Bill of Quantities
G Meas Unit Price
Total Price (In
r Description of Item ureme Quantity (In figures:
figures: BDT)
e o
Earthwork from Railway land (In
nt BDT)
shingle,
gravel, boulders, hard moorum
Sub mixed with stone or similar
Estt.
``A'' requiring use of picks) by head
1 Wor
ks
lead with cum 245.000 300.001 73500.245
porti lead not exceeding 30 meter &
on
height not exceeding
1.5 meter including dressing.
Sub
Estt.
Dismantling
3 ``A''
Wor
Cement concrete including removing
the same within 30 meter lead.
cum 16.000 100.001 1600.016
ks
Sub Dismantling Reinforced
Estt.
``A'' cement concrete work from Slabs,
4 Wor
ks
Beam, Column
etc and removing the same within
cum 6.000 16000.001 96000.006
porti
on
100 ft.
Khoa Consolidation
Sub
Estt. (2:1) in
``A'' foundation trenches or floor with 50 mm
8 Wor
ks
down well graded brick chips and sand cum 74.000 5000.001 370000.074
porti F.M. 1.2 as per drawing design,
on
Shoring upto 2
meter (7 ft) depth as per drawing
Sub design,
Estt.
``A'' standrad specification of contract and
19 Wor
ks
derection of
PM.
sqm 150.000 1500.001 225000.150
porti
on
Turfing earthwork 150
Sub
Estt.
mm thick including cutting, carrying,
``A'' fixing,
20 Wor
ks
ramming, dressing etc. all complete to sqm 1876.000 5.001 9381.876
porti any lead and lift.
on
Linking / Construction of
MG track including loading, unloading
of materials, preparation of formation
Sub
bed to proper slope, fixing center line,
Estt. pairing of rails, fastening rails &
``B'' sleeper, aligning the track, putting back
29 P-
Way ballast and initial Packing to pass
Km 0.750 80000.001 60000.001
porti train with restricted
on
speed [Excluding cost of Materials]
5243799.33