STRABAG DETERMINATION OF PARTICLE CONSULTANT :

STRABAG OMAN L.L.C. SIZE DISTRIBUTION CONSULTING ENGINEERING SERVICES


MATERIALS LABORATORY OMAN L.L.C.
PROJECT : MOD/2004/031 -MUSANA AIRBASE - PHASE II(A) - MA 3391
DESCRIPTION OF MATERIAL : GRANULAR SUB - BASE CLASS "A"
SAMPLE LOCATION : SAMPLE TAKEN FROM STOCK PILE (S-1)
LOCATION : NEAR CRUSHER PLANT

Weight of sample before washing (g) : 9025.00 Date of Sampling : 02 -02 -08
Weight of sample after washing (g) : 8812.00 Date of Testing : 02 -02 -08

Sieve sizeWeight retained Percentage Cumulitive Percentage Subbase Class A Remarks


retained retained passing Limits
(mm) (g) (%) (%) (%) Lower Upper

63 0.00 0 0 100 100


50 252.00 2.8 2.8 97.2 90 100
4.75 4532.00 50.2 53.0 47.0 35 70
0.075 4017.00 44.5 97.5 2.5 0 10
Pan 4.00

Total 9025.00

Upper Limit GCA Lower Limit


% of passing

100
90
80
70
60
50
40
30
20
10
0 Sieve Size in Log-scale
0.01 0.1 1 10 100

Date : Contractor : Consultant :


STRABAG DETERMINATION OF PARTICLE CONSULTANT :
STRABAG OMAN L.L.C. SIZE DISTRIBUTION CONSULTING ENGINEERING SERVICES
MATERIALS LABORATORY OMAN L.L.C.
PROJECT : MOD/2004/031 -MUSANA AIRBASE - PHASE II(A) - MA 3391
DESCRIPTION OF MATERIAL : Graded Crushed Aggregates
SAMPLE LOCATION : Sample taken from stock-pile (11+000 of FCC)
LOCATION : NEAR CRUSHER PLANT

Weight of sample before washing (g) : 12202.00 Date of Sampling : 02 -02 -08
Weight of sample after washing (g) : 11419.00 Date of Testing : 02 -02 -08

Sieve sizeWeight retained Percentage Cumulitive Percentage Subbase Class A Remarks


retained retained passing Limits
(mm) (g) (%) (%) (%) Lower Upper

37.5 0.0 0 0 100 100


25.0 1683.0 13.8 13.8 86.2 60 100
12.5 3812.0 31.2 45.0 55.0 30 65
4.75 2982.0 24.4 69.5 30.5 20 50
2.00 1191.0 9.8 79.2 20.8 15 40
0.425 887.0 7.3 86.5 13.5 5 25
0.075 841.0 6.9 93.4 6.6 0 8
Pan 20.0

Total 12202.00

Upper Limit GCA Lower Limit


% of passing

100
90
80
70
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Sieve Size in Log-scale

Date : Contractor : Consultant :


STRABAG DETERMINATION OF PARTICLE CONSULTANT :
STRABAG OMAN L.L.C. SIZE DISTRIBUTION CONSULTING ENGINEERING SERVICES
MATERIALS LABORATORY OMAN L.L.C.
PROJECT : MOD/2004/031 -MUSANA AIRBASE - PHASE II(A) - MA 3391
DESCRIPTION OF MATERIAL : Backfill Material
SAMPLE LOCATION : Sample taken from New Crusher (11+ 500 of FCC)
LOCATION : NEAR CRUSHER PLANT

Weight of sample before washing (g) : 3388.00 Date of Sampling : 15 -06 -08
Weight of sample after washing (g) : 3163.00 Date of Testing : 15 -06 -08

Sieve sizeWeight retained Percentage Cumulitive Percentage Subbase Class A Remarks


retained retained passing Limits
(mm) (g) (%) (%) (%) Lower Upper

40.0 0.0 0.0 0.0 100.0 100


4.75 1848.0 54.5 54.5 45.5 40 85
2.00 367.0 10.8 65.4 34.6 20 80
0.425 387.0 11.4 76.8 23.2 10 60
0.075 555.0 16.4 93.2 6.8 5 25
Pan 5.0

Total 3388.00

Upper Limit GCA Lower Limit


% of passing

100
90
80
70
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Sieve Size in Log-scale

Date : Contractor : Consultant :


STRABAG DETERMINATION OF PARTICLE CONSULTANT :
STRABAG OMAN L.L.C. SIZE DISTRIBUTION CONSULTING ENGINEERING SERVICES
MATERIALS LABORATORY OMAN L.L.C.
PROJECT : MOD/2004/031 -MUSANA AIRBASE - PHASE II(A) - MA 3391
DESCRIPTION OF MATERIAL : Gradation of Aggregates of Size 25-40 mm
SAMPLE LOCATION : Sample taken from New Crusher (11+500 of FCC)
LOCATION : NEAR CRUSHER PLANT

Weight of sample before washing (g) : 6696.00 Date of Sampling : 15 -06 -08
Weight of sample after washing (g) : Date of Testing : 15 -06 -08

Sieve sizeWeight retained Percentage Cumulitive Percentage Subbase Class A Remarks


retained retained passing Limits
(mm) (g) (%) (%) (%) Lower Upper
50 0 0 0 100
37.5 656 9.8 9.8 90.2
25 4528 67.6 77.4 22.6
20.0 1394.0 20.8 98.2 1.8
19.0 0.0 0.0 98.2 1.8
14.0 52.0 0.8 99.0 1.0
12.50 14.0 0.2 99.2 0.8
10.00 6.0 0.1 99.3 0.7
9.500 6.0 0.1 99.4 0.6
5.000 15.0 0.2 99.6 0.4
Pan 20.0

Total 6696.00
% of passing

100
90
80
70
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Sieve Size in Log-scale

Date : Contractor : Consultant :


STRABAG DETERMINATION OF PARTICLE CONSULTANT :
STRABAG OMAN L.L.C. SIZE DISTRIBUTION CONSULTING ENGINEERING SERVICES
MATERIALS LABORATORY OMAN L.L.C.
PROJECT : MOD/2004/031 -MUSANA AIRBASE - PHASE II(A) - MA 3391
DESCRIPTION OF MATERIAL : Gradation of Aggregates of Size 12-25 mm
SAMPLE LOCATION : Sample taken from New Crusher (11+500 of FCC)
LOCATION : NEAR CRUSHER PLANT

Weight of sample before washing (g) : 4965.00 Date of Sampling : 15 -06 -08
Weight of sample after washing (g) : Date of Testing : 15 -06 -08

Sieve sizeWeight retained Percentage Cumulitive Percentage Subbase Class A Remarks


retained retained passing Limits
(mm) (g) (%) (%) (%) Lower Upper

25.0 0 0.0 0.0 100.0


20.0 1092.0 22.0 22.0 78.0
19.0 291.0 5.9 27.9 72.1
14.0 1643.0 33.1 60.9 39.1
12.50 562.0 11.3 72.3 27.7
10.0 970.0 19.5 91.8 8.2
9.50 188.0 3.8 95.6 4.4
5.0 200.0 4.0 99.6 0.4
Pan 15.0

Total 4965.00
% of passing

100
90
80
70
60
50
40
30
20
10
0
1.00 10.00 100.00
Sieve Size in Log-scale

Date : Contractor : Consultant :


STRABAG DETERMINATION OF PARTICLE CONSULTANT :
STRABAG OMAN L.L.C. SIZE DISTRIBUTION CONSULTING ENGINEERING SERVICES
MATERIALS LABORATORY OMAN L.L.C.
PROJECT : MOD/2004/031 -MUSANA AIRBASE - PHASE II(A) - MA 3391
DESCRIPTION OF MATERIAL : Gradation of Aggregates of Size 4-12 mm
SAMPLE LOCATION : Sample taken from New Crusher (11+500 of FCC)
LOCATION : NEAR CRUSHER PLANT

Weight of sample before washing (g) : 2626.00 Date of Sampling : 02 -02 -08
Weight of sample after washing (g) : Date of Testing : 02 -02 -08

Sieve sizeWeight retained Percentage Cumulitive Percentage Subbase Class A Remarks


retained retained passing Limits
(mm) (g) (%) (%) (%) Lower Upper

12.5 8.0 0.3 0.3 99.7


10.0 72.0 2.7 3.0 97.0
9.50 147.0 5.6 8.6 91.4
5.00 2063.0 78.6 87.2 12.8
4.750 70.0 2.7 89.9 10.1
2.360 262.0 10.0 99.8 0.2
Pan 2.0

Total 2626.00
% of passing

100 GCA

90
% of passing

GC
A
80
100
70
90
60
80
70
50
60
40
50
30
40
30
20
20
10
10
0
1.00 10.00 100.00
Sieve Size in Log-scale

Date : Contractor : Consultant :


STRABAG DETERMINATION OF PARTICLE CONSULTANT :
STRABAG OMAN L.L.C. SIZE DISTRIBUTION CONSULTING ENGINEERING SERVICES
MATERIALS LABORATORY OMAN L.L.C.
PROJECT : MOD/2004/031 -MUSANA AIRBASE - PHASE II(A) - MA 3391
DESCRIPTION OF MATERIAL : Gradation of Aggregates of Size 0-4 mm
SAMPLE LOCATION : Sample taken from New Crusher (11+500 of FCC)
LOCATION : NEAR CRUSHER PLANT

Weight of sample before washing (g) : 1489.00 Date of Sampling : 02 -02 -08
Weight of sample after washing (g) : Date of Testing : 02 -02 -08

Sieve sizeWeight retained Percentage Cumulitive Percentage Subbase Class A Remarks


retained retained passing Limits
(mm) (g) (%) (%) (%) Lower Upper

5.0 3 0.2 0.2 99.8


4.75 0 0.0 0.2 99.8
2.36 463.0 31.1 31.3 68.7
2.00 111.0 7.5 38.8 61.2
1.18 269.0 18.1 56.8 43.2
0.60 213.0 14.3 71.1 28.9
0.30 155.0 10.4 81.5 18.5
0.150 102.0 6.9 88.4 11.6
0.075 65.0 4.4 92.7 7.3
Pan 2.0

Total 1489.00
% of passing

100
90
80
70
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Sieve Size in Log-scale

Date : Contractor : Consultant :


STRABAG DETERMINATION OF CONSULTANT :
STRABAG OMAN L.L.C. COMPACTION CONSULTING ENGINEERING SERVICES
MATERIALS LABORATORY ( PROCTOR TEST ) OMAN L.L.C.
PROJECT : MOD/2004/031 -MUSANA AIRBASE - PHASE II(A) - MA 3391
DESCRIPTION OF MATERIAL : Sub - Base (Mixture of Boulder + Gravel And Sand )
SAMPLE LOCATION : Km 14+200 Sub Base Sample Taken From Mobile Plant S - 3 Date of Sampling : 09 -06 -08
Date of Testing : 09 -06 -08
Test acc. Standard :AASHTO T 180
Test No. 1 2 3 4 5
Number of blows ( standard / modified) 56 56 56 56 56
Weight of weight soi W2 g 7561 7710 7799 7787
Weight of mould W1 g 2595 2595 2595 2595

Weight weight soil W3 g W2-W1 4966 5115 5204 5192


Volume of mould V cm³ V 2118 2118 2118 2118
Weight density of soi Wd g/cm³ W3/V 2.345 2.415 2.457 2.451
Moisture content mc % m 3.5 4.6 5.5 6.5
Dry density of soil DD g/cm³ 100Wd/(100+mc) 2.265 2.309 2.329 2.302

MDD/OMC DETERMINATION
Dry Density(gm/cc)

2.35

2.325

2.3

2.275

2.25
3 3.5 4 4.5 5 5.5 6 6.5 7
Moisture Content (%)

Soil ClassificationA - 1-a Moisture ( MDD OMC LL PL PI Ic


Group index acc. (O) ( % ) g/cm³ % % % %
2.329 5.45

Date : Contractor : Consultant :


Sampling : 09 -06 -08
Testing : 09 -06 -08

6
56

6.5 7
STRABAG DETERMINATION OFCONSULTANT :
STRABAG OMAN L.L.C. CBR VALUE CONSULTING ENGINEERING SERVICES
MATERIALS LABORATORY OMAN L.L.C.
PROJECT : MOD/2004/031 -MUSANA AIRBASE - PHASE II(A) - MA 3391
DESCRIPTION OF MATERIAL : Subgrade (Mixture of Boulder , Gravel + Sand )
SAMPLE LOCATION : CH 5+180 TO 5+300 Runway (Subgrade) 1st layer
LOCATION : Runway Date of Sampling : 15 -06 -08
Date of Testing : 15 -06 -08
Test acc. Standard : AASHTO T 198 / ASTM D 1883
Number of mould 5 Swell data-specimen height =116.43mm
Hours
Number of blows 56 Date elapsed Gauge readSwell (mm) Swell (%)
Weight of weight soil W2 g 11032.0 5/18/2008 0 0.0 0.0
Weight of mould W1 g 5737 5/19/2008 24 0.0 0.0
Weight weight soil W3 g W2-W1 5295 5/20/2008 48 0.0 0.0
Volume of mould V cm³ V 2118 5/21/2008 72 0.0 0.0
Weight density of soi Wd g/cm³ W3/V 2.500 5/22/2008 96 0.0 0.0
Moisture content mc % m 6.2
Dry density of soil DD g/cm³100Wd/(100+mc) 2.354
Max. dry density(proc MDD g/cm³ 2.354
Relative Compaction % of MDD % 100.0

CBR Penetration/force data - gauge factor =0.0463 KN/Div


Penetration
Standard load Gauge reading 56 blows
mm KN mm gauge div. force KN mm gauge div. force KN Moisture ( %
MDD g/cm³ 2.345
OMC % 6.2
15.0 LL % NP
12.5 PI NP
7.500 7.500 0 0
6.350 6.350 395 18.3
5.000 20.02 5.000 285 13.2
3.750 3.750 171 7.9
2.500 13.34 2.500 69 3.2
1.875 1.875 41 1.9
1.250 1.250 22 1
0.625 0.625 9 0.4
CBR at 2. % 24
CBR at 5. % 66

Remarks

Date : Contractor : Consultant :


STRABAG
DETERMINATION OF CONSULTANT :
STRABAG OMAN L.L.C. CBR VALUE CONSULTING ENGINEERING SERVICES
MATERIALS LABORATORY OMAN L.L.C.
PROJECT : MOD/2004/031 -MUSANA AIRBASE - PHASE II(A) - MA 3391
DESCRIPTION OF MATERIAL : Sub Grade ( Mixure of Boulder,Gravel & Sand )
SAMPLE LOCATION : ch: 5+180 to 5+300 Runway (Subgrade)
LOCATION : Runway Date of Sampling : 15 -06 -08
Test acc.Standard : AASHTO T 198 / ASTM D 1883 Date of Testing : 15 -06 -08
CBR penetration / force data diagram
Gauge reading 56 blows

mm Div. Force (KN)

15.000
12.500
7.500 0
6.350 395 18.3
CBR PENETRATION
5.000 285 13.2
40
3.750 171 7.9

38
2.500 69 3.2

36
1.875 41 1.9
1.250 22 1
34

0.625 9 0.4
Force on plunger (KN)

32

30 CBR at 2. % 24
28
CBR at 5. % 66
26

Gauge reading 56 blows


24
mm Div. Force (KN)
22

20
15.000
18
12.500
16 7.500 0 0.0
14 6.350 0 0.0
12 5.000 0 0.0
10 3.750 0 0.0
8 2.500 0 0.0
6 1.875 0 0.0
4
1.250 0 0.0
2
0.625 0 0.0
0

0 1 2 3 4 5 6 7 8 9 10
CBR at 2. %
Penetration in mm
CBR at 5. %

Remarks :

Date : Contractor : Consultant :


Contractor- Lotus Construction DETERMINATION OF FIELD
and Real Estate Investment DENSITY (BY Sand
Replacement) CONSULTANT : CES
LLC

CLIENT : Ministry of Regional Muncipalties and Water Resoures

PROJECT : Construction of Protection of Costal Erosion At Widam Al Sahil in Wilayyat Mussanah

Description Of Material : Exsixting Material Location:0+100 to 0+240(Road Area) top Layer sub Grade

Determination of Field Density


Tickness Of Layer - - 15 CM 15 CM 15 CM 15 CM
CHAINAGE 0+120 0+180 0+225
Test No. - - 32 33 34
Sand Density Cone No
Weight of Soil + Container W1 g 9,022 8,515 8,863
Weight of Container W2 g 0.0 0.0 0.0
Weight of Wet Soil - ( W ) W1-W2 g 9,022 8,515 8,863
Weight of Sand before pouring W3 g 8,530 7,820 8,154
Weight of Sand after pouring W4 g 2,009 1,580 1,730
Weight of Sand in hole and cone W3-W4 g 6,528 6,240 6,424
Weight of sand in cone - g 1,470 1,470 1,470
Weight of sand in hole W5 cm3 5,058 4,770 4,954
Density of Sand - (Y) Y cm3 1.314 1.314 1.314
Volume of Excavated Soil - (V) W5/Y cm3 3,849 3,630 3,770
Wet Density of Excavated Soil W/V g/cm3 2.343 2.345 2.350
Moisture Content - % 3.0 3.0 3.0
Dry Density of Soil - g/cm3 2.275 2.272 2.280
MDD of Soil - g/cm3 2.270 2.270 2.270
Degree of Compaction - % 100.2 100.1 100.4
Determination of Moisture Content
Container No. - -
Weight of Wet Soil + Container W2 - 980.0 785.0 980.0
Weight of Dry Soil + Container W3 - 955.0 765.0 955.0
Weight of Container W1 - 104.0 104.0 104.0
Weight of Dry Soil -( W4 ) W3-W1 - 25.000 20.0 25.000
Weight of Moisture -( W5 ) W2-W3 - 851.0 661.0 851.0
Moisture Content 100x(W5/W4) - 3.0 3.0 3.0
Date of Testing Tested By. Consultant: