Concrete Footings
Height(m) Width(m) Length(m) No. of Footings Volume in m³
0.11 1.5 1.5 10 2.475
Concrete Slabs
NUMBER OF CHB
r)
Floor Length(mHeight(m
Volume in m³ 1st Floor Wall 80 4
3.125 2nd Floor Wall 78 4
1st Floor
17 1
Window and Doors
Volume in m³ 2nd Floor
15 1
2.475 Window and Doors
QUANTITY
1st Floor Total CHB 3787.5
Cement(bags) Sand(m³) Gravel(m³)
2nd Floor Total CHB 3712.5
51 2.8 5.6
40 2.8 5.6 TOTAL WALL VOLUM
No. of Floor Thickness(m)
1st Floor 0.0125
2nd Floor 0.0125
Volume in (m³)
CLASS B MIXTURE
10.56
Cement(bags) Sand(m³)
10.56
40kg 12 1
QUANTITY 50kg 9.5 1
Cement(bags) Sand(m³) Gravel(m³)
191 10.56 21.12 HOLLOW CELL (MORTAR)
148 10.56 21.12 Hollow Cell
No. of Floor Height(m)
Dimension(m)
1st Floor 4 0.05
2nd Floor 4 0.05
CLASS B MIXTURE
Cement(bags) Sand(m³)
er of CHB per floor = 3/0.2 = 15 layers 40kg 12 1
ll Height per floor = 4 m 50kg 9.5 1
Plaster (Masonry)
Given:
Plaster Thickness = 0.016 m
Wall Height per floor = 4 m
1st Floor Wall Total Length (Inside and Outside) =
2nd Floor Wall Total Length (Inside and Outside) =
MORTAR PLASTERIN
No. of Floor Total Wall Length(m)
1st Floor 80
2nd Floor 78
CLASS B MIXTURE
Cement(bags) Sand(m³)
40kg 12 1
50kg 9.5 1
INSTRUCTOR: ENGR. ANGELICA LOSARES
Score:
NUMBER OF CHB
CHB Length(m) CHB Height(m) No. of CHB
0.4 0.2 4000
0.4 0.2 3900
= 3788 CHB
= 3713 CHB
MORTAR PLASTERING
Wall
No. of
Height(Plaster Thickness(m) Volume(m³)
Side
m)
4 0.016 2 10.24
4 0.016 2 9.984