KEMENTRIAN PERHUBUNGAN

DIREKTORAT JENDERAL PERHUBUNGAN UDARA


KANTOR UNIT PENYELENGGARA UPBU MOROWALI
BANDAR UDARA MOROWALI

Pekerjaan : Pembangunan Rehabilitasi dan Pemeliharaan Prasarana Bandar Udara


Kegiatan : Pengembangan Sisi Udara
Konsultan : PT. BENANTA JASINDO
Kontraktor : PT. KASIH VANDARINDO BANJARINDO

JOB MIX FORMULA ATB

SIEVE ANALY SIS

Hot Bin Hot Bin Hot Bin


SIEVE ORIGINAL GRADATION ( % ) PASS Filler
I II III
COMBINED Spec
Hot Bin
No MM Hot Bin II Hot Bin III Semen 48% 30% 22% 0%
I
1" 25.0 100.00 100.00 100.00 100.00 48.00 30.00 22.00 0.00 100.00 100

3/4" 19.0 100.00 100.00 74.03 100.00 48.00 30.00 16.29 0.00 94.29 76 - 98

1/2" 12.5 100.00 83.53 50.73 100.00 48.00 25.06 11.16 0.00 84.22 66 - 86

3/8" 9.5 98.46 58.91 25.37 100.00 47.26 17.67 5.58 0.00 70.51 57 - 77

No.4 4.75 70.19 24.47 17.54 100.00 33.69 7.34 3.86 0.00 44.89 40 - 60

No. 8 2.36 50.57 5.90 5.99 100.00 24.28 1.77 1.32 0.00 27.36 26 - 46

No. 16 1.18 35.18 3.93 5.01 100.00 16.89 1.18 1.10 0.00 19.17 17 - 37

No. 30 0.6 22.70 3.78 4.71 100.00 10.89 1.13 1.04 0.00 13.07 11 - 27

No. 50 0.3 14.83 3.47 4.22 100.00 7.12 1.04 0.93 0.00 9.09 7 - 19

No. 100 0.15 9.63 3.03 3.56 100.00 4.62 0.91 0.78 0.00 6.31 6 - 16

No. 200 0.075 8.64 2.73 3.00 100.00 4.15 0.82 0.66 0.00 5.62 3-8

U.S. Standar Sieve Size


No.200 No.100 No.50 No.30 No.16 No.8 No.4 3/8"21/2" 3/4" 1" 11/2"
100.00 100.00

90.00 90.00
80.00 80.00

70.00 70.00
Percent Passing by Weight

Percent Passing by Weight


60.00 60.00

50.00 50.00
40.00 40.00

30.00 30.00

20.00 20.00

10.00 10.00

0.00 0.00
0 0 1 10 100
Gradasi Spec

Perkiraan kadar Aspahlt Optimum :


Pb = 0.035 ( % CA ) + 0.045 ( % FA ) + ( 0.18 ( % FILLER ) + K
Pb = 5.99 % max Pb
Pb = 5.04 % min Percobaan ke I II III IV V VI
CA = 27.36 Kadar Asphalt untuk test marshalt ( % ) 5.0 5.5 6.0 6.5 7.0 7.5
FA = 67.01
FILLER = 5.62 Pemilihan kadar Aspalt :
K max = 1 - Dibulatkan ke 0.5 terdekat - 2 ( dua ) kadar Asphalt di bawah Pb
K min = 0.05 - 3 ( tiga ) kadar Asphalt di atas Pb - Jumlah 6 ( enam ) kadar Asphalt

Direksi Teknik Konsultan Kontraktor

Ahmad Liemin. SE Rolix Royce. ST Andriansyah


NIP. 19791231 200903 1 006 Engineer Pavement Lab. Teknisi