No. Measurement Payment 1. Earthwork 1. Earthwork in excavation m3 % of m3 2. Earthwork in filling in foundn trenches m3 % of m3 3. Earthwork in filling in plinth m3 % of m3 2. Concrete 1. Lime concrete in foundn m3 2. Cement concrete in lintels m3 3. RCC in slab m3 4. C.C. or R.C.C. Chajja sunshed m3 5. L.C. in roof terracing (thk. specified.) m2 Per m3 6. Cement concrete bed m3 7. R.C.C. Sunshed (Specified width and ht.) m3 Sr. Particular OR Items Units of Units of No. Measurement Payment 3. Damp proof course (D.P.C.) m2 Per m3 (thk should be mentioned) 4. Brickwork 1. Brickwork in foundn m3 2. Brickwork in plinth m3 3. Brickwork in super-structure m3 Per m3 4. Thin partition walls m2 5. Brickwork in arches m3 6. Reinforced brick work (R.B. work) m3 Sr. Particular OR Items Units of Units of No. Measurement Payment 5. Wood work 1. Doors and windows frame or chowkhats, m3 Per m3 rafters, beams 2. Shutters of doors and windows (thk. specified m2 Per m2 3. Doors and windows fittings (like hinges, Number Per no. tower bolts, sliding bolts, handles) 6. Stone masonry (Stone work) m3 Per m3 Sr. Particular OR Items Units of Units of No. Measurement Payment 7. Steel work 1. Steel rlf bars etc in RCC or R.B. work Quintle Per quintal 2. Bending, Binding of steel rlf Quintle Per quintal 3. Rivets, bolts and nuts, anchor bolts, Lewis Quintle Per quintal bolts, holding down bolts. 4. Iron hold fasts Quintle Per quintal 5. Iron railing (ht & types specified) Quintle Per quintal 6. Iron grills m2 Per m2 8. Roofing 1. RCC or R.B. slab roof (excluding steel) m3 Per m3 2. L.C. roof over and inclusive of tiles or m2 Per m2 bricks or stone slab etc. (thk. specified) 3. Centering and shuttering of formwork m2 Per m2 4. A.C. sheet roofing m2 Per m2 Sr. Particular OR Items Units of Units of Payment No. Measurement 9. Plastering, Pointing and finishing 1. Plastering - cement or lime mortar (thk. and m2 Per m2 proportion specified) 2. Pointing m2 Per m2 3. White washing, colour washing, cement wash m2 Per m2 (no. of coats specified) 4. Distempering (no. of coats specified) m2 Per m2 5. Painting, varnishing (no. of coats specified) m2 Per m2 10. Flooring 1. 25 mm cement concrete over 75 mm lime m2 Per m2 concrete floor (including L.C.) 2. 25 mm or 40 mm C.C. floor m2 Per m2 3. Doors and window sills m2 Per m2 (CC or cement mortar plain) Sr. Particular OR Items Units of Units of Payment No. Measurement 11. Rain water pipe/plain pipe Running meter Per RM 12. Steel wooden truss Numbers Numbers 13. Glass panels (Supply) m2 m2 14. Fixing of Glass panels or cleaning Numbers Numbers