Professional Documents
Culture Documents
October 2015
Indian Railways Institute of Civil Engineering
Pune 411001
First Edition : October 2015
October 2015
Indian Railways Institute of Civil Engineering,
Pune 411001
i
ii
Foreword
(Vishwesh Chaubey)
Director/IRICEN
iii
iv
CONTENTS
v
S.N. Title Page
L. Land matters 192
M. Steel Structures in Work Shops, Running Sheds &
P/F Covers 197
N. Steel Water Tank, Staging and Flood Light Towers 198
O. Water Supply Installation 200
P. Rain Water Harvesting System 203
5 Check List for New Construction Site
A. Worksite 204
B. Work in/near Electrified Area 206
C. Precautions within Station Premises 207
D. Track Ballast 207
E. Formwork in Concrete Work 210
F. Box Pushing Work 210
vi
CHAPTER - 1
INSPECTION SCHEDULES OF ENGINEERING OFFICIALSG
1
S. Type of Schedule of Reference
N. Inspection Inspection
7. Curves Minimum one curve in
each ADEN’s section every
four month
8 Inspection of As much as possible
ongoing works of during Foot Plate/Trolley
construction and inspections to check quality
other organization and safety
e.g. RVNL etc RB No.
2013/CE-
9. Land boundary During trolley inspection at II/CS/1 dated
verification vulnerable locations 20.06. 2013
10. Track renewal/ As much as possible during
Deep Screening site Trolley inspection
11. AT welding site As much as possible during
Trolley inspection
12. Private sidings When referred
13. Review of Routine checking during
inspection by trolley inspection
subordinate
14. Bridge:
• Important Bridge • Once in a year
• On reference by • On reference
ADEN
• Bridge with • Once in a year Para 1104
Overall Rating of IRBM
number (ORN)
1,2,3
2
S. Type of Schedule of Reference
N. Inspection Inspection
15. Tunnel on on reference Para 1104
reference of IRBM
from ADEN
16. Inspection of Track
machines working
in the section
• CSM, BCM, FRM, • Once a two month when
P&C Tamper, DTS working in section
• T-28, PQRS • At least once in a month
• UT, UNO, DUO, • As per need
BRM RB No. 2013/
CE- II/CS/1
17. Night/surprise Minimum once in three dated
Inspection month. More intensive 20.06.2013
during monsoon
18. Monsoon Patrolling Minimum once in two
month to evaluate
adequacy of safety
19. Gang Inspection Minimum one gang per .
SSE every three month
20. Railway Affecting Peruse the inspection
Works/ Tanks report of revenue /PWD
and forward, with name Para 726 of
of Tank (so marked) for IRPWM
inspection by ADEN to
report upon.
21. TRC/OMS run Accompany each TRC run RB No. 2013/CE-
and alternate OMS run II/CS/1 dated
20.06.2013
3
S. Type of Schedule of Reference
N. Inspection Inspection
2 2 Inspection of Once a year IRPWM Para
waterworks 554 (d)
4
S. Type of Schedule of Reference
N. Inspection Inspection
7. Bridge Once in a year after Para 102(a) of
monsoon IRBM
8 Inspection of Side Once in a year before
drains, Catch water on set of rains Para 223(C) of
drains and Water IRPWM
ways of bridges & CS no. 132
culvert
9 Inspection of Once in a year before Para 1011 of
Cutting onset of rain IRBM C.S. NO.28
10. Tunnel Once in a year before Para 1004 of
Monsoon IRBM
11 Inspection of Track
machines working
in the section
• CSM, BCM, FRM, • Once a month when C.S. No.14 of
P&C Tamper, DTS working in section IRTMM
• T-28, PQRS, TRT • At least once in fortnight Para 5.3.3
& RGM
• UT, UNO, DUO, • At least once in a period
BRM of working in their section
12. Night foot plate Once in a month between Para 107 of
Inspection 0.0 – 4.00 hrs. IRPWM
13. AT Welding AT welding each site as Para 107 (11) of
much as possible but at IRPWM
least once in a month C S NO. 132.
5
S. Type of Schedule of Reference
N. Inspection Inspection
14. Test check of USFD USFD checking few hours Para 4.3 of USFD
Inspection each month (min. two manual 2012
hours) during regular
Trolley Inspection.
15. Monsoon At night once in a month Para 107 (6) of
Patrolling either by train, push IRPWM
trolley, Motor trolley. (C.S. No. 132)
16. Private Sidings Min. once in a year S. NO.1.4
Inspection
Manual Rly.Bd.
17. Gang Inspection Min. one Gang each SSE Para 107 (1) of
every quarter IRPWM
(C.S. No. 132)
18. RAW/RAT Min. once in a year before Para 726 of
inspection monsoon IRPWM
19. Inspection of Sand Min. once in a year -
Humps
20. Inspection of Steel Once in 12 month Para 273(b)(7) of
Channel Sleepers alternately with SSE IRPWM
(P way) (C.S.No. 128)
21. TRC/OMS Run Every Run Para 111 of
IRPWM
6
S. Type of Schedule of Reference
N. Inspection Inspection
22. Inspection of
Steel Structures
• Structure such as work- • One fifth every year
shops, running sheds, on a programmed
platform covers and basis
foot over bridges
• Cast iron, wrought • As required
iron or pressed
steel plate water
tanks and
staging’s whether of
steel section or rails
• Structures with roof • 10-20% test check
trusses inspection of struc-
Para 228(a)
ture under each
of IRWM
group
• Other structures in • 10-20% test check
which timber, rail or inspection of
steel work is used to structure under
support any part of the each group
structure
• Tie rods of arched roof • 10-20% test check
excluding jack inspection of
structure under
each group
• Wrought iron or mild • 10-20% test check
steel tanks or sleeper inspection of
cribs at temporary structure under
watering kilometerage. each group
7
S. Type of Schedule of Reference
N. Inspection Inspection
9
S. Type of Schedule of Reference
N. Inspection Inspection
2 Inspection of Over all in-charge Para 124 of
Gangs / Trolley – Entire section by Push/ IRPWM (C.S.
Inspection Motor Trolley – Once in a No. 132)
month Para 139 of
Not Overall in charge IRPWM
- Entire section by Push (CS No.132)
trolley – Once in a
fortnight
3 Loco / Break van / Para 123 &
SSE/JE –
Rear window 139 (6) of C.S.
Once in a month 132, IRPWM
4 Night Foot plate Over all in charge – Night Para 124 & 139
Inspection Foot plate once in a of IRPWM
month between 00 to C.S. No. 132
4.00 hrs
5 Night Inspection Not over all in charge – Para 139 (8) of
Once in a month IRPWM CS
no.132
6 Monsoon Over all in-charge – One
Patrolling inspection every month by
train and inspection by
trolley – As per the schedule
laid down by the
administration Para 126 of
Not over all in charge – One IRPWM
inspection every fortnight by
train and inspection by
trolley - As per the schedule
laid down by the
administration
10
S. Type of Schedule of Reference
N. Inspection Inspection
7 Points & Crossings Passenger & running line
– Once in three month by
rotation with JE / P. way.
Other lines & yards lines –
Para 126 of
Once in a six month by
IRPWM
rotation with JE / P. way.
12
S. Type of Schedule of Reference
N. Inspection Inspection
20 Inspection of Land Over all in charge - Para 813 of
boundary and Once a year IRWM
Encroachment
13
S. Type of Schedule of Reference
N. Inspection Inspection
26 Inspection of Once in three month Para 814 (d) of
Encroachment IRWM
14
S. Type of Schedule of Reference
N. Inspection Inspection
pressed steel
plate water
tanks and
staging’s
whether of steel
section or rails
• Structures with • Once a year during the
roof trusses prescribed month.
• Other structures in • Once a year during the
which timber, rail prescribed month
or steel work is
used to support Para 228 (a)
any part of the of IRWM
structure
• Tie rods of arched • Once a year during
roof excluding jack the prescribed month
• Wrought iron or • Once a year during
mild steel tanks the prescribed
or sleeper cribs at month
temporary
watering
kilometerage
2 Inspection of All the buildings, water
Buildings supply installations,
sewerage installations Para 224 (e)
and drainage of IRWM
arrangements once a
year.
15
S. Type of Schedule of Reference
N. Inspection Inspection
3 Inspection of all Frequently
water supply Para 552 (a)
installations & Pipe of IRWM
lines
18
S. Type of Schedule of Reference
N. Inspection Inspection
19
S. Type of Schedule of Reference
N. Inspection Inspection
4 Superstructure Once in five years on Para 107 (1d)
including bearings planned basis. of IRBM
of all steel girders
of span 12.2m and
above, RCC,PSC and
composite girder
bridges.
5 Other nominated Once in five years. Para 107 (1e)
steel structures, of IRBM
being maintained
by Bridge Inspector
20
Inspection Schedules of Assistant Engineer
(Track machine)
S. Type of Schedule of Reference
N. Inspection Inspection
1 Inspection of
Machines
• CSM • Monthly
• Unimat • Monthly
• BCM • Fortnightly
• BRM • Once in two month
Para 5.3.2 (ii)
• SBCM • Monthly of IRTMM
• DTS • Once in two month
• UNO • Monthly
• DUO • Monthly
• T-28 • Monthly
• PQRS • Monthly
• TRT • Weekly
21
Inspection Schedules of SSE/Track Machine
S. Type of Schedule of Reference
N. Inspection Inspection
1 Inspection of
Machines
• CSM • Fortnightly
• Unimat • Fortnightly
• BCM • Weekly
• BRM • Monthly
Para 5.3.2(ii)
• SBCM • Fortnightly of IRTMM
• DTS • Monthly
• UNO • Fortnightly
• DUO • Fortnightly
• T-28 • Fortnightly
• PQRS • Fortnightly
• TRT • Daily
22
CHAPTER - 2
LIST OF FUNCTIONARIES AUTHORISE TO ISSUE COMPETENCY
CERTIFICATE FOR VARIOUS TRACK ACTIVITIES.
S. Authorise level Functionaries Authority &
N. Nature of Activity /Work of authorise to issue Reference
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
23
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
24
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
4 To carry out Maintenance work under Key man Zonal / LWR manual
their personal supervision in LWR/CWR. Divisional 1996 Para
Permitted only following works Training 9.2.2 and
1. (a) Ensuring that all creep anchors centre. Para 9.2.3
butt against sleepers during daily (Valid for 3 and ANN VI
rounds. years from the
(b) Renewal of fastenings not date of issue)
requiring lifting.
2. Emergency repairs to Rail fracture
3. Inspection and Checking of SEJ, oiling
and greasing and re-tightening /
renewal of fittings once a fortnight.
(Posting of Key men after getting
valid competency certificate by
Zonal/ Divisional training centre
which will be valid for three years
from the date of issue.)
25
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
5 a. Hot weather patrolling as per a .Hot Weather SSE/P. way Para 1008 of
IRPWM and LWR manual Patrolmen (Experienced IRPWM and
and trust ANN VI (para
b. Cold weather patrolling b.Cold Weather worthy men 5 & 6) of LWR
Patrolmen from the Manual 1996.
Permanent
c. Protection of track and secure safety c. Patrolman/ Gang to work
of trains in case of buckling, rail Trackman/ as patrolmen/
fractures, or any abnormal Gang Mate Watchmen.
behaviour of track Also be verified
for vision test &
shall not
employed as
Patrolmen
unless passed
requisite
medical test.)
26
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
27
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
28
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
10 Use of private trolley Permitted ONLY Non Rly Official Only by CE, G& SR Ch. XV
in siding (By name) (use of CSO & DRM Para SR Para
private trolley) 15.18.(13)
11 Certificate of competency to permit Motor Minimum JA G&SR Chapter
use of Motor trolley trolley driver Grade officer SR 15.18.3 and
of Eng. dept CE, IRPWM 1103
CTE, CBE, DRM and 1104
29
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
31
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
16 Operation of On Track Machine Track Machine Issued by Dy.CE/ Para 1.4.1 &
Operator TM of the zonal 4.2.1 and 4.3
Railway of IRTMM
* (Valid for 3
years and shall
be kept in
Personal custody
of the operator)
17 SSE/SE/JE (P.Way) supervising Departmental Issued by Para 4.1.2.3
departmental AT welding. AT Welding & annex . I of
TPP/Lucknow Manual for
(after successful completion of training Supervisor or TWC/ Fusion
course) Vijayawada welding of
Rails by the
Alumino –
Thermic
Process
32
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
33
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
35
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
36
S. Authorise level Functionaries Authority &
Nature of Activity /Work of authorise to issue Reference
N.
Supervision/ competency / from Manual/
Designation permission for Circular/
work. G&SR
RailwayBoard
L.No.Track/21/
2004/0902/7
Vol –II Dt.24/
10/2014
30 Cold Weather Patrolling (Period and Period of Chief Para 9.1.2 (ii)
section) CWP engineer & ANN X B
LWR Manual
welding in
Structural steel
bridge code.
40
CHAPTER - 3
ENGINEERING DEPARTMENT REGISTERS
(PHYSICAL/TMS)
Physical Register
4 Whether proper entry has been Yes/No Ann 2/6 & 2/6
done in each column of point and (A) of IRPWM
crossing register?
41
TMS
1 Check Inspection Planning Report. Go to Report >
Inspection > 3. Inspection Planning. Choose PWI and
year, press GO. The asset number color indicates the
position of inspection.
Inspection planned Inspection planned
and done in in the month but
same month. inspection done in Yes/No
later month.
2. Curve Register
This register is maintained by SSE/SE (P.Way) of the section and it is kept
in his office. Versines, Super Elevation and Gauge in the curve are recorded
in the register along with compliance chart of inspections carried out by
Junior Engineer/Senior Section Engineer (Permanent Way) [JE/SSE (P.Way)]
and Assistant Divisional Engineer/Divisional Engineer (ADEN/DEN).
42
Physical Register
S. Item Check Reference
N.
TMS
1 Check Inspection Planning Report. Go to Report >
Inspection > 3. Inspection Planning. Choose PWI and
year, press GO. The asset number color indicates the
position of inspection.
Inspection planned Inspection planned
and done in in the month but
same month. inspection done in Yes/No
later month.
43
2 Check whether planned inspections done by the
official or not. Go to Report > Inspection > 4. Inspection
Register > select ‘feature type’, ‘from date’, ‘to date’
Yes/No
and click on ‘Click here to see Inspections of individual
assets’ from the list choose same P&C no. and check
details of inspection done during the month or not.
45
4. Level Crossing Register
This register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. It contains permanent features of a level crossing.
Physical Register
46
Inspection planned Inspection planned
in the month and and not done so
month is not over. far
Note down the points and crossings to be
inspected during sample month.
2 Check whether planned inspections done by the
official or not. Go to Report > Inspection > 4. Inspection
Register > select ‘feature type’, ‘from date’, ‘to date’ Yes/No
and click on ‘Click here to see Inspections of individual
assets’ from the list choose same LC no. and check
details of inspection done during the month or not.
47
TMS
1 Whether latest TRC report is uploaded on TMS. Go to Yes/No
‘Reports(M-Z)>TRC>TRC Report> select all Parameters
and check the date of latest run from drop down
menu
2 Check on locations needing attention based on TRC Yes/No
from ‘Reports (A-L)>Locations Needing Attention>
select indirect>TRC
6. Section Register
This register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. It contains all important information including a brief history of
the section. A few pages for major unusual occurrences are also included.
Physical Register
48
TMS
1 Check for latest entry by going to ‘Reports(M-Z)>Misc Yes/No
Registers
7. Encroachment Register
This register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. In the register, one page is allotted to each encroachment, so
that about 15 years record is available at a glance regarding efforts made
in the removal of the encroachments.
Physical Register
TMS
1 Check on entries on encroachment from ‘Reports Yes/No
(A-L) > Land Management
49
8. Land Boundary Verification Register
This register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. One page is allotted to record availability and location of boundary
stones in each kilometer. About 10 years record is available at a glance
about attentiveness exercised in maintenance and fixation of the land
boundary stones.
Physical Register
TMS
1 Check on land offset file in excel and verify sample Yes/No
boundary pillars at site from ‘Reports(A-L)>Land
Management>Land Offset File (Excel file)
2 Whether land boundary diagram is prepared? Yes/No
3 Whether missing boundary stones recorded? Yes/No
4 Whether missing stones are replaced? Yes/No
50
9. Creep Register
This register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. A separate page is allotted for each kilometer of track to record
creep in fish plated/SWR Track.
Physical Register
TMS
1 Check from ‘Inspection Register’> choose LWR Yes/No
on type of asset
2 Whether excessive creep is adjusted and Yes/No
recorded with date?
51
Physical Register
TMS
1 Check from ‘Reports(M-Z)> Misc Register> Gap Survey Yes/No
2 Whether gap survey is done in the month of February Yes/No
regularly?
3 Whether gaps requiring gap adjustments are Yes/No
adjusted?
4 Whether gap survey is done in rising trend of Yes/No
temperature?
52
Physical Register
TMS
53
Physical Register
TMS
1 Check from ‘Report(A-L)’>Asset Register Yes/No
2 Check from wire book whether all blocks taken
for rail renewal has been entered in TMS? Yes/No
Physical Register
Physical Register
TMS
1 Check from ‘Report(M-Z)>USFD>USFD due/Overdue Yes/No
2 Check monthly progress Yes/No
3 Check defect list Yes/No
56
17. Rail / Weld Fracture Register:
This register is maintained by SSE/SE (P.Way) of the section and it is
kept in his office. It contains records of Rail/Weld Fractures in his
section. A statement showing details of Rail/Weld fracture occurred
during the current and preceding years are also attached to have a
clear assessment of fracture prone areas and to have special watch
over those kilometers
Physical Register
TMS
1 Check from ‘Report(A-L)>Fracture>Fracture Yes/No
Analysis
2 Check whether all fracture reports have remarks Yes/No
of USFD PWI
3 Check whether all reports have photos Yes/No
57
18. Glued Joints Register
Register is maintained by the sectional JE/P. Way and it is kept in the
office of SSE/SE (P.Way), in which details of glued insulated joints and
annual record of its maintenance and performance is kept. A separate
page is used for each Glued Joint.
Physical Register
TMS
1 Check from ‘Report(A-L)’>Asset Register> select Yes/No
feature type – Glued Joint
58
Physical Register
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No -
2 Whether track Parameters are Yes/No Para 3.1.2 (i)
recorded before tamping of IRTMM
3 Whether track Parameters are Yes/No Para 3.1.4 (iv)
recorded after tamping? of IRTMM
4 Whether quality of work is Yes/No -
assessed and mentioned?
TMS
1 Check from ‘Report(M-Z)>Track Machine Yes/No
59
21. Inspection Notes of Higher Officials :
This register is maintained by SSE/SE (P.Way) of the section and it
is kept in his office. Inspection notes of higher officials and their
compliance is recorded in this register.
Physical Register
TMS
1 Check from ‘Miscellaneous’>Inspection Notes Yes/No
2 Whether action taken is recorded against each
item? Yes/No
3 Whether timely action is taken? Yes/No
4 Whether items pertaining to higher officials Yes/No
brought to their notice?
60
Physical Register
Physical Register
62
TMS
1 Check from ‘Register (M-Z)>Material Under Trial Yes/No
2 Whether any material is under trial in the Yes/No
section?
3 Whether proper entries are made in Yes/No
corresponding columns?
4 Whether register is brought up-to-date? Yes/No
Physical Register
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No Para 505 (iii)
of IRPWM
2 Whether proper entries are Yes/No
made in corresponding columns?
TMS
1 Check from ‘Register (M-Z)>Miscellaneous Yes/No
Register> 7. Temperature Register
2 Whether register is up dated? Yes/No
3 Whether proper entries are made in Yes/No
corresponding columns?
63
26. Assurance Register
Physical Register
S. Item Check Reference
N.
1 Whether assurance of having Yes/No Para 826 of
read all rules & guidelines has IRPWM
been recorded?
TMS
1 Check from ‘Register (M-Z)>Miscellaneous Yes/No
Register> 10. Circular Viewed
64
CHAPTER - 4
CIVIL ENGINEERING INSPECTIONS
65
S. Item to be inspected Remarks Reference
N.
5. Whether oiling and greasing of Yes/No IRPWM
fishplate joints is being done as per Para 241(3)
annual schedule? (once in 12 month)
6. Whether there is any blowing/ Yes/No
pumping joint?
7. Whether knowledge of staff regarding Yes/No
safety of track is up to the mark?
8. Whether proper protection is resorted Yes/No IRPWM Para
to at track work site as per prescribed 806,807,808
norms?
9. Whether P.Way material is properly Yes/No
stacked and is away from running
track and marked wherever required?
10. Is the Machine tamping overdue Yes/No
(in Mechanised maintained track)?
11. Whether “Location needing Yes/No
Inspection” are being regulated by
field official?
12. Whether all field officials are entering Yes/No
their irregularities in Track
Management System (TMS)?
13. Whether resources/work planning Yes/No
has been done with respect to
“Location needing attention” as per
TMS?
66
2. Gang Inspection
67
S. Item to be inspected Remarks Reference
N.
4.8 Bar Straightening Yes/No
4.9 Bar Claw Yes/No
4.10 Tommy Bar Yes/No
4.11 Wire Claw Yes/No
4.12 Punches Yes/No IRPWM
Para
4.13 Wire Basket Yes/No 232(2)(c)
4.14 Spanners Yes/No
4.15 Hammer Yes/No
4.16 Rail drilling Ratchet Yes/No
4.17 Track Bond Drill/ Drill Twist Yes/No
4.18 Chisel Yes/No
4.19 Rail hole chamfering kit Yes/No
4.20 Tools for Lubrication of ERCs Yes/No
4.21 ERC Extractor / Applicator Yes/No
4.22 Rail Tongues Yes/No
4.23 Rail Shunt-Cable (Jumper) Yes/No
4.24 Cutting Blowpipe Yes/No
4.25 De-stressing Roller Yes/No
4.26 Rail Roller Yes/No
68
S. Item to be inspected Remarks Reference
N.
69
S. Item to be inspected Remarks Reference
N.
6. Knowledge of Mate and Gang Yes/No IRPWM
regarding safety and quantity of Para 232 (3)
work is adequate?
7. Whether PME of Mate, Keyman and Yes/No IRMM Vol I
Trackman is being done regularly as Para 514(B)
per norms? (On attaining the age
of 45 years and thereafter at the
termination of every period of
five years)
8. Whether compliance of various Yes/No
points noted during last inspection
have been made?
9. Whether Gang Progress/work is Yes/No
being entered in TMS?
71
S. Item to be inspected Remarks Reference
N.
72
S. Item to be inspected Remarks Reference
N.
2. Whether condition of stock rail and Yes/No
tongue rail of switch is damaged or
worn out?
a. Tongue rail is chipped/crack within Yes/No
200 mm length in 1000 mm from ATS
b. Vertical wear of Tongue rail is Yes/No
within 8/5 mm at 13 mm head width
and level point (60/52 kg) IRPWM
c. Lateral wear of tongue rail at Q Yes/No Para 237(2)
point and Level point is within 8/6 & 302
mm(60/52 kg)
d. Vertical wear of Stock rail is within Yes/No
13/8 mm (60/52 kg)
e. Lateral wear of Stock rail is within Yes/No
i. 6/8 mm (A&B / C,D,E routes on
straight track)
ii. 8/10 mm (A&B / C,D,E routes on
curved track)
3. Whether tongue rails are out of Yes/No
square?
4. Whether tongue rail houses properly Yes/No
against stock rail?
5. Whether throw of switch is within Yes/No SOD Ch.2
tolerance limit? (Straight switch- Item 16
95mm, Curved switch-115mm, Thick
web switch-160mm)
73
S. Item to be inspected Remarks Reference
N.
6. Whether correct gauge and cross Yes/No IRPWM Para
level is maintained at toe of switch 237(1)(g)
in both the settings i.e., Normal and
Reverse? (nominal gauge + 6 mm for
T/out having SEA> 0020’00” & nominal
gauge for T/out having SEA ≤
0 020’00”)
7. Whether all tongue rail fittings are Yes/No
intact and effective?
8. Whether correct gauge and cross Yes/No IRPWM Para
level is maintained in lead portion? 237(8)
75
S. Item to be inspected Remarks Reference
N.
4. Whether drainage is good on the Yes/No
Insulated/Glued Joints?
5. Whether inspections are entered Yes/No
regularly in TMS?
6. Deep Screening
S. Item to be inspected Remarks Reference
N.
1. Whether work is being done under Yes/No C.S. 128 of
competent supervisor? (JE/P.Way or PWS IRPWM
now a days, redesignated subject to
competency certificate issued by CTE)
2. Whether stipulated speed Yes/No IRPWM Para
restrictions are imposed at work site? 238(2)(f)
3. Whether level pegs are provided for Yes/No IRPWM Para
initial/final rail level restoration? (At 238(2)
every 30 M)
4. Whether screened muck is thrown Yes/No IRPWM Para
away from running track? 238(2)(e)
5. Whether proper wooden blocks and Yes/No IRPWM Para
other packing are used for passing the 238(2)(e)
trains?
6. Whether cess is cross-sloped and Yes/No IRPWM Para
repaired? 238(2)(e)
7. Whether Deep screening is being Yes/No
entered in TMS?
76
7. Lifting of Track.
S. Item to be inspected Remarks Reference
N.
1. Whether SE/P.Way is present at the Yes/No C.S. 128 of
site of lifting of track? IRPWM
2. Whether proper speed restrictions Yes/No IRPWM Para
are imposed at site? 233(3)
3. Whether track protection is done at Yes/No IRPWM Para
site? 806,807,808
4. Whether level pegs are provided for Yes/No IRPWM Para
finalising the required level? (At every 233 & 234
30M)
5. Whether lifting is being done from Yes/No IRPWM Para
down-hill end? 233(4)
6. Lifting of track should not more than Yes/No IRPWM Para
75mm at a time. Whether these 233(3)
instruction followed?
7. Whether work done is being entered
in TMS?
8. Drainage in Station Yards/Block Sections
S. Item to be inspected Remarks Reference
N.
1. Whether all drains were cleaned Yes/No IRPWM
before monsoon and its silt was Para 239 &
taken away from track? 240
77
S. Item to be inspected Remarks Reference
N.
2. Whether cleaning of shoulder ballast, Yes/No IRPWM Para
and removal of vegetation/weeds has 239 & 240
been ensured before monsoon?
3. Whether all side drains, catch water Yes/No IRPWM Para
drains are intact and desilted before 239 & 240
monsoon?
4. Whether work done has been Yes/No
entered in TMS?
9. Ballast Depot
S. Item to be inspected Remarks Reference
N.
1. Whether adequate leveled spacious Yes/No IRPWM Para
ground is available at specific ballast 266(2)
depot?
2. Whether all testing equipments are Yes/No
available and in working order at
depot laboratory?
3. Whether all records including Yes/No
registers, challans are updated and
intact?
4. Whether all qualitative and Yes/No IRS-GE-1
quantitative measures are being 2004
followed?
5. Whether adequate space is available Yes/No
between the stacks?
78
S. Item to be inspected Remarks Reference
N.
6. Whether unloading facilities are Yes/No
adequate?
79
S. Item to be inspected Remarks Reference
N.
6. Whether staff is aware about rules? Yes/No LWR Manual
Para 8.1.3,
7. Whether Hot/Cold Weather Patrolling Yes/No Annexure X-
is being practiced at prescribed A & X-B of
temperatures? LWR Manual
td + 25 for HWP on LWR with PSC
sleeper & density 1540 or more
td + 20 for LWR in other cases for HWP
td - 30 for Cold weather patrolling
8. Whether Hot Weather Patrolmen is Yes/No Annexure
equipped with all stipulated tools X-A, LWR
mentioned in LWR Manual? Manual
9. Whether the condition of sleepers is O.K? Yes/No
10. Whether all fittings are available and Yes/No
tight?
11. Whether reference posts are Yes/No Para 5.9 of
available? LWR Manual
82
S. Item to be inspected Remarks Reference
N.
8. Whether all service records, leave Yes/No
staff are neatly maintained?
9. Whether all C&P and T&P available Yes/No
as per scale?
10. Whether proper water supply, Yes/No
electric supply and toilet facilities
are available?
83
S. Item of Works Observation/
N. Values Recorded
2. Adequate staff for handling /
lifting of machines Yes / No
B. USFD Machines & Condition
1. Machine used is RDSO approved Yes / No
2. Availability of requisite tools & plants
i Sensitivity block Yes / No
ii IIW block for calibration Yes / No
iii Standard Rail test piece Yes / No
3. Visual Condition of electronic unit Proper / Not proper
4. Visual condition of Trolley Proper / Not proper
5. Condition of Probes & shoes
a Right Hand Side
i 0 degree Proper / Not proper
ii 70 degree (F) Proper / Not proper
iii 70 degree (B) Proper / Not proper
b Left Hand Side
i 0 degree Proper / Not proper
ii 70 degree (F) Proper / Not proper
iii 70 degree (B) Proper / Not proper
84
S. Item of Works Observation/
N. Values Recorded
c For Flange testing
i 70 degree 2 MHz Proper / Not proper
ii 70 degree 2 MHz (Side looking probe) Proper / Not proper
iii 45 degree 2 MHz Proper / Not proper
d Alignment probes & Lifting System
with respect to centre line Central / eccentric
6. Check on Characteristics of Machine
a Date of Check
b Whether due or not (Monthly check) Due / Not Due
7. Condition of Battery Charged/Not Charged
8. Condition of Audio Alarm Sounding /
Not Sounding
9. All Controls of electronic unit i.e.
depth range, gain, reject etc.
properly functioning Yes / No
10. Whether watering arrangement for
Probes is functional Yes / No
11. Availability of spares
i 0 0, 4 MHz Double crystal Probes : 8No. Yes / No
ii 00, 2 MHz Double crystal Probes : 8 No. Yes / No
Iii 700 (F&B) probes, 2 MHz Single
crystal : 8 No. Yes / No
85
S. Item of Works Observation/
N. Values Recorded
iv 450, 2 MHz Single crystal Probes : 2 No. Yes / No
v 700, 2 MHz Single crystal Probes : Yes / No
4 No.
vi 700, 2 MHz Single Crystal Probes Yes / No
(SLP) : 2 No
vii 00, 2/2.5 MHz Single crystal Yes / No
Probes : 2 No.
viii Connecting Cable (Flaw detector Yes / No
with junction box.) : 6 No
ix BNC Connector : 6 No. Yes / No
x IIW Block (as per IS : 1408) :2 Yes / No
xi 60x50x50 mm steel block (as per steel Yes / No
grade 45 C8 to IS : 1875-1992) : 1 No.
xii Battery Charger : 1 No. Yes / No
xiii Fuse : 12 No. Yes / No
xiv Step gauge : 1 No. Yes / No
C Check on sensitivity settings and calibration
1. Calibration Check
a Calibration for 300/200 mm longitudinal Proper /
wave using 00, Double crystal Probe Not Proper
b 165 mm Direct shear wave Proper /
calibration for 700, 2 MHz Single Not Proper
crystal Probe
86
S. Item of Works Observation/
N. Values Recorded
2. Sensitivity setting of equipment
and probes with help of standard Proper / Not Proper
rail piece
a Whether gain is locked after setting Yes / No
3. Check on function & sensitivity
of probes
a Normal Probe
(Back wall echo adjusted to full Proper / Not Proper
screen height)
b Angle probe 700 (Centre forward &
backward) (Amplitude of 12 mm dia. Proper / Not Proper
hole to be set to 3 div. i.e. 60% of
full screen height)
c Gauge face & Non gauge face
corner probe 700 (Forward &
Backward) Proper / Not Proper
(Signal amplitude from 5 mm FBH
to be set 60% of full height)
d 45 0 probe Proper / Not Proper
4. Whether adjustment in sensitivity
setting was done for variation in Proper / Not Proper
rail temperature
5. Whether gain has been increased Yes / No
by 10 db. for D Marked rails
87
S. Item of Works Observation/
N. Values Recorded
6. Check on equipment characteristic
a Linearity of time base of flaw Proper / Not Proper
detector
b Linearity of Amplification of flaw
detector Proper / Not Proper
c Penetrative Power Proper / Not Proper
d Resolving Power Proper / Not Proper
e Probe index Proper / Not Proper
f Burn angle Proper / Not Proper
7. Whether scheduled maintenance Yes / No
of USFD machine was done
D. Check on Work
1. Whether equipment is in proper Yes / No
working order duly calibrated
a Battery is fully charged Yes / No
b All controls of electronic unit Yes / No
properly functioning
c Calibration & sensitivity setting Yes / No
done
d Whether the gap between probing
face and probe shoe is proper Yes / No
(0.2 mm)
88
S. Item of Works Observation/
N. Values Recorded
e Whether alignment of probes is Yes / No
proper
f Adequate supply of water for
coupling for all the probes is Yes / No
ensured
2. Check on previous day’s work
(i) Date of testing
(ii) Location of testing (From Km to Km)
(iii) Rail testing
a Whether all IMR defects confirmed Yes / No
b If No, number of additional defects
1. Over Reported
2. Under Reported
(c) Whether preventive action taken Yes / No
on all defects
(d) Whether all OBS defects confirmed Yes / No
(e) If No, number of additional defects
1. Over Reported
2. Under Reported
(f) Whether preventive action taken Yes / No
on all defects
89
S. Item of Works Observation/
N. Values Recorded
(iv) Weld testing
(a) Type of Welds
(b) Whether all defects confirmed
(c) If No, number of additional defects
1. Over Reported
2. Under Reported
(d) Whether preventive action taken Yes / No
on all defects
(v) Whether the A-scans of all defects Yes / No
preserved in machine
3. Check on day's work
(a) Type of Testing Rail / weld
(b) The A-Scans of all defects being
preserved Yes / No
(c) The defects details are properly Yes / No
logged in machine
(d) Defects are properly entered in Yes / No
Register
E. Schedule of USFD testing and adherence
1. Date of last USFD Testing of
Inspected Stretch
(a) Rail testing
90
S. Item of Works Observation/
N. Values Recorded
(b) Weld testing
2. Stipulated frequency of section
(a) Rail testing
(b) Weld testing
3. Whether testing is done as per Yes / No
Schedule
4. Proper up keep of defects register Yes / No
has been done
91
S. Item of Works Observation/
N. Values Recorded
(d) Properly Packed Yes / No
2. Igniters
(a) Storage different from portion Yes / No
(b) Stored in locked steel cupboard Yes / No
3. Prefabricated Moulds
(a) Dampness Yes / No
(b) Properly Packed / Neatly stacked Yes / No
B. Preparatory Arrangements at Site
1. Availability of complete T & P and
consumables at site
(A) Preheating Equipment
A-1 Air-Petrol Heating
1. Pressure Tank with Pressure Yes / No
gauges : 1 No.
2. Vaporizers ( Burner ) complete : 1 No. Yes / No
3. Nozzle Pricker : 2 Nos. Yes / No
4. Nozzle Keys : 1 No. Yes / No
5. Vaporizer stand : 1 No. Yes / No
6. Goose neck attachment to Yes / No
vaporizers : 2 No.
A - 2 Compressed Air - Petrol Pre-Heating
92
S. Item of Works Observation/
N. Values Recorded
1. Compressor system with Pressure Yes / No
gauge : 1 No.
2. Torch ( Burner ) complete :2No. Yes / No
3. Torch ( Burner ) Keys : 1 No. Yes / No
4. Torch ( Burner ) Stand : 2 No. Yes / No
5. Goose neck attachment to Yes / No
vaporizers : 2 No.
A - 3 Oxy - LPG Pre-Heating
1. Oxy - LPG Torch ( Burner ) : 1 No. Yes / No
2. Oxygen Cylinder with Pressure Yes / No
gauge : 1 No.
3. LPG Cylinder with Pressure Yes / No
gauge : 1 No.
4. Torch ( Burner ) Stand : 1 No. Yes / No
5. Connecting Hose Pipe : 2 No. Yes / No
B. Sufficient quantity of fuel
(Petrol / LPG-Oxygen as required Yes / No
from authorized sources )
(Indicate Source) →
C. Crucible and accessories :
1. Crucible Complete : 1 No.
(a) Crucible shell Yes / No
93
S. Item of Works Observation/
N. Values Recorded
(b) Crucible Lining (Availability of
Magnesite powder & sodium
silicate )
2. Crucible cap : 1 No. Yes / No
3. Crucible forks : 1 No. Yes / No
4. Crucible stands : 1 No. Yes / No
5. Crucible rings : 1 No.
D. Mould fixing arrangement
1. Mould Pressure ( Clamp ) : 1 set Yes / No
2. Mould Shoes : 2 Pairs Yes / No
E. Weld Trimmer with power pack: 1 No.
( From Approved source ) Yes / No
Indicate Source →
F. Rail profile weld grinder: 1 No.
( From Approved source ) Yes / No
Indicate Source →
G. Measuring Tools :
1. Straight Edge 1m long : 1 No. Yes / No
2. Straight Edge 10 cm long : 1 No. Yes / No
3. Gap gauge & Height Gauge : 1 No. Yes / No
4. Filler gauge : 1 No. Yes / No
94
S. Item of Works Observation/
N. Values Recorded
5. Pyrometer / Thermal chalk for Pyrometer /
measurement of Rail Temperature Thermal Chalk
: 1 No.
6. Stop watch : 1 No. Yes / No
H. Other tools / Equipments
1. Cleaning rod round : 1 No. Yes / No
2. Tapping rod : 1 No. Yes / No
3. Aluminum / steel rod for thermal
plugging : 1 No, Yes / No
4. Leather washers for pump : 2 No. Yes / No
5. Tool for punch marking : 1 set Yes / No
6. Mirror 150 X 100mm with Yes / No
handle : 1 No.
7. Wooden wedges for rail Yes / No
alignment : 12 No.
I. Tool box Containing following :
1. Hot Sets (Chisels): 2 No. Yes / No
( For Emergency use only )
2. Rail file 350 X 40-6 mm: 2 No. Yes / No
( For Emergency use only )
3. Funnel tin for pouring petrol : 1 No. Yes / No
4. Adjustable spanner : 1 No. Yes / No
95
S. Item of Works Observation/
N. Values Recorded
5. Hammer 1 kg : 1 No. Yes / No
6. Sledge hammer double panel 5 kg : 2 No. Yes / No
7. Steel wire brush : 1 No. Yes / No
8. Blue goggles : 2 pairs Yes / No
9. Paint brush 50 mm : 1 No. Yes / No
10. Slag container (bowl) : 1 No. Yes / No
11. Asbestos gloves : 2 pairs Yes / No
12. Hose clips : 4 No. Yes / No
13. Pliers : 1 No. Yes / No
J. Insulation hood for control cooling Yes / No
(for HH rail, 110 UTS rail welding ) Required /
Not Required
2. Welding Technique used is proper Yes / No
as per extant provisions
(Compressed Air/Oxy-LPG Heating,
3 piece mould & Auto Tapping
Thimble for 52 kg 90 UTS rails and
above)
(Indicate Technique being used) →
2.1 Technique is approved for the firm Yes / No
3. Welding Portion & consumable
(a) Portion as per Rail section /UTS to Yes / No
be welded & of proper technique
96
S. Item of Works Observation/
N. Values Recorded
1. Supplier / Firm
2. Batch No.
3. Portion No.
4. IC No.
5. Date of Manufacture
6. Results of Reaction test, if the Required / Not
portion is 2 years old Required
Nature of Reaction Normal / Boiling
7. Condition of Packing
(b) Three piece Mould
1. Condition of Mould Damp / Dry Cracked
/ Intact
2. Condition of vents in mould Blocked / Clear
(c) Proper quality looting sand,
ignition etc. are properly inspected Yes / No
(d) Other consumables Indicate Material &
Condition
4. Welding Team
(a) Whether full contingent of welding
team is available at site
(i) Welder : 1 No. Yes / No
(ii) Skilled Artisan : 2 No. Yes / No
97
S. Item of Works Observation/
N. Values Recorded
(iii) Helper Khalasi / Khalasi : 5 No. Yes / No
(iv) Track Man: As required for site Yes / No
protection.
Name of Welder
Details of competency certificate
(b) (certificate no. & validity )
Whether competency is for Yes / No
technique to be used & is valid
Name of supervisor
Details of competency certificate
(c) (certificate no. & validity )
Whether competency is for Yes / No
technique to be used & is valid
(d) Welding of Rails being welded
5. Details of Rails being welded
(a) Section / UTS
(b) Old or new
(c) In case old Rails,
1. Anticipated balance service life
2. Rail is free from corrosion or Yes / No
excess wear.
3. Result of USFD testing.
98
S. Item of Works Observation/
N. Values Recorded
4. General Condition of rails
6. General Condition of Rail ends
1. Condition of Rail Ends Hogged / Battered
Straight
2. Battering / Hogging in mm
3. End Bends of the rails in mm Vertical :
( Vertical : +0.5mm/ -0.0 mm Lateral :
Lateral : 0.5 mm )
4. End cuts are truly vertical Yes / No
5. Ends are cleaned by K-oil & wire
brush Yes / No
6. Fish bolt holes have been
eliminated Yes/No
If no. distance of fish bolt holes
from rail end being welded
C. Execution of Welds
1. Traffic Block Time
2. Gap between rail in mm
(25mm + 1for normal welds
50 + 1 and 75 + 1 for wide gap welds)
3. Alignment of rail with 1m straight
edge
99
S. Item of Works Observation/
N. Values Recorded
a Lateral
(+0.5mm)
b Vertical
(The joint shall be kept higher by :
3 to 4 mm for 72UTS and 2 to
2.4 mm for higher UTS)
4. Whether proper clear working
space of 250 mm is available and Yes / No
fastening of 5 adjacent sleepers
removed
5. Proper Fixing of Prefabricated
Mould
(a) Mould aligned Centrally Yes / No
(b) The gap between mould and rail Yes / No
packed firmly with luting sand
6. Proper Fixing of Mould shoes : Yes / No
perfectly vertical, not skew
7. Pressure in Preheating
arrangement
(a) Air Petrol : Compressor tank
Pressure (7+0.7 Kg/cm2)
(b) Compressed Air Petrol : Air Pressure
(0.2 to 0.3 Kg/cm2)
(c) Oxy - LPG Pre heating :
100
S. Item of Works Observation/
N. Values Recorded
(i) Pressure for Oxygen Cylinder
(7 to 8 Kg/cm2)
Pressure for LPG Cylinder
(2 to 2.5 Kg/cm2)
8. Whether pre heating torch is Yes / No
properly placed
9. Proper fixing of crucible
9(a) Whether the crucible has been
repaired properly with no loose Yes / No
sand particles
10. Specific check on AT welding Dry / Wet
portion before pouring in crucible
11. Preheating time (in minutes)
(a) Air Petrol Heating (10 to 12 minutes)
(b) Compressed air petrol (4 to 4.5
minutes)
(c) Oxy - LPG preheating (2 to 2.5
minutes)
12. Reaction of AT welding portion on Normal / Boiling
ignition violent
13. Tapping time in seconds
(Manual Tapping: (20+3) sec,
Auto Tapping L As per approval)
(a) Tapping done at time
101
S. Item of Works Observation/
N. Values Recorded
14. Mould waiting time
(4-6 minutes for 25 mm weld
12 minutes for 75 mm welds)
(a) Mould Removed at time
15. Trimming of weld done by weld Yes / No
trimmer with alignment wedges
in position
a . Wedges was removed fastening Yes / No
re-fixed and sleeper spacing
corrected
b. Wedges removed at time
16. All the removed fastening
re-fixed and sleeper spacing Yes / No
corrected
17. Provision of wooden block
below the weld for support Yes / No
before passing first train
18. Removal of Risers & Runners
(a) Whether weld has completely Yes / No
cooled
(b) Removed by knocking towards Yes / No
the rail
19. First train was passed after 30
min of pouring weld metal and Yes / No
completion of weld trimming
102
S. Item of Works Observation/
N. Values Recorded
(a) First Train passed at time
(b) First train passed with speed
restriction of
20. Grinding of Weld
Whether Grinding done with Profile Grinder /
profile grinder or manually Manual
Grinding was done after how
much time
Grinding of location as required Yes / No
D. Inspection of Weld
1. Visual Inspection Satisfactory /
Not satisfactory
2. Tolerances of finished weld
(a) Vertical (with 1m straight edge)
(Variation not more than +1mm/
-0.0 mm)
(b) Lateral (with 1m straight edge)
(Variation not more than +0.5mm)
(c) Finished of top surface at the
end of 10cm straight edge
(+0.4 mm /-0.0mm)
(d) Finished on sides of rail head at
the centre of 10cm straight
edge (+0.3mm)
103
S. Item of Works Observation/
N. Values Recorded
3. Numbering of Weld
(a) Serial number of Weld
(b) Marking on weld done on NGF Yes / No
side as per provisions
4. Whether USFD testing of weld was Yes / No
done
(a) If yes, result of USFD testing
Action Plan for Re-welding in case
the weld found defective
(b) If no, necessary precautions taken
at site
(Protection of weld by joggled
fish plates)
5. Whether painting of thermit weld Yes / No
done or not
6. Whether the details of weld was Yes / No
properly entered in weld Register
E. Miscellaneous Items
1. Whether sample test joint are due
to be made for testing. (One out of
100 joints to be tested for Load
deflection, Hardness & porosity
tests)
(a) If, yes Indicate details viz. Joint
No. etc.
104
S. Item of Works Observation/
N. Values Recorded
(b) Action Taken for testing of sample
joints
2. In case of contractual welding
2.1 Contract Details
(a) Name of firm
(b) CA No.
(c) Validity of contract
2.2 Total number of welds done so far
2.3 Details of USFD Testing
(a) Total no. of weld found defective in
USFD Testing
(b) Total no. of welds failed in service
during guarantee period
(c) Total Percentage of defective Welds
(d) The % of defective weld is within
the permissible range
2.4 Load Deflection Test, Hardness &
Porosity test
(a) Total No. of samples Required to
be tested @ 1 sample per 100 welds
(b) No. of test weld tested in Load
deflection, hardness & porosity test
105
S. Item of Works Observation/
N. Values Recorded
(c) Test Weld Samples results Yes / No
satisfactory
(d) Action taken in case of
unsatisfactory results
3. Proper Maintenance of Weld Yes / No
Register
106
E. Level Crossing.
1. Manned Level Crossing.
107
S. Item to be inspected Remarks Reference
N.
10 Whether the knowledge of gate man Yes/No IRPWM Para
is up to the mark? 914
109
S. Item to be inspected Remarks Reference
N.
28 Is the gate man fully acquainted with Yes/No
the use of the equipments?
29 Whether overhauling of the gate has Yes/No IRPWM Para
been done and is not overdue? (Once 914(1)(b)
in 2 years on PSC sleepers. Every year
for other than PSC sleepers)
30 Whether night inspections are being Yes/No IRPWM Para
carried out regularly? 914(1) (d)
31 Whether the TVU data is updated as Yes/No IRPWM
per three years schedule? Para 919
32 Whether the speed breakers are Yes/No IRPWM
provided on both sides of the road? (20 Annexure
m from gate post) 9/1
33 Is the revolving unit of the lifting Yes/No
barrier in working order?
34 Is the communication to the gate Yes/No IRPWM
proper by means of telephone? Annexure 9/1
35 Whether Station Master is responding Yes/No
to rings from the gate?
36 Whether private number are being Yes/No
recorded correctly at gate?
37 Has a hand pump for drinking water Yes/No
provided at the site?
38 Whether fencing has been provided
Yes/No IRPWM
along the track, at the level crossing Annexure 9/1
gate? (15 Meters)
110
S. Item to be inspected Remarks Reference
N.
39 Has the cleaning of the check rails being Yes/No
done properly at the gate?
40 Whether Check rail clearance is in Yes/No SOD Ch. I
order? (Clearance 51–57mm Clear item 5 & 6
depth-38mm )
41 Are the road signs on the approaches Yes/No IRPWM
properly maintained? Annexure 9/1
42 Whether the protection diagram has Yes/No
been exhibited at gate?
43 Whether detonators are available at Yes/No G&SR CS. No
LC Gate in adequate numbers with 30
valid date? (Validity 5 years and
extended up to 8 years).
44 Whether competency certificate of the Yes/No
gate man is current and valid?
(Once in 3 years)
45 Whether condition of check rail, check Yes/No
rail blocks proper or not?
46 Whether adequate ballast cushion is Yes/No
available below sleeper or not?
47 Whether proper bend/flair in check Yes/No
rails end portion has been provided?
48 Whether extra shoulder ballast has Yes/No
been provided in the approaches of
level crossing track to arrest the extra
111
S. Item to be inspected Remarks Reference
N.
stress in rails during extreme hot
weather?
49 Whether painting and fitting of rails Yes/No
and check rails has been done? (Along
with over hauling)
50 Whether adequate longitudinal slope Yes/No IRPWM
has been given in the approach road of Annexure 9/1
level crossing?
51 Whether adequate width has been Yes/No IRPWM
provided on the road in the Annexure 9/1
approaches, as well as on the track
portion i.e. as per class of road?
52 Are the W/L boards provided at Yes/No IRPWM
adequate distance? (600 m) 916/1
53 Is the gate lodge as per standard of the Yes/No
type plan?
54 Whether the wall clock in working Yes/No
condition?
55 Have the Safety posters been Yes/No
displayed?
56 Whether the train time tables have Yes/No
been displayed at the gate lodge?
Yes/No
57 Whether the inspection book of level Yes/No
crossings is available at the gate?
112
S. Item to be inspected Remarks Reference
N.
58 Whether the complaint book is Yes/No
available at the gate?
59 Whether level crossing registers are Yes/No IRPWM
available at the gate? Para 915
60 Whether the gate booms/gate leaves Yes/No
are properly functioning?
61 Whether the gate man is aware of the Yes/No
safety rules in case of emergency?
115
S. Item to be inspected Remarks Reference
N.
116
S. Item to be inspected Remarks Reference
N.
j) Rated output of the machine
(No. of Sleepers/Hour)
k) Name of SSE/TM/In-charge
l) Name/designation of the operator
2 Is there any tamping tool(s) missing Yes/No Para 3.1.3
or worn-out? (V)
(Wear to be < 20% of cross sectional (IRTMM)
area)
3 Is the Condition of tamping tools Yes/No Para 3.1.3
satisfactory and fitting tight? (V) (IRTMM)
117
S. Item to be inspected Remarks Reference
N.
1 0 Pre-tamping Inspection
i) Location of inspection
KM.
Line
Blocksection
Route
Division
ii) Availability of
a) Clean Cushion (minimum 150 mm) Yes/No Para 3.1.1(iv)
(IRTMM)
b) Adequate ballast for min. 20 mm Yes/No
lift in shoulder / crib
iii) Month & Year of Last Deep
Screening
iv) Is the condition of track drainage Para 3.1.2
satisfactory, pumping locations (vi)
attended & rounded ballast replaced Yes/No
(IRTMM)
with clean angular ballast?
v) Is the condition of cess satisfactory Yes/No Para 3.1.2(v)
and low cess made-up? (IRTMM)
vi) Is the speacing of sleeper’s Yes/No Para 3.1.2(iv)
uniform? (IRTMM)
vii) Are fittings in good Condition and Yes/No Para 3.1.2
tightened? (vi)
(IRTMM)
118
S. Item to be inspected Remarks Reference
N.
viii) Has all missing/broken fittings Yes/No Para 3.1.2
been replaced? (vii) (IRTMM)
120
S. Item to be inspected Remarks Reference
N.
S&T staff been ensured, as required? Yes/No/ Para 3.2.2 (v)
NA of IRTMM
xxviii) Has adjustment of gaps in Yes/No/ Para 3.1.2 (x)
joints / creep adjustment been NA of IRTMM
done?
xxix) UNIMAT working
a) Turnout No.
b) Station
c) Angle of crossing
d) LH/RH
e) When was it last Tamped?
(Month/ Year )
f) Is the layout including spacing of Yes/No Para 3.2.1 (i)
sleepers as per relevant drawings? (IRTMM)
g) Is the battered or worn Crossing Yes/No Para 3.2.1 (ii)
attended? (Reconditioning/ (IRTMM)
Replacement)
h) Are the S&T gears likely to infringe Yes/No Para 3.2.2 (v)
during tamping cleared? (IRTMM)
LWR
i) Destressing temperature of LWR
ii) Last destressing date
121
S. Item to be inspected Remarks Reference
N.
iii) Is the temporary de-stressing Yes/No Para 3.1.2(x)
done at higher/lower temperature? Temp (IRTMM)
td= °C
iv) Likelihood of temperature Yes/No Para 6.2.1 (i)
exceeding t d+20°C (a) (LWR
Manual)
9 Section of work
i) Division
ii) ADEN
iii) SSE Section
1 0 Section of work / Traffic block
i) Block section and lines blocked
ii) Timing and total Duration (minutes)
iii) Travel time to work spot (minutes)
iv) Actual working time (minutes)
v) Travel time to clear block (minutes)
vi) Total ineffective time (minutes) Railway
(Max ineffective time = 0.45 Hrs.) Board
(27 minutes) Letter
No.98/
Track-III/Tk/
27-Pt dated
20-05-2003
122
S. Item to be inspected Remarks Reference
N.
11 Operations During Tamping
i) Has the protection of the site of Para 4.2.2
Yes/No
work and adjoining track done as per (IRTMM)
G&SR?
ii) Working alignment .
(Straight/curve)
iii) Degree & Length of curve Degree=
Length=
in meter
iv) Is there any Points & Crossings Yes/No
present in planned stretch for
tamping?
v) Are there points and crossing Yes/No
being tamped in same block?
vi) Is the Lining being done in Design Yes/No
mode?
vii) Lining Working Method adopted 3 Point
4 Point
viii) Is the Levelling being done in Yes/No
Precision mode?
ix) Has the Setting of tamping depth Yes/No Para 3.1.3 (i)
been done as per track structure? (IRTMM)
The gap between top edge of the
tamping blade and the bottom edge
of the sleeper in closed position of
the tamping tool should be adjusted
123
S. Item to be inspected Remarks Reference
N.
depending upon the type of rail and
sleepers.
(For Metal sleeper: 22-25 mm, for
Flat bottom sleeper : 10-12 mm)
x) Is the Squeezing pressure of Yes/No Para 3.1.3
tamping unit correctly set? (iii) (IRTMM)
a) PSC sleepers (110-120 kg/cm2),
b) ST, Wooden sleepers (100-110 kg/
cm2),
c) CST-9 sleepers (90-100 kg/cm2)
xi) Minimum Slew Value (mm) mm
xii) Maximum Slew Value (mm) ( Not mm Para 3.1.3
more than 50 mm) (viii) (IRTMM)
xiii) Maximum lift value (mm) ( Not mm Para 3.1.3
more than 50 mm) (viii) (IRTMM)
xiv) Has it been ensured that a Yes/No Para 3.1.1
minimum 15-20 mm general lift is (i) (IRTMM)
given at high point?
xv) Is no. of insertion commensurate Yes/No Para 3.1.3
with lift? (iii) (d)
(up to 30mm lift – single insertion, (IRTMM)
30mm to 50mm – two insertions for
PSC sleeper track)
124
S. Item to be inspected Remarks Reference
N.
xvi) Is the squeezing time set Yes/No Para 3.2.3
correctly? (0.4 to 0.6 sec) (iv) (IRTMM)
xvii) Are the feeding of correction Yes/No/ Annexure
values on transitions of curves (Vm/ NA 2.1
F) being done? (In 4 point system of (IRTMM)
lining only)
xviii) Is the feeding of SE values done Yes/No/ Track Machine
as per feeding location? NA Documentation
xix) Is the correction for new SE, (K) Yes/No/ Track Machine
being done? NA Documentation
xx) Is the feeding of ‘X’ correction for Yes/No/ Track Machine
vertical curve being done? NA Documentation
125
S. Item to be inspected Remarks Reference
N.
c) Is the Sequence of tamping is first Para 3.2.2
on main line then on turnout side? Yes/No (i)
(ML → LL) (IRTMM)
d) Is the turnout side rail supported Yes/No/ Para 3.2.2
after lifting on mainline; till it is NA (i)
tamped (IRTMM)
126
S. Item to be inspected Remarks Reference
N.
ii) Has all loose fittings been Yes/No Para3.1.4 (i)
tightensd? IRTMM
128
Safety Equipment
S. Description Quantity
N.
1 Detonators in a tin case 1 Box
2 H.S. flag red 2 Nos.
3 H.S. flag green 1 Nos.
129
S. Description Quantity
N.
18 Working time table of section where machine
1 Copy
working
19 G&SR book with upto date amendment slips 1 Copy
130
G. Inspection for Ballast Screening Site (BCM Working)
132
S. Narration Observa- Reference
N. tions
supplementing the ballast for Yes/No Para 3.3.1
complete profile as per IRPWM? (iv) (IRTMM)
1 5 Are Sleeper fittings in good Condition Yes/No Para 3.3.2
and tightened? (x) (IRTMM)
16 Has all missing/broken fittings and Yes/No Para 3.3.2
Damaged/broken sleepers been (x) (IRTMM)
replaced?
17 Has it been ensured that entire ballast Yes/No Para 3.3.2
beyond the reach of cutter chain is (iv) (IRTMM)
transferred in its cutting width?
18 Has it been ensured that a trench of Yes/No
300mm depth & 1 meter width is
prepared lowering of cutter bar in
advance? Para 3.3.2
(xiii)
In case of screening of turnout, Yes/No (IRTMM)
whether requisite trench for
installation of extension pieces on right
side is prepared?
19 Has it been ensured that proper Yes/No Para 5.3.5
lighting arrangement are made for (viii)
night working on machine and/or OHE (IRTMM)
Mast?
20 Has it been ensured that there is no Yes/No Para 3.3.2
obstruction (including LWR pegs, creep (v) & (vii)
post, signal rodding/cables etc.) in the (IRTMM)
width of 4100mm to avoid
infringement to cutter chain?
133
S. Narration Observa- Reference
N. tions
21 Has it been ensured that L-Xing should Yes/No Para 3.3.2
be opened in advance so as to enable (ix)
machine to work? (IRTMM)
136
S. Item to be inspected Remarks Reference
N.
38 Has it been ensured that a round of
Yes/No Para 3.3.4(v)
tamping with DTS is carried out (IRTMM)
immediately after deepscreening to
resume trafficat aspeed of 40 Kmph?
Post BCM Working
39 Has all loose fittings been tightened? Yes/No Para 3.1.4 (i)
(IRTMM)
40 Has all broken fittings been replaced? Para 3.1.4
(ii) (IRTMM)
41 Has all check rails/guard rails been re-
fixed?
42 Has it been ensured that adequate
Para 3.3.4
ballast is trained out for complete Yes/No
(iii) (IRTMM)
ballast profile as per IRPWM and
profiling done?
43 BCM working – Has all S&T/OHE Yes/No Para 3.2.3
connections restored? (IRTMM)
44 Is the actual Output of the machine Yes/No Railway Board
matches with rated Progress of the Letter No.98/
Machine? Track-iii/Tk/27-
Pt dated 20-
(BCM - 0.2 Km/effective hour of working)
05-2003
45 Has it been ensured that watchman is
posted after the block or round the clock Yes/No Para 3.3.4
at the location while cutter bar & chain (iv) (IRTMM)
are left at site?
46 Any other specific observation (not
covered above):
137
Safety Equipment
S. Description Quantity
N.
1 Box
1 Detonators in a tin case
2 Nos.
2 H.S. flag red
1 Nos.
3 H.S. flag green
2 Nos.
4 H.S. Tri colour lamps (LED)
1 Set
5 Chain & Padlock
2 Nos.
6 Clamp with Padlock
1 No.
7 10 T jack
4 Nos.
8 Crow bars
8 Nos.
9 Wooden blocks off sizes
1 No.
10 Gauge cum level
1 No.
11 Rail thermometer (dial type)
2 Nos.
12 Banner flag
1 No.
13 Portable Control Phone
2 Nos.
14 Walky Talky
1 No.
15 First Aid Box
2 Nos.
16 Skids
138
S. Description Quantity
N.
139
Checklist for Machine Operator for Safe Operation of Track Machine
140
S. Item to be inspected Remarks Reference
N.
B. Yard
1 Is Track Machine stabled clear of Yes/No Para 4.6.5
fouling mark, sand traps and not (IRTMM)
obstructing adjacent line(s)?
2 Are necessary precaution taken Yes/No Para 4.5.1(i)
against rolling down such as pinning (IRTMM)
down hand brakes, chaining and
provision of skids and temporary
buffers?
3 Are concerned points set against the Yes/No Para 4.6.6
line on which track machine(s) is (IRTMM)
stabled and such points are secured
with clamps or cotter bolts and
padlocks?
4 Is brake feel test conducted before Yes/No GR 4.31
proceeding from siding?
5 Is the shunting order issued by on duty Yes/No Para 4.5.1
SM to move the machine in running line (ii)(IRTMM)
to/from the siding/stabling line?
6 Is shunting staff with proper shunting Yes/No GR 5.13
order available during shunting?
7 Is track machine having proper Yes/No Para 4.5.1
authority to proceed? (iii)(IRTMM)
8 Is special caution order issued by SM Yes/No Para 4.5.1
duly signed by JE/SE (P.Way) and (IRTMM)
Operator?
141
S. Item to be inspected Remarks Reference
N.
9 Is authority issued to work all Yes/No GR0 4.65
machines working in convoy as per
Subsidiary Rule of Railway?
10 Is facing point locked by clamp for Yes/No Para 4.6.6
movement of machines? (IRTMM)
C. Block Section Working.
1 Is proper line block taken for working Yes/No Para 4.5.1
the Track Machine indicating number (IRTMM)
of machines to work duly endorsed by
SM with special instruction to proceed,
work and return via right or wrong
direction?
2 Is the adjacent line also blocked (and Yes/No Para 4.6.2
permitted by control and SM) in case of (IRTMM)
some BRM, T-28 etc. likely to foul
adjacent line(s).
3 Is SE (P.Way) available on machine for Yes/No Para 4.2.2
working in block section? (IRTMM)
4 Are all restriction followed as detail Yes/No GR 4.09
given in caution order?
5 Is continuous whistling being done Yes/No Para 4.6.4
approaching to L-Xing? (IRTMM)
6 Is safe distance of 120m between the Yes/No Para 4.6.4
machines moving in convoy (IRTMM)
maintained?
142
S. Item to be inspected Remarks Reference
N.
7 Is the machine moving cautiously at Yes/No GR 9.07(5)
very low speed which shall under no
circumstances exceed 10 kmph in foggy
weather / poor visibility/dust storm
etc.?
8 Is minimum 120 meter distance kept Yes/No Para 4.6.4
machine to machine while travelling & (IRTMM)
50 meter while working?
9. Is protection of work site in block Yes/No Para 4.6.1
section and also for adjoining track(s), & 4.6.2
in case of infringement, carried out by (IRTMM)
SE/JE (P.Way)?
10 Is temporary whistle board is provided Yes/No Para 4.6.8
by SE/JE/P.Way on adjoining track at (ii)(IRTMM)
Track Machine work site?
11 Are hooter available with the track Yes/No Para 4.6.8
machine deployed at site? (i)(IRTMM)
144
Maintenance Instructions & Guidelines for
Different On-Track Machines.
Report is also available at: http://www.rdso.indianrailways.gov.in/
view_section.jsp?lang=0&id=0,2,465,610,1073
145
S. Name of Document Issue Report
N. Machine Date No.
Trouble-Shooting Mar.2004 TM-62
Manual
List of Critical Spare Jul.2012 CSP
Parts(Rev.01)
5 Dynamic Inspection Check List Oct.2005 TM-92
Track Maintenance Aug.2005 TM-90
Stabilizer(DGS- Schedule
Plasser-62N)
Trouble-Shooting Sept.2010 TM-148
Manual
List of Critical Spare Aug.2004 CSP
Parts
6 Shoulder Inspection Check List Sept.2005 TM-91
Ballast Maintenance
Cleaning Feb.2005 TM-79
Schedule
Machine(FRM-
80) Critical Spare Part Dec. 2014 CSP
list of Shoulder
Ballast Cleaning
Machine (FRM-80)
7 Shoulder Inspection Check List Dec.2009 TM-136
Ballast Maintenance Nov.2008 TM-125
Cleaning Schedule
Machine
(FRM-85F)
8 Multipurpose Inspection Check List Dec.2006 TM-105
Track Tamping Maintenance Jun.2006 TM-100
Machine Schedule
(UNIMAT
Compact-M) List of Critical Spare Parts Aug.2004 CSP
146
S. Name of Document Issue Report
N. Machine Date No.
9 Plasser Quick Inspection Check List Mar.2015 TM-108 Rev.-1
Relaying Maintenance Mar.2015 TM-101
System Schedule Revision-1
(PQRS)
Trouble-Shooting Feb.2009 TM-128
Manual
List of Critical Spare Aug.2004 CSP
Parts
1 0 Point And Inspection Check List Sept.2006 TM-103
Crossing Maintenance Aug.2006 TM-102
Changing Schedule
Machine
(AMECA T-28) Trouble-Shooting Mar.2007 TM-110
Manual
List of Critical Spare Aug.2004 CSP
Parts
1 1 Tamping Inspection Check List Dec. 2014 TM-106 Rev.-1
Express Maintenance May.2005 TM-85
(09-3X) Schedule
List of Critical Spare Jul.2012 CSP
Parts (Rev.01)
1 2 Track Inspection Check List Jul.2011 TM-160
Relaying Maintenance Jul.2011 TM-159
Equipment Schedule
(TLE-SIMPLEX)
Trouble-Shooting Feb.2009 TM-128
Manual
1 3 Track Inspection Check List Feb.2007 TM-107
Relaying Maintenance Oct.2006 TM-104
Train (TRT) Schedule
147
S. Name of Document Issue Report
N. Machine Date No.
Critical Spares Parts Dec. 2014 CSP
list of Track Relaying
Train
1 4 Point & Inspection Check List Sept.2004 TM-71
Crossing Maintenance Jun.2013 TM-175
Tamping Schedule
Machine Mar.2006
Trouble-Shooting TM-99
(UNIMAT)
Manual
List of Critical Spare Aug.2004 CSP
Parts
1 5 Unomatic Tie Inspection Check List Dec.2004 TM-76
Tamping Maintenance May.2005 TM-83
Machine Schedule
Trouble-Shooting Jul.2005 TM-88
Manual
1 6 Utility Track Inspection Check List Jun.2009 TM-132
Vehicle Maintenance Jun.2008 TM-121
(Phooltas Schedule
Make)
Critical Spares Parts Jul.2014 CSP
1 7 Worksite Inspection Check List Aug.2010 TM-144
Tamping Maintenance Jun.2010 TM-141
Machine Schedule
(METEX Make)
1 8 Worksite Inspection Check List Mar.2009 TM-129
Tamping Maintenance Mar.2009 TM-130
Machine Schedule
(8049
148
S. Name of Document Issue Report
N. Machine Date No.
Onwards) Trouble-Shooting Feb.2008 TM-117
Manual
List of Critical Spare 2013-14 CSP
Parts
1 9 UNIMAT-4S Maintenance May-12 TM-168
Schedule
Inspection Check List Dec. 2014 TM-169Rev.1
Critical Spares Part Apr-15 CSP
list of Unimat-4S
2 0 Rail Grinding Maintenance Jan. 2014 TM-180
Machine Schedule
2 1 Ballast Maintenance Feb. 2014 TM -178
Cleaning Schedule
Machine List of Critical Spare Nov.2013 CSP
(BCM-RM-80- Parts
92U)
Inspection Check List Mar- 2015 TM-186
2 2 Worksite Inspection Check List Mar-15 TM-183
Tamping Maintenance Mar-15 TM-187
MachineVPR- Schedule
02M
(Kalugaputmash
Make)
2 3 Inspection INSPECTION OF Aug-15 TM-184
Check List UNIMAT-SPLIT HEAD
MFI
149
H. Check list for Inspection of Concrete Sleeper Plant:
S. Item Remark
N.
A About Plant
1 Whether plant is approved for production? Yes/No
2 Whether plant is approved for production of 1 in 8.5 Yes/No
T/out sleepers?
3 Whether plant is approved for production of 1 in 12 Yes/No
T/out sleepers?
4 Whether plant is approved for production of any Yes/No
other type of sleepers?
B Quality Assurance Plan & ISO Certification
5 Whether QAP is approved by RDSO? Yes/No
6 Whether Plant is having ISO: 9001-2008? Yes/No
C About Organisation
7 Whether plant is having at least one Graduate Civil Yes/No
Engineer?
8 Whether plant is having at least one Diploma Civil Yes/No
Engineer for each shift per casting shed?
9 Whether plant is having one Mechanical/Electrical Yes/No
diploma Engineer for maintenance of equipments?
150
S. Item Remark
N.
D Layout Requirement
1 0 Whether Cement godown capacity is as per STR? Yes/No
(Minimum covered area 576 Sqm.)
1 1 Whether HTS storage capacity is as per STR? Yes/No
151
S. Item Remark
N.
per STR for production line are available or not? Yes/No
E2 HTS Wire
2 6 Whether HTS wire is procured from BIS approved Yes/No
source?
2 7 Whether HTS wire is inspected by railway’s Yes/No
inspecting Authority?
2 8 Whether HTS wire coils are wrapped in Jute/plastic Yes/No
cloths?
152
S. Item Remark
N.
2 9 Whether Manufacture’s tag & seal of Inspecting Yes/No
Authority available on coils?
3 0 Whether HTS wire coils are stacked in covered Yes/No
godown?
E3 Aggregates (CA1 & CA2)
3 1 Whether source is approved by RDSO? Yes/No
E4 Inserts
3 2 Whether Inserts are being procured from RDSO Yes/No
approved source?
3 3 Whether Inserts are inspected by RITES with lead seal Yes/No
on every bag?
3 4 Whether dimensional checking of each & every Yes/No
inserts is done before use in Plant?
3 5 Whether Inserts are stacked in covered godown / Yes/No
heat no wise& supplier wise?
E5 PVC Dowel
3 6 Whether PVC Dowels are procured from RDSO Yes/No
approved source?
3 7 Whether PVC Dowels are inspected by RDSO? Yes/No
F Production Shed
3 8 Whether regular cleaning of mould’s by cup wired Yes/No
153
S. Item Remark
N.
brush is being done before use? Yes/No
3 9 Filling of black putty for sealing the gap between end Yes/No
plates & mould is being done properly or not?
4 0 Whether Greasing for inserts pockets in moulds is Yes/No
done?
4 1 Whether labours are doing hand pulling of HTS wire Yes/No
for removal of sag before tensioning?
4 2 Is Calibration of tensioning m/c as per schedule being Yes/No
done?
4 3 Whether Tensioning m/c is equipped with auto cut- Yes/No
off?
4 4 Whether tensioning supervisor is measuring the Yes/No
elongation of HTS wire of each & every bench and
entering it in register regularly?
4 5 Whether Calibration of bottom vibrators as per
Yes/No
schedule is done?
4 6 Whether Calibration of automatic batching plant as Yes/No
per schedule is done?
4 7 Whether Pouring of cement in mixture is through Yes/No
screw conveyor?
48 Whether calibration of thermometers of steam
154
S. Item Remark
N.
chambers as per schedule being carried out? Yes/No
4 9 Whether Keeping & maintaining half hourly record Yes/No
of temperature of each & every chambers by
supervisor, as per steam cycle?
5 0 De-tensioning of benches after required release Yes/No
strength is done or not?
5 1 Whether Paint marking of batch no and date of Yes/No
casting on every demoulded sleeper is done?
5 2 Whether end painting of every demoulded sleeper Yes/No
before submerged for curing is done?
5 3 Whether casted sleeper in submerged water curing Yes/No
tanks are kept in layer wise just after demoulding?
5 4 Whether stacking of sleepers is batch wise & type Yes/No
wise (not more than 25 layers in each stack) in
stacking yard?
5 5 2nd coat end painting of sleepers after submerged Yes/No
water curing
5 6 Is Critical dimensional checking of sleepers done Yes/No
completely? (100 %)
5 7 Is 10% General dimensional checking of sleepers Yes/No
done?
155
S. Item Remark
N.
5 8 FTC checking of sleepers done or not? Yes/No
156
I. CHECK LIST FOR BRIDGE & TUNNEL:
157
S. Description Remarks Reference
N.
7 Whether the date of lubrication of Yes/No IRBM-1107
bearing is indicated on the bridge? (4) (v)
If so, Last date of lubrication done?
Date=…………
8 Whether bridge / FOB is over railway track,
Yes/No SOD CH-
whether clearances are as per SOD?
1(10) (iii)
If so, what is the vertical clearance IRBM-1107
(5870 mm / 6350 mm)? (14) (a) (ii)
Vertical clearance=……………………
9 What is the clear horizontal distance
between respective centre of track and SOD CH-1 (8)
any other structure (limiting value
2135 mm)?
10 Whether Trolley refuge is provided? Yes/No IRBM- 1107
(8)
If so, Nos. required ______________ and
Nos. provided ____________.
11 Whether creep of bridge girder is Yes/No ------
notice?
12 Whether condition of the footpath is Yes/No IRBM-1107
good? (9)
13 Whether condition of drainage
Yes/No IRBM-210
arrangement is good? (2)
14 Whether the Camber has been
recorded at the time of Inspection? Yes/No IRBM-212
158
S. Description Remarks Reference
N.
If so, What is the method of recording IRBM-1107
Camber? (15) (b)
What is the Camber
a) As per Drawing? .....mm
b) As per time of Last inspection? .....mm
c) At the time of Present Inspection? .....mm
15 Whether the bridge is to be inspected Yes/No
at increased frequency? IRBM-107
If so, What is the frequency? (1)
159
S. Description Remarks Reference
N.
e) Stringers .....% IRBM-215
(3)
f) Bracing& Foot Path .....%
g) Base Plate .....%
2 0 Whether any member of steel girder IRBM-212
Yes/No
is overstressed? (As advised by CBE) (a)
160
S. Description Remarks Reference
N.
requirement? IRBM-218-
(2) (ii)
a) Metalising (150 Micron)
b) Epoxy Painting (200 Micron)
28 Whether the Painting has been done Yes/No IRBM-217-
as per schedule (1 to 6 years)? (5)
If so, What is the last date of Painting? -----------
29 Whether all Holding Down (HD) Bolts Yes/No IRBM-1107-
are intact? (4)(ii)
What is the percentage of intact bolts
per bearing? ------%
Date of greasing…………….
33 Whether there are any cracks in Yes/No BS-102-
Knuckle slab, Saddle Plate and Roller? (3.2.3.1)
34 Whether bearing is centralized? Yes/No ------
161
S. Description Remarks Reference
N.
Date of oil replacement…………….
36 Whether connection of saddle plate Yes/No ------
with bottom boom is intact?
37 Whether condition of elastomeric Yes/No BS-102-
bearing is examined? (3.5.3)
If so, than
a) Is shear deformation more than Yes/No
50% of height of pads?
b) Is compression more than 5% of the Yes/No
height of Pads?
c) While in rotation any loss of contact Yes/No
between bearing and girder?
38 Whether any tilting/settlement is Yes/No IRBM-1107
reflected in cracks in substructure? (1) (a) (ii)
162
S. Description Remarks Reference
N.
done? Yes/No
Date of inspection--_______________
43 Whether the Pitching of Guide bund/ Yes/No IRBM-809 (4)
groins is intact? (a)IRBM-
1107(3) (a)
163
S. Description Remarks Reference
N.
54 Whether backfill materials are intact Yes/No
in case of horizontal crack on abutment
face?
55 Whether any bulging/tilting is noticed Yes/No IRBM-1107-
in ballast wall on abutment? (2)
56 Whether there is Highest Flood Level Yes/No IRBM-1107-
(HFL) with year & Danger Level (D L) (10) & 203
marking in abutments and gauge (2 & 3)
marking on shore piers on important
bridges?
57 Whether bridge tablet is showing Yes/No IRBM-
direction of flow, Bridge Number, span 1107(10) d,
arrangement, Rail level etc. has been f, h & 203 (2
provided? to 9)
58 Whether ballast retainer is leaning? Yes/No ------
59 Whether cracks in Arch Barrel with Yes/No IRBM-208-
special reference to its direction of (1) (i)
propagation & length of the crack IRBM-
observed? 1107(2) (e)
60 Whether any cracks in the intrados are Yes/No IRBM-208-
observed to be propagating in (1) (ii)
transverse direction i.e. direction IRBM-
perpendicular to traffic? 1107(2) (e)
61 Whether immediate rehabilitation Yes/No IRBM-209
measures for repair of cracks in the IRBM-
intrados planned & such cracks have 1107(2) (e)
been kept under close observation?
164
S. Description Remarks Reference
N.
62 Whether crushing of masonry of Arch, Yes/No IRBM-208-
loosening of Key stone etc. noticed? (1), (iv).IRBM-
1107(2) (e)
(viii)
165
S. Description Remarks Reference
N.
70 Whether there are any loose boulders Yes/No IRBM-1007
in tunnel wall and roofing? (4, 2)
RH side .....mm
167
S. Description Remarks Reference
N.
8 6 C/C spacing between sleepers (450 Yes/No C/slip No.
mm), what is actual value? 102 & para
273 (B/iii) of
IRPWM
8 7 Clear spacing between sleepers. ......mm
8 8 Whether guard rail are provided on Yes/No IRPWM Para
girder bridges? no.275
8 9 Clearance between guard rail and -----mm
running rail?
(250+50/ 250-50 mm)
9 0 Straight length of guard rail beyond the -----mm
span L1 (1875 mm)? IRPWM Para
no.275/2
9 1 Length of flared portion of guard rail L2 -----mm
(4875 mm)?
9 2 How much below is the top table of -----mm
guard rail from top of running rail (< 25
mm)?
9 3 Whether the ends of guard rails are Yes/No
vertically bent and buried and block of
timber is provided
9 4 Whether pathway has been provided Yes/No IRPWM C/
at the centre of the track with slip No. 102
chequered plates?
9 5 Whether all AT welds on bridge as well Yes/No C/slip No.
as on approaches of 100 M of both ends 131 of
IRPWM
168
S. Description Remarks Reference
N.
are provided with joggled fish plates
and clamps or with fish bolts at two far
end bolts?
9 6 Whether trolley refuses are provided? Yes/No CS No. 119 of
(at every 100 m or on every pier) IRPWM
9 7 Whether track Parameters like gauge, Yes/No IRBM-1107-
cross level, cant, versines are within limits? (7) (g) (i)
9 8 Whether condition of track fittings and
their tightness, particularly rubber
pads in case of steel channel sleeper Yes/No ------
are good?
9 9 Whether guard rail are bent down in IRBM-1107-
Yes/No
the ballast at approach? (e) iii
100 Whether tightness and correct osition IRBM-1107-
of lips of hook bolts checked by actually Yes/No (c)
touching with hand?
101 Whether steps are provided for
Yes/No ------
inspection of bridge?
102 Whether anti sabotage/theft fittings
Yes/No ------
are provided on the bridge?
103 Whether zero toe load track fastening
(rail free fastening) of LWR on bridge ------
Yes/No
and box anchoring of 2 to 4 sleepers in
the Centre of girders are provided as
per LWR manual?
104 Whether arrow mark of hook bolts is
aiming towards c/l of track? Yes/No
Percentage of hook bolts not holding
flange of girder--_______ .
169
J. ITEMS PERTAINIG TO PASSAENGERS AMMINITIES
A. ADARSH STATION.
170
S. Item to be Inspected REMARK
N.
8 Whether circulating area is available with Yes/No
necessary lighting?
(refer Table at Pg. no.186,187 for required
illumination level)
9 Whether landscaping and circulating area is Yes/No
available? (If space is available)(Except ‘C’ category)
1 0 Whether earmarked parking is available? Yes/No
1 1 Whether prepaid taxi/radio taxi booth available? Yes/No
(Except ‘B & C’ category)
1 2 Whether electronic train indicator board/ plasma Yes/No
TV train indicator system is available?
1 3 Whether lifts/escalator (if feasible) is available? Yes/No
(Except ‘B’ & for ‘C’ category, GM can sanction based
on need & demand)
1 4 Whether standard signage are available? Yes/No
171
S. Item to be Inspected REMARK
N.
1 9 Whether FOB is available? (For ‘C’ category – Wider FOB) Yes/No
172
2. FACILITIES AT ADARSH STATIONS (‘D & E’ CATEGORY)
173
S. Item to be Inspected REMARK
N.
1 1 Whether ‘water coolers’ are available? Yes/No
174
B. FACILITIES AT STATION NOMINATED AS MODEL STATION
1. For categories ‘A1, A & B’
175
S. Item to be Inspected REMARK
N.
1 0 Whether Parking / Circulatory Area is provided? Yes/No
(High mast with light is to be provided if feasible)
1 1 Whether washable apron with jet cleaning machines Yes/No
are provided?
1 2 Whether electronic train indicator boards are Yes/No
provided?
1 3 Whether touch screen enquiry system is provided? Yes/No
1 4 Whether watering vending machines are provided? Yes/No
(Optional for category ‘A & B’)
1 5 Whether FOB is provided? Yes/No
1 6 Whether escalator is provided? (Except category ‘B’) Yes/No
1 7 Whether travellator is provided? Yes/No
(Except category ‘B’)
(Subject to space available and feasibility)
1 8 Whether standardized signage are provided? Yes/No
1 9 Whether modular catering stalls are provided? Yes/No
2 0 Whether automatic vending machines are provided? Yes/No
(Optional for category ‘A & B’)
2 1 Whether pay & use toilets are provided on platforms Yes/No
and circulating area?
2 2 Whether cyber cafes are provided?
Yes/No
(Except category ‘A & B’, subject to space available
and feasibility)
176
S. Item to be Inspected REMARK
N.
2 3 Whether ATMs, preferably with ticketing facilities Yes/No
have been provided?
2 4 Whether at least one AC VIP/Executive lounge is Yes/No
provided? (Except category ‘A & B’)
2 5 Whether Food Plaza is provided? (Except category ‘A Yes/No
& B’)
2 6 Whether train coach indication system is provided?
Yes/No
(Except category ‘A & B’)
2 7 Whether Close Circuit Television (CCTV) for Yes/No
announcement and security purpose is provided?
(Except category ‘A & B’)
2 8 Whether coin operated ticket vending machines are Yes/No
provided?
2 9 Whether pre-paid taxi service facility is provided? Yes/No
(Only at category ‘A1’ with GM’s approval)
3 0 Whether high level platforms available? Yes/No
177
C. MINIMUM ESSENTIAL AMENITIES AT STATIONS OF
DIFFERENT CATEGORIES.
178
S. Facilities As per Norms Facilities
N. A1 A provided
7 Urinals 12 nos 10 nos Yes/No
i. includes provision in waiting rooms/hall
ii. 1/3rd to be reserved for ladies. In case of 2 toilets
existing, one each should be earmarked for ladies
and gents
iii. Includes ‘Pay & Use’ toilets also.
8 Latrines 12 nos 10 nos Yes/No
i. includes provision in waiting rooms/hall
ii. 1/3rd to be reserved for ladies. In case of 2 toilets
existing, one each should be earmarked for ladies
and gents
iii. Includes ‘Pay & Use’ toilets also.
9 Foot Over Bridge Minimum one FOB Yes/No
(with cover, new FOB- per station
minimum width 6m)
1 0 Water Cooler Two on each platform Yes/No
1 1 Signage As per standard (Refer Yes/No
Railway Board’s circular No.
97/TG II/39/11/signage dated
11.03.99)
179
S. Facilities As per Norms Facilities
N. A1 A provided
1 3 Ligting Refer Rly Bd.’s letter no. Yes/No
2004/Elec (G)/109/1 dated
18-05-2007 – Extract at Pg.
no.186,187
1 4 Fans One row of fans/Bay of COP Yes/No
for 6 to 9 m wide shed.
Two rows of fans/Bay of COP Yes/No
for shed wider than 9 m.
180
2. MINIMUM ESSENTIAL AMENITIES AT ‘B, C & D’ CATEGORY
STATION
S. Facilities As per Norms Facilities
N. B C D provided
1 Booking facility - 6 4 4 Yes/No
(No. of Counters)
(To operate round the
clock except if there
is no night working)
2 UTS As per norms Yes/No
8 Ltrines(Nos) 6 2 4 Yes/No
181
S. Facilities As per Norms Facilities
N. B C D provided
i. includes provision in waiting rooms / hall
ii. 1/3rd to be reserved for ladies. In case of 2 toilets
existing, one each should be earmarked for
ladies and gents
iii. Includes ‘Pay & Use’ toilets also.
9 Foot Over Bridge Minimum one FOB Yes/No
per station
1. New FOB-minimum width 6m.
2. For ‘D’ category FOB to be provided during
doubling/Gauge conversion for crossing
stations.
1 0 Water Cooler - on 02 02 01 Yes/No
each platform.
Ref: Rly Bd.’s letter
no. 69/Elect (g)/730/8
dt.30-03-1971.
1 1 Signage (Refer As per standerd Yes/No
Railway Board’s (Expect ‘C & D’ category)
circular No. 97/TG II/
39/11/signage dated
11.03.99)
1 2 Platform (Level) Medium High Medium Yes/No
1 3 Lighting Ref: Rly Bd.’s letter no. 2004/ Yes/No
Elect(G)/109/1 dated 18-05-
2007 , extract at page no.
186,187
182
S. Facilities As per Norms Facilities
N. B C D provided
14 Fans One row of fans/Bay of COP Yes/No
for 6 to 9 m wide shed.
Two rows of fans/Bay of COP Yes/No
for shed wider than 9 m.
186
K. ITEMS PERTAINIG TO COLONY AND OTHER BUILDINGS
Ref: Rly Bd.’s letter no. 2014/LMB-II/1/1 dated 25-07-
2014 and 2014/LMB-II/1/1 (A) dated 25-07-2014.
(A) COLONY INSPECTION BY ‘COLONY INSPECTION GROUP
(CIG)’
1. General:
S. Particular Remarks
N.
1 Whether ‘CIG’ formulated as per latest Yes/No
instructions?
2 Whether ‘CIG’ inspection & meetings are held Yes/No
regularly once in THREE months?
3 Artisans training: Initial and refresher arranged Yes/No
regularly?
4 Whether modern tools & equipment are available Yes/No
with artisans?
5 Whether standard ‘Tool kit’ is available with Yes/No
artisans?
6 Whether ‘Valve’ operation is automised? Yes/No
187
S. Particular Remarks
N.
2 Whether quarters are maintained in sound Yes/No
condition having structural integrity?
3 Whether leaky roofs are attended properly? Yes/No
188
(B) MAINTENANCE SCHEDULE FOR STAFF QTRS. AND COLONY:
1. Schedule for finishing items: For type II to V Qtrs.
S. Particular Remarks
N.
1 Whether exterior colour washing & Interior white Yes/No
washing including ceiling done once in a year?
2 Whether white washing of Kitchen & pantry done Yes/No
once in a year?
3 Whether painting with plaster paint, synthetic Yes/No
enamel, Oil bound distemper, acrylic paint and
acrylic distemper done once in TWO years?
4 Whether polishing/painting of interior wood work Yes/No
and painting of steel work done once in THREE years?
5 Whether premix, semi dense carpeting of roads Yes/No
done once in FIVE years?
6 Whether collection of water samples and analysis
done for:
a . Physical & bacteriological test – Every month. Yes/No
b. For chemical test – Six monthly. Yes/No
190
S. Particular Remarks
N.
FLOORS
1 Are there any cracks in floors, skirting and dado? Yes/No
2 Are the floors laid to proper slopes? Yes/No
191
S. Particular Remarks
N.
WATER SUPPLY AND SANITATION
1 Is there any leakage in the sewer lines, drainage Yes/No
pipes etc.?
2 Are flushing cisterns, wash basins etc. correctly Yes/No
fitted and working properly?
3 Are the covers of manholes, gully traps and floor Yes/No
traps etc. provided?
4 Is the slope of sanitary pipes proper? Yes/No
5 Is the condition of water overhead tank proper Yes/No
including float valve & cleaning of tank?
6 Any other deficiency noticed in the building Yes/No
193
S. Item to be inspected Remarks Reference
N.
dealt under Public Yes/No
Premises (Eviction of
Unauthorized
occupants) Act (PPE
Act)?
1 3 Whether any action is Yes/No
being taken for removal
of encroachment?
1 4 Whether there is any Yes/No
case registered in the
Court regarding
encroachments?
1 5 Whether there is any Yes/No Para 818 of IRWM
unauthorized Religious
structure in the
premises?
1 6 Whether Religious Yes/No
structure register is
maintained?
1 7 Whether track crossing Yes/No -
register is maintained?
1 8 Whether there is any Yes/No -
unauthorized track
crossing?
1 9 Whether realization of Yes/No Para 1033 of ENGG
way leaves charges CODE.
done?
194
S. Item to be inspected Remarks Reference
N.
2 0 Whether validity period Yes/No
of any track crossing
expired? Para 1033 of
2 1 Whether agreements Yes/No Engg. Code
are available for track
crossing?
2 2 Is there any private Yes/No Para 1830 and 1139 of
siding? Engg. Code. OR refer
liberalized siding
policy vide boards
various letters.
2 3 Are there any Yes/No Para 821 (c) of IRWM.
commercial plots?
2 4 Are there any Shops/ Yes/No
Tehbazari?
2 5 Whether license fee has Yes/No Para 821 (f) of IRWM.
been updated for the
current year?
2 6 Whether license fee has Yes/No Refer Rly Bd updated
been updated on the policy.
basis of market value of
land after 5 years?
2 7 Whether land is licensed Yes/No No. 2009/LML/16/3
to Railway Staff for Grow dated 16/07/2010
More Food (GMF)
purposes?
195
S. Item to be inspected Remarks Reference
N.
2 8 Whether any land is Yes/No Refer Rly Bd updated
licensed to Container policy.
Corporation of India /
International Container
Depot (CONCOR)?
2 9 Whether execution of Yes/No
land license agreement
has been done for all
cases?
3 0 Whether validity of any Yes/No
agreement has expired?
3 1 Whether any tree is Yes/No Para 715 of IRWM
infringing signal / OHE /
track?
3 2 Whether matured trees Yes/No Para 721 of IRWM.
are being processed for
sale?
3 3 Whether tree register is Yes/No Para 720 of IRWM
maintained?
3 4 Whether any action has Yes/No Para 721 (2) of IRWM.
been initiated for de
notification of protected
forest?
3 5 Whether master data Yes/No N0.2014/LML-II/2/3
entry in land module has dated 28/07/2014
been done or not?
196
M. STEEL STRUCTURES IN WORKSHOPS, RUNNING SHEDS AND
PLATFORMCOVERS IN WHICH ROOF TRUSSES ARE FIXED
TO BUILT UP STANCHIONS
Ref: Para229 IRWM
199
S. Item to be inspected Remarks
N.
9 Whether anchor-bolts are tightly fastened to Yes/No
foundations & bearings?
9(a) If not, whether any remedial action is being taken? Yes/No
10 Whether any deformation of the structure has Yes/No
occurred?
10(a) If so, whether any remedial action is being taken? Yes/No
201
S. Item to be inspected Remarks
N.
3 If the plant is maintained and operated through Yes/No
contract, are all records of operation and
maintenance properly maintained?
4 Are plant failures promptly attended? Yes/No
5 If the plant is maintained and operated Yes/No
departmentally, are spares of all critical
components in stock?
6 Whether chlorine demand of the raw/untreated Yes/No
water is being regularly tested?
7 Whether equipment/disinfectant chemicals in Yes/No
chlorination plant are stored properly in safe
condition?
8 Whether proper record of date of receipt, date of Yes/No
testing and date of consumption of the hypochlorite
solution maintained?
9 Are all components of chlorination plant Yes/No
functioning properly including proportionate dozing
system (if provided)?
10 Whether contact period of 30 to 60 minutes is Yes/No
maintioned?
11 Whether residual chlorine of 0.2 ppm is available Yes/No
in normal condition?
202
P. RAIN WATER HARVESTING SYSTEM (RWH)
203
CHAPTER NO – 5
Inspection at New construction Site
204
S. Items to be checked Remarks Reference
N.
5 Whether trained drivers are being
utilized and the presence of at least Yes/No
one flag man and one supervisor
certified for such work?
6 If night working is done, whether it has Para 826
been permitted by AEN/XEN in writing Yes/No of IRPWM,
any by deputing one inspector? For
dimensional
7 Whether walkie talkie sets or mobile details
phones have been provided at the refer ann-
site of work? ii of PCE/
ECR
8 Whether S & T and electrical staff
circular
have been informed before starting
no. 16/
of work along the track?
2010/
9 Whether vehicle / tractor drivers Track
trained by the Railway Officers/
Supervisors to work along the track
as per safety guide lines?
10 For night working whether sufficient
light has been provided?
205
B. Work in /near Electrified Territory :
206
C. Precautions within station Premises
207
b. Is the impact value of the ballast is Yes/No
less than 20% Specification
of ballast
c. Is Water absorption in less than 1% Yes/No as per IRS
GE-1, June
(In exceptional cases on technical and
2004
economic ground, can be relaxed up to
corrected
35% and 25% respectively by CTE in
upto CS no
open line and CAO/C for construction
3 dtd 05-1-
projects.)
09GCC
3 Size and gradation:
Is the ballast satisfy the following size Yes/No
and gradation:
a . Retained on 65 mm Sq. mesh sieve Yes/No
5% Maximum
b. Retained on 40 mm Sq. mesh sieves Yes/No
40% - 60%
c. Retained on 20 mm Sq. mesh sieve Yes/No
Not less than 98% for machine
crushed. Not less than 95% for hand
broken.
Oversize Ballast:
a . In case retention on 65 mm square
mesh sieve exceeds 10%, the stack
shall be rejected.
b. In case retention on 40 mm square
mesh sieve exceeds 70%, the stack
shall be rejected.
208
Under size Ballast:
The ballast shall be treated as under
size and shall be rejected if:-
a. Retention on 40 mm sq. mesh sieve Yes/No
is less than 40%
b. Retention on 20 mm sq. mesh sieve
is less than 98%
(For machine crushed) or 95% (for hand Yes/No Specification
broken.) Has this been done? of ballast
4 Stack measurement as per IRS
GE-1, June
Stacking if done on a neat, plain and firm 2004
ground with good drainage. The height corrected
of stack is not less than 1 m except in upto CS no
hilly area where it may be 0.5 mm. 3 dtd 05-1-
Cubical content of each stack should 09GCC
normally be not less than 30 cum in plain
area and 15 cum in hill area.
The screen for sieving the ballast shall
be of square mesh. If Mesh in not less
100 X 70 X 10 cm (LXBXH). The following
tolerances in the size of the hole for 65,
40 and 20mm nominal size shall be
permitted.
209
a. 65 mm sq. mesh plus/minus 1.5 mm Specification
of ballast
b. 40mm sq. mesh plus/minus1.5 mm as per IRS
c. 20mm sq. mesh plus/minus 1.0 mm GE-1, June
2004
corrected
upto CS no
3 dtd 05-1-
09GCC
210
3 Whether track parameter has been checked Yes/No
and recorded before the passing of first train?
4 After close of box pushing work whether the Yes/No
speed of first train passed at speed of stop
dead and 10 kmph and subsequent trains were
upto 30 kmph?
5 Whether track parameter has been checked Yes/No
after each round of box pushing by the
supervisor In-charge before leaving site?
6 Whether posting of proper look out Man with
Yes/No
banner flags and other protection equipments
has been ensured when box pushing is not in
progress?
211
Notes
212
Notes
213
Notes
214
Notes
215
Notes
216
Notes
217
Notes
218
This book is compilation of updated instructions on different
subjects, kindly also refer to latest correction slips, if any.
Printed by :
Kalyani Corporation, Sadashiv Peth, Pune - 30.
Price < 60/-