You are on page 1of 6

PROJECT UPGRADING JALAN ANGKUT BATUBARA KM.72 to KM.

86
MENGGUNAKAN METODE CHIPSEAL DOUBLE LAYER

SIEVE ANALYSIS
SNI ASTM C136 - 2012

OWNER : PT. PARAMITHA CIPTA SARANA Date of test : 3-Mar-24


CONTRACTOR : PT. WIDYA SAPTA CONTRACTOR Tested by : Egi
LOCATION : KAB. BALANGAN - KALSEL
WORK ITEM : BASE COURSE CLASS A
SOURCE OF MAT. : EX. AI ( STOCK PILE KM 66 )

Location of test : Lab Wasco

Base Course Class B

SIEVE Wt. Retained Average


% Retained % Passing Specification
SIZE ( gr )
% Passing
inch mm 1 2 1 2 1 2 Min Max

2" 50,00 - - - - 100,00 100,00 100,00 100 100

11/2 " 37,50 - - - - 100,00 100,00 100,00 100 100

1" 25,00 1.282 1.867 12,81 18,37 87,19 81,63 84,41 79 85

3/4 " 19,10 2.602 3.696 25,99 36,36 74,01 63,64 68,82

3/8 " 9,50 5.083 6.090 50,78 59,92 49,22 40,08 44,65 44 58

# 4 4,75 5.741,0 6.802,0 57,35 66,92 42,65 33,08 37,86 29 44

# 10 2,00 7.371,0 8.176,0 73,64 80,44 26,36 19,56 22,96 17 30

# 40 0,42 8.706,0 9.140,0 86,97 89,93 13,03 10,07 11,55 7 17

# 200 0,075 9.706,0 9.917,0 96,96 97,57 3,04 2,43 2,73 2 8

TOTAL 10.010,0 10.164,0

NOTE :

100

90

80
Total Percen Passing (%)

70

60

50

40

30

20

10

0
0,01 0,10 1,00 10,00 100,00
Particle Size (mm)

OWNER CONTRACTOR
PT. Paramitha Cipta Sarana PT. Widya Sapta Contractor

Dwi Yanto Joko Nasrudin


Quality Control Engineering Quality Control Spv.
PROJECT UPGRADING JALAN ANGKUT BATUBARA KM.72 to KM.86
MENGGUNAKAN METODE CHIPSEAL DOUBLE LAYER

GUMPALAN LEMPUNG DAN BUTIRAN-BUTIRAN MUDAH PECAH


SNI 03-4141-1996

OWNER : PT. PARAMITHA CIPTA SARANA Date of test :4-Mar-23


CONTRACTOR : PT. WIDYA SAPTA CONTRACTOR Tested By Egi
:
LOCATION : BALANGAN - KALSEL
WORK ITEM : BASE COURSE CLASS A
SOURCE OF MAT. : EX. AI ( STOCK PILE KM 66 )

LOCATION : LAB WASCO CA (G) AGG > NO.4 = 62,14 %

NO. SAMPEL : 1 FA (H) AGG < NO.4 = 37,86 %


UKURAN SARINGAN GRADASI BERAT MASING- BERAT KEHILANGAN KADAR KADAR
BENDA UJI MASING MASING- BERAT LEMPUNG DAN LEMPUNG
FRAKSI MASING MASING- BUTIR-BUTIR DAN BUTIR-
SEBELUM FRAKSI MASING MUDAH PECAH BUTIR MUDAH
PENGUJIAN SETELAH FRAKSI PECAH
NO KET.
PENGUJIAN DIKOREKSI
LOLOS TERTAHAN DENGAN
GRADASI
(%) ( Gram ) ( Gram ) (%) (%) (%)
A B C D=(B-C) E=(D/B)x100 F=(AxE)/100

1 35.5 mm 0,00 0,0 0,0 0,00 0,00 0,00


Spec.
2 35.5 mm 19.0 mm 49,38 5090,0 4698,0 392,00 7,70 3,80 0-5%

3 19.0 mm 9.5 mm 30,47 3141,0 2819,0 322,00 10,25 3,12

4 9.5 mm 4.75 mm 20,14 2076,0 1729,0 347,00 16,71 3,37

JUMLAH GUMPALAN LEMPUNG DAN BUTIR-BUTIR MUDAH PECAH DARI AGREGAT KASAR ( I ) 10,29

5 4.75 mm 1.18 mm 100 1143,0 887,0 256,00 22,40 22,40

JUMLAH GUMPALAN LEMPUNG DAN BUTIR-BUTIR MUDAH PECAH DARI AGREGAT HALUS ( J ) 22,40

TOTAL (G x I)+(H x J) 14,88 %


Notes :

OWNER CONTRACTOR
PT. Paramitha Cipta Sarana PT. Widya Sapta Contractor

Dwi Yanto Joko Nasrudin


PROJECT UPGRADING JALAN ANGKUT BATUBARA KM.72 to KM.86
MENGGUNAKAN METODE CHIPSEAL DOUBLE LAYER

Pengujian Kadar Lumpur / Jumlah Bahan Dalam Agregat Yang Lolos Saringan
No. 200 ( 0.075 mm )
SNI 03-4142 : 1996
OWNER : PT. PARAMITHA CIPTA SARANA Date of test : 4-Mar-24
CONTRACTOR : PT. WIDYA SAPTA CONTRACTOR Tested By : Egi
LOCATION : KAB. BALANGAN - KALSEL
WORK ITEM : BASE COURSE CLASS A
SOURCE OF MAT. : EX. AI ( STOCK PILE KM 66 )
LOCATION : LAB WASCO
No. Sample : 1 1

Uraian I II Remark
Berat benda uji kering oven sebelum pengujian Lolos Saringan
( gr ) 950 852
Saringan No. #4
Berat benda uji kering oven setelah pengujian dengan cara
( gr ) 801 727
pencucian, tertahan pada saringan No. #200
Kadar Lumpur/butiran yang lolos saringan No. #200
A-B (%) 15,68 14,67
Kadar Lumpur = X 100
A
Rata-rata 15,18 %

Notes :

OWNER CONTRACTOR
PT. Paramitha Cipta Sarana PT. Widya Sapta Contractor

Dwi Yanto Joko Nasrudin


PROJECT UPGRADING JALAN ANGKUT BATUBARA KM.72 to KM.86
MENGGUNAKAN METODE CHIPSEAL DOUBLE LAYER

DOKUMENTASI

Sieve Analysis Base Course Class A Sieve Analysis Base Course Class A

Sieve Analysis Base Course Class A Sieve Analysis Base Course Class A

Gumlem dan butiran mudah pecah Gumlem dan butiran mudah pecah
PROJECT UPGRADING JALAN ANGKUT BATUBARA KM.72 to KM.86
MENGGUNAKAN METODE CHIPSEAL DOUBLE LAYER

DOKUMENTASI

Gumlem dan butiran mudah pecah Gumlem dan butiran mudah pecah

Gumlem dan butiran mudah pecah Gumlem dan butiran mudah pecah

kadar lumpur agregat yang lolos #200 kadar lumpur agregat yang lolos #200
PROJECT UPGRADING JALAN ANGKUT BATUBARA KM.72 to KM.86
MENGGUNAKAN METODE CHIPSEAL DOUBLE LAYER

DOKUMENTASI

kadar lumpur agregat yang lolos #200 kadar lumpur agregat yang lolos #200

kadar lumpur agregat yang lolos #200 kadar lumpur agregat yang lolos #200