RENCANA CAMPURAN BERASPAL

SPEC. GRADASI LASTON ACBC


MENGGUNAKAN ASPAL PEN 60
URAIAN SIEVE SIZE
Inch 1" 3/4" 1/2" 3/8" #4 #8 #16 #30 #50 #100 #200
mm 25.4 19.0 12.5 9.5 4.75 2.36 1.18 0.600 0.300 0.150 0.075

Spec. gradasi
Max 100 100 90.0 39.0 8.0
Min 100 90.0 23.0 4.0
Fuller 100 87.8 72.7 64.2 47.0 34.3 25.1 18.5 13.6 9.9 7.3
Daerah Larangan
Max 34.6 28.3 20.7 13.7
Min. 34.6 22.3 16.7 13.7

Gradasi AC BC Halus
Maks. 100.0 100.0 86.0 75.0 55.0 49.0 32.0 24.0 17.0 12.0 6.0
Min. 100.0 90.0 71.0 58.0 37.0 34.6 28.3 20.7 13.7 4.0 4.0
Gradasi Rencana 100.0 95.0 78.5 68.0 50.0 37.5 30.0 22.0 15.0 8.0 6.0
Persen berat lolos, %

100

90

80

70

60

50

40

30

20

10

0
0,075 0,3 0,6 1,18 2,36 4,75 9,5 12,5 19,0 25,4

Ukuran Saringan, mm

Titik Kontrol Daerah Larangan Daerah Larangan Grad. rencana


Titik Kontrol s1.5 s3/4 s1/2
s3/8 s4 s8 s16
s30 s50 s200 Fuller
GRADASI RENCANA CAMPURAN AC BC GRADASI HALUS (ASPAL PEN 60)

P e rs e n be ra t lolos , %
Diatas fuller
No. Saringan

% Lolos % Tertahan
(inc) (mm)
100
90
1" 25.4 100.0
80
3/4" 19 95.0 5.0
70
1/2" 12.5 78.5 16.5 60
3/8" 9.5 68.0 10.5 50 Titik Kontrol
Daerah
#4 4.75 50.0 18.0 40 Larangan
30 Daerah
#8 2.36 37.5 12.5 Larangan
20 Grad.
#16 1.18 30.0 7.5 rencana
10 Titik Kontrol
#30 0.6 22.0 8.0 s1.5
0
#50 0.3 15.0 7.0
Ukuran Saringan, mm
#100 0.15 8.0 7.0

#200 0.075 6.0 2.0

Pan 6.0

PB = 5.685

DAFTAR TIMBANGAN UNTUK MARSHALL AC BC GRADASI HALUS (ASPAL PEN 60)

Coba-coba

Kadar aspal 4.5 5.0 5.5 6.0 6.5 5.7

Total campuran 1217.0 1217.0 1217.0 1217.0 1217.0 1200.0


Berat aspal 54.8 60.9 66.9 73.0 79.1 68.2

Berat agregat 1162.2 1156.2 1150.1 1144.0 1137.9 1131.8

3/4" 5.0 58.1 57.8 57.5 57.2 56.9 56.6


1/2" 16.5 191.8 190.8 189.8 188.8 187.8 186.7

3/8" 10.5 122.0 121.4 120.8 120.1 119.5 118.8

#4 18.0 209.2 208.1 207.0 205.9 204.8 203.7

#8 12.5 145.3 144.5 143.8 143.0 142.2 141.5


#16 7.5 87.2 86.7 86.3 85.8 85.3 84.9

#30 8.0 93.0 92.5 92.0 91.5 91.0 90.5

#50 7.0 81.4 80.9 80.5 80.1 79.7 79.2


#100 7.0 81.4 80.9 80.5 80.1 79.7 79.2

#200 2.0 23.2 23.1 23.0 22.9 22.8 22.6

Pan 6.0 69.7 69.4 69.0 68.6 68.3 67.9

BERAT KOMULATIF

Kadar aspal 4.5 5.0 5.5 6.0 6.5 5.7

3/4" 58.1 57.8 57.5 57.2 56.9 56.6

1/2" 249.9 248.6 247.3 246.0 244.6 243.3

3/8" 371.9 370.0 368.0 366.1 364.1 362.2

#4 581.1 578.1 575.0 572.0 568.9 565.9

#8 726.4 722.6 718.8 715.0 711.2 707.4

#16 813.6 809.3 805.0 800.8 796.5 792.2

#30 906.5 901.8 897.1 892.3 887.6 882.8

#50 987.9 982.7 977.6 972.4 967.2 962.0

#100 1069.3 1063.7 1058.1 1052.5 1046.9 1041.2

#200 1092.5 1086.8 1081.1 1075.3 1069.6 1063.9

Pan 1162.2 1156.2 1150.1 1144.0 1137.9 1131.8


GRADASI RENCANA CAMPURAN AC BC GRADASI HALUS (ASPAL PEN 60)

P e rs e n be ra t lolos , %
Diatas fuller
No. Saringan

% Lolos % Tertahan
(inc) (mm)
100
90
1" 25.4 100.0
80
3/4" 19 95.0 5.0
70
1/2" 12.5 78.5 16.5 60
Titik Kontrol
3/8" 9.5 68.0 10.5 50 Daerah
Larangan
#4 4.75 50.0 18.0 40
Daerah
30 Larangan
#8 2.36 37.5 12.5 Grad.
20 rencana
#16 1.18 30.0 7.5 Titik Kontrol
10
s1.5
#30 0.6 22.0 8.0
0
#50 0.3 15.0 7.0
Ukuran Saringan, mm
#100 0.15 8.0 7.0

#200 0.075 6.0 2.0

Pan 6.0

PB = 5.685

DAFTAR TIMBANGAN UNTUK MARSHALL AC BC GRADASI HALUS (ASPAL PEN 60)

Mrshall WTM FATIQ

Kadar aspal 5.05 5.05 5.05

Total campuran 1217.0 10800.3 21600.5


Berat aspal 61.5 545.4 1090.8

Berat agregat 1155.5 10254.9 20509.7

3/4" 5.0 57.8 512.7 1025.5


1/2" 16.5 190.7 1692.1 3384.1

3/8" 10.5 121.3 1076.8 2153.5

#4 18.0 208.0 1845.9 3691.7

#8 12.5 144.4 1281.9 2563.7


#16 7.5 86.7 769.1 1538.2

#30 8.0 92.4 820.4 1640.8

#50 7.0 80.9 717.8 1435.7


#100 7.0 80.9 717.8 1435.7

#200 2.0 23.1 205.1 410.2

Pan 6.0 69.3 615.3 1230.6

BERAT KOMULATIF

Kadar aspal 5.05 5.05 5.05

3/4" 57.8 512.7 1025.5

1/2" 248.4 2204.8 4409.6

3/8" 369.8 3281.6 6563.1

#4 577.8 5127.4 10254.9

#8 722.2 6409.3 12818.6

#16 808.9 7178.4 14356.8

#30 901.3 7998.8 15997.6

#50 982.2 8716.6 17433.3

#100 1063.1 9434.5 18868.9

#200 1086.2 9639.6 19279.1

Pan 1155.5 10254.9 20509.7


No.Formulir 1

FORMULIR Terbitan/Revisi
Tanggal Revisi

UJI BERAT JENIS DAN PENYERAPAN AIR


LAB.PENGUJIAN BALAI
AGREGAT KASAR Halaman 1 dari 1
BAHAN & PERKERASAN JALAN

1. No. Order/Contoh :
2. Jenis Contoh Uji : Agregat > No.8
3. Jenis Pekerjaan :
4. Diterima tanggal :
5. Di uji tanggal : 04 / 04 / 2011
6. Metode uji : SNI 03-1969-2008
7. Hasil pengujian :

I II
No. Contoh
A 7 C D

Berat benda uji kering oven BK 3094.2 3097.9

Berat benda uji kering perm. Jenuh BJ 3134.7 3140.9

Berat benda uji didalam air BA 1976.7 1975.0

A B rata-rata C D rata-rata

BK
Berat jenis (Bulk) BJ - BA 2.672 2.657 2.665

BJ
Berat jenis kering perm. jenuh BJ - BA 2.707 2.694 2.700

BK
Berat jenis semu (Apparent) BK - BA 2.769 2.759 2.764

BJ - BK
Penyerapan (Absorption) x 100% 1.31 1.39 1.348
BK

Bandung, 06 April 2011

Dikerjakan oleh Teknisi : Aceng Diperiksa Penyelia : Ali Amal / Yusep Firdaus

Tanggal : 04 April 2011 Tanggal : 06 April 2011

Tanda Tangan : Tanda Tangan :


No.Formulir 1
FORMULIR Terbitan/Revisi
Tanggal Revisi

UJI BERAT JENIS DAN PENYERAPAN AIR


LAB.PENGUJIAN BALAI
AGREGAT HALUS Halaman 1 dari 1
BAHAN & PERKERASAN JALAN

1. No. Order/Contoh :
2. Jenis Contoh Uji : Agregat < No.8 - > No.200
3. Jenis Pekerjaan
4. Diterima tanggal :
5. Di uji tanggal : 04 / 04 / 2011
6. Metode uji : SNI 03-1970-2008
7. Hasil pengujian :

I II
No. Contoh
A B C D

Berat benda kering perm. Jenuh (SSD) 500 500.0 500.0

Berat benda uji kering oven BK 494.0 494.7

Berat piknometer diisi air (25oC) B 2083.0 2083.0

Berat pik + Benda uji (SSD) + air (25oC) Bt 2398.2 2397.3

A B rata-rata C D rata-rata

BK
Berat jenis (Bulk) B + 500 - Bt 2.673 2.664 2.669

500
Berat jenis kering perm. jenuh B + 500 - Bt 2.706 2.693 2.699

BK
Berat jenis semu (Apparent) B + BK - Bt 2.763 2.742 2.753

500 - BK
Penyerapan (Absorption) x 100% 1.215 1.071 1.143
BK

Bandung, 06 April 2011

Dikerjakan oleh Teknisi : Aceng Diperiksa Penyelia : Ali Amal / Yusep Firdaus

Tanggal : 04 April 2011 Tanggal : 06 April 2011

Tanda Tangan : Tanda Tangan :


No.Formulir : 3
FORMULIR Terbitan/Revisi :
Tanggal Revisi :

LAB.PENGUJIAN BALAI BAHAN &


PERKERASAN JALAN PENGUJIAN BERAT JENIS Halaman 1 dari 1

1. No. Order/Contoh :
2. Jenis Contoh Uji : Agregat < No. 200
3. Jenis Pekerjaan :
4. Diterima tanggal :
5. Di uji tanggal : 04 / 04 / 2011
6. Metode uji : SNI 1964 : 2008
7. Hasil pengujian :

Nomor contoh/kedalaman/Sta. Filler abu batu

Nomor piknometer B 6

Berat piknometer + contoh ( W2 ) 59.80 60.50

Berat piknometer ( W1 ) 50.72 42.75

Berat tanah ( Wt = W2 - W1 ) 9.08 17.75

Temperatur 25oC

Berat piknometer + air + tanah pada suhu 25oC ( W3 ) 151.80 154.68

Berat piknometer + air pada suhu 25oC ( W4 ) 146.05 143.46

W5 = W2 - W1 + W4 155.13 161.21

Isi tanah ( W5 - W3 ) 3.33 6.53

Berat Jenis (Wt / W5 - W3) 2.727 2.718

Berat Jenis rata-rata 2.722

Bandung, 06 April 2011

Dikerjakan oleh Teknisi : 04 April 2011 Diperiksa Penyelia : Ali Amal / Yusep Firdaus

Tanggal : Tanggal : 06 April 2011

Tanda Tangan : Tanda Tangan :


Berat jenis Bulk Ag. Hotbin Gabungan

Proporsi Bj. Bulk Bj. Bulk Bj. Bulk agregat


No. Agregat
agregat agregat agregat Gabungan

1 Agregat > No. 8 62.50% 2.665 23.46

2 Agregat < No. 8 - > No. 200 31.50% 2.669 11.80

3 Agregat > No.200 6.00% 2.722 2.20

100.00 37.46 2.669

Dikerjakan oleh : Aceng Bandung, 05 April 2011

Diperiksa : Ali Amal / Yusep F


No.Formulir 3

FORMULIR Terbitan/Revisi

Tanggal Revisi

PENGUJIAN BERAT JENIS


LAB.PENGUJIAN BALAI Halaman 1 dari 1
BAHAN & PERKERASAN JALAN MAKSIMUM CAMPURAN

1. No. Order/Contoh :
2. Jenis Contoh Uji : Campuran AC BC menggunakan aspal pen,60
3. Jenis Pekerjaan :
4. Diterima tanggal :
5. Di uji tanggal : 05 / 04 / 2011
6. Metode uji : SNI 03-6893-2002
7. Hasil pengujian :

Nomor contoh
No. Contoh

I II rata-rata

Berat fiqnometer + benda uji (gr) A 2413.8

Berat fiqnometer (gr) B 1218.0

Berat benda uji (gr) A-B=C 1195.8

Berat fiqnometer + air (gr) D 3696.1

Berat piqnometer + air + benda uji (gr) E 4411.4

Volume benda uji (cc) (C + D) - E = F 480.5

GMM C/F 2.489 2.489

Bandung, 07 April 20112010

Dikerjakan oleh Teknisi : Aceng Diperiksa Penyelia : Ali Amal / Yusep Firdaus

Tanggal : 05 April 2011 Tanggal : 07 April 2011

Tanda Tangan : Tanda Tangan :

UJI BJ. MAKSIMUM CAMPURAN BERASPAL /FT/5.4/1/Ag-05


Terbitan-4/Revisi-1, Tgl. 14/04/2008
No.Formulir 4

FORMULIR Terbitan/Revisi

Tanggal Revisi

UJI CAMPURAN
LAB.PENGUJIAN BALAI Halaman 1 dari 2
BAHAN & PERKERASAN JALAN DENGAN ALAT MARSHALL

1. No. Order/Contoh : 5. Di uji tanggal : 05 / 04 / 2011


2. Jenis Contoh Uji : Campuran AC BC menggunakan aspal pen,60 6. Metode uji : SNI 06-2489-1991
3. Jenis Pekerjaan : 7. Hasil pengujian :
4. Diterima tanggal :
Kal. Proving ring = 15.13

Kadar Aspal Berat Benda Uji Berat Jenis Rongga Rongga Rongga Satabilitas
Hasil Kadar Tebal
Kode Isi Benda Campuran Dalam Terhadap Terisi
Kepadatan Bacaan Kalibrasi Pelelehan Bagi Aspal Film
Briket thd Berat thd Berat Uji Maksimum Agregat Campuran Aspal Setelah
Kering SSD Dalam Air Pada Proving Marshall Effektif Aspal
Agregat Campuran (teoritis) (VMA) (VIM) (VFB) Dikoreksi
Alat Ring
% % gr gr gr cc gr/cc % % % kg mm kg/mm % mikron
r=c-
c=100/ i=100/((100- j=100-(h* k=100- l=100* (j-
a b d e f g=e-f h=d/g m n o=m*n p q=o/p ((x/100)* s
(100+b)*b c)/v+c/w) (100-c))/u) (100*(h/i) k)/j
(100-c))
1 4.5 1205.6 1207.6 694.3 513.3 2.349 2.526 15.97 7.02 56.01 92 1392.0 1392.0 2.54 548.0 3.94 6.69
2 4.5 1206.6 1209.5 696.3 513.2 2.351 2.526 15.88 6.93 56.37 88 1331.4 1331.4 4.32 308.3 3.94 6.69
4.5 1204.6 1209.6 699.1 510.5 2.360 2.526 15.58 6.59 57.68 84 1270.9 1270.9 4.06 312.7 3.94 6.69
4.5 2.353 2.526 15.81 6.85 56.69 1331.4 3.64 389.7 3.94 6.69
1 5.0 1204.7 1206.5 700.0 506.5 2.378 2.507 15.35 5.14 66.53 90 1361.7 1416.2 3.05 464.6 4.45 7.59
2 5.0 1206.0 1209.1 697.0 512.1 2.355 2.507 16.18 6.07 62.48 79 1195.3 1243.1 3.68 337.5 4.45 7.59
5.0 1205.3 1206.6 700.7 505.9 2.382 2.507 15.21 4.98 67.27 85 1286.1 1337.5 3.94 339.7 4.45 7.59
5.0 2.372 2.507 15.58 5.40 65.43 1332.2 3.56 380.6 4.45 7.59
1 5.5 1205.3 1206.5 703.7 502.8 2.397 2.489 15.13 3.68 75.71 96 1452.5 1510.6 3.43 440.5 4.95 8.49
2 5.5 1205.7 1206.6 703.1 503.5 2.395 2.489 15.22 3.78 75.18 95 1437.4 1494.8 3.56 420.4 4.95 8.49
5.5 1205.4 1206.8 704.6 502.2 2.400 2.489 15.02 3.55 76.35 97 1467.6 1526.3 3.94 387.7 4.95 8.49
5.5 2.397 2.489 15.13 3.67 75.75 1510.6 3.64 416.2 4.95 8.49
1 6.0 1203.3 1203.6 703.6 500.0 2.407 2.470 15.25 2.58 83.08 97 1467.6 1526.3 4.06 375.6 5.45 9.41
2 6.0 1206.0 1206.7 702.9 503.8 2.394 2.470 15.70 3.10 80.27 82 1240.7 1290.3 4.32 298.8 5.45 9.41
6.0 1205.5 1206.6 703.0 503.6 2.394 2.470 15.70 3.10 80.26 91 1376.8 1431.9 4.57 313.2 5.45 9.41
6.0 2.398 2.470 15.55 2.93 81.21 1416.2 4.32 329.2 5.45 9.41
1 6.5 1202.6 1203.0 700.7 502.3 2.394 2.452 16.13 2.37 85.32 100 1513.0 1573.5 4.19 375.5 5.96 10.33
2 6.5 1202.4 1202.6 700.3 502.3 2.394 2.452 16.15 2.38 85.24 77 1165.0 1211.6 4.70 257.8 5.96 10.33
6.5 1202.4 1202.5 700.3 502.2 2.394 2.452 16.13 2.36 85.34 87 1316.3 1369.0 4.50 304.5 5.96 10.33
6.5 2.394 2.452 16.14 2.37 85.30 1384.7 4.46 312.6 5.96 10.33

Gmm * :2.489 Ka Gmm : 5.5 Bj. agregat bulk : 2.669 Bj. agregat eff. : 2.710 Bj. aspal : 1.036 Abs. Aspal : 0.583
No.Formulir 7

FORMULIR Terbitan/Revisi

Tanggal Revisi

UJI CAMPURAN
LAB.PENGUJIAN BALAI Halaman 1 dari 1
BAHAN & PERKERASAN JALAN DENGAN ALAT PRD

1. No. Order/Contoh : 5. Di uji tanggal : 05 / 04 / 2011


2. Jenis Contoh Uji : Campuran AC BC menggunakan aspal pen,60 6. Metode uji : SNI 06-2489-1991
3. Jenis Pekerjaan : 7. Hasil pengujian :
4. Diterima tanggal :
Kal. Proving ring = 15.13
Kadar Aspal Berat Benda Uji Berat Jenis Rongga Rongga Rongga Satabilitas
Hasil Kadar Tebal
Kode Isi Benda Campuran Dalam Terhadap Terisi
Kepadatan Bacaan Kalibrasi Pelelehan Bagi Aspal Film
Briket thd Berat thd Berat Uji Maksimum Agregat Campuran Aspal Setelah
Kering SSD Dalam Air Pada Proving Marshall Effektif Aspal
Agregat Campuran (teoritis) (VMA) (VIM) (VFB) Dikoreksi
Alat Ring
% % gr gr gr cc gr/cc % % % kg mm kg/mm % mikron
r=c-
c=100/ i=100/((100- j=100-(h* k=100- l=100* (j-
a b d e f g=e-f h=d/g m n o=m*n p q=o/p ((x/100)* s
(100+b)*b c)/v+c/w) (100-c))/u) (100*(h/i) k)/j
(100-c))
1 5.0 2713.8 2718.2 1600.3 1117.9 2.428 2.507 13.60 3.18 76.63
5.0
1 5.5 2717.0 2717.7 1606.1 1111.6 2.444 2.489 13.47 1.79 86.74
5.5
1 6.0 2705.1 2705.5 1597.7 1107.8 2.442 2.470 14.01 1.15 91.78
6.5

Gmm * :2.489 Ka Gmm : 5.5 Bj. agregat bulk : 2.669 Bj. agregat eff. : 2.710 Bj. aspal : 1.036 Abs. Aspal : 0.583
Keterangan : f = isi (d-e) i = % rongga thd. agregat 100-(g*(100-b))/bj.bulk) o = kelelehan (mm)
a = % aspal terhadap agregat +
g = berat isi (c/f) j = % rongga thd. campuran 100-(100x(g/h) p = Hasil bagi Marshall
b = % aspal terhadap campuran h = berat jenis maksimum (teoritis) k = % rongga terisi aspal (100x(i-j))/i n / o (kg/mm)
c = berat kering (gr) l = pembacaan arloji stabilitas q = Kadar aspal eff. (%)
d = berat dalam keadaan jenuh (gr) 100 m = stabilitas (l x konversi) c-((Abs.aspal/100)*(100-c))
e = berat dalam air (gr) %agregat %aspal n = stabilitas (kg) r = Tebal film aspal (mikron)
BJ. agregat BJ. aspal m x koreksi benda uji 1000*(Pb-Pba)
SA*BJAspal*(100-Pb)

* Gmm : ditentukan dengan cara AASHTO T 209


pada kadar aspal optimum perkiraan (Pb) (100-Pb) *** Absorpsi aspal terhadap total agregat =
** BJ. Eff Agr =
Pb = 0,035(%CA)+0,045(%FA)+0,18(%FF)+K (100/Gmm)-(Pb/BJ.aspal) (BJ. Eff. agr - BJ. Bulk agr)
100 x x BJ. Aspal
K = 0,5-1 untuk Laston; 2-3 untuk Lataston (BJ. Eff. agr x BJ. Bulk agr)

Bandung, 07 April 2011

Dikerjakan oleh Teknisi : Aceng Diperiksa Penyelia : Ali Amal / Yusep Firdaus

Tanggal : 05 April 2011 Tanggal : 07 April 2011

Tanda Tangan : Tanda Tangan :


No.Formulir 5
FORMULIR Terbitan/Revisi
Tanggal Revisi
GRAFIK
LAB.PENGUJIAN BALAI Halaman 1 dari 1
BAHAN & PERKERASAN JALAN MARSHALL

1. No. Order/Contoh : 5. Di uji tanggal : 06 / 04 / 2011


2. Jenis Contoh Uji : Campuran AC BC menggunakan aspal pen,60 6. Metode uji : SNI 06-2489-1991
3. Jenis Pekerjaan : 7. Hasil pengujian :
4. Diterima tanggal :
Kepadatan, gr/cc

19
2.44 18

VMA, %
2.42
17
2.40
16
2.38 f(x) = − 0.0200731 x² + 0.24238253 x f(x) = 0.7180223 x² − 7.7720846 x + 36.307236
15
2.36 + 1.6670736
14
2.34
13
2.32

2.30 12
4.00 4.50 5.00 Kadar aspal,
5.50 % 6.00 6.50 7.00 4.00 4.50 5.00 Kadar 5.50
aspal, % 6.00 6.50 7.00

100 8

90 7
VFB, %

VIM, %
80 f(x)
6 = 0.7948592 x² − 11.027782 x + 40.452849
f(x) = − 4.0418671 x² + 59.061587 x − 127.67832 5
70
4
60
3
50 f(x)
2 = 24653.5557733604 x^-5.57404049461363
40 1
30 0
4.00 4.50 5.00 Kadar5.50
aspal, % 6.00 6.50 7.00 4.00 4.50 5.00 Kadar aspal,
5.50 % 6.00 6.50 7.00
Kelelehan, mm
Stabilitas, kg

2000 6.0
1800 5.5

1600 5.0
4.5
1400
f(x) = − 96.3708952 x² + 1098.1671 x f(x)
4.0 = 0.2999619 x² − 2.8186743 x + 10.202333
1200
− 1681.48768 3.5
1000
3.0
800 2.5
600 2.0
4.00 4.50 5.00 Kadar aspal,
5.50 % 6.00 6.50 7.00 4.00 4.50 5.00 Kadar aspal,
5.50 % 6.00 6.50 7.00
M ar s ha al quo tie nt, k g /m m

T ebal film as pal, m ik r on

800 12
700 11
600 10
500
f(x)
9
= 0.0192281 x² + 1.6054942 x − 0.9197785
400 8
f(x)
300 = − 39.318849 x² + 391.38218 x − 577.88671 7
200 6
100 5
0 4
4.00 4.50 5.00 Kadar aspal,
5.50 % 6.00 6.50 7.00
4.00 4.50 5.00 5.50
Kadar aspal, % 6.00 6.50 7.00

Kepadatan KAO 5.05 %


Stabilitas Kepadatan 2.353 t/m3
VMA VFB 67.50 %
VFB VIMmarshall 5.03 %
VIM 2x75 VMA 15.4 %
VIM PRD VIMprd 3.0 %
Kelelehan Stabilitas 1407 kg
MQ
Kelelehan 3.62 mm
MQ 396 kg/mm
4.50 5.00 Kadar5.50
aspal, % 6.00 6.50 85.8 %
Stab. sisa
Tebal film 7.7 mic

Bandung, 08 April 2011

Dikerjakan oleh Teknisi : Aceng Diperiksa Penyelia : Ali Amal / Yusep Firdaus

Tanggal : 06 April 2011 Tanggal : 08 April 2011

Tanda Tangan : Tanda Tangan :


No.Formulir 6

FORMULIR Terbitan/Revisi
Tanggal Revisi
UJI CAMPURAN
LAB.PENGUJIAN BALAI Halaman 1 dari 2
BAHAN & PERKERASAN JALAN DENGAN ALAT MARSHALL

1. No. Order/Contoh : 5. Di uji tanggal :


2. Jenis Contoh Uji : Campuran AC BC menggunakan aspal pen,60 6. Metode uji : SNI 06-2489-1991
3. Jenis Pekerjaan : 7. Hasil pengujian :
4. Diterima tanggal :
Kal. Proving ring = 15.13
Kadar Aspal Berat Benda Uji Berat Jenis Rongga Rongga Rongga Satabilitas
Hasil Kadar Tebal
Kode Isi Benda Campuran Dalam Terhadap Terisi
Kepadatan Bacaan Kalibrasi Pelelehan Bagi Aspal Film
Briket thd Berat thd Berat Uji Maksimum Agregat Campuran Aspal Setelah
Kering SSD Dalam Air Pada Proving Marshall Effektif Aspal
Agregat Campuran (teoritis) (VMA) (VIM) (VFB) Dikoreksi
Alat Ring
% % gr gr gr cc gr/cc % % % kg mm kg/mm % mikron

r=c-
c=100/ i=100/((100- j=100-(h* k=100- l=100* (j-
a b d e f g=e-f h=d/g m n o=m*n p q=o/p ((x/100)* s
(100+b)*b c)/v+c/w) (100-c))/u) (100*(h/i) k)/j
(100-c))

Setelah direndam selama 1 x 30 menit pada suhu 60oC


1 5.05 1202.9 1204.6 701.9 502.7 2.393 2.505 14.88 4.49 69.82 98 1482.7 1542.0 4.32 357.1 4.50 7.71
2 5.05 1202.6 1204.4 701.4 503.0 2.391 2.505 14.95 4.57 69.42 94 1422.2 1479.1 3.05 485.3 4.50 7.71
3 5.05 1200.6 1202.4 699.7 502.7 2.388 2.505 15.04 4.67 68.93 90 1361.7 1416.2 3.81 371.7 4.50 7.71
5.05 2.391 2.505 14.96 4.58 69.39 1479.1 3.73 404.7 4.50 7.71

Setelah direndam selama 1 x 24 menit pada suhu 60oC 85.802


1 5.05 1204.0 1205.4 698.0 507.4 2.373 2.505 15.59 5.29 66.08 82 1240.7 1290.3 4.06 317.5 4.50 7.71
2 5.05 1204.4 1206.3 698.2 508.1 2.370 2.505 15.68 5.39 65.64 79 1195.3 1195.3 4.32 276.8 4.50 7.71
3 5.05 1204.9 1206.4 701.2 505.2 2.385 2.505 15.16 4.81 68.30 84 1270.9 1321.8 4.32 306.1 4.50 7.71
5.05 2.376 2.505 15.48 5.16 66.67 1269.1 4.23 300.1 4.50 7.71
Gmm * :2.489 Ka Gmm : 5.500 Bj. agregat bulk : + 2.669 Bj. agregat eff. : 2.710 Bj. aspal : 1.036 Abs. Aspal : 0.583
Keterangan : f = isi (d-e) i = % rongga thd. agregat 100-(g*(100-b))/bj.bulk) o = kelelehan (mm)
a = % aspal terhadap agregat g = berat isi (c/f) j = % rongga thd. campuran 100-(100x(g/h) p = Hasil bagi Marshall
b = % aspal terhadap campuran h = berat jenis maksimum (teoritis) k = % rongga terisi aspal (100x(i-j))/i n / o (kg/mm)
c = berat kering (gr) l = pembacaan arloji stabilitas q = Kadar aspal eff. (%)
d = berat dalam keadaan jenuh (gr) 100 m = stabilitas (l x konversi) c-((Abs.aspal/100)*(100-c))
e = berat dalam air (gr) %agregat %aspal n = stabilitas (kg) r = Tebal film aspal (mikron)
BJ. agregat BJ. aspal m x koreksi benda uji 1000*(Pb-Pba)
SA*BJAspal*(100-Pb)
* Gmm : ditentukan dengan cara AASHTO T 209
pada kadar aspal optimum perkiraan (Pb) (100-Pb) *** Absorpsi aspal terhadap total agregat =
Pb = 0,035(%CA)+0,045(%FA)+0,18(%FF)+K ** BJ. Eff Agr = (100/Gmm)-(Pb/BJ.aspal) (BJ. Eff. agr - BJ. Bulk agr)
100 x x BJ. Aspal
K = 0,5-1 untuk Laston; 2-3 untuk Lataston (BJ. Eff. agr x BJ. Bulk agr)

Bandung, 15 April ..2011

Dikerjakan oleh Teknisi : Aceng Diperiksa Penyelia : Ali Amal / Yusep Firdaus

Tanggal : 13 April 2011 Tanggal : 15 April 2011

Tanda Tangan : Tanda Tangan :