Annex I - Bill of Quantities RFQ

Emergency Flood Response for vulnerable in Omdurman- Karari- Alfath East Date: 08.10.2014
Bill of quantities for a RCC 2pipes culvert (2 vents) in Karari locality Contract reference: 00089952
Unit Rate
Pay Item Items Unit Quantity Amount (USD)
(USD)
A Mobilization and preparation works

1.00 Mobilization L.S 1

CLEARING AND Cleaning the site area and remove all debris such as cabbage and the existing
2.00 concrete structures from the site to approved area, all in accordance with L.S 1
specifications, drawings, and engineer's instructions.

3.00 Provide Detour (diversion) with gravel and approved material with modified density as required m3 30

Sub-total A

B Culvert "1" Structure

Excavation,Clearing and grubbing at inlets and outlets of current hydraulic structures and canal excavation within
specified depth ( 7.5 meters long and 3.5 meters width ) and surface level for foundation at new pipe culvert 3
4.00 m 50
location backfill with suitable material from the excavation and compaction, disposal of surplus and unsuitable
material.Dia 1800mm (internal)

Provide approved material (bolders with cement grouting) for foundation layer (20 cm)at culvert location and
5.00 m3 5.25
compact (gravel)
Provide and cast plain concrete layer, ratio of 1:2:4 and thickness of 10 cm over the gravel layer in foundation with
6.00
2% slope. m3 2.625

Provide Reinforced concrete Pipes with Dia 90 cm (internal) and 12.4 cm thick and 250 cm a long Reinforced
7.00 No 6
concrete pipe complying with AASHTO M 170 M including assembling, jointing and all ancillary works

Install and transprot of Reinforced concrete Pipes with Dia 90 cm (internal) and 12.4 cm thick and 250 cm a long
8.00 No 6
Reinforced concrete pipe complying with AASHTO M 170 M including assembling, jointing and all ancillary works

Provide and construct cut-off wall (Reiforced concrete 1:2:4), and head and wing walls . including all ancillary 3
9.00 m 5.25
works according to drawings.

10.00 Provide and costruct of Steel bars 12 mm for Head wall and wing wall with dimension according to drawings. ton 1

Granular filling over pipe/Back filling behind abutments, wing walls/retaining and return walls or any other area with
11.00 m3 68
selected granular materials and well compacted with approved quality as directed by the site Engineer.

12.00 Providing sub-grade preparation for the length of 350m from asphalt road to next culvert close to school enterance m3 420

13.00 Sub-base preparation for the length of 350m including well compaction and proper slope according to the drawings m3 440

14.00 Ditch excavation for both sides of the road according to drawing m3 87.5

Sub-total B
C Stone Masonry, 1:4 and excavation of channel

15.00 Stone Pitching 1:4 mortar at the inlet and outlet parts of the culvert m2 75

Excavation of trench/channel within specified depth (according to site engineer instruction) from the culvert outlet
16.00 m3 100
toward natural drainage
Sub-total C

Total (A+B+C)

TOTAL Culvert 1
Unit Rate
Pay Item Items Unit Quantity Amount (USD)
(USD)

C Culvert "2" Structure

Excavation of trench within specified depth ( 10 meters long and 5 meters width ) and surface level for foundation
17.00 at new pipe culvert location backfill with suitable material from the excavation and compaction, disposal of surplus m3 24
and unsuitable material.Dia 1800mm (internal)

Provide approved material (bolders with cement grouting) for foundation layer (20 cm)at culvert location and
18.00 m3 3.2
compact (gravel)

Page 1 of 2
Annex I - Bill of Quantities RFQ
Emergency Flood Response for vulnerable in Omdurman- Karari- Alfath East Date: 08.10.2014
Bill of quantities for a RCC 2pipes culvert (2 vents) in Karari locality Contract reference: 00089952

Install Steel Pipes with Dia 90 cm (internal) and 500 cm a long pipe and all ancillary works (Pipes are already
19.00 No 5
avalilable no need to consider pipes cost)

Provide and construct cut-off wall (Reiforced concrete 1:2:4), and head and wing walls . including all ancillary
20.00 m3 4.5
works according to drawings and technical specification

21.00 Provide and costruct of Steel bars 12 mm for Head wall and wing wall with dimension according to drawings. ton 0.5

Granular filling over pipe/Back filling behind abutments, wing walls/retaining and return walls or any other area with
22.00 m3 12
selected granular materials of approved quality complete as directed by the site Engineer.

23.00 Providing sub-grade preparation for the length of 80m from Cluvert to School enterance including well compaction m3 128

24.00 Sub-base preparation for the length of 80 m from cluvert to the school enterance including well compaction m3 128

25.00 Base preparation for the length of 80 m from cluvert to the school enterance including well compaction m3 84

26.00 Ditch excavation for both sides of the road according to drawing m3 33.6

TOTAL Culvert 2
TOTAL of Cluvert 1 and 2
Contingency (10%) LS 1 0.00
Grand Total

Page 2 of 2