SIEVE ANALIYSIS AGGREGATE CLASS A

TABLE D. 5 SPECT PROJECT


Material For : VENDOR KIM Date : 07 February 2023
Material From : Stock Agg A ( Limo Utara ) Tested By : Surya
Description : AGGREGATE A Calculated By : Supra

Sample I Sample II SPECT


UKURAN SARINGAN Cumulative Cumulative Passing Cumulative Cumulative Passing PROJECT
Average
Retained Retained Sieve Retained Retained Sieve TABEL 8.01
Inch mm gram % % gram % %
2" 50 100 - 100
1½ " 37.5 100 - 100
1" 25.0 79 - 85
¾" 19.0 -
½" 12.5 100.00 100.00 100.00 -
⅜" 9.5 1197 39.27 60.73 1630 45.42 54.58 57.66 44 - 58
No.4 4.75 1785 58.56 41.44 2317 64.56 35.44 38.44 29 - 44
No.8 2.36 -
No.10 2.00 2251 73.85 26.15 2817 78.49 21.51 23.83 17 - 30
No.16 1.18 -
No.40 0.425 2630 89.55 10.45 3181 91.70 8.30 9.38 7 - 17
No.200 0.075 2937 96.36 3.64 3469 96.66 3.34 3.49 2 - 8
Sample Weight 3048 3589

KETERANGAN :
# . Aggregate Ex, Muksin perlu penambahan material 20mm - 30 mm = 10 % dari total aggregate
# . Aggregate Ex, Muksin perlu penambahan material 10mm - 20 mm = 5 % dari total aggregate
SIEVE ANALIYSIS AGGREGATE CLASS A
TABLE D. 5 SPECT PROJECT

Material For : VENDOR KIM Date : 07 February 2023


Material From : STONE CRUSHER PASIFIC Tested By : Surya
Description : AGGREGATE A Calculated By : Supra

COMMBINE GRADING PASSING SPECT


UKURAN SARINGAN Aggregate Aggregate Agg Agg Average PROJECT
0 - 20' 20 - 30 ' 0 - 20' 20 - 30 '
Inch mm mm mm 80.00% 20.00% 100%
2" 50 100 - 100
1½ " 37.5 100 100.00 80.00 20.00 100.00 100 - 100
1" 25.0 100 29.57 80.00 5.91 85.91 79 - 85
-
-
⅜" 9.5 57.66 1.17 46.12 0.00 46.12 44 - 58
No.4 4.75 38.44 0.00 30.75 0.00 30.75 29 - 44
-
No.10 2.00 23.83 0.00 19.06 0.00 19.06 17 - 30
-
No.40 0.425 9.38 0.00 7.50 0.00 7.50 7 - 17
No.200 0.075 3.49 0.00 2.79 0.00 2.79 2 - 8
Sample Weight Gram Gram

KETERANGAN :

Abu =35 5-10 =20 10-20=20 20-30=25