You are on page 1of 5

inch. mm.

% Passing ROCKFILL PARTICLE SIZE DISTRIBUTION CHART


20 " 500 100
18 " 450 92.7 Ministry of Finance RFI;
Owner SEMD-RFI-RD- 5384

16 " 400 87.4 Nano Engineering consultants Report Date: 7/31/2023


Consultant

14 " 350 82.8 Mohammed A. Al Swailem Company Sampling Date;


Main Contractor 7/27/2023

12 " 300 77.3 South East Madinah Development Sample No; 1


Project Name

10 " 250 73.0 Rock fill material Sampled By; Consultant& GDA
Material Description

8.0 " 200 65.4 Zone C3/ Point (95) Tested By; GDA
Source Of Materials

6.0 " 150 60.2


5.0 " 125 56.4 Original Source Proposed Use or Spec's.

4.0 " 100 49.1


3.0 " 75 45.0 100
percent passing, %

2 1/2 " 63.5 41.6


90
2.0 " 50.0 36.6
1 1/2 " 37.5 30.0 80
1.0 " 25.0 23.6
70
3/4 " 19.0 16.4
1/2 " 12.5 11.0 60
3/8 " 9.5 8.8
50
No. 4 4.75 8.2
No.10 2.00 5.6 40
No. 30 0.600 3.6
30
No.40 0.425 3.1
No.180 0.180 2.7 20
No.200 0.075 0.0
10

D60 = 165.00 0
D10 = 13.00 0.01 0.1 1 sieve size, mm. 10 100 1000

Cu = 12.7 UNIFORMITY COEFFICIENT = 6.0 % Min.


Passing Sieve No. 40 ( 0.425 mm ) = 25.0 % Max.

Prepared By Checked By Approved By


SIEVE ANALYSIS for Rock Fill

Owner Ministry of Finance RFI ; SEMD-RFI-RD- 5384


Consultant Nano Engineering consultants Report Date: 7/31/2023
Main Contractor Mohammed A. Al Swailem Company Sampling Date; 7/27/2023
Project Name South East Madinah Development Sample No; 1
Material Description Rock fill material Samled By; Consultant& GDA
Source Of Materials Zone C3/ Point (95) Tested By; GDA

SIEVE ANALYSIS Grading (C)

Weight of Sample, grams


Original, g. Tested By :

Oven Dry, g. 2265.6 grms Computed By:

Wash Oven Dry, g. 1765.3 Checked By :

Sieve Weight Cum. Wt. Cum. %. Adjusted % Spec's.


Opening Retained Passing Passing Passing Retained
20" 500 mm.
18" 450 mm.
16" 400 mm.
14 " 350 mm.
12 " 300 mm. # 4 Retained = 0.0 kg
10 " 250 mm. # 4 Passing = 2265.6 kg
8" 200 mm. Total Weight = 2265.6 kg
6" 150 mm.
5" 125 mm. % Retained on # 4 = 0.0 %
4" 100 mm. % PASSING # 4 = 100 %
3" 75 mm. % Passing on # 4 = 8.2 %
2 1/2 " 63 mm.
2" 50 mm.
1 1/2 " 37.5 mm.
1" 25.4 mm.
3/4 " 19.0 mm.
1/2 " 12.5 mm.
3/8 " 9.5 mm.

#4 4.75 mm 0.0 2265.6 100 8.2


# 10 2.00 mm 698.3 1567.3 69.2 5.6
# 30 0.600 mm 570.0 997.3 44.0 3.6
# 40 .0425 mm 150.0 847.3 37.4 3.1
# 80 0.180 mm 111.3 736.0 32.5 2.7
# 200 0.075 mm 250.0 0.0 0.0 0.0
Pan 30.2 0.0
Wash -30.2
Total 1779.6

Remarks :

Prepared By: Checked By: Approved By:


SIEVE ANALYSIS for Rock Fill

Owner Ministry of Finance RFI ; SEMD-RFI-RD- 5384

Consultant Nano Engineering consultants Report Date: 7/31/2023

Main Contractor Mohammed A. Al Swailem Company Sampling Date; 7/27/2023

Project Name South East Madinah Development Sample No; 1

Material Description Rock fill material Sampled By; Consultant &GDA

Source Of Materials Zone C3/ Point (95) Tested By; GDA

SIEVE ANALYSIS Grading (B)

Weight of Sample, grams


Original, g. Tested By :

Oven Dry, g. 11200.0 g Computed By:

Wash Oven Dry, g. 8963.4 Checked By :

Sieve Weight Cum. Wt. Cum. %. Adjusted % Spec's.


Opening Retained Passing Passing Passing Retained
20" 500 mm.
18" 450 mm.
16" 400 mm.
14 " 350 mm.
12 " 300 mm. # 4 Retained = 9166.00 kg
10 " 250 mm. # 4 Passing = 2034.00 kg
8" 200 mm. Total Weight = 11200.00 kg
6" 150 mm.
5" 125 mm. % Retained # 4 = 81.8 %
4" 100 mm. % PASSING # 4 = 18.2 %
3" 75 mm. 0.000 11200.0 100.0 45.0 % Passing on 3 " = 45.0 %
2 1/2 " 63 mm. 850.0 10350.0 92.4 41.6
2" 50 mm. 1230.0 9120.0 81.4 36.6
1 1/2 " 37.5 mm. 1650.0 7470.0 66.7 30.0
1" 25.4 mm. 1590.0 5880.0 52.5 23.6
3/4 " 19.0 mm. 1790.0 4090.0 36.5 16.4
1/2 " 12.5 mm. 1356.0 2734.0 24.4 11.0
3/8 " 9.5 mm. 550.0 2184.0 19.5 8.8
#4 4.75 mm 150.0 2034.0 18.2 8.2
# 10 2.00 mm

# 30 0.600 mm

# 40 .0425 mm

# 80 0.180 mm

# 200 0.075 mm
Pan 30.9
Wash 2003.1
Total 11200.0 0
0.0
Remarks :

Prepared By: Checked By: Approved By:


SIEVE ANALYSIS for Rock Fill

Owner Ministry of Finance RFI: SEMD-RFI-RD- 5384


Consultant Nano Engineering consultants Report Date: 7/31/2023
Main Contractor Mohammed A. Al Swailem Company Sampling Date; 7/27/2023
Project Name South East Madinah Development Sample No; 1
Material Description Rock fill material Sampled By; Consultant& Gda
Source Of Materials Zone C3/ Point (95) Tested By; GDA

SIEVE ANALYSIS Grading (A)


Weight of Sample, grams
Original, g. Tested By :

Oven Dry, g. 3960.00 kgrms Computed By:

Wash Oven Dry, g. Checked By :

Sieve Weight Cum. Wt. Cum. %.


Opening Retained Passing Passing
20 " 500 mm. 195 3960.0 100
18 " 450 mm. 290.0 3670.0 92.7
16 " 400 mm. 210.0 3460.0 87.4
14 " 350 mm. 180.0 3280.0 82.8
12 " 300 mm. 220.0 3060.0 77.3 3 " Retained - 2179.1 Kg
10 " 250 mm. 170.0 2890.0 73.0 3 " Passing - 1780.9 Kg
8" 200 mm. 302.0 2588.0 65.4 Total Weight - 3960.0 Kg
6" 150 mm. 204.6 2383.4 60.2
5" 125 mm. 150.0 2233.4 56.4 % Retained on 3" - 55.0 %
4" 100 mm. 288.6 1944.8 49.1
3" 75 mm. 163.9 1780.9 45.0 % Passing on 3" - 45.0 %
2 1/2 " 63 mm.
2" 50 mm.
1 1/2 " 37.5 mm.
1" 25.4 mm.
3/4 " 19.0 mm.
1/2 " 12.5 mm.
3/8 " 9.5 mm.
# 4 4.75 mm
# 10 2.00mm
# 30 0.600mm
# 40 0.425mm
# 80 0.180mm
# 200 0.075mm
Pan 0.0
Wash 0.0
Total 3960.0
Remarks :

Prepared By: Checked By: Approved By:


KINGDOM OF SAUDI ARABIA ‫المملكة العربية السعودية‬
MINISTRY OF TRANSPORTATION ‫وزارة النقل‬
MATERIALS RESEARCH and ‫ادارة المواد والبحــوث‬
TESTING DEPARTMENT

Project : JEDDAH MAKKAH EXPRESS WAY PHASE II

Description: Rockfill

(Sampled By and Designation ) Mouaz Mohammed

Tested By : Mouaz mohammed

Computed By: Saleh Mhammed

Checked By : Hossam Eldeen

Contractor : M.A.AL.SWAILEM Co

Consultant : SETS CONSULTANT

Contractor ME HOSSAM ELDEEN

CONSULTANT / M.I ABDELLATEEF AL SADI

CONSULTANT / M.E NABIL ABDALLAH