Bill of Quantities
G Meas Unit Price
Total Price (In
r Description of Item ureme Quantity (In figures:
figures: BDT)
e o
Earthwork from Railway land (In
nt BDT)

shingle,
gravel, boulders, hard moorum
Sub mixed with stone or similar
Estt.
``A'' requiring use of picks) by head
1 Wor
ks
lead with cum 245.000 300.001 73500.245
porti lead not exceeding 30 meter &
on
height not exceeding
1.5 meter including dressing.

Dismantling Brick works in Mud or in


Lime
Sub mortar including Jack arch roofing or in
Estt. Cement
``A'' mortar whatever it may
2 Wor
ks of any proportion in/c. cleaning and
cum 40.000 50.001 2000.040
porti stacking to a lead of 30
on
meter.

Sub
Estt.
Dismantling
3 ``A''
Wor
Cement concrete including removing
the same within 30 meter lead.
cum 16.000 100.001 1600.016
ks
Sub Dismantling Reinforced
Estt.
``A'' cement concrete work from Slabs,
4 Wor
ks
Beam, Column
etc and removing the same within
cum 6.000 16000.001 96000.006
porti
on

100 ft.

One layer of brick soling with 1st Class


Sub
Estt. bricks in foundation or in floor in/c
``A'' preparation of bed and filling
5 Wor
ks
the intersectices with local sand sqm 24.000 100.001 2400.024
porti etc all complete.
on
Brick works in Cement mortar
in Super Structure or Ground floor with
Sub
Estt.
first class
``A'' bricks In Proportion 1:4 as per drawing
6 Wor
ks
design, standrad specification of cum 13.000 9000.001 117000.013
porti contract and derection of
on PM.

Earthwork from Railway land by head


lead with
lead not exceeding 30 meter & height
not exceeding
Sub
1.5 meter including dressing. In shingle,
Estt. gravel, boulders, hard moorum mixed
``A'' with stone or similar requiring use of
7 Wor
ks
picks Extra on items 1(i) to (iv) if
cum 260.000 600.001 156000.260
porti saturated inclusive of bailing out of
on water and Extra on items 1(i) to
(iv) for works on foundation.

Khoa Consolidation
Sub
Estt. (2:1) in
``A'' foundation trenches or floor with 50 mm
8 Wor
ks
down well graded brick chips and sand cum 74.000 5000.001 370000.074
porti F.M. 1.2 as per drawing design,
on

standrad specification of contract and


derection of
PM.

Sub Concrete in cement mortar with


9 Estt.
``A'' cement, sand (F.M. 1.2)
Wor and 20 mm (3/4") down graded broken
ks
brick chips in proportion 1:2:4 cum 6 15000 90000.006
porti
on including mixing, laying, compacting to
level, curing
etc. all complete.
Flush pointing to brick wall with cement
Sub sand (F.M. 1.2)
Estt. mortar in proportion (1:2) with cement
``A''
including raking out joints, and
10 Wor
ks necessary scaffolding, curing at least 7
sqm 55.000 5.001 275.055
porti days in/c all the charge etc. all
on
complete.

Reinforced Cement Concrete with


Sub
Estt. Composite Portland Cement
``A'' (conforming to
12 Wor
ks
BDS EN-197-1-CEM 1 (32.5 to 52.5 cum 69.000 14000.001 966000.069
porti N)/ , best quality of 100% Sylhet sand
on or coarse sand of
equivalent (F.M. 2.2)] and 20 mm (3/4")
down graded broken stone chips in
proportion 1 :
1.5 : 3 including mixing, laying,
compacting by
vibrator machine, erecting & removing
centering- shuttering (Steel), curing
etc. all complete in mate footing,
abutment, pier, slab, wingwall , Drop
walls, Railings, etc. [ Excluding Cost
of Reinforcement
and its Fabrication]
Sub Supplying, Fabrication of
13 Estt.
``A'' M.S rod (60 grade) in RCC works as
Wor per drawing design,
ks
standrad specification of contract and
porti
on derection of M.ton 12 70000 840000.012
PM.

Making & fixing


Sub Number Plaques on buildings, bridges
Estt. etc including painting, lettering etc as
``A'' per drawing
14 Wor
ks design, standrad specification of
Nos. 4.000 100.001 400.004
porti contract and derection of
on
PM.
Sub Making weep holes in 50 t0 75 mm dia
Estt. in
``A''
wall ( for passage of
15 Wor
ks water )
Meter 140.000 50.001 7000.140
porti
on
Sub
Estt. Supplying, filling Sand (F.M.0.8 to 1.0)
in foundation,
16 ``A''
Wor
cum 230.000 500.001 115000.230
ks
porti
plinth, road
bed, embankment
including ramming in 150 mm layer with
watering etc. all
complete.

Sub Supplying, fitting & fixing 50 mm dia


17 Estt.
``A'' best quality uPVC Soil, waste,
Wor Ventilation pipe having wall thickness
ks
2.5 -
porti
on 3.0 mm and other physical, Meter 46 200.001 9200.046
chemical, thermal, fire resistivity
properties in position with sock-ets,
bend, cowl, clamp
etc. all complete.

Supplying and laying of Single


Layer Polythene Sheet weighing one
Sub
Estt. Kilogram per 6.5 Sqm. in floor or any
``A'' where below
18 Wor
ks
cement concrete etc. with 150 mm lap sqm 64.000 20.001 1280.064
porti in joint etc. complete in all
on respect

Shoring upto 2
meter (7 ft) depth as per drawing
Sub design,
Estt.
``A'' standrad specification of contract and
19 Wor
ks
derection of
PM.
sqm 150.000 1500.001 225000.150
porti
on
Turfing earthwork 150
Sub
Estt.
mm thick including cutting, carrying,
``A'' fixing,
20 Wor
ks
ramming, dressing etc. all complete to sqm 1876.000 5.001 9381.876
porti any lead and lift.
on

Sub Carriage of materials by head lead with


Estt.
``A'' extra 17 leads
21 Wor
ks
etc. cum 394.000 500.001 197000.394
porti
on
Sub Filling earth &
22 Estt.
``A'' bats or boulders behind retaining walls
Wor or behind the abutments of
ks
bridges available within a lead of 400 cum 62 4500.001 279000.062
porti
on meter and lift not exceeding
1.5 meter

Excavating earth/ sand/ ashes from


Railway land, supplying gunny bags &
filling the excavated earth/ sand in
Sub
Estt.
gunny bags of 0.0354 Cum
``A'' [1.25 cft] capacity [assuming 0.0283
23 Wor
ks
Cum (1 Bags 5780.000 50.001 289005.780
porti
cft) of fill] with
on stitching, throwing in water or pitching in
layers by head lead in/c all lead & lifts.

Earthwork from Railway land by head


lead with
lead not exceeding 30 meter & height
not exceeding
Sub 1.5 meter including dressing In Clay
Estt. stiff & soft
``A''
moorum requiring use of picks Leads
24 Wor
ks on earth 150 mm thick actually carried
cum 940.000 30.001 28200.940
porti over 30 meter for every 15 meter or
on
part there of in excess of the 1st 30
meter free and Lift on earth 150 mm
thick actually lifted over 1.5 meter
height for every 1.5 meter or part there
of in excess of the 1st 1.5 meter
free.

Cost of conducting sub


soil investigation
and site surveying including preparation
of detail structural design drawing
Sub
Estt. considering 25
``A'' M.T safe axle
25 Wor
ks
load all complete and review of the Nos. 1.000 75000.001 75000.001
porti drawing from any recognized
on institutions as per direction of Engineer -
in
-charge or PE .

Dismantling of fish plated wooden


sleepered MG Track including loading
the released materials at outside station
Sub limit and unloading the same at station
Estt.
``B''
limit, stacking excluding cost of carrying
26 P-
Way
i.e. hire charge of Ballast Train Km 0.750 8000.001 6000.001
porti
on

Lifting track (MG) 150 mm


by three lifts of 50 mm each including
Sub tightening fastenings, putting back
Estt. ballast, aligning
``B''
to correct alignment, leveling to proper
27 P-
Way level, packing, boxing and tiding the
Km 0.750 80000.001 60000.001
porti ballast to proper section
on
etc. all complete
Lowering track (MG) 150 mm
in three stage, each stage of
50 mm including tightening fastenings,
Sub putting back ballast, aligning
Estt. to correct alignment, leveling to proper
``B'' level, packing, boxing and tiding the
28 P-
Way ballast to proper section
Km 0.75 80000 60000.001
porti etc. all complete.
on

Linking / Construction of
MG track including loading, unloading
of materials, preparation of formation
Sub
bed to proper slope, fixing center line,
Estt. pairing of rails, fastening rails &
``B'' sleeper, aligning the track, putting back
29 P-
Way ballast and initial Packing to pass
Km 0.750 80000.001 60000.001
porti train with restricted
on
speed [Excluding cost of Materials]

Final Through Packing of wooden


Sub sleepered track
Estt. including putting back ballast, aligning
``B''
and leveling the track, boxing ballast
30 P-
Way and tidying the ballast to proper section
Km 0.750 80000.001 60000.001
porti (MG Track).
on

Sub Wages for


Estt.
31 ``B''
P-
bridge chowkider 3
Nosx 05 Month.
Man-
month 15.000 13000.001 195000.015
Way
Labor for Loading within station limit
Sub
Estt.
with head lead not exceeding 30 meter
``C'' in case of earth, sand, ballast etc. &
BE/ 60 meter in case of other materials
32 E/C
TG` including stacking where necessary &
M.ton 60.000 2000.001 120000.060
s loading into
Porti wagon.
on
Sub Carriage by materials trolley upto
33 Estt.
``C'' distance of 5 Km. including
BE/ both way loading,
E/C
un-loading and stacking of materials
TG`
s within 60 meter lead M.ton 60 2000.001 120000.06
Porti and 1.5 meter lift & carrying the empty
on
trolley to the nearest station and
keeping the same to a safe place.
Sub
Estt.
Making crib for
``C'' temporary arrangement with C.C. Crib
34 BE/
E/C
including loading, unloading etc all
complete.
Nos. 200.000 10.001 2000.200
TG`
s
Porti
Sub
Dismantling crib from temporary
Estt. arrangement
``C'' making/ erected with
BE/
35 E/C
TG`
C.C. Crib including loading, unloading,
carrying and stacking to a safe distance
Nos. 60.000 200.001 12000.060
s
etc. all complete.
Porti
on
Sub
Estt. Making Sleeper
``C'' bed block including all iron works
BE/ excluding the cost of sleeper and
36 E/C
TG` dismantling
cum 200.000 500.001 100000.200
s
Porti
on
the same.
Sub
Estt. Erecting RS
``C'' Joist as temporary service girder in
BE/ Bridges on block period excluding the
37 E/C
TG` works pre
M.ton 17.500 18000.001 315000.018
s block.
Porti
on
Sub
Estt. Supplying, filling Sand (F.M.0.8 to 1.0)
``C'' in foundation, plinth, road
BE/ bed, embankment
38 E/C
TG` including ramming in 150 mm layer with
cum 80.000 700.001 56000.080
s watering etc. all
Porti
complete.
on
Providing Compacted Sub-base Course
with well graded
metal of crushed well brunt 1st class
picked jhama chips / khoa and sand
Sub
(F.M. 1.2) with mixing
Estt. proportion 2: 1
``C'' having compacted thickness made
BE/
as per specification including handling,
39 E/C
TG` spreading uniformly to proper grade,
cum 75.000 1700.001 127500.075
s camber and super elevation,
Porti
on compacted by 8
to 10 ton capacity power driven road
roller and watering properly and
blinding with sand in/c all
cost.

5243799.33