SIEVE ANALYSIS TEST Sample No. :


COARSE AND FINE AGGREGATE Tested By :
( SK SNI 1968 - 1990 F ) Date : 15-Jun-2013

Project : : Penngaspalan Jalan - jalan Dalam Kota Idi.


: : ( Otsus ) Aceh Timur,Tahun 2013
Contractor : : PT. NABILA UTAMA
Description Of Sample : Aggt. Class A

Individual Cumm. Ret Retained Passing Grading Limit


SIEVE SIZE
Ret (g) (g) (%) (%) (% Passing)
100.00
1 1/2" 0 0 100 100
1" 1022 18.58 81.42 79 - 85
3/8" 2900 52.73 47.27 44 - 58
#4 3740 68.00 32.00 29 - 44
# 10 4378 79.60 20.40 17 - 30
# 40 4985 90.64 9.36 7 - 17
# 200 5210 94.73 5.27 2-8

Pan.

Wt. Dry sample before washing = 5500 g

Wt. Dry sample after washing = g

GRADATION CHART BASE CLASS -A

100.00

90.00

80.00

70.00
% Pass Sieve Size

60.00

50.00

40.00

30.00

20.00

10.00

0.00
.010 .100 1.000 10.000 100.000
Sieve Size (mm)

Gradation Result Specification Limit. Specification Limit.

Prepared By : Checked By : Approved By :


Contractor Consultant PENGAWAS LAP PU
PT. NABILA UTAMA

MUSAWIR
Lab Tech Lab Techh

file:///conversion/tmp/activity_task_scratch/692290636.xlsx
PT. ABAD JAYA ABADI SENTOSA
Jalan Banda Aceh - Medan KM. 260, Krueng Geukueh, Aceh Utara

Project : Pengaspalan Jalan - jalan Dalam kota Idi Tanggal : 15 juni 2013
: Otsus Aceh Timur 2013
Sample : Aggregate Class A Volume Mold 993 cm3
Contractor : Weight Hammer gr
2.610 Drop Hammer 45 cm
Number of drop 25/layer (5 layer)
Methode Type D

Sample No. W. Mold Wmold+Soil Wet Soil Vol Mold Wet density w (%) Dry Density
1 2797.2 7302.6 4505.4 2235.2 2.02 2.70 1.963
2 2797.2 7801.4 5004.2 2235.2 2.24 4.59 2.141
3 2797.2 8029.6 5233.5 2235.2 2.34 6.30 2.203
4 2797.2 7890.1 5092.9 2235.2 2.28 8.62 2.098
5 2797.2 7505.8 4708.6 2235.2 2.11 10.20 1.912

Water Content
TEST TIN MASS OF MASS OF TIN + MASS OF TIN + MOISTURE Zerro Air Void
NUMBER NUMBER TIN (g) MOIST SOIL (g) DRY SOIL (g) CONTENT (%) (ZAV)
1 A1 32.20 153.80 150.60 2.70 2.44
2 A2 34.90 158.00 152.60 4.59 2.33
3 A3 33.10 134.40 128.40 6.30 2.24
4 A4 33.30 159.30 149.30 8.62 2.13
5 A5 32.90 144.20 133.90 10.20 2.06

Proctor Compaction Curves

2.40000

2.30000 g Maks = 2. 202 cm3


% wopt = 6..30
2.20000
Dry Density (gr/cm3)

2.10000

2.00000

1.90000

1.80000

1.70000

1.60000

1.50000
2

10

12
11

Water Content (%)


Prepared by : Checked by : Approved by :
Contractor Consultant Pengawas Lap PU
PT. NABILA UTAMA

MUSAWIR
Lab Tech Lab Tech

file:///conversion/tmp/activity_task_scratch/692290636.xlsx
PT. ABAD JAYA ABADI SENTOSA
Jalan Banda Aceh Medan KM. 260, Krueng Geukueh, Aceh Utara

Pekerjaan : Pengaspalan jalan - Jalan Dalam Kota Idi No. Sample :


: Otsus, Aceh Timur, 2013 Sample : Aggt. Class A
Pelaksana : PT. NABILA UTAMA Tanggal : 15 Juni 2013

PEMERIKSAAN CBR
(SNI-1744-89)

STANDARD/MODIFIED Berat isi kering yang dikehend : gr/cc


Pengembangan Kadar air yang dikehendaki :%
Tangggal Sebelum Sesudah
Jam Berat tanah + cetakan 8855.5 8920
Pembacaan Berat cetakan 4135 4135
Perubahan Berat tanah basah 4720.5 4785
Isi cetakan 2068 2068
Penetrasi : Berat isi basah 2.283 2.314
Waktu Penurunan Pembacaan arloji Beban (lb) Berat isi kering 2.152 2.178
(mnt) (in) Atas Bawah Atas Bawah

1/4 0.0125 9 102.2


1/2 0.0250 22 249.7
1 0.0500 67 760.5
11/2 0.0750 135 1532.3 10000
2 0.1000 212 2428.5
3 0.1500 249 2826.2
9000
4 0.2000 385 4217.6
6 0.3000 584 6628.4
8 0.4000 793 9000.6 8000
10 0.5000

7000

Kadar air : Sebelum Sesudah


6000
Tanah basah+cawan 221.50 205.15
Beban (lb)

Tanah kering+cawan 212.00 196.45


Krus (No.........) 55.86 56.4 5000
Air 9.50 8.70
Tanah kering 156.14 140.05
4000
Kadar air (%) 6.08 6.21

3000

CBR : 93.72 Harga CBR 2000


0.1" 0.2"
2429 4218
Atas
X 100 % X
X 100
100 %
% 1000
3x1000 3x1500

80.95 % 93.72 %
............ ............ 0
X 100 % X
X 100
100 %
%
Bawah 3x1000 3x1500 .000 .100 .200 .300 .400 .500
:.............. % :................ % Penurunan (in)

Dibuat Oleh : Diperiksa Oleh Disetujui Oleh :


Kontraktor Pelaksana Konsultan supervisi PENGAWAS LAP PU
PT. NABILA UTAMA

MUSAWIR
Lab Tech Lab Tech

file:///conversion/tmp/activity_task_scratch/692290636.xlsx
PT. ABAD JAYA ABADI SENTOSA
Jalan Banda Aceh - Medan KM. 260, Krueng Geukueh, Aceh Utara

Pekerjaan : Otsus Aceh Timur 2013 Tanggal: Juni 2013


: Pengaspala Jalan - Jalan Dalam kota Idi Sample : Aggt. Clas A
Pelaksana : PT. NABILA UTAMA

PENENTUAN NILAI KEPADATAN DAN CBR


SNI 1744 - 1989 - F

Pemadatan : Modified

2.45000 2.30

2.40000
2.25
2.35000
2.20
2.30000

2.25000 2.15

2.20000 2.10
Berat isi kering t/m3

2.15000
2.05
2.10000
2.00
2.05000
1.95
2.00000

1.95000 1.90

1.90000
1.85
1.85000
1.80
1.80000
1.75
1.75000

1.70000 1.70
3 5 7 9 11 0 50 100
Kadar air (%) CBR (%)

Cara Pemadatan : Modified


Berat Jenis : 2.600
Kadar air Optimum : 6.30 %
gd maksimum : 2.203 t/m3
95% gd maks. : 2.093 t/m3
CBR ( 100% ) : 93.72 %

Prepared by : Checked by : Approved by :


Contractor Consultant Pengawas Lap PU
PT. NABILA UTAMA
Musawir MARZUKI ALFIANSYAH
Lab Tech Lab Tech
PT. ABAD JAYA ABADI SENTOSA
Jalan Banda Aceh - Medan KM. 260, Krueng Geukueh, Aceh Utara

PEMERIKSAAN KEAUSAN AGREGAT DENGAN MESIN LOS ANGELES


( ABRASI )
(PB - 0206 - 76)
AGGREGAT KASAR

Gradasi Pemeriksaan Type A/B/C/D/E

Saringan Type / Metode B

Berat Berat Berat Berat


Lewat Tertahan
Sebelum Sesudah Sebelum Sesudah

76.2 mm (3.0") 63.5 mm (2.5")


63.5 mm (2.5") 50.5 mm (2.0")
50.5 mm (2.0") 38.1 mm (1.5")
38.1 mm (1.5") 25.4 mm (1.0")
25.4 mm (1.0") 19.1 mm (3/4")
19.1 mm (3/4") 12.5 mm (1/2") 2500
12.5 mm (1/2") 9.5 mm (3/8") 2500
9.5 mm (3/8") 6.3 mm (1/4")
6.3 mm (1/4") 4.75mm (No.4")
4.75mm (No.4") 2.26mm (No.8")
Jumlah Berat, ( A ) 5000

Berat Tertahan Saringan No. 12,( B ) 3880.5

A = 5000 Gram
B = 3880.5 Gram
A-B= 1119.5

Abrasi = ( A - B) /A ) x 100 = 22.39 %

Prepared by : Checked by : Approved by :


Contractor Consultant PENGAWAS LAP PU
PT. NABILA UTAMA

MUSAWIR
Lab Tech Lab Tech
file:///conversion/tmp/activity_task_scratch/692290636.xlsx
PT. ABAD JAYA ABADI SENTOSA
Jalan Banda Aceh - Medan KM. 260, Krueng Geukueh, Aceh Utara

Pekerjaan Pengaspalan Jalan - Jlan Dlam Kota Idi Tanggal : Juni 2013
Otsus, Aceh Timur Sample : Aggt. Clas A
Pelaksana : PT NABILA UTAMA Material : CA

PENGUJIAN BERAT JENIS DAN PENYERAPAN AIR AGREGAT KASAR


SNI 03-1969-1990

I II
No. Contoh
A B C D

Berat benda uji kering oven 3197.0

Berat benda uji kering perm. Jenuh 3204.0

Berat benda uji didalam air 1978.0

A B rata-rata C D rata-rata

Berat jenis (Bulk) 2.608

Berat jenis kering perm. jenuh 2.613

Berat jenis semu (Apparent) 2.623

Penyerapan (Absorption) 0.219

Prepared by : Checked by : Approved by :


Contractor Consultant Pengawas Lap PU
PT. NABILA UTAMA

Musawir
Lab Tech Lab Tech
PT. ABAD JAYA ABADI SENTOSA
Jalan Banda Aceh - Medan KM. 260, Krueng Geukueh, Aceh Utara

Pekerjaan Pengaspalan jalan - Jalan Dalam kota Idi Tanggal : Juni 2013
Otsus, Aceh Timur 2013 Sample : Aggt. Clas A
Pelaksana : PT. NABILA UTAMA Material : MA

PENGUJIAN BERAT JENIS DAN PENYERAPAN AIR AGREGAT KASAR


SNI 03-1969-1990

I II
No. Contoh
A B C D

Berat benda uji kering oven 3015.0

Berat benda uji kering perm. Jenuh 3054.0

Berat benda uji didalam air 1923.0

A B rata-rata C D rata-rata

Berat jenis (Bulk) 2.666

Berat jenis kering perm. jenuh 2.700

Berat jenis semu (Apparent) 2.761

Penyerapan (Absorption) 1.294

Prepared by : Checked by : Approved by :


Contractor Consultant Pengawas Lap Pu
PT. NABILA UTAMA

MUSAWIR
Lab Tech Lab Tech
PT. ABAD JAYA ABADI SENTOSA
Jalan Banda Aceh - Medan KM. 260, Krueng Geukueh, Aceh Utara

Pekerjaan : Pengaspalan jaln - Jalan Dalam Kota Idi Tanggal : Juni 2013
: Otsus, Aceh Timur 2013 Sample : Aggt. Clas A
Pelaksana : PT. NABILA UTAMA Material : Dust
:

PENGUJIAN BERAT JENIS DAN PENYERAPAN AIR AGREGAT HALUS


SNI 03-1970-1990

I II
No. Contoh
A B C D

Berat benda kering perm. Jenuh (SSD) 502.0

Berat benda uji kering oven 493.8

Berat piknometer diisi air (25oC) 665.7

Berat pik. + Benda uji (SSD) + air (25oC) 977.3

A B rata-rata C D rata-rata

Berat jenis (Bulk) 2.593

Berat jenis kering perm. jenuh 2.637

Berat jenis semu (Apparent) 2.710

Penyerapan (Absorption) 1.661

Prepared by : Checked by : Approved by :


Contractor Consultant Pengawas Lap PU
PT. NABILA UTAMA

MUSAWIR
Lab Tech Lab Tech

file:///conversion/tmp/activity_task_scratch/692290636.xlsx
PT. ABAD JAYA ABADI SENTOSA
Jalan Banda Aceh - Medan KM. 260, Krueng Geukueh, Aceh Utara

Pekerjaan Pengaspalan jalan - Jalan Dalam kota Idi Tanggal : Juni 2013
: Otsus , Aceh Timur Sample : Aggt. Clas A
Pelaksana : PT. NABILA UTAMA Material : Pasir

PENGUJIAN BERAT JENIS DAN PENYERAPAN AIR AGREGAT HALUS


SNI 03-1970-1990

I II
No. Contoh
A B C D

Berat benda kering perm. Jenuh (SSD) 505.2

Berat benda uji kering oven 493.5

Berat piknometer diisi air (25oC) 686.7

Berat pik. + Benda uji (SSD) + air (25oC) 995.6

A B rata-rata C D rata-rata

Berat jenis (Bulk) 2.514

Berat jenis kering perm. jenuh 2.574

Berat jenis semu (Apparent) 2.673

Penyerapan (Absorption) 2.371

Prepared by : Checked by : Approved by :


Contractor Consultant PengawasPU
PT. NABILA UTAMA

MUSAWIR
Lab Tech Lab Tech

file:///conversion/tmp/activity_task_scratch/692290636.xlsx
PT. ABAD JAYA ABADI SENTOSA
Jalan Banda Aceh - Medan KM. 260, Krueng Geukueh, Aceh Utara

JOB MIX FORMULA AGGREGATE CLASS - A


( JMF )
PENGASPALAN JALAN - JALAN DALAM KOTA IDI
OTSUS ACEH TIMUR, TAHUN 2013

HASIL PEMERIKSAAN LABORATURIUM


Jenis Pemeriksaan
NO HASIL SPEC QUARRY
Uraian Satuan
CA 2.608
MA 2.666
1 Berat Jenis Bulk
Dust 2.593
Pasir 2.514
2" 0.00 100.0
1 1/2" 0.00 100.0
1" 81.42 79 - 85
2 Persentase melalui saringan 3/8" 47.27 44 - 58
No. 4 32.00 29 - 44
No. 10 20.40 17 - 30
No. 40 9.36 7 - 17
No. 200 5.27 2-8
d max 2.203
3 Compaction
w opt 6.30
4 CBR rendaman % 93.72 > 90
5 Abration test % 22.39 < 40

Prepared by : Checked by : Approved by :


Contractor Consultant KOORDINATOR LAPANGAN
PT. NABILA UTAMA PU DINAS BINA MARGA

SURYADI,Amd
Chif Quality Control Quality Engeneering