,000.00
Semen Portland kg 163.000 1,300.00 211,900.00
Pasir pasang m3 0.520 150,000.00 78,000.00
JUMLAH HARGA BAHAN 457,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 806,671.90
E Overhead & Profit 10% x D (maksimum) 80,667.19
F Harga Satuan Pekerjaan (D+E) 887,339.09

A.8.4.7.5 Pemasangan 1 m2 plesteran 1 SP : 3PP tebal 15 cm


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga (RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang batu L.02 OH 0.150 147,992.00 22,198.80
Kepala tukang L.03 OH 0.015 149,992.00 2,249.88
Mandor L.04 OH 0.0150 157,992.00 2,369.88
JUMLAH TENAGA KERJA 69,754.38
B BAHAN
Portland Cement kg 7.776 1,300.00 10,108.80
Pasir Pasang m3 0.023 150,000.00 3,450.00
JUMLAH HARGA BAHAN 13,558.80

C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 83,313
E Overhead & Profit 10% x D (maksimum) 8,331.32
F Harga Satuan Pekerjaan (D+E) 91,644.50

Page 253
A.8.4.7. 6. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga (RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Tukang batu L.02 OH 0.100 147,992.00 14,799.20
Kepala tukang L.03 OH 0.010 149,992.00 1,499.92
Mandor L.04 OH 0.0150 157,992.00 2,369.88
JUMLAH TENAGA KERJA 61,604.82
B BAHAN
Bata merah buah 70.000 580.00 40,600.00
Semen Portland Kg 9.680 1,300.00 12,584.00
Pasir pasang m3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 59,934.00

C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 121,539
E Overhead & Profit 10% x D (maksimum) 12,153.88
F Harga Satuan Pekerjaan (D+E) 133,692.70

A.8.4.7.7.Membuat 1 m3 beton mutu f’c = 7,4 Mpa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga satuan (RP) (RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 247.00 1,300.00 321,100.00
pasir beton kg 869.00 - -
kerikil (maks 30 mm) kg 999.00 - -
air Liter 215.00 - -
JUMLAH HARGA BAHAN 321,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 615,257.9
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 61,525.79
F Harga Satuan Pekerjaan (D+E) 676,783.71

A.8.4.7.8 Penggalian 1 m3 tanah sedalam 1 m


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga satuan (RP)
(RP)
A TENAGA
Pekerja L.01 OH 0.563 143,119.40 80,576.22
Mandor L.02 OH 0.056 157,992.00 8,894.95
JUMLAH TENAGA KERJA 89,471.17
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 89,471.2
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 8,947.12
F Harga Satuan Pekerjaan (D+E) 98,418.29

A.8.4.7.9 Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K.175)
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga satuan (RP)
(RP)
A TENAGA
Pekerja L.01 OH 1.650 143,119.40 236,147.01
Tukang batu L.02 OH 0.275 147,992.00 40,697.80
Kepala tukang L.03 OH 0.028 149,992.00 4,199.78
Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 294,157.92
B BAHAN
semen portland kg 326.00 1,300.00 423,800.00
pasir beton kg 760.00 230,000.00 174,800,000.00
kerikil (maks 30 mm) kg 1,029.00 208.33 214,371.57
air Liter 215.00 6.50 1,397.50

Page 254
JUMLAH HARGA BAHAN 175,439,569.07
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 175,733,727.0
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 17,573,372.70
F Harga Satuan Pekerjaan (D+E) 193,307,099.69

A.8.4.7.10 Pemasangan 1 m2 bekisting untuk sloof


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga satuan (RP) (RP)
A TENAGA
Pekerja L.01 OH 0.520 143,119.40 74,422.09
Tukang batu L.02 OH 0.260 147,992.00 38,477.92
Kepala tukang L.03 OH 0.026 149,992.00 3,899.79
Mandor L.04 OH 0.260 157,992.00 41,077.92
JUMLAH TENAGA KERJA 157,877.72
B BAHAN
Kayu kelas III m3 0.05 5,500,000.00 247,500.00
Paku 5 – 10 cm Kg 0.30 16,000.00 4,800.00
Minyak bekisting Liter 0.10 38,000.00 3,800.00
JUMLAH HARGA BAHAN 256,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 413,977.7
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 41,397.77
F Harga Satuan Pekerjaan (D+E) 455,375.49

A.8.4.7.11 Pembesian 10 kg dengan besi polos atau besi ulir


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga satuan (RP)
(RP)
A TENAGA
Pekerja L.01 OH 0.0070 143,119.40 1,001.84
Tukang batu L.02 OH 0.0070 147,992.00 1,035.94
Kepala tukang L.03 OH 0.0007 149,992.00 104.99
Mandor L.04 OH 0.0004 157,992.00 63.20
JUMLAH TENAGA KERJA 2,205.97
B BAHAN
Besi beton
(polos/ulir) Kg 1.05 13,000.00 13,650.00
Kawat beton Kg 0.02 15,000.00 225.00
JUMLAH HARGA BAHAN 13,875.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 16,081.0
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 1,608.10
F Harga Satuan Pekerjaan (D+E) 17,689.07

A.8.4.7.12 Pemasangan 1 unit Box Culvert 40.40.100 gandar 20 ton


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga (RP)
A TENAGA
Pekerja L.01 OH 0.650 143,119 93,028
Kepala tukang L.03 OH 0.152 147,992 22,421
Mandor L.04 OH 0.2500 157,992 39,498
JUMLAH TENAGA KERJA 154,946
B BAHAN
Box culvert Unit 1.00 1,100,000.00 1,100,000
JUMLAH HARGA BAHAN 1,100,000

C PERALATAN % 10 125,494.64 12,549.46


JUMLAH HARGA ALAT 12,549.46
D Jumlah (A+B+C) 1,267,495.86
E Overhead & Profit 10% x D (maksimum) 126,749.59
F Harga Satuan Pekerjaan (D+E) 1,394,245.45

A.8.4.7.13 Pembuangan 1 m3 tanah sejauh 30 meter


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga satuan (RP)
(RP)
A TENAGA
Pekerja L.01 OH 0.449 143,119.40 64,289.23
Mandor L.04 OH 0.015 157,992.00 2,369.09
JUMLAH TENAGA KERJA 66,658.32
B BAHAN

Page 255
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 66,658.32
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 6,665.83
F Harga Satuan Pekerjaan (D+E) 73,324.16

Page 256
A.8.4.7.13 Pemasangan 1 unit U-ditch 40.40.120 gandar 5 ton
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga (RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119 28,624
Mandor L.04 OH 0.2500 157,992 39,498
JUMLAH TENAGA KERJA 68,122
B BAHAN
U-ditch m2 1.00 490,000.00 490,000
Pasir urug m3 0.03 115,000.00 2,875
JUMLAH HARGA BAHAN 492,875

C PERALATAN % 10 56,099.69 5,609.97


JUMLAH HARGA ALAT 5,609.97
D Jumlah (A+B+C) 566,606.85
E Overhead & Profit 10% x D (maksimum) 56,660.68
F Harga Satuan Pekerjaan (D+E) 623,267.53

A.8.4.7.14 Pemasangan 1 unit U-ditch 40.50.120 gandar 20 ton


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga (RP)
A TENAGA
Pekerja L.01 OH 0.200 143,119 28,624
Mandor L.04 OH 0.2500 157,992 39,498
JUMLAH TENAGA KERJA 68,122
B BAHAN
U-ditch m2 1.00 1,253,560.00 1,253,560
Pasir urug m3 0.03 115,000.00 2,875
JUMLAH HARGA BAHAN 1,256,435

C PERALATAN % 10 132,455.69 13,245.57


JUMLAH HARGA ALAT 13,245.57
D Jumlah (A+B+C) 1,337,802.45
E Overhead & Profit 10% x D (maksimum) 133,780.24
F Harga Satuan Pekerjaan (D+E) 1,471,582.69

A.8.4.7.15 Pemasangan 1 unit Cover U-ditch 50.10.120 gandar 20 ton


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga (RP)
A TENAGA
Pekerja L.01 OH 0.100 143,119 14,312
Mandor L.04 OH 0.0100 157,992 1,580
JUMLAH TENAGA KERJA 15,892
B BAHAN
Cover m2 1.00 490,000.00 490,000
JUMLAH HARGA BAHAN 490,000

C PERALATAN % 5 25,294.59 2,529.46


JUMLAH HARGA ALAT 2,529.46
D Jumlah (A+B+C) 508,421.32
E Overhead & Profit 10% x D (maksimum) 50,842.13
F Harga Satuan Pekerjaan (D+E) 559,263.45

A.8.4.7.16.Pengurugan 1 m3 dengan pasir urug


No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga (RP)
A TENAGA
Pekerja L.01 OH 0.300 143,119.40 42,935.82
Mandor L.04 OH 0.010 157,992.00 1,579.92
JUMLAH TENAGA KERJA 44,515.74
B BAHAN
Pasir urug m3 1.200 115,000.00 138,000
JUMLAH HARGA BAHAN 138,000
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 182,515.74
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 18,251.57
F Harga Satuan Pekerjaan (D+E) 200,767.31

Page 257
DAFTAR HARGA
BAHAN BANGUNAN DAN UPAH KERJA DI WILAYAH KAB. SIDOARJO
PERIODE SEMESTER I TAHUN 2021
SEBELUM PPN

NO NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2021 URAIAN CATATAN


I BATA, BATU DAN PASIR
Bata Merah Buah 580.00
Bata merah press Kelas I Buah 650.00
Bata ringan tebal 10 cm Buah 6,500.00
Bata ringan tebal 7.5 Buah 5,500.00
Bata berongga Buah 3,800.00
Bata Rosster Buah 4,000.00
Batu Kali m3 140,000.00
Batu Split Pecah Mesin 1/2 m3 250,000.00
Batu Split Pecah Mesin 3/5 m3 250,000.00
Batu Split per Kg Kg 208.33
Agregat Klas A m3 185,000.00
Agregat Klas B m3 175,000.00
Pasir Beton m3 230,000.00
Pasir Beton (Bj 1400 ) Kg 230.00
Pasir Pasang (sedang) m3 150,000.00
Pasir Pasang (sedang) (Kg) Kg 150.00
Pasir Urug m3 115,000.00
Tanah Urug m3 100,000.00
Tanah Liat m3 78,000.00
Air Liter 6.50
Batako/HB20 bh 4,500.00
Batako/HB15 bh 4,500.00
Batako/HB10 bh 4,500.00

II BAHAN PEREKAT
Semen (50Kg) Zak 63,000.00
Semen (40Kg) Zak 52,000.00
Semen PC Kg 1,300.00
Semen Warna Kg 12,000.00
MSP Zak 65,000.00
MSP Kg 1,625.00
Semen grouting (25 Kg/Zak ) Kg 5,200.00
Additive Ltr 45,000.00
Kapur Padam m3 270,000.00
Kapur Sirih Kg 2,500.00
Screening (Beton Screening ) (50Kg) Zak 58,000.00
Screening (Beton Screening ) (50Kg) Kg 1,160.00

III BAHAN BESI / BAJA :


Besi U-24 (Polos) Kg 13,000.00
Besi U-39 (Ulir ) Kg 14,000.00
Besi Plat Rata - Rata Kg 14,850.00
Besi Tempa m2 247,500.00
Besi strip tebal 5 mm Kg 11,200.00
Baja Struktur Kg 11,500.00
Baja Struktur titik leleh 3500kg/cm2 Kg 11,500.00
Kawat beton Kg 15,000
Kawat Bronjong Kg 17,600
Kawat Las Kg 29,000
Wiremesh Kg 35,000
Kawat Jaring m 22,600
Kawat Jaring Panjang 240 cm Lembar 54,240
Kawat tali kg 22,000
Kawat nyamuk m2 19,500
Kawat duri Barbwire Galvanize m' 2,900.00
Kawat duri Razorwire 450 Strech 8 -9 m Roll 370,000.00
Kawat duri Razorwire 500 Strech 9 -10 m Roll 395,000.00
Besi Angkur Ø 8 mm Kg 15,500.00
Baut Angkur Kg 35,000.00
Mur + Baut bh 6,540.00
Besi siku L30.30.3 Kg 27,500.00
Besi siku L30.30.3 Lonjor 165,000.00
Besi Hollow (10x10x0,6)mm Lonjor 28,500.00
Besi Hollow (10x10x0,6)mm m' 4,750.00

Page 258
Besi Hollow (20x20x1,60)mm - 6 m Lonjor 51,400.00
Besi Hollow (20x20x1,60)mm - 6 m m' 8,566.67
Besi Hollow (40x40 x3)mm - 6 m Lonjor 95,000.00
Besi Hollow (40x40 x3)mm - 6 m m' 15,833.33
Besi Hollow ( 50x50x3) mm Lonjor 230,000.00
Besi Hollow ( 50x50x3) mm Kg 38,333.33
Top Cross Rail - Heavy Dutty 0,70 mm (metal furing) m' 17,013.89
Furring Channel -Fire Rated 0,50mm (metal furing) m' 15,833.33
Connector Furing (metal furing) Buah 1,800.00
Tutup Besi Tempa 60 x 60 cm Buah 1,760,000.00
Tutup Besi Tempa 80 x 80 cm Buah 2,475,000.00
Baja Ringan Profil C 75.0,75 Batang 88,000
Baja Ringan Profil C 75.0,75 Kg 18,828
Baja Ringan Profil C 75.0,80 Batang 94,000
Baja Ringan Profil C 75.0,80 Kg 16,009
Baja Ringan Profil C 75.1,00 Batang 128,000
Baja Ringan Profil C 75.1,00 Kg 16,474
Baja Ringan Reng 28.45 Batang 35,000
Baja Ringan Reng 30.40 Batang 35,000
Baja Ringan Reng 30.45 Batang 45,000
Baja Ringan Reng 31.45 Batang 45,000
Baja Ringan Reng 32.45 Batang 45,000
Floordeck 0,65 m2 92,000
Floordeck 0,70 m2 100,000
Floordeck 0,75 m2 111,000

IV BAHAN KAYU
Kayu Klas I (Jati ) m3 9,000,000.00
Kayu Klas II (Kamper ) m3 7,000,000.00
Kayu Klas III (Marenti, Keruing , Merbau ) m3 5,500,000.00
Kayu Klas IV (Sengon Laut, Sono ) m3 4,000,000.00
Dolken dia 8 s/d 10 cm m3 27,000.00
Papan kayu kamper m3 8,625,000.00
Kaso-kaso (5 × 7) cm kayu kamper m3 5,175,000.00
Reng (2 × 3) cm kayu kamper m3 6,708,333.33
Kaso-kaso (5 × 7) cm kayu meranti m3 3,500,000.00
Kaso-kaso (5 × 7) cm kayu meranti Btg 75,000.00
Usuk (4x6) cm Kayu meranti m3 3,387,500.00
Kayu meranti (balok) m3 4,861,111.11
Balok kayu kamper m3 5,789,930.56
Bambu (P.600 cm) Btg 25,000.00
Ijuk Kg 5,500
Ijuk M3 1,429,000
list kayu m 21,000
Sirap Kayu buah 5,000

V BAHAN ALMUNIUM , KUSEN , PINTU dan PENGGANTUNG


Kusen Alumunium Profil 3" Putih m' 85,000.00
Kusen Alumunium Profil 3" Brown/Black m' 95,000.00
Kusen Alumunium Profil 4" Putih m' 105,000.00
Kusen Alumunium Profil 4" Brown/Black m' 125,000.00
Slimar Alumunium Profil 3/8" m' 110,000.00
Panel Sunscreen Aluminium m2 112,000.00
Aluminium Composit Panel m2 680,000
Aluminium Foil Singgle m2 6,500.00
Aluminium Foil Double m2 18,500.00
Aluminium Foil Buble Laminated m2 22,500
Aluminium Foil Foam m2 780,000
Rolling Door Allumunium m2 550,000
Alluminium Profil "T" m' 12,000
Kawat Nyamuk Alumunium m2 28,000
Kunci Tanam kecil Buah 76,500
Kunci Tanam Besar 2x Putar Kuningan Buah 139,500
Kunci Tanam Besar 2x Putar Kuningan SOLID Buah 189,800
Kunci Tanam Biasa Buah 69,000
Kunci Tanam Antik Buah 175,600
Kunci tanam KM/WC Buah 55,000
Kuncilemari ex 88 Buah 19,800
Kunci lemari ex Huben Buah 12,500
Engsel Jendela (Kuningan) Set 45,100
Engsel Pintu (Kuningan) Set 58,000
Engsel Jendela (Biasa) Set 3,000
Engsel Pintu (Biasa) Set 53,333
Page 259
Grendel Biasa (Kecil) Buah 12,500
Grendel Biasa (Besar) Buah
Grendel Tanam Buah 30,000
Grendel Kuningan (Kecil) Buah
Grendel Espanyolet Buah
Hak angin sikutan biasa Set 10,000
Hak angin sikutan kuningan Set 28,000
Spring Knip Set 25,000
Door Closed Set 40,000
Door Holder Set 145,000
Door Stop Set 18,000
Engsel angin Set 50,000
Engsel kupu - kupu Set 50,000
Engsel Pintu 5" Set
Rel Pintu Sorong Set 438,000
Silinder buah 60,000
Pintu WPC Buah 725,000
Pintu Kayu Kamper 80-90/220 Buah
Pintu Kayu Jati 80-90/220 Buah
Pintu gulung besi/ rolling door besi m2 500,000
Pintu Harmonika Ex. m2 1,250,000
Folding Door PVC m2 550,000.00
Jendela Nako ( Rangka + Kaca 5 mm) m2
Sealent Tube 36,000

VI BAHAN PELAPIS :
Tripleks 3 mm (120x240)mm Lbr 55,000
Tripleks 4 mm (120x240)mm Lbr 62,000
Tripleks 6 mm (120x240)mm Lbr 90,000
Tripleks 9 mm (120x240)mm Lbr 105,000
Tripleks 12 mm Phenolic Film Lbr 155,000
Formica Lbr 45,000
Plastik Aerator Lbr 12,000

VII BAHAN PERKERASAN , LANTAI & DINDING KERAMIK


Kanstin BDCM 40 cm Buah 17,250.00
Stopper Uskup tebal 6 cm Buah 6,000.00
Kanstin K-300 m1 25,625.00
Paving Block 6 cm natural m2 45,000.00
Paving Block 6 cm warna m2 48,000.00
Paving Block 8 cm natural m2 65,000.00
Paving Block 8 cm warna m2 78,000.00
Ubin granit tile (60x60) cm Bh 134,191.20
Homogeneous Tile 60x60 ex Niro /Estilo: Elda, Carla m2 175,000.00
Keramik Lantai (11x11) cm (polos) buah 568.00
Keramik Lantai (20x20) cm (polos) m2 35,000.00
Keramik Lantai (20x20) cm (Kasar) m2 48,250.00
Keramik Lantai (30x30) cm (polos) buah 5,000.00
Keramik Lantai (30x30) cm (polos) m2 65,000.00
Keramik Lantai (30x30) cm (warna) m2 72,000.00
Keramik Lantai (30x30) cm (warna) buah 5,600.00
Keramik Lantai (33x33) cm m2 97,000.00
Keramik Lantai (40x40) cm (Polos) m2 78,000.00
Keramik Lantai (40x40) cm (Polos) buah 13,000.00
Keramik Lantai (40x40) cm (warna) m2 80,000.00
Keramik Lantai (40x40) cm (warna) buah 13,500.00
Keramik Lantai (50x50) cm (Polos) m2 115,000.00
Keramik Lantai (50x50) cm (warna) m2 118,000.00
Keramik Mozaik (30x30) cm m2 999,000.00
Plint Keramik (10x40) cm Buah 17,000.00
Plint Keramik (10x20) cm Buah 11,000.00
Plint Keramik (10x10)cm Buah 9,000.00
Plint Keramik (5x20)cm Buah 8,000.00
Step Nosing (10x20)cm Buah 16,666.67
Step Nosing (10x30)cm Buah 17,012.12
Step Nosing (10x40)cm Buah 27,787.88
Plint Internal cove buah 2,200.00
Keramik Rock Tile m2 47,500.00
Granite Rock Tile m2 230,000.00
Marmer (100x100) cm m2 535,900.00
Batu alam m2 120,000.00
Granit Lokal / Andesit m2 180,000.00
Tegel alur jalur tuna netra m2 128,000.00
Page 260
Keramik Artistik m2 82,000.00
Teraso Polos Warna STD (30x30)cm m2 75,350.00
Teraso Polos Warna STD (30x30)cm Buah 6,782.00
Teraso Polos Abu abu STD (30x30)cm m2 46,600.00
Teraso Polos Abu abu STD (30x30)cm Buah 4,236.00
Teraso Polos Abu abu STD (20x20)cm m2 43,500.00
Teraso Polos Abu abu STD (20x20)cm Buah 1,740.00
Teraso Motif (30x30)cm m2 81,000.00
Teraso Motif (30x30)cm Buah 7,363.64
Granit (30x30)cm m2 136,000.00
Granit (30x30)cm Buah 12,240.00
Granit (40x40)cm m2 270,000.00
Granit (40x40)cm Buah 31,520.00
Granit (60x60)cm m2 420,500.00
Granit (60x60)cm Buah 584,027.78
Marmer (60x120)cm m2 285,000.00
Marmer (60x120)cm Buah 205,200.00
Marmer (60x60)cm m2 240,000.00
Marmer (60x60)cm Buah 86,400.00
Marmer (40x40)cm m2 190,000.00
Marmer (40x40)cm Buah 30,400.00
Marmer (30x30)cm m2 185,000.00
Marmer (30x30)cm Buah 16,650.00
Plint Ubin (10x20)cm bh 1,620.00
Plint Ubin (10x30)cm bh 3,427.00
Plint Ubin (10x40)cm bh 4,640.00
Plint Ubin Warna (10x20)cm bh 2,100.00
Plint Ubin Warna (10x30)cm bh 3,727.00
Plint Ubin Warna (10x40)cm bh 4,940.00
Plint Gnanit (10x30)cm bh 45,333.33
Plint Gnanit (10x40)cm bh 49,250.00
Plint Teralux Kerang (10x30)cm bh 5,550.00
Plint Teralux Kerang (10x40)cm bh 7,600.00
Plint Teralux Marmer (10x30)cm bh 5,550.00
Plint Teralux Marmer (10x40)cm bh 7,600.00
Plint Teralux Marmer (10x60)cm bh 14,400.00
Lantai Vinyl Box 700,000.00
Lantai Vinyl Buah 21,000.00
Plint Vinyl 15x30 cm Buah 18,750.00
Plint Vinyl profil 10 cm x 240 cm Batang 110,000.00
Karpet Lantai m2 160,000.00
Underlayer m2 7,250.00
Parquet m2 196,000.00
Floor Hardener Kg 17,600.00
Bata Keramik / Klinker m2 243,569.00
Panel Beton Pra cetak 240x50x5 Lbr 135,575.00
Kolom beton Pracetak t.300 Batang 421,080.00

VIII BAHAN PENUTUP ATAP


Genteng Plentong Kecil 25pcs/m2 Buah 1,750
Genteng Pelentong Besar (Murando) 18pcs/m2 Buah 3,500
Genteng Kodok Bambe 20pcs/m2 Buah 4,700
Genteng Kodok Glazur 20pcs/m2 Buah 6,500
Genteng Kodok Goodyear 20pcs/m2 Buah 7,700
Genteng Glazur Ex. KIA Buah 10,500
Genteng Metal Ex.SAKURA Lembar 85,000
Genteng kaca 12 mm Buah 45,000
Genteng Beton Buah 7,500
Genteng Aspal/Sirap Ex CTI m2 120,000
Genteng Aspal/Sirap Ex CTI Buah 4,000
Bubungan Glazur Ex.KIA Buah 20,000
Bubungan Genteng Plentong Buah 8,500
Bubungan Genteng Kodok Buah 9,700
Bubungan Genteng Aspal Buah 65,200.00
Bubungan Genteng Beton Buah 20,000.00
Seng plat 0,3 x 90 m' 18,000
Seng Gelombang BJLS 0,25 x 80 m'
Seng Gelombang BJLS 0,3 x 80 m'
Seng Gelombang BJLS 0,3 x 80 x 210 lembar 86,000
Plat Galvalum BJLS 0,4 x 120 m'
Plat Galvalum BJLS 0,4 x 120 x 240 cm Lembar
Bubung Stel Gelombang 0,92 m lembar 110,000
Bubung Stel Gelombang 1,05 m lembar 110,000
Bubung Stel Gelombang 1,08 m lembar 110,000
Bubung Paten 0,92 m lembar 45,000
Page 261
Bubung Paten 1,05 m lembar 45,000
Bubung Paten 1,08 m lembar 45,000
Asbes gelombang kecil 105 x 240 Lembar 72,000.00
Asbes gelombang kecil 105 x 300 Lembar 82,000.00
Asbes gelombang besar 105 x 250 Lembar 105,000.00
Asbes gelombang besar 105 x 300 Lembar 125,000.00
Asbes Semen Gel. Kecil m2 29,166.00
Asbes Semen Gel Besar m2 41,500.00
Asbes gelombang besar 92 x 250 lbr 110,000.00
Asbes gelombang besar 92 x 300 lbr 110,000.00
Rooflight 90 x 180 lbr 54,000
Nok Stel RATA 0,92 m lbr 104,000
Nok Genteng Aspal buah 80,000
Nok genteng Metal buah 27,000

IX BAHAN KACA
Krepyak Nako Buah 16,000
Kaca Polos 3 mm m2 70,000
Kaca Polos 5 mm m2 180,000
Kaca Polos 8 mm m2 220,000
Kaca Polos 10 mm m2 210,000
Kaca Rayban Tebal 5 mm m2 160,000
Kaca Wireglassed 5 mm m2 99,000
Kaca Tempered 12 mm m2 460,000
Kaca Cermin 5 mm m2 125,000
Kaca Cermin 8 mm m2 150,000
Kaca Patri 5mm m2 2,000,000

X BAHAN PAKU DAN MUR BAUT :


Paku 1 s/d 3 cm Kg 15,000
Paku 5 s/d 10 cm Kg 16,000
Paku 8 s/d 12 cm Kg 16,000
Paku Skrup Bh 700
Paku Payung /Seng 7 cm Kg 28,500.00
Paku Payung /Seng 10 cm Kg 35,000.00
Skrup Gypsum 3 " Bh 300.00
Paku Asbes Sekrup 4 inchi Bh 900.00
Skrup Fixer 4' Bh 950.00
Ramset /Dynabolt Bh 1,800.00
Angkur Bh 17,000.00
Paku pancing 6 x 23 kg 17,100.00

XI BAHAN FINISHING :
Cat Dasar Tembok Kg 20,000
Cat tembok (Interior) Kg 175,000
Cat tembok (Exterior) Kg 185,000
Cat tembok (Exterior) weathershield Kg 62,000
Cat Meni Kayu/besi Kg 40,000
Cat Besi/Kayu Kg 59,000
Dempul Besi Kg 50,000
Cat Anti Karat Kg 32,800
Menie A kg 31,500.00
Menie B kg 24,500.00
Politur Liter 71,000.00
Wood Filler Kg 79,000
Vernis Liter 35,800
Wood Stain Liter 70,000
Sanding Sealer Liter 65,000
Melamic Liter 74,600
Teak Oil Liter 80,000
Thinerr Liter 25,000
Plamir Tembok Kg 30,000
Minyak Begisting Liter 38,000
Seal Tape Bh 3,000
Amplas Lbr 5,000.00
Kuwas / roll Bh 12,000.00
Residu/Olie Bekas Liter 2,900.00
Bensin Liter 7,350.00
Solar Liter 9,400.00
Minyak pelumas Liter 45,000.00
Lem Kayu ex. Rajawali kg 15,000.00
Lem Kayu ex. Fox kg 48,000.00
Lem pipa PVC gel Tube 9,000.00
Lem pipa PVC cair Kaleng 46,000.00
Vertical Blind Standart m2 225,000.00
Page 262
Vertical Blind Backout Deluxe m2 380,000.00
Vertical Blind Solar Screen m2 525,000.00
Wallpaper m 89,000.00
solar liter 9,400.00

XII BAHAN SANITARI


Wastafel 180,000.00
Closet jongkok Unit/Buah 210,000.00
Closet duduk Tanpa Tabung Ex INA Unit/Buah 650,000.00
Closet duduk Tabung Ex INA Unit/Buah 1,680,000.00
Urinoir Unit/Buah 180,000.00
Bak air fiberglas Unit/Buah 275,000.00
Bak air fiberglas 1 m3 Unit/Buah 1,125,000.00
Bak air Teraso Unit/Buah 675,000.00
Shower Spray Unit/Buah 100,000.00
Shower Set Unit/Buah 75,000.00
Floor drain PVC Buah 75,000.00
Floor drain crome Buah 80,000.00
Tempat Sabun Buah 45,000.00
Bak Cuci Piring Teraso Buah 643,500.00
Kitchenzink Unit/Buah 185,000.00
Water Drain + Basket Buah 38,500.00
Kran Air 1/2 " Crome Buah 47,000.00
Kran Air 1/2 (besi) Buah 42,125.00
Kran Air 1/2 (Plastik) Buah 14,950.00
Kran Air 3/4 " Plastik Buah 16,000.00
Kran Air 3/4 (besi) Buah 33,350.00
Kran Angsa 1/2 " (Plastik) Buah 78,000.00
Kran Angsa 1/2 " (Chrome) Buah 342,000.00
Kran Air Panas/Dingin 1/2 " (Chrome) Buah 562,000.00
Bathube Porselen Unit/Buah 8,500,000.00

XIII BAHAN PARTISI DINDING /PLAFOND


Gypsumboard t.9 mm 55,000.00
List Profil 10 cm Gypsum 12,000.00
Rangka plafond Metal furing m2 30,000.00
Kalsiboard 1200x2400x35mm Lembar 67,900.00
Kalsiboard 1200x2400x35mm m2 23,579.00
Akustik (30x30) cm 9 mm lembar 17,000.00
Akustik (30x60) cm 9 mm lembar 19,500.00
Akustik (60x120) cm 9 mm Lembar 34,500.00
Asbes Semen 100x100 t.4 Lembar 18,000.00
Asbes Semen100 x 100 t.5 Lembar
Asbes Semen 120 x 240 t.6 Lembar

XIV BAHAN SALURAN AIR /HIDRANT


Pipa PP Air Panas 1/2 " Ljr 103,200.00
Pipa PP Air Dingin 1/2 " Ljr 100,000.00
Pipa PVC 1/2" Type AW Panjang 4 m Ljr 24,000.00
Pipa PVC 3/4" Type AW Panjang 4 m Ljr 32,000.00
Pipa PVC 1" Type AW Panjang 4 m Ljr 40,000.00
Pipa PVC 1 1/2" Type AW Panjang 4 m Ljr 44,000.00
Pipa PVC 2" Type AW Panjang 4 m Ljr 56,000.00
Pipa PVC 2,5" Type AW Panjang 4 m Ljr 78,000.00
Pipa PVC 3" Type AW Panjang 4 m Ljr 92,000.00
Pipa PVC 4" Type AW Panjang 4 m Ljr 138,000.00
Pipa PVC 5" Type AW Panjang 4 m Ljr 192,000.00
Pipa PVC 6" Type AW Panjang 4 m Ljr 260,000.00
Pipa PVC 8" Type AW Panjang 4 m Ljr 985,400.00
Pipa PVC 10" Type AW Panjang 4 m Ljr 1,400,000.00
Pipa PVC 12" Type AW Panjang 4 m Ljr 2,000,480.00
Pipa PVC 14" Type AW Panjang 4 m Ljr 2,814,560.00
Pipa PVC 16" Type AW Panjang 4 m Ljr 3,518,120.00
Pipa PVC 18" Type AW Panjang 4 m Ljr 4,221,680.00
Pipa PVC 20" Type AW Panjang 4 m Ljr 4,925,330.00
Pipa PVC 22" Type AW Panjang 4 m Ljr 5,628,890.00
Pipa PVC 24" Type AW Panjang 4 m Ljr 6,332,450.00
Pipa PVC 26" Type AW Panjang 4 m Ljr 7,036,010.00
Pipa PVC 28" Type AW Panjang 4 m Ljr 7,739,570.00
pipa HDPE 4" m1 77,150.00
pipa HDPE 5" m1 97,450.00
pipa HDPE 6" m1 160,000.00
pipa HDPE 8" m1 248,500.00
pipa HDPE 10" m1 387,850.00
Page 263
pipa HDPE 12" m1 616,050.00
pipa HDPE 14" m1 986,050.00
pipa HDPE 16" m1 1,246,800.00
pipa HDPE 18" m1 1,537,950.00
Pipa HDPE 20" 500mm m1 2,662,500.00
Pipa HDPE 22" 600mm m1 3,231,300.00
pipa HDPE 24" m1 3,442,750.00
pipa HDPE 28" m1 3,704,700.00
pipa HDPE 30" m1 3,854,700.00
pipa HDPE 32" m1 4,204,700.00
pipa HDPE 34" m1 4,654,700.00
pipa HDPE 36" m1 6,204,700.00
Pipa GIP 2" 4m ljr 472,287.00
Pipa GIP 3" 4m ljr 973,681.00
Pipa GIP 4" 4m ljr 1,432,801.00
Pipa GIP 5" 4m ljr 1,784,983.00
Pipa GIP 6" 4m ljr 2,519,662.00
Pipa GIP 8" 4m ljr 3,793,758.00
Pipa GIP 10" 4m ljr 5,377,240.00
Pipa GIP 12" 4m ljr 7,108,727.00
Pipa GIP 14" 4m ljr 8,430,078.00
Pipa GIP 16" 4m ljr 10,993,428.00
Pipa GIP 18" 4m ljr 13,897,369.00
Pipa GIP 20" 4m ljr 16,353,727.00
Pipa GIP 22" 4m ljr 18,810,085.00
Pipa GIP 24" 4m ljr 21,266,443.00
Pipa GIP 26" 4m ljr 23,722,801.00
Pipa GIP 28" 4m ljr 26,179,159.00
Pipa DCI 4" 100mm m1 122,000.00
Pipa DCI 6" 150mm m1 274,400.00
Pipa DCI 8" 200mm m1 488,300.00
Pipa DCI 10" 250mm m1 687,500.00
Pipa DCI 12" 300mm m1 915,000.00
Pipa DCI 14" 350mm m1 1,175,000.00
Pipa DCI 16" 400mm m1 2,162,500.00
Pipa DCI 18" 450mm m1 2,412,500.00
Pipa DCI 20" 500mm m1 2,662,500.00
Pipa DCI 22" 600mm m1 3,231,300.00
Pipa DCI 24" 800mm m1 4,325,000.00
Pipa DCI 26" 900mm m1 4,575,000.00
Pipa DCI 28" 1000mm m1 5,400,000.00
Pipa DCI 30" 1100mm m1 5,650,000.00
Pipa DCI 32" 1200mm m1 5,900,000.00
Pipa Baja 2" 63mm ljr 311,080.00
Pipa Baja 4" 100mm ljr 911,990.00
Pipa Baja 5" 125mm ljr 1,241,890.00
Pipa Baja 6" 150mm ljr 1,611,820.00
Pipa Baja 8" 200mm ljr 2,421,350.00
Pipa Baja 10" 250mm ljr 3,431,670.00
Pipa Baja 12" 300mm ljr 4,541,610.00
Pipa Baja 14" 350mm ljr 5,382,350.00
Pipa Baja16" 400mm ljr 7,028,100.00
Pipa Baja18" 450mm ljr 8,881,600.00
Pipa Baja 20" 500mm ljr 10,451,940.00
Pipa Baja 22" 600mm ljr 10,851,940.00
Pipa Baja 24" 800mm ljr 14,558,370.00
Pipa Baja 26" 900mm ljr 15,008,370.00
Pipa Baja 28" 1000mm ljr 15,458,370.00
Pipa Baja 30" 1100mm Ljr 15,958,370.00
Pipa Baja 32" 1200mm Ljr 16,458,370.00
Valve Ø 150 mm Ljr 12,000.00
Valve Ø 200 mm Ljr 15,000.00
Valve Ø 250 mm Ljr 20,000.00
Valve Ø 300 mm Ljr 26,000.00
Valve Ø 400 mm Ljr 32,000.00
Valve Ø 450 mm Ljr 19,170,000.00
Valve Ø 500 mm Ljr 22,497,000.00
Valve Ø 600 mm Ljr 26,157,000.00
Valve Ø 700 mm Ljr 30,540,000.00
Valve Ø 800 mm Ljr 32,940,000.00
Valve Ø 900 mm Ljr 36,267,000.00
Valve Ø 1000 mm Ljr 39,927,000.00

Page 264
Valve Ø 1100 mm Ljr 44,310,000.00
Valve Ø 1200 mm Ljr 46,710,000.00
Tee Ø 150 mm Ljr 18,000.00
Tee Ø 200 mm Ljr 25,000.00
Tee Ø 250 mm Ljr 36,000.00
Tee Ø 300 mm Ljr 54,000.00
Tee Ø 400 mm Ljr 1,244,300.00
Tee Ø 450 mm Ljr 1,496,500.00
Tee Ø 500 mm Ljr 1,748,700.00
Tee Ø 600 mm Ljr 2,000,900.00
Tee Ø 700 mm Ljr 2,253,100.00
Tee Ø 800 mm Ljr 2,505,300.00
Tee Ø 900 mm Ljr 2,757,500.00
Tee Ø 1000 mm Ljr 3,009,700.00
Tee Ø 1100 mm Ljr 3,261,900.00
Tee Ø 1200 mm Ljr 3,514,100.00
Pipa PVC 11/2" Type C Panjang 4 m Ljr 51,318.75
Pipa PVC 2" Type C Panjang 4 m Ljr 39,847.50
Pipa PVC 3" Type C Panjang 4 m Ljr 90,562.50
Pipa PVC 4" Type C Panjang 4 m Ljr 144,900.00
Pipa PVC 5" Type C Panjang 4 m Ljr 265,000.00
Pipa PVC 6" Type C Panjang 4 m Ljr 365,000.00
Pipa PVC D dia 30 cm m1 298,221.00
Pipa GalvanisDia 1/2 " m1 48,760.00
Pipa GalvanisDia 3/4 " m1 64,250.00
Pipa GalvanisDia 1 " m1 67,540.00
Pipa GalvanisDia 1,5" Ljr 555,000.00
Pipa GalvanisDia 1,5" m1 92,500.00
Pipa GalvanisDia 2,5" m1 133,866.00
Pipa Hidrant Schedule 40 1/2 " Panjang 6 meter Ljr 83,619.00
Pipa Hidrant Schedule 40 3/4 " Panjang 6 meter Ljr 110,923.00
Pipa Hidrant Schedule 40 1 " Panjang 6 meter Ljr 164,394.00
Pipa Hidrant Schedule 40 1 1/4 " Panjang 6 meter Ljr 224,891.00
Pipa Hidrant Schedule 40 1 1/2 " Panjang 6 meter Ljr 266,735.00
Pipa Hidrant Schedule 40 2 " Panjang 6 meter Ljr 356,881.00
Pipa Hidrant Schedule 40 2 1/2 " Panjang 6 meter Ljr 567,700.00
Pipa Hidrant Schedule 40 3 " Panjang 6 meter Ljr 740,525.00
Pipa Hidrant Schedule 40 4 " Panjang 6 meter Ljr 1,053,487.00
Pipa Hidrant Schedule 40 5 " Panjang 6 meter Ljr 1,425,507.00
Pipa Hidrant Schedule 40 6 " Panjang 6 meter Ljr 1,842,465.00
Pipa Hidrant Schedule 40 8 " Panjang 6 meter Ljr 2,818,590.00
Pipa Hidrant SCH 40 (Galvanis) 1/2 " Panjang 6 meter Ljr 113,768.00
Pipa Hidrant SCH 40 (Galvanis) 3/4 " Panjang 6 meter Ljr 151,311.00
Pipa Hidrant SCH 40 (Galvanis) 1 " Panjang 6 meter Ljr 224,122.00
Pipa Hidrant SCH 40 (Galvanis) 1 1/4 " Panjang 6 meter Ljr 306,035.00
Pipa Hidrant SCH 40 (Galvanis) 1 1/2 " Panjang 6 meter Ljr 363,487.00
Pipa Hidrant SCH 40 (Galvanis) 2 " Panjang 6 meter Ljr 485,787.00
Pipa Hidrant SCH 40 (Galvanis) 2 1/2 " Panjang 6 meter Ljr 773,619.00
Pipa Hidrant SCH 40 (Galvanis) 3 " Panjang 6 meter Ljr 1,009,118.00
Pipa Hidrant SCH 40 (Galvanis) 4 " Panjang 6 meter Ljr 1,436,177.00
Pipa Hidrant SCH 40 (Galvanis) 5 " Panjang 6 meter Ljr 1,942,011.00
Pipa Hidrant SCH 40 (Galvanis) 6 " Panjang 6 meter Ljr 2,510,849.00
Pipa Hidrant SCH 40 (Galvanis) 8 " Panjang 6 meter Ljr 3,862,976.00
Stop kran dia 1" bh 25,000.00
Klep diameter 3/4" bh 25,000.00
Tangki air 1000 liter bh 2,450,000.00
Tangki air 500 liter bh 1,175,000.00
Pelampung otomatis bh 60,000.00
Roof Drain Metal Bh 25,000.00
Mesin Jet Pump kap.250 watt unt 1,250,000.00
Mesin Pompa tekan kap. 150 watt unt 400,000.00
Box Colvert 40.40.100 (gandar 20ton) Unit 1,100,000.00
U Ditch 40.40.120 (G 5 Ton) Unit 490,000.00
U Ditch 40.50-120 cm+Cover (G.20 Ton ) Buah 1,253,560
U Ditch 40.50-120 cm+Cover (G.10 Ton ) Buah 844,580
U Ditch 60.60-120 cm+Cover (G.20 Ton ) Buah 1,996,500
U Ditch 60.60-120 cm+Cover (G.10 Ton ) Buah 1,148,290
U Ditch 60.80-120 cm+Cover (G.20 Ton ) Buah 2,291,740
U Ditch 60.80-120 cm+Cover (G.10 Ton ) Buah 1,497,980
U Ditch 100.100-120 cm+Cover (G.20 Ton ) Buah 4,503,620
U Ditch 150.100-120 cm+Cover (G.20 Ton ) Buah 6,158,900
U Ditch 150.150-120 cm+Cover (G.20 Ton ) Buah 7,358,010

Page 265
U Ditch 200.100-120 cm+Cover (G.20 Ton ) Buah 7,533,460
U Ditch 200.150-120 cm+Cover (G.20 Ton ) Buah 8,941,900
U Ditch 300.100-120 cm+Cover (G.20 Ton ) Buah 13,610,080
U Ditch 300.150-120 cm+Cover (G.20 Ton ) Buah 14,880,580
U Ditch 60.60-120 cm (G.10 Ton ) tanpa cover Buah 655,600
U Ditch 60.80-120 cm (G.10 Ton ) tanpa cover Buah 941,600
DUB 400.300-120 cm (G.20 Ton ) (Top+Bottom) Buah 27,571,060
U Ditch 40.50-120 cm (G.10 Ton ) tanpa cover Buah 484,000
Sheet Pile (FPC 320.500) (Mcr min 13,00 ton.m) m1 758,670
U-ditch 100.100 - 120 cm + cover (G. 10 TON) Buah 2,701,710
DUB 500.200 - 200 cm (G. 20 TON) (TOP + Bottom) Buah 42,075,330
U-ditch 500.150 - 120 cm + Cover (G. 20 TON) Buah 28,666,110
U-ditch 600.150 - 120 cm + Cover (G. 20 TON) Buah 37,667,300.00
U-ditch 50.70 - 120 cm + Cover (G.20 TON) Buah 1,965,040.00
DUB 200.200 - 120 cm (G. 20 TON) ( TOP+Bottom) Buah 10,219,660.00
DUB 300.200 - 120 cm (G. 20 TON) ( TOP+Bottom) Buah 17,399,800.00
Buis beton dia 20 cm m1 77,000.00
Buis beton dia 30 cm m1 104,500.00
Buis beton dia 50 cm m1 126,500.00
Buis beton dia 60 cm m1 181,500.00
Buis beton dia 90 cm m1 231,000.00
Buis beton U dia 20 cm m1 55,000.00

Page 266
Buis beton U dia 30 cm m1 71,500.00
Tandon Cor 1 m3 Buah 2,695,000.00
Tandon Cor 2 m3 Buah 4,070,000.00
Tandon Cor 3 m3 Buah 4,620,000.00
Tandon Cor 4 m3 Buah 7,260,000.00
Tandon Cor 5 m3 Buah 9,570,000.00
Water Stop PVC 150 m' 8,000.00
Water Stop PVC 200 m' 8,000.00
Water Stop PVC 250 m' 8,000.00
Penjaga jarak bekisting/spacer Buah 1,300.00
Pipa Beton 30-100 cm m 124,200
Pipa Beton 15-20 cm m 21,600

XV PERALATAN ELEKTRIKAL
Box panel PVC isi 4 MCB Buah 25,000
MCB 10 Ampere Buah 80,000
MCB 6 Ampere Buah 42,000
MCB 4 A Buah 35,000
MCB 2 Ampere Buah 29,000
Kabel NYM 2 x 2,5 mm2 Buah 9,000
Kabel NYM 3 x 2,5 mm2 Buah 12,000
Kabel Telepon m1 6,000
Kabel UTP Cat 5 e m1 4,000.00
Kabel UTP Cat 6 e m1 11,978.00
Konektor RJ 45 Set 3,125.00
Isolator Buah 7,000
Saklar Tunggal Buah 13,000
Saklar Ganda Buah 15,000
Stop Kontak Buah 13,000
Outlet TV Buah 7,000
Outlet Telephone Buah 5,000
Down light / PLC 13 W Buah 35,000
Fitting Plafon Buah 15,000
Fiting Gantung EX Broco Buah 12,000.00
Lampu TL 2 x 18 watt grille Buah 45,000
Lampu TL 2 x 36 watt grille Buah 58,000
Kabel NYA 1.5 mm m1 5,000.00
Kabel NYA 1.5 mm (50m) rool 100,000.00
Kabel NYA 1.5 mm (100m) rool 300,000.00
Kabel NYA 2 x 1.5 mm m1 6,000.00
Klem Kabel pack 13,000.00
Kabel NYA 500 Volt 2 x 2,5 mm2 m' 9,000.00
Pipa Pralon 5/8 Lonjor 11,500.00
L Bow 5/8 Buah 1,000.00
T Doos Pvc Buah 3,450.00

XVI BAHAN LAIN - LAIN


Sabun Colek Kg 12,000.00
Beton Readymix K-175 m3 825,000.00
Beton Readymix K-200 m3 847,000.00
Beton Readymix K-225 m3 880,000.00
Beton Readymix K-250 m3 902,000.00
Beton Readymix K-275 m3 924,000.00
Beton Readymix K-300 m3 946,000.00
Beton Readymix K-350 m3 1,012,000.00
Beton Readymix K-400 m3 1,034,000.00
Beton Readymix K-450 m3 1,056,000.00
Beton Readymix K-500 m3 1,210,000.00

Page 267
B SEWA PERALATAN
1 ASPHALT MIXING PLANT E01 5,300,000.00
2 ASPHALT FINISHER E02 300,000.00
3 ASPHALT SPRAYER E03 150,000.00
4 BULLDOZER 100-150 HP E04 362,895.00 Sewa jam
5 COMPRESSOR 4000-6500 L/M E05 157,500.00
6 CONCRETE MIXER 0.3-0.6 M3 E06 575,200.00 Sewa hari
7 CRANE 10-15 TON E07 852,500.00 Sewa jam
8 DUMP TRUCK 3.5 TON E08 210,000.00 Sewa jam
9 DUMP TRUCK 10 TON E09 210,000.00 Sewa jam
10 EXCAVATOR 80-140 HP E10 442,915.00 Sewa jam
11 FLAT BED TRUCK 3-4M3 E11 95,000.00 Sewa jam
12 GENERATOR SET E12 150,000.00 Sewa Jam
13 MOTOR GRADER >100 HP E13 500,934.00 Sewa Jam
14 WHEEL LOADER 1.0-1.6 M3 E14 157,500.00 Sewa Jam
15 THREE WHEEL ROLLER 6-8 T E15 178,500.00 Sewa Jam
16 TANDEM ROLLER 6-8 T E16 157,500.00 Sewa Jam
17 TIRE ROLLER 6-8T E17 157,500.00 Sewa Jam
18 VIBRATORY ROLLER 5-8T E18 381,050.00 Sewa Jam
19 CONCRETE VIBRATOR E19 104,000.00 Sewa Hari
20 WATER TANKER 3000-4500 L. E20 217,970.00 Sewa Jam
21 PEDESTRIAN ROLLER E21 78,750.00 Sewa Jam
22 STAMPER E22 150,000.00 Sewa Jam
23 JACK HAMMER E23 250,000.00 Sewa Jam
24 CONCRETE PUMP E24 150,000.00 Sewa Hari
25 TRAILER 20 TON E25 210,000.00 Sewa Jam
26 PILE DRIVER + HAMMER E26 400,000.00 Sewa Jam
27 CRANE ON TRACK 35 TON E27 350,000.00 Sewa Jam
28 BORE PILE MACHINE E28 180,000.00 Sewa Jam
29 TRONTON E29 200,000.00 Sewa Hari
30 COLD MILLING E30 2,100,000.00 Sewa Hari
31 AGGREGAT (CHIP) SPREADER E31 584,000.00 Sewa jam
32 ASPHALT DISTRIBUTOR E32 150,000.00 Sewa jam
33 TRUCK MIXER (AGITATOR) E33 312,500.00 Sewa jam
34 BORE PILE MACHINE E34 180,000.00 Sewa jam
35 CRANE ON TRACK 75-100 TON E35 850,000.00 Sewa jam
36 ASPHALT LIQUID MIXER E36 150,000.00 Sewa jam
37 MESIN LAS 300 A diesel E37 350,000.00 Sewa hari
38 PILE DRIVER LEADER, 75 kw E38 160,000.00 Sewa jam
39 CHAIN SAW E39 68,250.00 Sewa jam
40 BATCHING PLANT E40 2,100,000.00 Sewa hari
41 PALU/GODAM (BAJA KERAS) E41 82,500.00 Buah
42 PAHAT/BETON (BAJA KERAS) E42 64,500.00 Buah
43 LINGGIS (BAJA KERAS) E43 80,000.00 Buah
44 ALAT UKUR WATERPASS E44 128,800.00 Sewa Hari
45 POMPA AIR E45 36,875.00 Sewa jam
46 PONTON E46 1,837,500.00 Sewa Hari
47 TRIPOT & TRIMBIS E47 625,000.00 Sewa Hari
48 THEODOLITE / TOTAL STATION E48 300,000.00 Sewa Hari
49 Scafolding E49 30,000 Set/Hari
50 Pipe Support E50 35,000 Set/Hari
51 Mesin Gergaji E51 618,500 Sewa Hari

Page 268
C UPAH
1 Pekerja Oh 143,119.40
2 Tukang Batu Oh 147,992.00
3 Tukang Las konstruksi Oh 147,992.00
4 Tukang Cat Oh 147,992.00
5 Tukang Las biasa Oh 147,992.00
6 Tukang alumunium Oh 147,992.00
7 Tukang Kayu Oh 147,992.00
8 Tukang besi Oh 147,992.00
9 Kepala Tukang Oh 149,992.00
10 Mandor Oh 157,992.00
11 Operator jam 25,413.00 203,304.00
12 Pembantu Operator jam 22,413.00 179,304.00
13 Sopir/Driver jam 22,414.00 179,312.00
14 Pembantu Sopir/Driver jam 18,664.00 149,312.00
15 Mekanik jam 23,976.00 191,808.00
16 Pembantu Mekanik jam 22,413.00 179,304.00
17 Juru Ukur jam 23,872.00 190,976.00

Page 269
PERHITUNGAN VOLU

PEKERJAAN : Gedung Asrama Putri


LOKASI : BLK Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN

A PEKERJAAN STRUKTR
I Pekerjaan Persiapan
1 Uitset mengunakan theodolith
2 Pembuatan Bedeng 3.00 6.00
3 Pemasangan Bouwplank 46.30 20.40 66.70
4 Pembersihan lokasi 48.30 22.40

II Pekerjaan Tanah
1 Galian Tanah
PC3 20.00 1.47 CAD 0.75
PC6 4.00 2.93 CAD 0.75
PC7 24.00 2.80 CAD 0.75

2 Galian Tanah
S1 20 x 40 44.00 m1 0.40 0.35
S1 20 x 40 72.00 m1 0.40 0.35
S2 25 x 50 84.00 0.45 0.40
S3 20 x 40 264.00 0.40 0.35
S4 15 x 20 100.00 0.35 0.30
3 Pengurugan Kembali Galian Tanah PC 81.24 49.06
Pengurugan Kembali Galian Tanah Sloo 78.82 43.90
4 Pengurukan dibawah lantai Dengan Tanah Urug 4.00 18.00
4.00 16.00
5 Pemadatan Tanah
6 Urugan pasir
Urugan Pasir dibawah Pile Cap =10cm
PC3 20.00 1.47 CAD 0.10
PC6 4.00 2.93 CAD 0.10
PC7 24.00 2.80 CAD 0.10
Urugan Pasir dibawah Sloof=10cm
S1 20 x 40 44.00 m1 0.20 0.10
S1 20 x 40 72.00 m1 0.20 0.10
S2 25 x 50 84.00 0.25 0.10
S3 20 x 40 264.00 0.20 0.10
S4 15 x 20 100.00 0.15 0.10

Urugan Pasir dibawah Lantai =10cm 4.00 18.00


4.00 16.00
Lantai kerja beton f'c 7,4 Mpa dibawah Pile Cap, sloof, lantai bawah = 5 cm
7 PC
PC3 20.00 1.47 CAD 0.05
PC6 4.00 2.93 CAD 0.05
PC7 24.00 2.80 CAD 0.05

Sloof
S1 20 x 40 44.00 m1 0.20 0.05
S1 20 x 40 72.00 m1 0.20 0.05
S2 25 x 50 84.00 0.25 0.05
S3 20 x 40 264.00 0.20 0.05
S4 15 x 20 100.00 0.15 0.05

Lantai
Lantai 4.00 18.00
4.00 16.00

III Pekerjaan Struktur


A Pondasi
1 Bored pile
a Bored pile Ø 30 cm , 4 m ( asumsi )
BP 3 20.00 3.00 4.00
BP6 4.00 4.00 4.00
BP7 24.00 7.00 4.00
Besi 68.95 200.00
Beton
2 Pile Cap
Beton f'c 21,7 Mpa
PC3 20.00 1.03 CAD 0.60
PC6 4.00 2.33 CAD 0.60
PC7 24.00 2.16 CAD 0.60
Begisting
PC3 20.00 4.01 0.60
PC6 4.00 5.68 0.60
PC7 24.00 6.00 0.60
Besi 49.06 200.00

3 Sloof
Beton
S1 20 x 40 44.00 m1 0.20 0.40
S1 20 x 40 72.00 m1 0.20 0.40
S2 25 x 50 84.00 0.25 0.50
S3 20 x 40 264.00 0.20 0.40
S4 15 x 20 100.00 0.15 0.20
Begisting
S1 20 x 40 44.00 m1 2.00 0.40
S1 20 x 40 72.00 m1 2.00 0.40
S2 25 x 50 84.00 2.00 0.50
S3 20 x 40 264.00 2.00 0.40
S4 15 x 20 100.00 2.00 0.20
Besi 43.90 200.00

B Lt SATU
1 Beton lantai tebal 8 cm fc 21,7 Mpa 8-200 4.00 18.00
4.00 16.00
Besi dia 8 - 200 ; 1 lapis 57.60 55.00 kg
11.00 m1 12.50
2 Kolom
K1 Begisting 8.00 0.25 0.30
25x30 Besi 1.92 200.00
Beton f'c 21,7 Mpa ( K 250 ) 8.00 0.25 0.30

K2 Begisting 8.00 0.25 0.60


25x60 Besi 3.84 200.00
Beton f'c 21,7 Mpa ( K 250 ) 8.00 0.25 0.60

K3 Begisting 20.00 0.25 0.25


25x25 Besi 4.00 200.00
Beton f'c 21,7 Mpa ( K 250 ) 20.00 0.25 0.25

K4 Begisting 16.00 0.25 0.50


25x50 Besi 6.40 200.00
Beton f'c 21,7 Mpa ( K 250 ) 16.00 0.25 0.50

KP 12 x 12 f'c 17 Mpa
1 Begisting 192.00 0.12 0.12
Besi 8.85 200.00
Beton f'c 17,4 Mpa ( K 200 ) 192.00 0.12 0.12

Tangga
Begisting
pelat pondasi 1.00 2.00
pelat pondasi vertikal 0.15 2.00
Pelat tangga 5.15 1.93
anak tangga 1.93 0.18
balok borders tangga 0.20 0.25
Besi 4.81 200.00
Struktur tangga f'c 21,7 Mpa ( K 250 )
pelat pondasi 1.00 2.00
pelat pondasi vertikal 1.00 2.00
Pelat tangga 5.15 1.93
anak tangga 0.50 0.30
balok bordsers tangga 0.20 0.25

lantai 2
1 Balok
Begisting
B1 20 x 40 44.00 m1 2.00 0.40
B1 20 x 40 72.00 m1 2.00 0.40
B2 25 x 50 84.00 m1 2.00 0.50
B3 20 x 40 264.00 m1 2.00 0.40
B4 15 x 20 100.00 m1 2.00 0.20
BA 15 x 30 100.00 m1 2.00 0.30
Besi 33.27 m1 200.00
Beton
B1 20 x 40 44.00 m1 0.20 0.40
B1 20 x 40 72.00 m1 0.20 0.40
B2 25 x 50 84.00 m1 0.25 0.50
B3 20 x 40 264.00 m1 0.20 0.40
B4 15 x 20 100.00 m1 0.15 0.20
BA 15 x 30 104.00 m1 0.15 0.30

2 Pelat lantai 2
Begisting 4.00 18.00
4.00 16.00
pengurangan void 2.65 1.33
3.80 2.88
Besi 83.41 100.00
Beton lantai tebal 12 cm fc 21,7 Mpa 4.00 18.00
4.00 16.00
pengurangan void 2.65 1.33
3.80 2.88

3 Kolom
K1 Begisting 8.00 0.20 0.25
20x25 Besi 1.28 200.00
Beton f'c 21,7 Mpa ( K 250 ) 8.00 0.20 0.25

K2 Begisting 8.00 0.25 0.30


25x30 Besi 1.92 200.00
Beton f'c 21,7 Mpa ( K 250 ) 8.00 0.25 0.30

K3 Begisting 20.00 0.15 0.20


15x20 Besi 1.92 200.00
Beton f'c 21,7 Mpa ( K 250 ) 20.00 0.15 0.20

K4 Begisting 16.00 0.15 0.25


15x25 Besi 1.92 200.00
Beton f'c 21,7 Mpa ( K 250 ) 16.00 0.15 0.25

4 KP 12 x 12 f'c 16,9 Mpa


Begisting 192.00 0.12 0.12
Besi 8.85 200.00
Beton f'c 17,4 Mpa ( K 200 ) 192.00 0.12 0.12
Lantai atap
1 Balok
Begisting
B1 20 x 40 44.00 m1 2.00 0.40
B2 25 x 50 28.00 m1 2.00 0.50
B3 20 x 40 48.00 m1 2.00 0.40
BA 15 x 30 16.00 m1 2.00 0.30
Besi 8.24 m1 200.00
Beton
B1 20 x 40 44.00 m1 0.20 0.40
B2 25 x 50 28.00 m1 0.25 0.50
B3 20 x 40 48.00 m1 0.20 0.40
BA 15 x 30 16.00 m1 0.15 0.30

2 Pelat lantai atap


Begisting 4.00 18.00
Besi 17.28 100.00
Beton lantai tebal 12 cm fc 21,7 Mpa 4.00 18.00

3 Ring balok 15 x 20
RB Begisting 344.00 - 0.20
15x20 Besi 10.32 150.00
Beton f'c 21,7 Mpa ( K 250 ) 344.00 0.15 0.20

RB Begisting 6.25 - 0.12


10X12 Besi 1.20 100.00
Beton f'c 21,7 Mpa ( K 250 ) 6.25 0.10 0.12

RB Begisting 104.00 - 0.20


15x20 Besi 3.12 150.00
Beton f'c 21,7 Mpa ( K 250 ) 104.00 0.15 0.20

4 Kolom
K1 Begisting 48.16 0.15 0.20
15x20 Besi 1.44 150.00
Beton f'c 21,7 Mpa ( K 250 ) 48.16 0.15 0.20

K2 Begisting 37.27 0.15 0.20


15x20 Besi 1.12 150.00
Beton f'c 21,7 Mpa ( K 250 ) 37.27 0.15 0.20

IV Pekerjaan Atap
1 Rangka Baja Ringan 4.63 18.30
15.76 19.20
2 Spandek berwarna Thk. 0,3mm
3 Pekerjaan listplank kalsiplank - 15.76 2.00
19.20 2.00
3.85 1.00

V Pekerjaan Lain-lain
1 Kisi - kisi t jemur
Begisting 0.30 0.15
Besi 8.67 100.00
Beton f'c 21,7 Mpa ( K 250 ) 0.30 0.15

Pelester 0.30 0.15


Acian
Cat exterior
Besi hollow 40x 60 9.40 m 7.10
Cat besi hollow 0.33 /m 400.44 m1 0.04
2 Waterproofing dak atap t jemur dan screedeing
Waterproofing coating ex sika 4.15 18.15
Screeding 4.15 18.15

B PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
LANTAI 1
1 Pekerjaan Bata Merah 4.00 hor 3.00 16.00
km 2.85 hor 1.00 16.00
t jemur, setrika,r bersama 4.00 hor 2.00 2.00
lobby 4.00 hor 1.00 2.00
t jemur, setrika,r bersama 2.35 hor 2.00 2.00
t jemur, setrika,r bersama 18.00 ver 2.00 2.00
6.00 ver 2.00 4.00
6.50 ver 2.00 4.00
km 1.00 ver 2.00 16.00

2 Pekerjaan Plesteran 1,349.53 2.00


dinding area balok 125.40 cad 0.45
dinding keramik km, shower 380.80
3 Pekerjaan Acian
4 Acian Dak Beton
5 Pekerjaan Dinding Loster 1.80 0.80 2.00
samping kiri kanan 2.60 2.20 2.00
samping kiri kanan 1.20 2.20 2.00
t jemur, r setrika 2.35 3.00 4.00
LANTAI 2
1 Pekerjaan Bata Merah 4.00 hor 3.00 16.00
km 2.85 hor 1.00 16.00
t jemur, setrika,r bersama 4.00 hor 2.00 2.00
lobby 4.00 hor 1.00 2.00
t jemur, setrika,r bersama 2.35 hor 2.00 2.00
t jemur, setrika,r bersama 18.00 ver 2.00 2.00
6.00 ver 2.00 4.00
6.50 ver 2.00 4.00

km 1.00 ver 2.00 16.00

2 Pekerjaan Plesteran 1,340.69 2.00


dinding area balok 125.40 cad 0.45
380.80
3 Pekerjaan Acian
4 Acian Dak Beton
5 Pekerjaan Dinding Loster 1.80 0.80 2.00
samping kiri kanan 2.60 2.20 2.00
samping kiri kanan 1.20 2.20 2.00
t jemur, r setrika 2.35 3.00 4.00
t belakang 3.60 2.80 1.00

LANTAI ATAP
1 Pekerjaan Bata Merah 16.00 2.67 2.00
16.00 1.34 2.00
atap tengah dpn 4.00 4.79 1.00
atap tengah bklg 4.00 2.15 1.00
19.16 2.15 2.00
19.16 1.35 2.00
bt loster 3.60 2.80 1.00
2 Pekerjaan Plesteran 279.96 2.00

3 Pekerjaan Acian
4 Loster 3.60 2.80 1.00

II PEKERJAAN PLAFON
LANTAI 1
1 Pekerjaan Rangka plafond Plafond
unit kamar, WC, shower cad 20.72 1.45
r cuci, r jemur cad 27.24
r bersama, r setrika cad 45.60
selasar cad 149.64
pengurangan void selasar 2.65 1.33
pengurangan void tangga 3.80 2.88
2 Pekerjaan Plafond Gypsumboard
3 Pekerjaan List Plafond
unit kamar, WC, shower cad 22.77 4.60
r cuci, r jemur cad 22.61
r bersama, r setrika cad 41.00
selasar cad 105.60
void selasar cad 13.80

LANTAI 2
1 Pekerjaan Rangka plafond Plafond
unit kamar, WC, shower cad 20.72 1.45
r cuci, r jemur cad 27.24
r bersama, r setrika cad 45.60
selasar cad 149.64
2 Pekerjaan Plafond Gypsumboard
3 Pekerjaan List Plafond
unit kamar, WC, shower cad 22.77 4.60
r cuci, r jemur cad 22.61
r bersama, r setrika cad 41.00
selasar cad 105.60
void selasar cad 13.80

III PEKERJAAN KERAMIK


LANTAI 1
1 Pek. keramik lantai 60x60cm homogenous tile polish
unit kamar cad 20.72
r bersama, r setrika cad 45.60
selasar cad 149.64

2 Pek. keramik lantai 60x60cm homogenous tile unpolish


r cuci, r jemur cad 27.24
teras cad 12.56 3.33

3 Pek. Keramik Lantai 20x20cm (kamar mandi) unpolish


WC, shower cad 1.45

4 Pek. Keramik Dinding 20x40cm (kamar mandi) polish


WC cad 5.10 m1 2.80
shower cad 4.60 m1 2.80

5 Pekerjaan keramik tangga 30x30cm polish


lantai, antrede 5.00 3.82
optrede 0.18 3.82

LANTAI 2
1 Pek. keramik lantai 60x60cm homogenous tile polish
unit kamar cad 20.72
r bersama, r setrika cad 45.60
selasar cad 149.64
pengurangan void selasar 2.65 1.33
pengurangan void tangga 3.80 2.88

2 Pek. keramik lantai 60x60cm homogenous tile unpolish


r cuci, r jemur cad 27.24
teras cad 12.56 3.33

3 Pek. Keramik Lantai 20x20cm (kamar mandi) unpolish


WC, shower cad 1.45

4 Pek. Keramik Dinding 20x40cm (kamar mandi) polish


WC cad 5.10 m1 2.80
shower cad 4.60 m1 2.80

IV PEKERJAAN KUSEN PINTU & JENDELA


a lantai 1
1 Pintu PU 1.00 1.00
2 Pintu P1 1.00 16.00
3 Pintu P2 2.00 16.00
4 Jendela J1 1.00 16.00
5 Pintu t jemur 1.00 2.00
b Lantai 2
1 Pintu P1 1.00 16.00
2 Pintu P2 2.00 16.00
3 Jendela J1 1.00 16.00
4 Jendela J2 1.00 1.00
5 Pintu t jemur 1.00 2.00

V PEKERJAAN PENGECATAN & FINISHING


LANTAI 1
1 Pekerjaan Pengecatan Interior
pekerjaan acian 2,374.69 303.74
2 Pekerjaan Pengecatan Exterior
44.30 18.40 62.70
J1 1.90 2.70 16.00
PU 3.70 3.00 1.00
bt krw 1.80 0.80 2.00
bt krw 2.60 2.20 2.00
bt krw 1.20 2.20 2.00
kisi2 9.70 1.80 2.00
3 Pekerjaan Pengecatan Plafond luasan pemasangan plafond
LANTAI 2
1 Pekerjaan Pengecatan Interior
pekerjaan acian 2,357.01 294.90
2 Pekerjaan Pengecatan Exterior
44.30 18.40 62.70
J1 1.90 2.70 16.00
j2 3.40 2.90 1.00
bt krw 1.80 0.80 2.00
bt krw 2.60 2.20 2.00
bt krw 1.20 2.20 2.00
kisi2 9.70 1.80 2.00
bt krw blk 3.60 2.80 1.00
3 Pekerjaan Pengecatan Plafond luasan pemasangan plafond

LANTAI ATAP
1 Pekerjaan Pengecatan Exterior 44.30 4.60 48.90
44.30 18.40 62.70
2 Pekerjaan Pengecatan Listplank GRC 44.30 18.40 62.70

VI PEKERJAAN ORNAMEN
1 Pekerjaan Letter GEDUNG ASRAMA
lbr bwh lbr atas
2 Pekerjaan Fasad Dinding ACP jendela 1 ver 1.60 0.70
hor 0.90 x 0.20
0.90 x 2.00
0.90 x 0.80
0.90 x 0.50
lobby-atap 1.20 x 12.50
1.20 x 2.85
1.20 x 19.38
3 Pekerjaan Railing Tangga pipa besi stainless 2,5" 3.20 0.20

VII PEKERJAAN SANITAIR


LANTAI 1
1 Kloset Duduk toto cw 421 1.20 16.00
2 Jet washer toto THX20NB 1.00 16.00
3 Hand Shower Toto THX19NB 2  1.00 16.00
4 Kran Cabang TOTO TX423ST1 1.00 16.00
5 Kran air toto T 23 B13 1/2" 2.00 16.00
6 Floor Drain Toto TX 1DB, setara 1.00 16.00
7 Pemasangan Cermin 70 x 115 cm 0.70 1.15 0.81
8 Washtafel toto LW 247 1.00 16.00
9 Kran t cuci 1.00 2.00
10 Floor drain t cuci, r jemur, R bersama ; toto TX 1 DB , setara 2.00 2.00
LANTAI 2
1 Kloset Duduk toto cw 421 1.00 16.00
2 Jet washer toto THX20NB 1.00 16.00
3 Hand Shower Toto THX19NB 2  1.00 16.00
4 Kran Cabang TOTO TX423ST1 1.00 16.00
5 Kran air toto T 23 B13 1/2" 2.00 16.00
6 Floor Drain Toto TX 1DB, setara 1.00 16.00
7 Pemasangan Cermin 70 x 115 cm 0.70 1.15 0.81
8 Washtafel toto LW 247 1.00 16.00
9 Kran t cuci 1.00 2.00
10 Floor drain t cuci, r jemur, R bersama ; toto TX 1 DB , setara 2.00 2.00
LANTAI ATAP
1 Pemasangan Roof Drain 4", pipa 3" 3.00 2.00

VIII SEPTICTANK
1 Bio septick tank kapasitas 5000 ltr
Galian tanah 6.00 2.00 2.00
Urgan pasir 6.00 2.00 0.10
Lt kerja beton 7,4 Mpa 6.00 2.00 0.05
Besi beton 6.00 2.00 0.20
Beton 21,7 Mpa 2.40 150.00
Urugan diluar Septick tank 24.00 5.00
Bak kontrol
C PEKERJAAN PLUMBING
1 Instalasi air bersih dari pipa induk
1 Pipa PVC AW 2" 20.00 40.00
2 Gate Valve PVC 2"
2 Instalasi pipa air kotor ke Septick tank PVC AW 4" 4.00 21.00
3 Instalasi pipa air bekas ke Saluran luar bangunan PVC AW 4" 4*21 + 2*7,6
4 Testing dan Commissioning

II INSTALASI PEMIPAAN
1 LANTAI 1
a Pengadaan dan Pemasangan Pipa PVC AW ( Pipa Air Bersih )
1 Pipa PVC AW 1" t cuci 1.00 1.90 7.90
2 Pipa PVC AW 1" 16.00 1.00 2.50
3 Pipa PVC 3/4" 16.00 1.00 3.00
4 Pipa PVC 1/2" 16.00 0.50 5.00
5 Fitting & accessories 16.00 1.00 1.00
6 Gate Valve PVC 1" 16.00 1.00 1.00
7 Gate Valve PVC 3/4" 16.00 3.00 1.00
b Pengadaan dan Pemasangan Pipa PVC Class 10 kg (AW)
& Fitting ( Pipa Air Kotor, Air Buangan Dan Vent )
1 Instalasi Pipa Air Kotor PVC AW 4" 16.00 3.50
2 InstalasiPipa Air Bekas PVC AW 2" 16.00 1.06 0.53
3 InstalasiPipa vent 1 " 16.00 3.60
2 DENAH LANTAI 2
a Pengadaan dan Pemasangan Pipa PVC AW ( Pipa Air Bersih )
1 Pipa PVC AW 1" t cuci 1.00 1.90 7.90
2 Pipa PVC AW 1" 16.00 1.00 2.50
3 Pipa PVC 3/4" 16.00 1.00 3.00
4 Pipa PVC 1/2" 16.00 0.50 5.00
5 Fitting & accessories 16.00 1.00 1.00
6 Gate Valve PVC 1" 16.00 1.00 1.00
7 Gate Valve PVC 3/4" 16.00 3.00 1.00
b Pengadaan dan Pemasangan Pipa PVC Class 10 kg (AW)
& Fitting ( Pipa Air Kotor, Air Buangan Dan Vent )
1 Instalasi Pipa Air Kotor PVC AW 4" 16.00 3.50 + 3.60
2 InstalasiPipa Air Bekas PVC AW 2" 16.00 1.06 0.53
3 InstalasiPipa vent 1 " 16.00 3.60 0.80

Instalasi Pipa Air Hujan


1 Pipa PVC AW 3" 4.00 2.00 7.20
2 Roof Drain, Cast Iron

III PANEL & INSTALASI PENERANGAN/ARMATURE


LANTAI 1
Pemasangan daya listrik
- Pengurusan Sertifikasi meliputi
BP - UJL 1 x 82 KVA
1 - BP
2 - UJL
KONSUIL
1 JILDAK / AKLI
2 SLO
3 Biaya Pengurusan & Perijinan
Pekerjaan Panel
1 Panel MDP
2 PP. panel penerangan.LT1
3 PP. panel penerangan.LT2
4 PP. Panel Power LT 1
5 PP. Panel Power LT 2

Pengkabelan
Kabel Feeder dari PLN ke MDP
1 Kabel NYY 4x50mm
Kabel Feeder dari MDP ke
2 SDP-PENERANGAN Kabel NYY 4x4mm
3 SDP-POWER & AC Kabel NYY 4x16mm
Kabel Feeder dari SDP PENERANGAN ke
5 PP-Lantai 1 NYY 4 x 4 mm
6 PP-Lantai 2 NYY 4 x 4 mm
PP. Power & AC Lt 1
PP. Power & AC Lt 2
Kabel Feeder dari SDP POMPA ke
1 P-TRANSFER PUMP NYY 4x2,5 mm
KABEL TRAY
2 Kabel tray 200 x 100
Penerangan dan Stop Kontak
1 Lampu Downlight LED 7 Watt 16.00 3.00
2 Lampu Downlight LED 4 Watt 16.00 2.00
3 Lampu Baret 16 w (t jemur, r setrika) (6*2)+(4*1)+1
4 Lampu Baret 10 w ( corridor ) (5*2)
5 Saklar Ganda 16.00 2.00 32.00
7 Saklar Hotel tunggal 1.00
6 Stop Kontak 1 Phase 16.00 4.00 64.00
7 Inst. Penerangan NYM 3 x 2,5 mm2 16.00 5.00 80.00
8 Inst. Stop kontak NYM 3 x 2,5 mm2 16.00 4.00 64.00

LANTAI 2
Penerangan dan Stop Kontak
1 Lampu Downlight LED 7 Watt 16.00 3.00
2 Lampu Downlight LED 4 Watt 16.00 2.00
3 Lampu Baret 16 w (t jemur, r setrika) (6*2)+(4*1)+1
4 Lampu Baret 10 w ( corridor ) (5*2)
5 Saklar Ganda 16.00 2.00 32.00
7 Saklar Hotel tunggal 1.00
6 Stop Kontak 1 Phase 16.00 4.00 64.00
7 Inst. Penerangan NYM 3 x 2,5 mm2 16.00 5.00 80.00
8 Inst. Stop kontak NYM 3 x 2,5 mm2 16.00 4.00 64.00

IV PEKERJAAN SISTEM PEMADAM KEBAKARAN


Lantai - 1
1 Bh - Fire Extinguisher,ABC (Dry chemical)
Capacity (5 kg)
Type (Dry chemical)
Lantai - 2
2 Bh - Fire Extinguisher,ABC (Dry chemical)
Capacity (5 kg)
Type (Dry chemical)

V PEKERJAAN SISTEM TATA UDARA


PEKERJAAN INSTALLASI TATA UDARA
DENAH LANTAI 1
1 Titik - Instalasi Daya AC 16.00 1.00 unit
2 Wall Mounted 9.600 BTU/h + standart 16.00 1.00 unit
3 Pipa PVC AW 3/4 darain Ac 16.00 7.00 m
4 Pipa Refrigerant 1/4 + 1/2 16.00 10.00 m
DENAH LANTAI 2
1 Titik - Instalasi Daya AC 16.00 1.00 unit
2 Wall Mounted 9.600 BTU/h + standart 16.00 1.00 unit
3 Pipa PVC AW 3/4 darain Ac 16.00 7.00 m
4 Pipa Refrigerant 1/4 + 1/2 16.00 10.00 m

VI PEKERJAAN PENANGKAL PETIR


INSTALASI
1 Arester Lightning protection radius 50 meter
2 Tiang pipa dia 65 = 3 meter + acessories
3 Down Conduktor BC 50mm + accessories
4 Grounding System max. 3 ohm
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
1 Biaya Instalasi
2 Material Bantu
3 Testing & Comissioning included perijinan dari DEPNAKER
4 Bracket, Seal , Test Box , dls
RHITUNGAN VOLUME PEKERJAAN

PERHITUNGAN

=
2.00 =
=

81.24
22.05
8.79
50.40

78.82
6.16
10.08
15.12
36.96
10.50
32.18
34.92
2.00 144.00 0.17 24.48
9.00 576.00 0.17 97.92

7.89
2.94
1.17
6.72
11.20
0.88
1.44
2.10
5.28
1.50
72.00
2.00 144.00 0.10 14.40
9.00 576.00 0.10 57.60
5.42
1.47
0.59
3.36

5.60
0.44
0.72
1.05
2.64
0.75

36.00
2.00 144.00 0.05 7.20
9.00 576.00 0.05 28.80

240.00 0.07 16.96


64.00 0.07 4.52
672.00 0.07 47.48

12.36
5.59
31.10

48.12
13.63
86.40

3.52
5.76
10.50
21.12
3.00

35.20
57.60
84.00
211.20
40.00

2.00 144.00 0.08 11.52


9.00 576.00 0.08 46.08

137.50 0.40 54.31

0.55 2.00 3.65 32.12


384.00
3.20 1.92

0.85 2.00 3.65 49.64


768.00
3.20 3.84

0.50 2.00 3.65 73.00


800.00
3.20 4.00

0.75 2.00 3.65 87.60


1,280.00
3.20 6.40

0.24 2.00 3.65

3.20

3.00 2.00 0.15 0.90


2.15 2.00 1.00 4.30
1.00 2.00 19.83
20.00 6.93
0.40 0.85 4.00 3.40

0.15 0.30
0.15 0.30
0.15 2.00 2.97
0.18 20.00 1.93 1.04
4.00 0.20
0.12 0.28 24.64
0.12 0.28 40.32
0.12 0.38 63.84
0.12 0.28 147.84
0.12 0.08 16.00
0.12 0.18 36.00

0.12 0.28 2.46


0.12 0.28 4.03
0.12 0.38 7.98
0.12 0.28 14.78
0.12 0.08 1.20
0.12 0.18 2.81

2.00 144.00
9.00 576.00
4.00 - 14.02
1.00 - 10.92

2.00 144.00 0.12 17.28


9.00 576.00 0.12 69.12
4.00 14.02 0.12 - 1.00 - 1.68
1.00 10.92 0.12 - 1.00 - 1.31

0.45 2.00 3.20 23.04


256.00
3.20 1.28

0.55 2.00 3.20 28.16


384.00
3.20 1.92

0.35 2.00 3.60 50.40


384.00
3.20 1.92

0.40 2.00 3.60 46.08


384.00
3.20 1.92

0.24 2.00 3.60

3.20
0.12 0.28 24.64
0.12 0.38 21.28
0.12 0.28 26.88
0.12 0.18 5.76

0.12 0.28 2.46


0.12 0.38 2.66
0.12 0.28 2.69
0.12 0.18 0.43

2.00 144.00

2.00 144.00 0.12

0.20 2.00 137.60


1,548.00
10.32

0.12 2.00 16 unit 24.00


120.00
16 unit 1.20

0.20 2.00 41.60


468.00
3.12

0.35 2.00 33.71


216.72
1.44

0.35 2.00 26.09


167.71
1.12

1.00 84.74
2.00 605.09
2.00 63.04
1.00 38.39
1.00 3.85

0.45 ### m1

10.75 2.00 2.00 2.00 86.00 ### m1


9.88 2.00 2.00 2.00 79.04
3.46 2.00 2.00 2.00 27.68

0.30 0.75 ### m1

m 2.00
0.06 0.10 2.00 0.20

2.00
2.00

pengurangan ( opening )
3.60 691.20 J1 1.90 2.70 16.00 82.08
3.60 164.16 P1 0.90 2.10 16.00 30.24
3.60 57.60 P2 0.80 2.10 32.00 53.76
3.60 28.80 PU 3.70 3.00 1.00 11.10
0.60 5.64 P tj 2.85 3.00 2.00 17.10
3.60 259.20 bt krw 1.80 0.80 2.00 2.88
3.60 172.80 bt krw 2.60 2.20 2.00 11.44
3.60 187.20 bt krw 1.20 2.20 2.00 5.28
3.60 115.20 kisi2 9.70 1.80 2.00 34.92
openi 1.74 3.00 16.00 83.47
1,681.80 m2 332.27

2,699.06
56.43
- 1.00 - 380.80

2.88
11.44
5.28
28.20
pengurangan ( opening )
3.60 691.20 J1 1.90 2.70 16.00 82.08
3.60 164.16 P1 0.90 2.10 16.00 30.24
3.60 57.60 P2 0.80 2.10 32.00 53.76
3.60 28.80 j2 3.40 2.90 1.00 9.86
0.60 5.64 P tj 2.85 3.00 2.00 17.10
3.60 259.20 bt krw 1.80 0.80 2.00 2.88
3.60 172.80 bt krw 2.60 2.20 2.00 11.44
3.60 187.20 bt krw 1.20 2.20 2.00 5.28
bt krw 3.60 2.80 1.00 10.08
3.60 115.20 kisi2 9.70 1.80 2.00 34.92
k lion 1.74 3.00 16.00 83.47
1,681.80 m2 341.11

2,681.38
56.43
- 1.00 - 380.80

2.88
11.44
5.28
28.20
10.08

85.44
42.72
19.16
8.60
82.39
51.73
- 1.00 - 10.08
559.92

1.22 23.39 16.00 374.24


27.24 2.00 54.48
45.60 2.00 91.20
149.64 1.00 149.64
4.00 14.02 1.00 - 1.00 - 14.02
1.00 10.92 1.00 - 1.00 - 10.92
unit
5.10 32.47 16.00 519.52
22.61 2.00 45.22
41.00 2.00 82.00
105.60 1.00 105.60
13.80 2.00 27.60

1.22 23.39 16.00 374.24


27.24 2.00 54.48
45.60 2.00 91.20
149.64 1.00 149.64

unit
5.10 32.47 16.00 519.52
22.61 2.00 45.22
41.00 2.00 82.00
105.60 1.00 105.60
13.80 2.00 27.60

20.72 16.00 331.52


45.60 2.00 91.20
149.64 1.00 149.64

27.24 2.00 54.48


2.96 18.85 2.00 37.70

1.22 2.67 16.00 42.72

pintu
14.28 m2 0.80 2.10 1.68 m2 12.60 ### 201.60
12.88 m2 0.80 2.10 1.68 m2 11.20 ### 179.20

19.08
10.00 6.87

20.72 16.00 331.52


45.60 2.00 91.20
149.64 1.00 149.64
4.00 14.02 1.00 - 1.00 - 14.02
1.00 10.92 1.00 - 1.00 - 10.92

27.24 2.00 54.48


2.96 18.85 2.00 37.70

1.22 2.67 16.00 42.72

pintu
14.28 m2 0.80 2.10 1.68 m2 12.60 ### 201.60
12.88 m2 0.80 2.10 1.68 m2 11.20 ### 179.20

2.00 3.60 451.44


82.08 147.70
11.10
2.88
11.44
5.28
34.92
2.00 3.60 451.44
82.08 156.54
9.86
2.88
11.44
5.28
34.92
10.08

2.00 1.34 130.56


2.00 3.47 435.14
2.00 0.30

9.00 tg 10.35 m2 2.00 16.00 331.20


2.00 2.00 0.72
4.00 jml 2.00 2.00 28.80
3.00 jml 2.00 2.00 8.64
2.00 2.00 1.80
2.00 30.00
2.00 6.84
2.00 46.51
0.20 3.20 0.30 2.10

16.00
16.00

40.00 2.50

= 84.00 15.20

9.80 2.00 19.60


1.00 4.50
3.00
2.50
1.00
1.00
3.00

1.88 0.25 0.64 0.31 = 4.67

9.80 2.00 19.60


1.00 3.60 8.10
3.00
2.50
1.00
1.00
3.00

= 7.10
1.88 0.25 0.64 0.31 3.60 = 8.27
= 4.40

2.00 9.20
7.00

7.00
27.00
7.00

7.00

7.00
27.00
7.00
Volume Satuan

18.00
133.40
1081.92
18.00 m2
133.40 m1
1,081.92 m2

160.06 m3

151.46

67.10 m3 106.84

122.40 m3 349.92

122.40 m3 349.92

91.09 m3 44.91
47.02 m3 22.46

976.00 m1 1008.00

13,790.88 kg
68.95 m3

49.06 m3 52.00
93.60

148.15 m2 218.40

9,811.20 kg 18720.00

43.90 m3

428.00 m2 300.80
8,780.00 kg 7520.00

57.60 m3 103.68

3,168.00 kg
3836.16

242.36 m2 22.46
3,232.00 kg 262.08
16.16 m3 4492.80

336.38 m2 10.78
1,769.47 kg 359.42
8.85 m3 1617.41

35.36 m2

962.73 kg 1271.90
4.81 m3
328.64 m2

6,653.60 kg
33.27 m3

695.06 m2

8,340.72 kg
83.41 m3

147.68 m2
1,408.00 kg
7.04 m3

331.78 m2
1,769.47 kg
8.85 m3
78.56 m2

1,648.80 kg
8.24 m3

144.00 m2
1,728.00 kg
17.28 m3

203.20 m2
2,136.00 kg
14.64 m3

59.80 m2
384.43 kg
2.56 m3

689.83 m2 899.01
689.83 m2 899.01
105.28 m2 199.62

86.72 m2
867.24 kg
8.67 m3

144.54 m2
144.54 m2
144.54 m2
133.48 m2
80.09 m2

150.65 m2
150.65 m2

1,349.53 m2 1005.05

2,374.69 m2 2213.44

2,374.69 m2 2213.44

47.80 m2
1,340.69 m2 1005.05

2,357.01 m2 2213.44

2,357.01 m2 2213.44

57.88 m2

279.96 m2

559.92 m2

559.92 m2
10.08 m2

644.62 m2 695.06
644.62 m2
779.94 m1

669.56 m2

669.56 m2
779.94 m1

572.36 m2

92.18 m2

42.72 m2

380.80 m2

25.94 m2

547.42 m2
92.18 m2

42.72 m2

380.80 m2

1.00 unit
16.00 unit
32.00 unit
16.00 unit
2.00 unit

16.00 unit
32.00 unit
16.00 unit
1.00 unit
2.00 unit

2,070.95 m2

303.74 m2

644.62 m2
2,062.11 m2

294.90 m2

669.56 m2

565.70 m2

37.62 m2

454.51 m2

9.20 m1

19.20 set
16.00 set
16.00 set
16.00 set
32.00 set
16.00 unit
12.88 m2
16.00 set
2.00 unit
4.00 unit

16.00 set
16.00 set
16.00 set 0.40
16.00 set
32.00 set
16.00 unit
12.88 m2
16.00 set
2.00 unit
4.00 unit

6.00 unit

1.00 set
24.00 m3
1.20 m3
0.60 m3
2.40 m3
360.00 kg
19.00 m3
1.00 unit

102.50 m1
1.00 bh
84.00 m1
99.20 m1
1.00 ls

19.60 m1
72.00 m1
48.00 m1
40.00 m1
16.00 ls
16.00 bh
48.00 bh

56.00 m1
74.72 m1
57.60 m1

19.60 m1
129.60 m1
48.00 m1
40.00 m1
16.00 ls
16.00 bh
48.00 bh

113.60 m1
132.32 m1
70.40 m1

73.60 m1

48.00 titik
32.00 titik
17.00 titik
10.00 titik
39.00 titik
1.00 titik
71.00 titik
107.00 titik
71.00 titik

48.00 titik
32.00 titik
17.00 titik
10.00 titik
39.00 titik
1.00 titik
71.00 titik
107.00 titik
71.00 titik

16.00 unit
16.00 unit
112.00 m
160.00 m

16.00 unit
16.00 unit
112.00 m
160.00 m
PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

A PEKERJAAN STRUKTR
I Pekerjaan Persiapan
1 Uitset mengunakan theodolith (20+28)*2 96 m
2 Pembuatan bedeng pekerja 6x 3 24 m2
3 Pemasangan Bouplank 96/2 48.00 titik
4 Pembersihan lokasi (26*35) 910 m2
5 Papan Nama Proyek 1.00 ls
6 K3 Konstruksi
I Penyiapan RK3K
a Pembuatan Kartu Identitas Pekerja (KIP) 25.00 Org
II Sosialisasi dan Promosi K3
a Pengarahan K3 ( Safety Briefing) 1,440.00 Org.hr
b Spanduk K3 Uk.3 x1 m 2.00 Lmbr
c Poster K3 Uk. 42x60 cm 2.00 Lmbr
d Papan Informasi K3 1.00 Bh
III Alat Pelindung Kerja
a Pembatas Area ( Restricted Area ) 1.00 Ls
IV Alat Pelindung Diri
a Topi Pelindung ( Safety Helmet) 27.00 Bh
b Pelindung Mata (Goggles Spectacles ) 25.00 Bh
c Pelindung Pernapasan dan Mulut (Masker) 25.00 Bh
d Sarung Tangan (Safety Gloves ) 25.00 Psg
e Sepatu Keselamatan (Rubber Safety Shoes ) 25.00 Psg
f Rompi Keselamatan 25.00 Bh
V Asuransi dan Perijinan
a BPJS Ketenaga Kerjaan dan Kesehatan Kerja (Berdasarkan KEPMENAKER NoKEP-196/MEN/1999, untuk Tenaga Harian Proyek 1.00 Ls
VI Personil K3
a Petugas P3 K 1.00 Ls
VII Fasilitas Sarana Kesehatan
a Peralatan P3K (Kotak P3K,Tandu,Tabung Oksigen,Obat Luka,Perban Dll) 1.00 Ls

Page 312 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

b Ruang P3K ( Tempat Tidur Pasien,Stetoskop,Timbangan Berat Badan,Tensi Meter ) 1.00 Ls


VIII Rambu - Rambu
a Rambu Petunjuk 2.00 bh
b Rambu Larangan 2.00 bh
c Rambu Peringatan 2.00 bh
d Rambu Kewajiban 1.00 bh
IX Lain - Lain Terkait Pengendalian Risiko K3
a Alat Pemadam Api Ringan( APAR ) 10 Kg 1.00 bh
b Bendera K3 1.00 bh
c Bendera Nasional 1.00 bh

II Pekerjaan Tanah dan pasangan


1 Galian Tanah Rawa dengan alat berat sedalam 2,5m 23 x 31 = 713.00 x 2.5 = 1782.5 1782.5 m3
2 Timbunan tanah keras & pemadatan dangan alat stamper 23 x 31 = 713.00 x 2.5 = 1782.5 1782.5 m3
3 Urugan Pasir dibawah pondasi Rakit T=10cm 2x 1.5 = 3.00 x 0.1 = 0.3 x 44 = 13.2 23.10 m3
0.9 x 2.5 = 2.25 x 0.1 = 0.225 x 38 = 9.9
23.1

III Pekerjaan Struktur


Lantai 1
1 Pancang kayu Dolken dia 8-12cm sedalam 4m 44 x 35 = 1,540.00 1,540.00 ttk
2 Beton Poer Plat Rakit 200Px150Lx60Hcm fc 25 mpa 44 x 3= 132.00 x 0.6 = 79.2 79.20 m3
3 Pengikat Poer Plat Rakit 60Hx90Lx250Pcm fc 25 mpa 38 x 2.25 = 85.50 x 0.6 = 51.3 51.30 m3
4 Beton Pedestal uk 30x30 fc 25 mpa 0.4 x 0.3 = 0.12 x 1.9 = 0.228 x44 = 10.03 10.03 m3
5 Beton Sloof Beton S1 25x40 fc 25 mpa 0.4 x 0.25 = 0.10 x 225 = 22.5 22.50 m3
6 Beton Sloof Beton S2 20x30 fc 25 mpa 0.2 x 0.25 = 0.05 x 201.8 = 10.09 10.09 m3
7 Beton Rabat lantai tebal 8 cm fc 25 mpa + wiremesh M6 23 x 31 = 713.00 x 0.08 = 57.04 57.04 m3
8 Beton Kolom K1 30x40 fc 25 mpa 0.4 x 0.3 = 0.12 x 44 = 5.28 x4H = 21.12 21.12 m3
9 Beton kolom KP 12x12 cm fc 17 mpa 0.12 x 0.12 = 0.01 x 184 = 2.65 x4H = 10.60 10.60 m3
10 Struktur tangga 1.00 set

Page 313 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

lantai 2
1 Beton Kolom K2 30x40 fc 25 mpa 0.4 x 0.3 = 0.12 x 44 = 5.28 x3,5H = 18.48 18.48 m3
2 Beton kolom KP 12x12 cm fc 17 mpa 0.12 x 0.12 = 0.01 x 185 = 2.66 x3,5H = 9.32 9.32 m3
3 Beton Balok B1 30/50 fc 25 Mpa 0.5 x 0.3 = 0.15 x 272.8 = 40.92 40.92 m3
4 Beton Balok B2 25/40 fc 25 Mpa 0.4 x 0.25 = 0.10 x 110.9 = 11.09 11.09 m3
5 Beton Balok B3 20/30 fc 25 Mpa 0.3 x 0.2 = 0.06 x 114 = 6.84 6.84 m3
6 Beton Balok BP 15/20 fc 25 Mpa 0.15 x 0.2 = 0.03 x 24 = 0.72 0.72 m3
7 Beton Balok Latei 12/20 fc 17 Mpa 0.1 x 0.1 = 0.01 x 68 = 0.68 0.68 m3
8 Beton Plat lantai Tebal 12 cm fc 25Mpa (8,2 x 28 ) x2 + 4x4= 475.20 - 18 = 457.20 x12cm = 54.86 54.86 m3
lantai atap
1 Beton kolom KP 12x12 cm fc 17 mpa 0.12 x 0.12 = 0.01 x 16 = 0.23 x1,7H = 0.39 0.39 m3
2 Beton Balok RB 15/15 fc 17 Mpa 0.15 x 0.15 = 0.02 x 225 = 5.0625 5.06 m3
3 Beton Balok B3 20/30 fc 25 Mpa 0.3 x 0.2 = 0.06 x 153.6 = 9.216 9.22 m3
4 Beton Plat lantai Tebal 12 cm fc 25Mpa 1.75 x 22 x2 77.00 77.00 x12cm = 9.24 9.24 m3
5 Pedestal Kolom Rangka Atap transparan 0.4 x 0.3 = 0.12 x 12 = 1.44 x30cm = 0.43 0.43 m3

IV Pekerjaan Atap
1 Rangka Baja Ringan 8.5 x 28 = 238.00 x 2= 476.00 476.00 m2
2 Rangka Atap Hollo square 5x10cm & 5x5cm besi 5/10= (2,2x2+0,7)*13=66,3*4,6=305,64 besi 5/5=(22*5)*22,7/6=416,2 721.90 kg
3 Spandek berwarna Thk. 0,4mm 8.5 x 28 = 238.00 x 2= 476.00 476.00 m2
4 Pekerjaan Bubungan Atap 28 x 2= 56.00 56.00 m
5 Pekerjaan listplank kalsiplank 28 x 2= 56.00 56.00 m
6 Spandek Transparan Thk. 1mm 22 x 2.5 x 2.00 = 110 110.00 m2
7 Cat chromate baja 721.90 kg

V Pekerjaan Lain-lain
1 Water torn 2m3 1.00 unit

Page 314 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

B PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
LANTAI 1
1 Pekerjaan Bata Merah pasbata ((28*7)+(6,5*16))*3,8 dikurangi 36*2,2+(1*2*12)+12*2 1050 - 127.2 922.80 m2
2 Pekerjaan Dinding Loster (8,2*2,5*2)+(0,9*4*2)+4*8 80.2 m2
3 Pekerjaan Plesteran 922.80 x 2= 1,845.60 288 1,557.60 m2
4 Pekerjaan Acian 1,845.60 - 288 dinding kamar mandi 1,557.60 m2
5 Acian Dak Beton 22 x 2x 2.00 = 88.00 88.00 m2
LANTAI 2
1 Pekerjaan Bata Merah pasbata ((28*7)+(6,5*16))*3,8 dikurangi 37*2,2+(1*2*13)+13*2 1050 - 131.2 918.80 m2
2 Pekerjaan Plesteran 1,050.00 x 2= 2,100.00 312 1,788.00 m2
3 Pekerjaan Acian 1,050.00 x 2= 2,100.00 312 1,788.00 m2
4 Acian Dak Beton 22 x 2x 2.00 = 88.00 88.00 m2
LANTAI ATAP
1 Pekerjaan Bata Merah 28 x 1.7 x 2.00 = 95.20 95.20 m2
2 Pekerjaan Plesteran 95.20 x 1.00 = 95.20 95.20 m2
3 Pekerjaan Acian 95.20 x 1.00 = 95.20 95.20 m2

II PEKERJAAN PENGECATAN & FINISHING


LANTAI 1
1 Pekerjaan Pengecatan Interior pasbata ((28*7)+(6,5*16))*3,8 dikurangi 36*2,2+(1*2*12)+12*2 1050 - 127.2 922.80 m2
2 Pekerjaan Pengecatan Exterior 922.80 x 1= 922.80 288 634.80 m2
3 Pekerjaan Pengecatan Plafond (8,2 x 28 ) x2 + 4x4= 475.20 - 18 = 457.20 457.20 m3
LANTAI 2
1 Pekerjaan Pengecatan Interior pasbata ((28*7)+(6,5*16))*3,8 dikurangi 36*2,2+(1*2*12)+12*2 1050 - 127.2 922.80 m2
2 Pekerjaan Pengecatan Exterior 922.80 x 1= 922.80 288 634.80 m2
3 Pekerjaan Pengecatan Plafond (8,2 x 28 ) x2 + 4x4= 475.20 - 18 = 457.20 457.20 m3
4 Pekerjaan Waterproofing 1.75 x 22 x2 77.00 77.00 77.00 m2
LANTAI ATAP
1 Pekerjaan Pengecatan Exterior 95.20 x 1.00 = 95.20 95.20 m2

Page 315 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

2 Pekerjaan Pengecatan Listplank GRC 28 x 2.00 = 56.00 x 0.3 16.80 m2

III PEKERJAAN KERAMIK


LANTAI 1
1 Pekerjaan keramik lantai 60x60cm homogenous interior 12 x 20.8 = 249.60 249.60 m2
2 Pekerjaan keramik lantai 60x60cm homogenous eksterior (22*1,75*2)+(4*20+4*10) 197 197.00 m2
3 Pekerjaan Keramik Lantai 20x20cm (kamar mandi) =(1,3*2*2)*12 62.4 62.40 m2
4 Pekerjaan Keramik Dinding 20x40cm (kamar mandi) pjg din (1,5+0,85+0,5)+(1,7+1+1,2+1)*12*2,8 167.49 167.49 m2
5 Pekerjaan keramik tangga 30x30cm (1,8 *0,3)*21*2+(2*4) 30.68 30.68 m2
LANTAI 2
1 Pekerjaan keramik lantai 60x60cm homogenous interior 13 x 20.8 = 270.40 270.40 m2
2 Pekerjaan keramik lantai 60x60cm homogenous eksterior (22*1,75*2)+(4*4) 197 197.00 m2
3 Pekerjaan Keramik Lantai 20x20cm (kamar mandi) =(1,3*2*2)*13 67.6 67.60 m2
4 Pekerjaan Keramik Dinding 20x40cm (kamar mandi) pjg din (1,5+0,85+0,5)+(1,7+1+1,2+1)*13*2,8 181.21 181.21 m2
- m2

IV PEKERJAAN PLAFON
LANTAI 1
1 Pekerjaan Plafond Gypsumboard 12 x 20.8 = 249.60 249.60 m2
2 Pekerjaan Plafond Kalsiboard 12 x 5.2 = 62.40 62.40 m2
3 Pekerjaan List Plafond 4,5+4+4,5+4+2+1+1+2+1+1+1,5+1+1,5+1+2+2+2 36 x 12 432 432.00 m
LANTAI 2
1 Pekerjaan Plafond Gypsumboard 13 x 20.8 = 270.40 270.40 m2
2 Pekerjaan Plafond Kalsiboard 13 x 5.2 = 67.60 67.60 m2
3 Pekerjaan List Plafond 4,5+4+4,5+4+2+1+1+2+1+1+1,5+1+1,5+1+2+2+2 36 x 13 468 468.00 m

V PEKERJAAN KUSEN PINTU & JENDELA


a lantai 1
1 Pintu PU 1 1.00 set
2 Pintu P1 12 12.00 set
3 Pintu P2 24 24.00 set

Page 316 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

4 Jendela J1 12 12.00 set

b Lantai 2
1 Pintu P1 13 13.00 set
2 Pintu P2 25 25.00 set
3 Jendela J1 13 13.00 set

VI PEKERJAAN ORNAMEN
1 Pekerjaan Letter GEDUNG ASRAMA 1 1.00 set
2 Pekerjaan Letter EXIT 1 1.00 set
3 Pekerjaan Fasad Dinding ACP (28,5*3,5)*2+(0,6*9+(1,3*3*2)+5*3 227.7 227.70 m2
4 Pekerjaan Fasad Dinding Batu Alam (1,7*7)*2 30.94 30.94 m2
5 Pekerjaan Railing Tangga Besi pipa 2,5" 7*4+3,7+2*2 35.7 35.70 m

VII PEKERJAAN SANITAIR


LANTAI 1
1 Pemasangan Kloset Duduk 12 12.00 set
2 Pemasangan Jet Shower 12 12.00 set
3 Pemasangan Kran 12 12.00 set
4 Pemasangan Kran Kloset 12 12.00 set
5 Pemasangan Floor Drain 12 12.00 set
6 Pemasangan Cermin 12 12.00 m2
7 Pemasangan Washtafel Gantung 12 12.00 set
8 Pemasangan Kran Washtafel 12 12.00 set
LANTAI 2
1 Pemasangan Kloset Duduk 13 13.00 set
2 Pemasangan Jet Shower 13 13.00 set
3 Pemasangan Kran 13 13.00 set
4 Pemasangan Kran Kloset 13 13.00 set
5 Pemasangan Floor Drain 13 13.00 set
6 Pemasangan Cermin 13 13.00 m2

Page 317 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

7 Pemasangan Washtafel Gantung 13 13.00 set


8 Pemasangan Kran Washtafel 13 13.00 set
LANTAI ATAP
1 Pemasangan Floor Drain 8 8.00 set

VIII PEKERJAAN LANSEKAP


1 PEMBUATAN SEPTICTANK, RESAPAN
PEMBUATAN IPAL KAP = 5.00 M3 1 1.00 set
Termasuk
Galian tanah
Tangki
Blower
Panel & Instalasi
Dozing Pump
Submersible Pump
Sand Filter
Backtery Eco +
2 PEMBUATAN SUMUR RESAPAN (LENGKAP) 1.00 unit

C PEKERJAAN PLUMBING
I INSTALASI RUANG POMPA
1 Transfer Pump (100 l/menit) 1 1.00 unit
Kapasitas (100 l/menit)
Head (21 mtr)
Speed (1450 rpm)
PI (0,9 KW/380V/50Hz/3ph)
(2 Pompa) 1 duty, 1 standby ( bergantian), lengkap dengan panel control, wlc di Tanki Air Atas dan accessories
2 Kabel dari SDP ke Panel Pompa Transfer NYY 3 X 2,5 mm 30.00 m
Pipa air bersih (GSP medium class, incl. accessories)

Page 318 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

3 Pipa GSP Medium 3 ( Pipa Header ) 1.50 m


Pipa air bersih PVC 1 1/4
4 Pipa PVC AW 1" 14.00 m
5 Fitting & accessories 1.00 ls
Valve (Class 125 psi) & Accessories
6 Gate Valve PVC 1" 3.00 bh
7 Strainer 1" 2.00 bh
8 Flexible Joint 1" 3.00 bh
9 Check Valve 1" 1.00 bh
10 Testing dan Commissioning 1.00 ls

II INSTALASI PEMIPAAN
LANTAI 1
a Pengadaan dan Pemasangan Pipa PVC AW ( Pipa Air Bersih )
1 Pipa PVC 1" 28+28+20+20+15 111 111.00 m
2 Pipa PVC 3/4" 12*2 24 24.00 m
3 Pipa PVC 1/2" 8*12 96 96.00 m
4 Fitting & accessories 1 1 1.00 ls
5 Gate Valve PVC 1" 1 1 1.00 bh
6 Gate Valve PVC 3/4" 12 12 12.00 bh
b Pengadaan dan Pemasangan Pipa PVC Class 10 kg (AW)
& Fitting ( Pipa Air Kotor, Air Buangan Dan Vent )
Instalasi Pipa Air Kotor
1 Pipa PVC AW 4 12*2+(12*4)+20 92 77.00 m
InstalasiPipa Air Buangan
2 Pipa PVC AW 2 12*2+(12*4)+20 92 72.00 m
InstalasiPipa vent 12*2 24
DENAH LANTAI 2
a Pengadaan dan Pemasangan Pipa PVC AW ( Pipa Air Bersih )
1 Pipa PVC 1" 28+28+20+ 76 76.00 m
2 Pipa PVC 3/4" 13*2 26 26.00 m

Page 319 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

3 Pipa PVC 1/2" 8*13 104 104.00 m


4 Fitting & accessories 1 1 1.00 ls
Valve (Class 125 psi) & Accessories
1 Gate Valve PVC 1" 1 1 1.00 bh
2 Gate Valve PVC 3/4" 13 13 1.00 bh
Pengadaan dan Pemasangan Pipa PVC Class 10 kg (AW)
& Fitting ( Pipa Air Kotor, Air Buangan Dan Vent )
Instalasi Pipa Air Kotor
1 Pipa PVC AW 4 13*2+(13*4) 78 75.00 m
InstalasiPipa Air Buangan
2 Pipa PVC AW 2 13*2+(13*4) 78 74.00 m
InstalasiPipa vent 13*2 26
Instalasi Pipa Air Hujan
1 Pipa PVC AW 4 8*9+8*4 104 111.00 m
2 Fitting & Accesories 1 1 1.00 ls
3 Roof Drain, Cast Iron 8 8 10.00 bh
4 Pompa Booster Package 2 x CR 5 1 1 1.00 set
Kapasitas (50 Liter/menit)
Head ( 24,5 meter)
Daya (5,5 KW)
Jenis (Pakaged (1set 2 pompa))
Lengkap dengan kontrol panel , Accesoriest Valve,Presure Gage,kabel kontrol dan power dari panel kontrol ke pompa dan accessories sesuai gambar dan spesifikasi , Kabel Kontrol WLC Otomatis
LANTAI ATAP & TANGKI AIR ATAS
Tandon air 1500 ltr (Include Dudukan tandon) 2.00 unit

III PANEL & INSTALASI PENERANGAN/ARMATURE


DENAH LANTAI 1
Pemasangan daya listrik
- Pengurusan Sertifikasi meliputi
BP - UJL 1 x 82 KVA

Page 320 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

1 - BP 76,000.00 VA
2 - UJL 76,000.00 VA
KONSUIL
1 JILDAK / AKLI 76,000.00 VA
2 SLO 76,000.00 VA
3 Biaya Pengurusan & Perijinan 1.00 ls
Pekerjaan Panel
1 Panel MDP 1.00 unit
2 PP. panel penerangan.LT1 1.00 unit
3 PP. panel penerangan.LT2 1.00 unit
4 PP. Panel Power LT 1 1.00 unit
5 PP. Panel Power LT 2 1.00 unit
Pengkabelan
Kabel Feeder dari PLN ke MDP
1 Kabel NYY 4x50mm 12.00 m
Kabel Feeder dari MDP ke
2 SDP-PENERANGAN Kabel NYY 4x4mm 12.00 m
3 SDP-POWER & AC Kabel NYY 4x16mm 12.00 m
Kabel Feeder dari SDP PENERANGAN ke
5 PP-Lantai 1 NYY 4 x 4 mm 12.00 m
6 PP-Lantai 2 NYY 4 x 4 mm 15.00 m
PP. Power & AC Lt 1
PP. Power & AC Lt 2
Kabel Feeder dari SDP POMPA ke
1 P-TRANSFER PUMP NYY 4x2,5 mm 41.00 m
KABEL TRAY
2 Kabel tray 200 x 100 25.00 m
Penerangan dan Stop Kontak
1 Lampu Downlight Panel LED 18Watt 40 65 105.00 bh
2 Lampu Baret weatherproof 22 15 37.00 bh
3 Lampu Spothlight 10 Watt 10 13 23.00 bh

Page 321 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

4 Lampu Exit Emergency 1 1.00 bh


5 Lampu PJU LED 100 Include Tiang dan Pondasi 6 6.00 bh
6 Stop Kontak 1 Phase 48 48.00 bh
7 Saklar Tunggal 12 12.00 bh
8 Saklar Ganda 15 16 31.00 bh
9 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm 40 65 22 15 142.00 ttk
10 Inst. Stop kontak NYM 3 x 2,5 mm2 + PVC kond. 20 mm 48 48.00 ttk
11 Titik - Instalasi Penerangan PJU 6 6.00 ttk

IV PEKERJAAN SISTEM PEMADAM KEBAKARAN


Lantai - 1
1 Bh - Fire Extinguisher,ABC (Dry chemical) 4.00 bh
Capacity (5 kg)
Type (Dry chemical)
Lantai - 2
2 Bh - Fire Extinguisher,ABC (Dry chemical) 4.00 bh
Capacity (5 kg)
Type (Dry chemical)

V PEKERJAAN SISTEM TATA UDARA


PEKERJAAN TATA UDARA
DENAH LADENAH LANTAI 1
INSTALASI Power AC
1 Titik - Instalasi Daya AC 12 12.00 titik
Unit Ac Split Wall
2 Wall Mounted 9.600 BTU/h + Inverter 12 12.00 unit
Pipa Drain Ac
1 Pipa PVC AW 3/4 darain Ac 6+9+15 30 30.00 m
Pipa Refrigerant
1 Pipa Refrigerant 1/4 + 1/2 6+9+15 30 30.00 m
EXHAUST FAN TOILET

Page 322 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

1 - Capacity 100 CMH, Wall Mounted 12 12.00 ttk


2 Instalasi Pipa Exhoust Fan Diameter 4 inch 12 12.00 m
DENAH LANTAI 2
INSTALASI Power AC
1 Titik - Instalasi Daya AC 13 13.00 ttk
Unit Ac Split Wall
Wall Mounted 9.600 BTU/h + Inverter 13 13.00 unit
Pipa Drain Ac
1 Pipa PVC AW 3/4 darain Ac 6+9+15 30 30.00 m
Pipa Refrigerant
1 Pipa Refrigerant 1/4 + 1/2 6+9+15 30 30.00 m
EXHAUST FAN TOILET
1 - Capacity 100 CMH, Wall Mounted 12 12.00 ttk
2 Instalasi Pipa Exhoust Fan Diameter 4 inch 12 12.00 m

VI PEKERJAAN PENANGKAL PETIR


INSTALASI
1 Arester Lightning protection radius 50 meter 1.00 unit
2 Tiang pipa dia 65 = 3 meter + acessories 1.00 unit
3 Down Conduktor BC 50mm + accessories 33.00 m
4 Grounding System max. 3 ohm 1.00 lot
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
1 Biaya Instalasi 1.00 lot
2 Material Bantu 1.00 lot
3 Testing & Comissioning included perijinan dari DEPNAKER 1.00 lot
4 Bracket, Seal , Test Box , dls 1.00 lot

Page 323 of 324


PERHITUNGAN VOLUME PEKERJAAN
NAMA KEGIATAN Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
PEKERJAAN Pembangunan Puskesmas Sedati
LOKASI Kabupaten Sidoarjo

NO Uraian Pekerjaan PERHITUNGAN Volume Satuan

Tempat, tanggal & Bulan, 2020


Penawar
Nama Perusahaan

Nama Pimpinan
Direktur

Page 324 of 324