You are on page 1of 1

NATIONAL HIGHWAY AUTHORITY

CONSTRUCTION OF HASSAN ABDAL - HAVELIAN SECTION OF E-35


Package - 1 Burhan to jari Kas Km 0+000 ~ 20+400
BLENDING OF AGGREGATE
Source: Type Of Material: 3/4" Agg. & 3/8" Agg. Date: 23-Apr
Description: Location:
SIEVE SIZES 2.1/2" 2.0" 1.1/2" 1.0" 3/4" 1/2" 3/8" #4 #8 # 16 # 30 # 50 # 100 # 200
35--25 100 13.1 1.1 100.0 100.0 100.0
25--10 ` 100 100 72.8 26.7 7.3 100.0
10--5 100 100 100 100 86.0 35.3 0.9
5--0 100 100 100.0 100.0 100.0 100 92.8 31.7 12.8

SIEVE SIZES % Used


35--25 20 20 2.6 0.2
25--10 25 25 25.0 18.2 6.7 1.8
10--5 25 25 25.0 25.0 25.0 21.5 8.8 0.2
5--0 30 30 30.0 30.0 30.0 30.0 30.0 27.8 9.5 3.8
Combined Passing % 100 82.6 73.4 61.7 53.3 38.8 28.0 9.5 3.8
Mid Point - 82.5 72.5 62.5 52.5 37.5 25.0 10.0 4.5
Specification 100 75/90 65/80 55/70 45/60 30/45 15/35 15/150 102/752
JMF Limits 100 76/90 66/80 55/69 46/60 35/43 24/32 16/141 103/553

CONTRACTOR CONSULTANT

Lab Technician Material Engineer Lab Technician Material Engineer


Name
Signature
Date

You might also like