You are on page 1of 8

Buildings SCOPE OF WORK (Vertical Structures) UNITS

Part I. Earthworks
a) Clearing and Grubbing
Clearing and Grubbing Hectare
Clearing and Grubbing L.S.
Individual Removal of Trees, Small each
Individual Removal of Trees, Large each
b) Removal of Actual Structures/ Obstruction
Removal of Structures and Obstruction L.S.
Removal of Actual Structures/Obstruction each
Removal of Actual Structures/Obstruction sq.m.
Removal of Actual Structures/Obstruction ln.m
c) Excavation cu.m
Unsuitable Excavation
Surplus Common Excavation
Surplus Rock Excavation
Surplus Unclassified Excavation
d) Structure Excavation
Bridge Excavation cu.m
Foundation Fill cu.m
Excavation ordered below Plan Elevation cu.m
Shoring, cribbing and related work L.S.
Pipe culverts and drain excavation cu.m
e) Embankment
Selected Borrow for topping, Case 1 cu.m
Selected Borrow for topping, Case 2 cu.m
Earth Berm meter
f) Dredging cu.m
g) Reclamation cu.m
Part II. Plain and Reinforced Concrete Works
a) Reinforced Concrete cu.m
Part III. Finishing
a) Termite Control Work Liter
kg
b) Storm Drainage and Sewerage System meter
each
c) Plumbing
Cast Iron Soil Pipes and Fitting pieces/length
Galvanized Iron Pipes and Fittings pieces/length
Plumbing Fixtures set
Roof Drain and Strain set
d) Carpentry and Joinery Works pcs/set
e) Hardware
rough hardware pieces/kilo
finishing hardware pieces/set
f) Steel Windows sq.m
g) Steel Doors and Frames sq.m/set
h) Aluminum Glass Doors sq.m
i) Aluminum Glass Windows sq.m
j) Jalousie Windows sq.m
k) Wooden Doors and Windows
Frames and door locks set
Doors and Windows Sashes sq.m
l) Rolling Up Doors unit/set
m) Glass and Glazing sq.m
n) Corrugated Metal Roofing
Corrugated Roofing sq.m
Fabricated Roofing Accessories ln.m
Roof Ventilators each
o) Prepainted Metal Sheets sq.m
p) Clay Roof Tile sq.m
q) Water Proofing sq.m
r) Roof Drains with Strainers pieces/set
s) Ceramic Tiles sq.m
t) Wood Tiles sq.m
u) Vinyl Floor Tiles sq.m
ln.m
no. of places
v) Cement Floor Finish sq.m
w) Stucco Finish sq.m,
x) Granolithic Marble Work sq.m
ln.m
y) Pea Gravel Washout Finish In
sq.m
z) Bush Hammered Finish sq,m
aa) Pebble Washout Finish In
sq.m
bb) Cement Plaster Finish sq.m
cc) Synthetic Adobe sq.m
dd) Granatite Washout Finish sq.m
i.m
ee) Accoustal Ceiling sq.m
no of
pieces
ff) Accoustal Treatment sq.m
gg) Painting, Varnishing and Other Related Works sq.m
Part IV. Electrical
a) Conduits, Boxes and Fittings Length
pairs,
pieces,
kilos,
rolls, cans,
set and lot
b) Wires and Wiring Devices m
roll,
pieces
set,
c) Power Load Center, Switchgear and Panel Boards set,
pieces
Part V. Mechanical
a) Air-Conditioning and Refrigeration System
Compressor, Condenser and Evaporator set
Diffuser, Grilles and Valves piece
Pipe length
Ducts and Insulation sq.m
Pipe Insulation m
b) Water Pumping System
Pump and Water Truck set
Air Compressor set
Pipe length
Valve Fittings piece
c) Automatic Water Sprinkler System
Fire and Jockey pumps set
Sprinkler lead , valves and Fitting pipes piece
Pipes length
d) Electric Elevator
Traction or Hydraulic set
Machine and Car Heoistway doors, Counter weights, Guide rails, piece
annunciators, and hall position indicators
Electrical wire and conduits length
e) Electric Dumbwaiter
Machine set
Car, Door, Cable piece
Electrical wires and Conduit length
f) Oxygen, Nitrous Oxide, Vacuum and Fuel Gas System
Oxygen, Nitrous Oxide, Gas manifold and Duplex Vacuum pump set
Humidifier, Vacuum Trap Bottle, outlets and valves piece
Pipe and Tubing length
g) Heating System
Boilers, Fuel pump, Storage tank and Fuel Day Tank set
Pipes length
Valves and fittings pieces
h) Boiler
Steam Boilers, Air Compressor, Heat Exchanger & Fuel pump set
Pipes with insulation length
Valves and Fittings piece
Flood Control and Drainage SCOPE OF WORK (Horizontal Structures) UNITS
Part I. Earthworks
a) Clearing and Grubbing
Clearing and Grubbing Hectare
Clearing and Grubbing L.S.
Individual Removal of Trees, Small each
Individual Removal of Trees, Large each
b) Channel Excavation
c) Structure Excavation
Bridge Excavation cu.m
Foundation Fill cu.m
Excavation ordered below Plan Elevation cu.m
Shoring, cribbing and related work L.S.
Pipe culverts and drain excavation cu.m
d) Dredging
e) Embankment
Selected Borrow for topping, Case 1 cu.m
Selected Borrow for topping, Case 2 cu.m
Earth Berm meter
f) Fill and Backfill cu.m
g) Hauling and Disposal/Overhaul cu.m-km
h) Aggregate Subbase Course cu.m
i) Aggregate Base Course cu.m
j) Crushed Aggregate Base Course cu.m
Part II. Bank and Slope Protection Works
a) Riprap and Grouted Riprap cu.m
b) Stone Masonry cu.m
c) Concrete Slope Protection cu.m
d) Rubble Concrete/Sand or Stone Masonry cu.m
e) Gabions cu.m
f) Filter Fabric sq.m
g) Piling m
h) Sheet Piles ln.m
Part C. Drainage Works
a) Piper Culverts and Storm Drains ln.m
b) Underdrains ln.m
Granular backfill fiber material for underains cu.m
c) Manholes, Inlets and Catch Basins Each
d) Cleaning and Reconditioning of Existing Drainage Structures ln.m
HIGHWAYS AND AIRPORTS SCOPE OF WORK (Horizontal Structures) UNITS
I. Facilities for engineers
a) Office and Laboratories for the Engineer L.S
b) Vehicles for the Engineer
Vehicles each
Operation month
c) Assistance to the Engineer L.S.
d) Photographs Each
II. Other General Requirements
a) Offices, Shops, Stores and Workmens Accommodation for Contractor Unit
b) Medical Room and First Aid Facilities Unit
c) Construction Survey and Staking Km
d) Mobilization and Demobilization LS
III. Earthworks
a) Clearing and Grubbing
Clearing and Grubbing Hectare
Clearing and Grubbing L.S.
Individual Removal of Trees, Small each
Individual Removal of Trees, Large each
b) Removal of Actual Structures/ Obstruction
Removal of Structures and Obstruction L.S.
Removal of Actual Structures/Obstruction each
Removal of Actual Structures/Obstruction sq.m.
Removal of Actual Structures/Obstruction ln.m
c) Excavation cu.m
Unsuitable Excavation
Surplus Common Excavation
Surplus Rock Excavation
Surplus Unclassified Excavation
d) Structure Excavation
Bridge Excavation cu.m
Foundation Fill cu.m
Excavation ordered below Plan Elevation cu.m
Shoring, cribbing and related work L.S.
Pipe culverts and drain excavation cu.m
e) Embankment
Selected Borrow for topping, Case 1 cu.m
Selected Borrow for topping, Case 2 cu.m
Earth Berm meter
f) Subgrade Preparation sq.m
Subgrade Preparation (Common Material)
Subgrade Preparation (Existing Pavement)
Subgrade Preparation (Unsuitable Material)
g) Compaction Equipment and Density Control Strips Unit
h) Overhaul cu.m-km
Overhaul
Overhaul of Borrow, Case 1
IV. Subbase And Base Course
a) Aggregate Subbase Course cu.m
b) Aggregate Base Course cu.m
c) Crushed Aggregate Base Course cu.m
d) Lime Stabilized Road Mix Base Course cu.m
e) Portland Cement Stabilized Road Mix Base Course cu.m
f) Asphalt Stabilized Road Mix Base Course cu.m
g) Chemically Stabilized Road Mix Subbase Course or Base Course Liter
h) Portland Cement Treated Plant Mix cu.m
i) Aggregate Stockpile cu.m
V. Surface Courses
a) Aggregate Surface Course cu.m
b) Biituminous Prime Coat sq.m
c) Biituminous Tack Coat sq.m
d) Biituminous Seal Coat Tonne
e) Biituminous Surface Treatment Tonne
f) Slurry System for Road Surface Treatment sq.m
g) Biituminous Penetration Macadam Pavement Tonne
h) Biituminous Road Mix Surface Course Tonne
i) Biituminous Plant-Mix Surface Course General sq.m
j) Biituminous Plant-Mix Surface Course, Cold Laid sq.m
k) Biituminous Plant-Mix (Stockpile Maintenance Mixture) cu.m
l) Biituminous Concrete Surface Course, Hot Laid sq.m
m) Portland Cement Concrete Pavement sq.m
n) Rock Asphalt, Hot Laid sq.m
VI. Bridge Construction
a) Piling each
meter
b) Railings m
c) Timber Strucutres Span
d) Metal Structures Kg
e) Reinforcing Steel Kg
f) Structural Concrete cu.m
g) Prestressed Concrete Structures
Prestressed structural concrete members (identification) Each
Prestressed Concrete L.S
h) Concrete Structure cu.m
i) Steel Bridges L.S
j) Welded Structural Steel
k) Treated and Untreated Timber cu.m
l) Paint
m) Elastomeric Bearing Pads each
n) Pre-Molded Joint Filler for Concrete Paving and Structural Construction cu.m
o) Forms and Falseworks L.S
p) Elastomeric, Hot-Applied Joint Sealant With Single-Sized Aggregates for cu.m
Bridge Expansion Joints
q) Carbon Fiber sq.m
Part VII. Drainage and Slope Protection Structures
a) Pipe Culverts and Storm Drains ln.m
b) Underdrains and Bllind drain ln.m
Granular backfill fiber material for underains cu.m
c) Manholes, Inlets and Catch Basins each
d) Drainage Steel Grating with Frame set
e) Cleaning and Reconditioning Existing Drainage Structures ln.m
f) Riprap and Grouted Riprap cu.m
g) Stone Masonry cu.m
h) Rubble Concrete cu.m
i) Hand-Laid Rock Embankment cu.m
j) Sheet Piles ln.m
k) Concrete Slope Protection cu.m
l) Gabions and Matresses cu.m
Filter cloth sq.m
m) Erosion Control Mats, Roving and Cellular Confinement Systems sq.m
n) Permanent Ground Anchors ln.m
o) Shotcrete (Concrete Spray) sq.m
p) Mechanically-Stabilized Earth (MSE) Retaining Walls sq.m
q) Wet Stone Masonry (Cobble Stone) ln.m
r) Drain Pipe ln.m
s) Hydroseedig sq.m
Part VIII. Miscellaneous Structures
a) Curb and/or Gutter (cast in place) ln.m
Curb and/or Gutter (Precast) piece
b) Sidewalk sq.m
c) Monuments, Markers and Guide Posts each
d) Guardrails ln.m
Metal Beam End Piece each
e) Fencing ln.m
each
f) Road Sign each
g) Pavement Markings sq.m
h) Reflective Thermoplastic Stripping Material (Solid Form) each
i) Concrete Joint Sealant (Hot-Poured Elastic and Cold-Applied Types) kg
j) Waterstops m
L.S
k) Reflectorized Thermoplastic Rumble Strips sq.m
l) Chevron Signs each
m) Coconet Bio-Engineering Solutions sq.m

You might also like