You are on page 1of 3

EXPERIMENT NO.

-01
Prepare the list of items to be executed with units for detailed estimete of a given structure from the giving drawing.
giving drawing
Unts of
measurem Units of
Sub-head S.No. Particulars ent payments
Earthwork 1 Earthwork in excavation CUM Per CUM
2 Earthwork in filling in foundation trenches CUM Per CUM
3 Earthwork in filling in plinth CUM Per CUM
Concrete 1 Lime concrete in foundation
2 cement foundation in lintels
3 RCC in slab
4 Cement concrete or RCC in chujja,sunshade
5 Lean concrete in roof terracing (thickness specified) SQM Per SQM
6 Cement concrete bed CUM Per CUM

7 Reinforced concrete sunshade (specified width and height) CUM Per CUM
DPC 1 Damp proof course (DPC)-Thickness mentioned SQM Per SQM
Brickwork 1 Brickwork in foundation CUM Per CUM
2 Brickwork in plinth
3 Brickwork in super structure
4 Thin partition walls SQM Per SQM
5 Brickwork in arches CUM Per CUM
6 Reinforced Brickwork CUM Per CUM
Random Rubble masonry, Coursed Rubble masonry, Ashlar
Stone work 1 masonry walling and arches. CUM Per CUM
2 Stone work in wall facing etc. SQM Per SQM
Cut or Dressed stone work as in sills, steps, cornices, lintels,
3 copings etc. CUM Per CUM
4 Boulderwork CUM Per CUM

Wood work 1 Doors and windows frames or chaukhats, rafters, beams. CUM Per CUM
2 Shuters of doors and windows (thickness specified) SQM Per SQM
Doors and window fittings (like hinges, tower bolts, sliding
3 bolts, handles) Each Per Each
Per
Steel work 1 Steel reinforcement bars etc in RCC and reinforced brick work Quintal Quintal
Per
2 Bending, bending of steel reinforcement Quintal Quintal
Rivets,bolts and nuts,anchor bolts,lewis bolts, holding down Per
3 bolts Quintal Quintal
Per
4 Iron hold fasts Quintal Quintal
5 iron railing (height and types specified)
6 Iron grills SQM Per SQM
25mm cement concrete over 75mm lime concrete floor
Flooring 1 (including lean concrete) SQM Per SQM
2 25mm or 40mm cement concrete floor SQM Per SQM
3 Doors and window sills (CC or cement mortar plain SQM Per SQM
Roofing 1 RCC and RB slab roof (excluding steel ) CUM Per CUM
Lean concrete roof over and inclusive of tiles or brick or stone
2 slab etc (thickness specified) SQM Per SQM
3 Centering and shutering formwork SQM Per SQM
4 AC sheet roofing SQM Per SQM
Plastering,P
oints and plastering-cement or lime mortar (thickness and proportion
finishing 1 specified SQM Per SQM
2 Pointing SQM Per SQM
White washing,colour washing, cement washing, (number of
3 coats specified) SQM Per SQM
4 Distempering (number of coast specified) SQM Per SQM
5 Painting, varnishing (mumber of coats specified) SQM Per SQM
Miscellane-
ous item 1 Rain water pipe/plain pipe RM Per RM
2 steel wooden truss Each Per Each
3 Glass panels (supply) SQM Per SQM
4 Fixing of glass panels or cleaning Each Per Each
e giving drawing.