Professional Documents
Culture Documents
Improvement/ Upgradation of inner links of Wanbal Kralpora road by way of P/L of WBM GII, 75mm thick wet mix
NAME OF WORK
macadam, 50mm thick bituminous macadam, 25mm thick semidense with 6mm thick seal coaT
RD L W W(Avg) SA(Avg)
0 - 5.75 - -
2 2 4.2 4.98 9.95
17 15 3.45 3.83 57.38
Lane no.1
32 15 3.35 3.40 51.00
47 15 3.55 3.45 51.75
50.9 3.9 4.45 4.00 15.60
0 - 4.25 - -
3.4 3.4 3.15 3.70 12.58
18.4 15 3.35 3.25 48.75
33.4 15 3.25 3.30 49.50
Lane no.2 48.4 15 2.35 2.80 42.00
63.4 15 3.35 2.85 42.75
78.4 15 3.25 3.30 49.50
93.4 15 3.25 3.25 48.75
108.4 15 3.25 2.80 42.00
0 - 4.55 - -
1.5 1.5 3.25 3.90 5.85
16.5 15 3.35 3.30 49.50
31.5 15 3.55 3.45 51.75
Lane no.3 46.5 15 3.55 3.55 53.25
61.5 15 3.75 3.65 54.75
76.5 15 3.55 3.65 54.75
91.5 15 3.45 3.50 52.50
105.7 14.2 3.55 3.55 50.41
0 - 5 - -
2 2 3.75 4.38 8.75
17 15 3.65 3.70 55.50
32 15 3.55 3.60 54.00
Lane no.4
47 15 4.25 3.90 58.50
62 15 3.45 3.85 57.75
77 15 3.65 3.55 53.25
89.3 12.3 3.45 3.55 43.67
TOTAL SA (SQM) 1225.68 sqm A
@{(0.60+0.075+0.090)/3} mm thick (avg) 91.93 cum 1555.160 142959.64
Providing and applying tack coat on W.B.M. @ 0.75 Kg/sqm using hot straight run bitumen of grade VG-10, including heating the
bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing
2 road surface as per specifications.
RD L W W(Avg) SA(Avg)
0 - 5.75 - -
2 2 4.2 4.98 9.95
17 15 3.45 3.83 57.38
Lane no.1
32 15 3.35 3.40 51.00
47 15 3.55 3.45 51.75
50.9 3.9 4.45 4.00 15.60
0 - 4.25 - -
3.4 3.4 3.15 3.70 12.58
18.4 15 3.35 3.25 48.75
33.4 15 3.25 3.30 49.50
Lane no.2 48.4 15 2.35 2.80 42.00
63.4 15 3.35 2.85 42.75
78.4 15 3.25 3.30 49.50
93.4 15 3.25 3.25 48.75
108.4 15 3.25 2.80 42.00
0 - 4.55 - -
1.5 1.5 3.25 3.90 5.85
16.5 15 3.35 3.30 49.50
31.5 15 3.55 3.45 51.75
Lane no.3 46.5 15 3.55 3.55 53.25
61.5 15 3.75 3.65 54.75
76.5 15 3.55 3.65 54.75
91.5 15 3.45 3.50 52.50
105.7 14.2 3.55 3.55 50.41
0 - 5 - -
2 2 3.75 4.38 8.75
17 15 3.65 3.70 55.50
32 15 3.55 3.60 54.00
Lane no.4
47 15 4.25 3.90 58.50
62 15 3.45 3.85 57.75
77 15 3.65 3.55 53.25
89.3 12.3 3.45 3.55 43.67
0 - 5.1
Stretches on main road
12.6 12.6 5.3 5.20 65.52
L W
Patches on main road
1.4 3.4 4.76
TOTAL SA (SQM) 1295.96 sqm 61.30 79442.348
Providing and applying 50 mm thick Bituminous Macadam base course with stone agg. Of quantity size and grading as specified in
CPWD specifications and straight run bitumen of 80/100 @ 3% by weight of total mix incld. hot mixing of stone agg. and bitumen
in hot mix plant, transporting and laying mixed material with paver finisher to the required level and grade, rolling with road roller
of 8-10 tonne capacity to achieve the required compaction and density incld. Cost and carriage of all materials involved upto site of
3 work complete, tools, plants, equipments and all allied machinery, labour taxes, fee, testing charges for maintaining quality control
during and after execution of work complete in all respects incld. Cost and carriage of bitumen.