cum 20 2.5
For C. conc Drain 0.31 0.91 14.11 5733.60 80,872.43
Centering and shuttering including strutting, propping etc.
5 and removal of form work for Retaining walls, return walls,
walls (any thickness) including attached pilasters
sqm 40 2.5
For C. conc Drain - 0.91 91.00 286.35 26,057.85
12 mm thick cement sand plaster in 1:4 (1 cement : 4 fine
6 sand) complete
sqm 20 2.5
For C. conc Drain - 0.91 45.50 283.80 12,912.90
P/L of RCC spun pipes incl earthwork in excavation,
7 dressingof sides ramming of bottom, necessary cushon,
loading, unloading & all carriage
dia Qty (rft)
L(ft) (inch)
rft 45 8.0 24.00 - 360.00 1350.00 486,000
rft 10 8.0 36.00 80.00 2200.00 176,000
Providing and fixing in position precast R.C.C. manhole
cover and frame of required shape and approved quality.
Circular shape 560mm internal dia.
8
no. 20 20.00 2157.65 43,153
9 Carriage of material by MT
(a) Stone agg avg lead = 14 km cum 14.50 443.06 6,425.23
Amount
6,573.31
5,484.00
19,021.80
63,986.98
20,617.20
17,255.04
6,970.66
6,345.60
3,304.10
149,558.68
1001817.8
Abstract of cost for upgradation of Wanbal road bwo G-II at different spots at
DAMSAMA Kralpora incl Drain.