Professional Documents
Culture Documents
Total #REF!
Gymsum false ceiling
Plaster Type 1 (dash and base coats) Floor No. Area (m2)
Walls over false ceiling with waterproofing G. floor 45.53
Floor No. Area (m2) 1st floor 69.91
Total Err:509
Total Err:509
Total Err:509
G. floor 33.44
Total 118.01
Total 118.01
Total 329.13
Cadmus - Duhok : Schedule of Toilets
GF
Block B
WC3 Multipurpose Toilet 4.9 4.9 4.9 4.9
WC4 First Aid's Toilet 5.18 5.18 5.18 5.18
WC5 Cleaners Toilets 2.92 2.92 2.92 2.92
WC6 Cleaners Toilets 3.02 3.02 3.02 3.02
GF
Block B JANITOR 1.73 1.73 1.73
KITCHEN 77.1 77.1 77.1
KG KITCHEN 5.74 5.74 5.74
Generator room 82.15
elece. Room 33.9
mechanical room 95.07
33.44 118.01 118.01 329.13