Earthwork
. Earthwork in excavation in ordinary soil, earth-
work in mixed soil with kankar, bajri, etc.
earthwork in hard soil cu m per c u m cu ft
cu m per cum cuft
2. Rock excavation
Concrete
I. Lime conerete (L.C.) in foundation er cy
2 Lime concrete (LC.) in roof terracing, thick
ness specified
(May also be in volume basis as practice in
U.P.)
3 Cement concrete (C.C.)
4. Reinforced cement concrete (R.CC.)
5 C.C. or R.C.C. Chuja, sun shade
6. Precast C.C. or R.C.C. CU 1
pereu
7. Jali work or jaffri work or C.C. 1racery panels
(Thickness specified)
8. Cement concrete bed CU 1
8.
D.P.C.
9 Damp proof course Cement concrete, Kich
cement mortar, Asphalt, etc. (Thickness
specified) per s
Brick work
. Brickwork in foundation and plinth, in super
structure, in arches, etc., in cement, ime or
Cu per Cu 1
mud mortar
U.P)
4 Brickwork in jack arches, if measured sepa-
per eu
ratcly
5. Jack arch roofing including top finish1ng
Cu1 per Cu 1
6. Brickwork in well steining
1
7 Half-brickwork with or without reinforcement
My also be in cu m as practice n U.P)
8. per sg
Thin partition wall
CU D Per cu n
9.
Reinforced brickwork (R.B. work
weather coure,
10 Sring course, drip course,
metse pEr
Coping etc. (Projection specified)
FSTIMATING AND COSTING
Units of
Particulars of ltems Units of
measurement|
in MKS payment Units of
in MKS payment
in FPS
Cornice (Projection and type specified)
metre
per m
:2 Brickwork in Fire place, Chulla, Chimney... cu m
per r ft
per cu m
13. Pargetting Chimney, fire place flue
metre
T cu ft
14. Brick edging (by road side) per m
per r ft
metre
Stone work - per m
per r ft
Stone masonry, Random Rubble
Coursed Rubble masonry, Ashlar masonry,
walls,
in arches, etc. masonry in
cu m
per cu m
2 Cut stone work in
lintel, beam, etc. T% cu ft
cu m
percu m
33. Stone slab in roof, shelve, etc., stone chujjas, per cu ft
stone sun shed, etc.
(Thickness specified) Sq m
4.
4. Stone work in wall per sq m
facing or lining (Thickness %sq ft
specified
Sq m per sq m
Wood work per sq ft
Wood work, door and
window frame or
khat, rafters beams, roof chow-
trusses, etc. cu m per cu m
Door and window shutters or per cu ft
battened, glazed, part panelledleaves, panelled,
and part glazed,
wire gauged, etc.
(Thickness specified) sq m per sq m
3. Door and window per sq ft
fittings as
sliding bolts, handles, etc. hinges
tower bolts,
no.
(May also be on the basis of area of shutters as per no. per no.
practice in U.P)
4. Timbering, boarding (Thickness specified) Sq m per sq m per sq ft
5.Timbering of trenches (Area of face sup-
ported) sq m per sq ft
per sq m
6. Sawing of timber
Sq m per sq m per sq ft
77. Woodwork in
partition, Ply wood, etc. per sq ft
Sq m. per sq m
8. Ballies (Diameter specified) metre per r ft
per m
Steel work -
1. Rolled Steel joists, Channels, Angles, T-irons,
Flats, Squares, Rounds, etc. quintal per q
p e r cwt
Roofing
1. Tiled roof- Allahabad tile, Faizabad tile,
Mangalore tile, etc. including battens Sq m per sq m % sq ft
2. Country tile roof including bamboo jaffri . Sq m per sq mn % sq ft
3. Corrugated iron (G.C.I.) roof, Asbestos cement
| (A.C.) sheet roof sq m per sq m % sq ft
I8 ESTIMATING AND COSTING
SI Units of
Particulars of Items Units of
No. measurement| Units of
in MKSS payment
in MKS
payment
in FPS
4 Slate roofing, timber roofing Sq m
per sq m
Thatch roofing including bamboojaffri (Thick-
ness specified)
sq m
per sq m
6. Eave board (Thickness specified) o sq ft
sq m
7. R.C.C., R.B. slab foof (excluding steel) per sq m
cu m per sq ft
8. Lime concrete roof over and inclusive of per cu m
tiles or per cu ft
brick, or stone slab, etc.
specified) (Thickness
Sq m
9 Mud roof over and inclusive of tiles, or bricks per sq m
%sq ft
or stone slab, etc. (Thickness and type speci
fied)
Sq m
10. Ridges, valleys, gutters, (Girth per sq m
specified) To sq ft
11. metre
Tar felting, Bituminous painting per m
per r ft
sq m
12. per sq m
Insulating layer in roof of sand and %sq it
asphalt, etc. clay,
Sq m
13. per sq m
Expansion, contraction or % sq ft
14 constructionjoint... metre
Ceiling-Timber,
Cement plaster
A.C. Sheet plain,
on XPM, Paste
Cloth,
per m per rf
board, etc. ..
sq m
15. per sq m
Centering and shuttering, Form work-Sur
face area of R.C.C.
per sq f:
or R.B. work
(May also be per cu m (cu ft) of R. C. supported
C. or R.B.
sq m per sq m
%sq ft
work)
1.
Plastering, Pointing and
Finishing
Plastering- Cement
mortar, Lime mortar,
mud, etc.
(Thickness, proportion specified) sq m per sq m % sq ft
2.
Pointing-Struck, Flush, Weather, etc. Sq m per sq m % sq ft
3. Dado (Thickness and
type specified) sq m per sq m
% sq ft
Skirting (Thickness type and height specified) metre per m per r
5.
Cement mortar or lime mortar rubbing sq m per sq m
% sq t
7. %sq ft
Distempering (No. of coat specified) sq m
per sq m
Flooring
2.5 cm (1") C.C. over 7.5 cm (3") L.C. Floor
(including L.C.) sq m per sq mn %sq ft
2. onglomeratelloor, artificial patent stone floor
2.5
L.C.)
cm(l)C.C.over 7.5cem(3") L.C. (including m per sq m s q ft
Sq
3. 4 cm (1") thick stone floor flag stone floor
over 7.5 cm (3") L.C. (including L.C.) Sq m per sq m s q ft
4. 2.5 cm (1") marble flooring over 7.5 cm (3")
L.C. (including L.C.) sq m. per sq m per sq ft
Miscellaneous Items
. Ornamental cornice (Projection, type speci-
fied) metre per m per r ft
2. Moulding String course, Drip course, Bead-
ing, Throating, etc. metre per m per r ft
20 Units
Units of of
Particulars of liems
measurement| payment
in MKS
Urits o
No
St
in MKS
paymem
in FPS
Flowers,
Pillar base, no. per no.
Pillar caps,
Ornamental
Brackets, etc.
per no
metre per m
Railing (Height
and type specified) per ti
etc. speci
Surface drain small
(size, material, metre per m
fied) per rf
Surface drain large (item wise) cu m per cu m
() Masonry Sq m
per sq n
(i) Plastering
etc.
water pipe,
7 Pipe rainwater,
(Dia. specified)
sanitary, metre per m
per rf
water pipe, etc.
8. Laying pipe line sanitary,
-
metre per m
(Dia, depth, bedding etc. specified)
perrit
Sq m or per sq m or
Jungle clearance
(May also be per km for road and irrigation hectare per hectare of per aT
channe)
10. Silt
clearance in irrigation channels (Similar to
earthwork) cu m per cu m
(For thin layer upto 5 cm may be on area basis) cuit
Trestle, Crate (size, type, ete. specified) no. per no. per no.
12. Cleaning flues
no. per no. per no.
13. Cotton cords in sky
light
(May also be by weight in kg
no. per no. per no
14.
Easing doors and windows no. per no. per no.
15. Fixing doors and windows no. per no. per no.
16. Supply and-fixing of Hinges, Tower bolts,
Hasp and staples, Hand les, Hardwares,
etc... .
no. per no. per no.
17. Glazing
18. Glass panes Sq m per sq mn per sq
(supply) persqIt
19. Fixing of glass panes or cleaning8 sq m per sq mn
perno.
20.
Renewing of glass panes no. per no.
p e rno
21. Well no.
sinking (Masonary or tube per.no.
22. Pile well) perr t
perr
23.
Furnitures
specified) Chairs, tables,
-
etc.
metre per m
(size shape p e r
no
per no.
no.
Units of Units of
Units of
SI. Particulars of Items measurement payment payment
No. in MKS in FPS
in MKS
sq m)
cu m per cu m % cu ft
33. Dismantling of brick masonry
Materials
2 Units of Units of
measurement| payment
Units of
Particulars of Items
in MKS in MKS paymen
sNo in FPS
Aggre-
Stone ballast, per cu m
Supply of Brick ballast,
cu m
cu ft
gate, etc.
cu m per cu m
etc.
%cu ft
Broken bricks, Kankar, cu m per cu m
Supply of Timber
.cu ft
quintal per q or
per cwt
9. Supply of Steel per tonne
16. Supply of bare electric wire (size specified) quintal per quintal per cwt
Tents, sholdaries(size specified)
17. no. per no. per no.
19. Suppy of Wash hand basin (size specified).. no. per no.
per no.
24. metre
Supply of lead, lead wool per m
p e rc u t
kg or per kg or
25. Spun yarn quintal per quintal per/
kg per kg perg