BILL OF QUANTITIES

Reinforced cement concrete (1:2:4) as in roof slab, lintels, columns, be


Measurement
Sr no Description No
Length
1ST FLOOR
1 Roof slab 1 19.3
2ND FLOOR
1 Roof slab 2 19.3

1 Roof slab of mumty 1 9.3


1 Stairs 2 21
Lintels
2 0.75
1 Doors
1 0.75
2 0.75
2 Windows
2 0.75
1 0.75
3 Ventilators
1 0.75

Cement concrete (1:4:8) as under layer of floors


Measurement
Sr no Description No
Length
1 ROOM 3 20

1.5" thick cement concrete as top layer of floor finish


1 ROOM 3 20

Mild steel round bars as reinforcement including cutting, bending, binding and placing
Sr No Total Quantity
1 6.75 lbc/cft steel of 681.811188 cft concrete = 4602.2255.19 lbs
Total (lbs)= 4605 lbs

1/2" thick plaster inner side


Measurement
Sr no Description No
Length
First Floor
1 Long wall 2 30
2 Short wall 2 20
3 Bathroom Long wall 1 7
4 Bathroom short wall 1 5
5 Ceiling 2 20
Second Floor
1 Long wall 2 30
2 Short wall 2 20
3 Bathroom Long wall 1 7
4 Bathroom short wall 1 5
5 Ceiling 2 20
Mumty
31 Mumty Long walls 2 10
32 Mumty Room short walls 2 8
33 Mumty Room ceiling 1 10
2 0.75
1 Doors
1 0.75
2 0.75
2 Windows
2 0.75
1 0.75
3 Ventilators
1 0.75

1/2" Thick Plaster Outer Side


Measurement
Sr no Description No
Length
1st Floor
1 Front and Rear wall 2 20
2 Left and Right wall 2 30
2nd Floor
1 Front and Rear wall 2 20
2 Left and Right wall 2 30
Mumty
1 Front and Rear wall 2 11.5
2 Left and Right wall 2 9.5

1/2" Thick Plaster Parapet Wall


Measurement
Sr no Description No
Length
1 Rear Side 2 20
Left Side 2 30
2 Right Side 2 20.5
5 Front Side 2 9.5

STEPS
Measurement
Sr no Description No
Length
1 Tread 38 3.5
2 Riser 40 3.5
3 Sides 38 2

Deductions
Measurement
Sr no Description No
Length
2 0.75
1 Doors
1 0.75
2 0.75
2 Windows
2 0.75
1 0.75
3 Ventilators
1 0.75

Brick work in super structure using 1st class bricks in (1:4) cement san
Measurement
Sr no Description No
Length
1st Floor
1 9" Wall 97
2nd Floor
1 9" Wall 97

2 Mumty Wall 33

3 Parapet Wall 70

Deductions
Measurement
Sr no Description No
Length
2 0.75
1 Doors
1 0.75
2 0.75
2 Windows
2 0.75
1 0.75
3 Ventilators
1 0.75

ABTRACT OF QUANTITIES
Reinforce Cement Concrete (1:2:4) as Roof slab ,lintels over etc
Quantity from BOQ = 681.811188

(i) Dry material of 100cft of cement concrete


yields = 154

So,
Materials:-
(154*1*681.811188
(i) Cement= 149.99846136
)/(100*7)

(ii) sand= (154*2*681.811188 299.99692272


)/(100*7)
(154*4*681.811188
(iii) Coarse Aggregate= )/(100*7) 599.99384544

(iv) Mild Steel round bars as Reinforcements


including cutting , bending , binding & placing (BOQ item no. 08)= 4605
Reinforcements in position

As,

6.75lb of steel is assumed to be required for 1cft


of R.C.C work

So,
1lb = 0.454 Kg 4605*0.454 2090.67

1.5" thick P.C.C (1:2:4) Cement concrete as top layer of floor finished , smooth
Quantity from BOQ = 1800*0.125 = 74.9925

(i) Dry material of 100cft of cement concrete


= 154
yields
(ii) 1.5" = 0.125 ft

So,
Materials:-
(154*1*1800)/
(i) Cement= (100*7) 396

(ii) sand= (154*2*1800)/ 792


(100*7)
(154*4*1800)/
(iii) Coarse Aggregate= (100*7) 1584
1/2" thick (1:3) cement sand plaster to walls finished smooth
Quantity from BOQ = 16241

Dry mortar for 100sft of1/2" thick (1:3) cement


sand plaster = 6

So,
Materials:-
(6*1*16241)/
(i) Cement= 243.615
(100*4)

(ii) sand= (6*3*16241)/ 730.845


(100*4)

Brickwork in super structure using first class bricks in (1:4) cement sand mortar
Quantity from BOQ = 1881.757

Bricks for 100cft of brickwork = 1350


Dry mortar for 100cft of brickwork = 30

So,
Materials:-
(i) Bricks= (1350*1881.75)/100 25393.5

(ii) Cement= (30*1*1881.75)/ 112.905


(100*5)
(30*4*1881.75)/
(iii) sand= 451.62
(100*5)

SUMMARY (1st + 2nd Floor)


Sr. # Description of material Reference Quantity
902 cft = 722
1 Cement From Abstract item
Bags
2 Sand From Abstract item 2274 cft
3 Coarse aggregates From Abstract item 2184 cft
4 Mild steel round bars From Abstract item 2091 KG
5 Bricks From Abstract item 25340 no.s

BILL OF QUANTITIES
Measurement
Sr no Description No
Length
Basement PLAN
1 Roof slab 1 19.3
GROUND FLOOR
1 Roof slab 2 19.3
LINTELS
1 0.75
3 Ventilators
1 0.75

Cement concrete (1:4:8) as under layer of floors


Measurement
Sr no Description No
Length
1 basement + ground floor 2 20

1.5" thick cement concrete as top layer of floor finish


1 basement + ground floor 2 20

Mild steel round bars as reinforcement including cutting, bending, binding and placing
Sr No Total Quantity
1 6.75 lbc/cft steel of 681.811188 cft concrete = 4602.2255.19 lbs
Total (lbs)= 4605 lbs

1/2" thick plaster inner side of shops


Measurement
Sr no Description No of shops
Length
BASEMENT PLAN
1 Long wall 2 30
2 Short wall 3 20
5 Ceiling 2 20
GROUND FLOOR
1 Long wall 2 30
2 Short wall 3 20
5 Ceiling 2 20
1/2" Thick Plaster Outer Side
Measurement
Sr no Description No
Length
BASEMENT PLAN
1 Front and Rear wall 2 20
2 Left and Right wall 2 30
GROUND FLOOR
1 Front and Rear wall 2 20
2 Left and Right wall 2 30

Brick work in super structure using 1st class bricks in (1:4) cement san
Measurement
Sr no Description No
Length
BASEMENT PLAN
1 9" Wall 97
GROUND FLOOR
1 9" Wall 97

ABTRACT OF QUANTITIES
Reinforce Cement Concrete (1:2:4) as Roof slab ,lintels over etc
Quantity from BOQ = 568.433451

(i) Dry material of 100cft of cement concrete


yields = 154

So,
Materials:-
(154*1*568.433451
(i) Cement= 125.05535922
)/(100*7)

(ii) sand= (154*2*568.433451 250.11071844


)/(100*7)
(154*4*568.433451
(iii) Coarse Aggregate= )/(100*7) 500.22143688

(iv) Mild Steel round bars as Reinforcements


including cutting , bending , binding & placing (BOQ item no. 08)= 4605
Reinforcements in position
As,
6.75lb of steel is assumed to be required for 1cft
of R.C.C work

So,
1lb = 0.454 Kg 4605*0.454 2090.67

1.5" thick P.C.C (1:2:4) Cement concrete as top layer of floor finished , smooth
Quantity from BOQ = 1200*0.125 = 150

(i) Dry material of 100cft of cement concrete


yields = 154
(ii) 1.5" = 0.125 ft

So,
Materials:-
(154*1*1200)/
(i) Cement= (100*7) 264

(154*2*1200)/
(ii) sand= 528
(100*7)

(iii) Coarse Aggregate= (154*4*1200)/ 1056


(100*7)

1/2" thick (1:3) cement sand plaster to walls finished smooth


Quantity from BOQ = 16241

Dry mortar for 100sft of1/2" thick (1:3) cement


sand plaster = 6

So,
Materials:-
(i) Cement= (6*1*16241)/ 243.615
(100*4)
(6*3*16241)/
(ii) sand= (100*4) 730.845

Brickwork in super structure using first class bricks in (1:4) cement sand mortar
Quantity from BOQ = 1881.757

Bricks for 100cft of brickwork = 1350


Dry mortar for 100cft of brickwork = 30

So,
Materials:-
(i) Bricks= (1350*1881.75)/100 25393.5

(ii) Cement= (30*1*1881.75)/ 112.905


(100*5)
(30*4*1881.75)/
(iii) sand= (100*5) 451.62

SUMMARY (Basement+Ground Floor)


Sr. # Description of material Reference Quantity
1 Cement From Abstract item 745.57535922
2 Sand From Abstract item 1960.57571844
3 Coarse aggregates From Abstract item 1556.22143688
4 Mild steel round bars From Abstract item 2091 KG
5 Bricks From Abstract item 25393.5
ANTITIES
of slab, lintels, columns, beams etc.,
Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth

29.3 0.3333 188.477817 188.477817

29.3 0.3333 188.477817 376.955634

7.3 0.3333 22.627737 22.627737


3 0.5 31.5 63

7 5.25 10.5
7 5.25 5.25
4 3 6
4 3 6
2 1.5 1.5
2 1.5 1.5
TOTAL= 681.811188
under layer of floors
Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth
30 0.3333 199.98 599.94
TOTAL= 599.94

top layer of floor finish


30 600 1800
TOTAL= 1800

nding, binding and placing reinforcement in position


uantity
cft concrete = 4602.2255.19 lbs
4605 lbs

inner side
Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth

10 300 600
10 200 400
10 70 70
10 50 50
30 600 1200

10 300 600
10 200 400
10 70 70
10 50 50
30 5 3000 6000

10 100 200
10 80 160
8 80 80
7 5.25 10.5
7 5.25 5.25
4 3 6
4 3 6
2 1.5 1.5
2 1.5 1.5
Total= 9910.75
Outer Side
Measurement
Quantity (sft) Total Quantity (cft)
Breath Depth

10 400 800
10 600 1200

10 400 800
10 600 1200

10 230 460
10 190 380
Total= 4840
arapet Wall
Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth
4 160 320
4 240 480
4 164 328
4 76 152
Total= 1280
Measurement
Quantity (sft) Total Quantity (sft)
Breath Depth
1 3.5 133
0.5 1.75 70
0.5 1 38
Total= 241
Overall total= 16271.75
ns
Measurement
Quantity (sft) Total Quantity (sft)
Breath Depth
7 5.25 10.5
7 5.25 5.25
4 3 6
4 3 6
2 1.5 1.5
2 1.5 1.5
Total= 30.75
NET TOTAL= 16241
s bricks in (1:4) cement sand mortar
Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth

0.75 10 727.5 727.5

0.75 10 727.5 727.5

0.75 10 247.5 247.5

0.75 4 210 210


TOTAL= 1912.5
ns
Measurement
Quantity (sft) Total Quantity (sft)
Breath Depth
7 5.25 10.5
7 5.25 5.25
4 3 6
4 3 6
2 1.5 1.5
2 1.5 1.5
Total= 30.75
NET TOTAL 1881.75
els over etc
cft

cft

cft

cft

cft

lbs

Kg

r finished , smooth
cft

cft

cft

cft

cft
ed smooth
sft

cft

cft

cft

ement sand mortar


cft

Nos.
cft

Nos.

cft

cft

ANTITIES
Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth

29.3 0.3333 188.477817 188.477817

29.3 0.3333 188.477817 376.955634

2 1.5 1.5
2 1.5 1.5
TOTAL= 568.433451

under layer of floors


Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth
30 0.3333 199.98 399.96
TOTAL= 399.96

top layer of floor finish


30 600 1200
TOTAL= 1200

nding, binding and placing reinforcement in position


uantity
cft concrete = 4602.2255.19 lbs
4605 lbs

er side of shops
Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth

10 300 600
10 200 600
30 600 1200

10 300 600
10 200 600
30 5 3000 6000
TOTAL= 9600
Outer Side
Measurement
Quantity (sft) Total Quantity (cft)
Breath Depth

10 400 800
10 600 1200

10 400 800
10 600 1200
Total= 4000

s bricks in (1:4) cement sand mortar


Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth

0.75 10 727.5 727.5

0.75 10 727.5 727.5


Total= 1455

els over etc


cft

cft

cft

cft

cft

lbs
Kg

r finished , smooth
cft

cft

cft

cft

cft

ed smooth
sft

cft

cft

cft

ement sand mortar


cft

Nos.
cft
Nos.

cft

cft

loor) SUMMARY (1st + 2nd Floor)


Description of
UNIT Sr. # Reference Quantity
material
cft=597 Bags 1 Cement From Abstract item 902 cft = 722 Bags
cft 2 Sand From Abstract item 2274 cft
cft 3 Coarse aggregates From Abstract item 2184 cft
Kg 4 Mild steel round bars From Abstract item 2091 KG
No.s 5 Bricks From Abstract item 25340 no.s
Reinforced cement concrete (1:2:4) as in roof slab, lintels, colum
Measurement
Sr no Description No
Length
Basement PLAN
1 Roof slab 1 19.3
GROUND FLOOR
1 Roof slab 2 19.3
LINTELS
1 0.75
3 Ventilators
1 0.75

Cement concrete (1:4:8) as under layer of floo


Measurement
Sr no Description No
Length
1 basement + ground floor 2 20

1.5" thick cement concrete as top layer of floor fi


1 basement + ground floor 2 20

Mild steel round bars as reinforcement including cutting, bending, binding and pl
Sr No Total Quantity
1 6.75 lbc/cft steel of 681.811188 cft concrete = 4602.2255.
Total (lbs)= 4605

1/2" thick plaster inner side of shops


Measurement
Sr no Description No of shops
Length
BASEMENT PLAN
1 Long wall 2 30
2 Short wall 3 20
5 Ceiling 2 20
GROUND FLOOR
1 Long wall 2 30
2 Short wall 3 20
5 Ceiling 2 20

1/2" Thick Plaster Outer Side


Measurement
Sr no Description No
Length
BASEMENT PLAN
1 Front and Rear wall 2 20
2 Left and Right wall 2 30
GROUND FLOOR
1 Front and Rear wall 2 20
2 Left and Right wall 2 30

Brick work in super structure using 1st class bricks in (1:4) ceme
Measurement
Sr no Description No
Length
BASEMENT PLAN
1 9" Wall 97
GROUND FLOOR
1 9" Wall 97

ABTRACT OF QUANTITIES
Reinforce Cement Concrete (1:2:4) as Roof slab ,lintels over etc
Quantity from BOQ = 568.433451

(i) Dry material of 100cft of cement concrete = 154


yields

So,
Materials:-
(154*1*568.433451
(i) Cement= 125.05535922
)/(100*7)
(154*2*568.433451
(ii) sand= 250.11071844
)/(100*7)
(154*4*568.433451
(iii) Coarse Aggregate= )/(100*7) 500.22143688

(iv) Mild Steel round bars as Reinforcements


including cutting , bending , binding & placing (BOQ item no. 08)= 4605
Reinforcements in position

As,
6.75lb of steel is assumed to be required for 1cft
of R.C.C work

So,
1lb = 0.454 Kg 4605*0.454 2090.67

1.5" thick P.C.C (1:2:4) Cement concrete as top layer of floor finished , smooth
Quantity from BOQ = 1200*0.125 = 150

(i) Dry material of 100cft of cement concrete


yields = 154
(ii) 1.5" = 0.125 ft

So,
Materials:-
(154*1*1200)/
(i) Cement= 264
(100*7)
(154*2*1200)/
(ii) sand= 528
(100*7)

(iii) Coarse Aggregate= (154*4*1200)/ 1056


(100*7)

1/2" thick (1:3) cement sand plaster to walls finished smooth


Quantity from BOQ = 16241

Dry mortar for 100sft of1/2" thick (1:3) cement


sand plaster = 6

So,
Materials:-
(6*1*16241)/
(i) Cement= 243.615
(100*4)

(ii) sand= (6*3*16241)/ 730.845


(100*4)
Brickwork in super structure using first class bricks in (1:4) cement sand mortar
Quantity from BOQ = 1881.757

Bricks for 100cft of brickwork = 1350


Dry mortar for 100cft of brickwork = 30

So,
Materials:-
(i) Bricks= (1350*1881.75)/100 25393.5

(ii) Cement= (30*1*1881.75)/ 112.905


(100*5)
(30*4*1881.75)/
(iii) sand= (100*5) 451.62

SUMMARY (Basement+Ground Floor)


Sr. # Description of material Reference Quantity
1 Cement From Abstract item 745.57535922
2 Sand From Abstract item 1960.57571844
3 Coarse aggregates From Abstract item 1556.22143688
4 Mild steel round bars From Abstract item 2091 KG
5 Bricks From Abstract item 25393.5
slab, lintels, columns, beams etc.,
Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth

29.3 0.3333 188.477817 188.477817

29.3 0.3333 188.477817 376.955634

2 1.5 1.5
2 1.5 1.5
TOTAL= 568.433451

nder layer of floors


Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth
30 0.3333 199.98 399.96
TOTAL= 399.96

p layer of floor finish


30 600 1200
TOTAL= 1200

ing, binding and placing reinforcement in position


tity
concrete = 4602.2255.19 lbs
4605 lbs

side of shops
Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth

10 300 600
10 200 600
30 600 1200
10 300 600
10 200 600
30 5 3000 6000
TOTAL= 9600

uter Side
Measurement
Quantity (sft) Total Quantity (cft)
Breath Depth

10 400 800
10 600 1200

10 400 800
10 600 1200
Total= 4000

ricks in (1:4) cement sand mortar


Measurement
Quantity (cft) Total Quantity (cft)
Breath Depth

0.75 10 727.5 727.5

0.75 10 727.5 727.5


Total= 1455

over etc
cft

cft

cft

cft
cft

lbs

Kg

nished , smooth
cft

cft

cft

cft

cft

smooth
sft

cft

cft

cft
ent sand mortar
cft

Nos.
cft

Nos.

cft

cft

UNIT
cft
cft
cft
Kg
No.s