HOLY ANGEL UNIVERSITY

SCHOOL OF ENGINEERING AND ARCHITECTURE


A.Y. 2023-2024

PLATE NO. 2

CREATION OF BOM FORMAT

Angeles, Carl Joshua S.


Umali, Martin Abram P.
CE - 301
ITEM DESCRIPTION UNIT
I. GENERAL REQUIREMENTS

A Mobilization

B Temfacil lot

1 Bankhouse lot

2 Temporary Enclosure lot

3 Utilities lot

C Safety lot

D Demobilization lot

II. SITE WORKS


A Site Clearing & Grubbing, Layout & Staking lot
B Excavation lot

III. CIVIL & STRUCTURAL WORKS

A GROUND FLOOW CONCRETING & MASONRY

1 GF Footing

1.1 3000 Psi Concrete cu.m

1.2 Gravel Bedding cu.m

1.3 Rebars G33 kl

1.4 Formworks & Scaffolds sqm

2 Tie Beam lm
2.1 3000 Psi concrete cu.m

2.2 Rebars kl

2.3 Formworks & Scaffolds sqm


3 Wall Footing (additional) lm

3.1 3000 Psi Concrete cu.m

3.2 Gravel Bedding cu.m

3.3 Rebars G33 Ig

4 GF Column

4.1 3000 Psi concrete cu.m

4.2 Rebars kl

4.3 Formworks & Scaffolds sqm

5 GF Slab (additional) sqm

5.1 3000 Psi Concrete cu.m

5.2 Gravel Bedding cu.m


5.3
Rebars G33 Ig

6 Stairs

6.1 3000 Psi concrete cu.m

6.2 Rebars kl

6.3 Formworks & Scaffolds sqm

7 GF 6’’ Base Wall sqm

7.1 6’’CHB plastered with 10mm DRB sqm

7.2 Backfill & Compaction cubm

8 GF 4’’ CHB Wall (additional)

8.1 6’’CHB plastered with 10mm DRB sqm

B SECOND FLOOR CONCRETING & MASONRY

1 Suspended Slab & Beam (additional) sqm


1.1 3000 Psi concrete cu.m

1.2 Rebars kl

1.3 0.7mmx5cm profilex95cm eff. Width steel deck lm

1.4 Formworks & Scaffolds sqm

2 2F Column

2.1 3000 Psi concrete cu.m

2.2 Rebars kl

2.3 Formworks & Scaffolds sqm

3 Roof Beam

3.1 3000 Psi concrete cu.m

3.2 Rebars kl

3.3 Formworks & Scaffolds sqm

4 2nd Storey 4’’ CHB Wall sqm

4.1 6’’CHB plastered with 10mm DRB sqm

C ROOF FRAME & ROOFING WORKS

1 1.5mmx2’’x6’’ C Purlins Ig

2 1.2mmx2’’x6’’ C Purlins Ig

3 2.5mmx2’’Steel Angle (Cut as cleat) Ig

4 RibType Roofing lm

5 GI Pre-painted Inside Gutter Ig

6 GI Pre-painted End Wall Flashing Ig

7 Consumables lot

IV ARCHITECTURAL WORKS

A Glass and Aluminum (additional) sqft

B Doors & Gates


800mm wide Wooden Panel Door w/ doorknob-
1 set
painted
2 700mm wide PVC Louver Door set

C Floor & Wall Finishes

1 400x400mm CR wall tiles pc

2 400x400mm CR floor tiles pc

3 600x600mm Floor Tiles pc


400x400mm Rustic Floor Tiles (stair steps, kitchen,
4 pc
balconies)
5 Granite Slab pc

6 60x60cm Black Tiles pc

7 2’’x10’ Aluminum Stair Nosing Ig

8 Portland Cement bg

9 Fine Sand cubm

10 ABC Grout bg

D Ceiling Works

1 PVC Ceiling-Ficem Board on light metal frames sqm


GI Spandrel Ceiling-Ficem Board on light metal
2 sqm
frames
E Railing

1 1 1.5mm thk-38 Square Tube lot

2 1.2mm thk-25 Square Tube lot

3 Consumables lot

F Concrete Canopies

1 Concrete Canopies sqm

G Cabinets

1 Kitchen Counter Cabinet lot

H Painting Works

1 Masonry Wall
1.1 Concrete Neutralizer gal

1.2 Primer gal

1.3 Reducer gal

1.4 Skim Coat bg

1.5 Marine Epoxy gal

1.6 Semi-Gloss Latex gal

1.7 Consumables lot

1.8 Metal

1.9 Red Oxide gal

2 Epoxy Primer gal

2.1 Body Filler gal

2.2 Automotive Paint gal

2.3 Paint Thinner gal

2.4 Epoxy Reducer gal

2.5 Lacquer Thinner gal

2.6 Consumables lot

V PLUMBING WORKS

A Fixtures

1 Water Closet Package set

2 Shower Set set

3 Kitchen Sink set

4 Goose Neck Faucet set

5 Hose Bib unit

6 SS Floor Drain unit

B Sewer & Drainage System lot

C Clean Water System lot


E Catch Basin

1 400x400 Catch Basin unit

VI ELECTRICAL WORKS

1 EMT lg

2 Wire Holder pc

3 Entrance Cap pc

4 #8 THHN Stranded Wire lm

5 #10 THHN Stranded Wire lm

6 #12 THHN Stranded Wire lm

7 #14 THHN Stranded Wire lm

8 Electrical Devices, Conduits, etc lot

9 6 branches Panel Board unit

10 Single -Gang Switch pc

11 2 -Gang Switch pc

12 Duplex Convenience Outlet pc

13 ACU Outlet pc

14 50A CB (Plug-in) pc

15 15A CB (Plug-in) pc

16 20A CB (Plug-in) pc

17 30A CB (Plug-in) pc

18 Recessed Light with housing set

VII OTHERS

A Water Proofing (CR & roof deck) lot


VIII POST-CONSTRUCTION

A Cleaning of Physical Job Site

B Reviewing the Project with Clients


C Finalizing Project Documents

D Returning of Equipment

E Punchlisting

F Transferring of Documents