You are on page 1of 11

CENTER LINE METHOD PWD

S.No Discription No Length Breadth Depth/Height Quantity Explanatory


1 Earth Work in Foundation Excavation 1 30 25 9 6750 In Cu.ft (Soft Soil)
Under ground water tank 1 8 8 6 384
2 Concrete Work in Foundation 1 30 25 2 1500 In Cu.ft (PCC (1:4:8))
Concrete Work in UWT 1 8 8 1.5 96
Concrete work in Column C-1 1 1.5 0.75 75 84.38 Cu.ft
Concrete work in Column C-2 10 2 1 75 1500 Cu.ft
3 Steel in Foundation 0
0
0
3 Retaining wall in Basement 2 30 0.75 10 450 In Cu.ft (PCC (1:4:8))
1 25 0.75 10 187.5 In Cu.ft (PCC (1:4:8))
1 25 0.75 7 131.25 In Cu.ft (PCC (1:4:8))
768.75 In Cu.ft (PCC (1:4:8))
4

5 Brick Work In Super Structure 1 159.25 0.75 11 1313.81 (Cu.ft) First Class Brick
Deduction
Door Opening 2 3 0.75 7 31.5 (Cu.ft)
Window Opening 2 6 0.75 4.5 40.5 (Cu.ft)
Total Brick Quantity in Super Structure 1241.81 (Cu.ft)

6 Mortar Quantity for Brick Works (1:5)


Total Quantity of mortar for Brick work 372.543 (Cu.ft) 30% of total volume of brick work

7 R.C.C(1:2:4)Excluding Steel and Bending


Roof Slab 1 48.25 25 0.5 603.13 (Cu.ft) (1:2:4)

8 Plaster cement sand (1:6) inside 1 215.75 11 2373.25 (Sq.ft)


Deduction
Door Opening 4 3 7 84 (Sq.ft)
Window opening 4 6 4.5 108 (Sq.ft)
Total Plaster Area 2181.25 (Sq.ft)
Plaster Thickness 0.039 ft (12mm)
Total Quantity of Mortar 85.07 (Cu.ft)

9 Plaster cement sand (1:3)


Room 2 23 15 690 (Sq.ft)
Veranda 1 46.75 8.5 397.38 (Sq.ft)
Total Plaster Area for Ceiling 1087.38 (Sq.ft)
Plaster Thickness 0.039 ft (12mm)
Total Quantity of Mortar for Ceiling 42.41 (Cu.ft)
RATE ANALYSIS ESTIMATED COST FOR

S.No Discription Quantity


1 Earth Work in Foundation Excavation 6750
2 Under ground water tank 384
3 Concrete Work in Foundation
Cement 141
Fine Aggregate (Sand) 692.31
Coarse Aggregate (Crush) 1384.62
4 Concrete Work in UWT
Cement 9
Fine Aggregate (Sand) 44.31
Coarse Aggregate (Crush) 88.62

5 Concrete Work Retaining wall Basement


Cement 72
Fine Aggregate (Sand) 354.81
Coarse Aggregate (Crush) 709.62

3 Brick Work in foundation and Plint


Total Brick Quantity in Sub Structure 0

4 Damp Proof Course


Cement 0
Fine Aggregate (Sand) 0
Coarse Aggregate (Crush) 0

5 Brick Work In Super Structure 16764

6 Mortar Quantity for Brick Works (1:5)


Cement 66
Fine Aggregate (Sand) 403.59

7 R.C.C(1:2:4)Excluding Steel and Bending


Roof Slab
Cement 105
Fine Aggregate (Sand) 258.48
Coarse Aggregate (Crush) 516.97

8 Plaster cement sand (1:6) inside


Total Quantity of Mortar
Cement 13
Fine Aggregate (Sand) 94.79
9 Plaster cement sand (1:3)
Mortar Ceiling
Cement 6
Fine Aggregate (Sand) 47.26

10 Mild Steel 1% of Slab (Volume) in R.C.C 20.41

11 Labours for Earth Work


Beldars 2
Mazdoors 2

12 Concrete Work in Foundation


Beldar 5
Mazdoor 8
Bhishti 2
Mason 1

13 Brick Work in Sub Structure/ Super Structure


Mazdoor 75
Bhishti 8
Mason 42

14 RCC Work
Beldar 27
Mazdoor 27
Bhishti 12
Mason 5

15 Finishing/Plastering
Mason 102
Mazdoor 102
Bhishti 34

Total

Add 10% Contractor Profit


8% Water Charges
8% Electrification Charges
5% Contingencies

Grand Total
ATED COST FOR PROJECT
Unit Rate Per (Unit) Amount (Rupees)
Cu.ft 7 Cu.ft 47250
Cu.ft 7 Cu.ft 2688

No of Bags 1120 1 Bag 157920


Cu.ft 14 Cu.ft 9692.34
Cu.ft 18 Cu.ft 24923.16

No. of bags 1120 1 Bag 10080


Cu.ft Cu.ft 0
Cu.ft Cu.ft 0
0
0
No. of bags 1120 1 Bag 80640
Cu.ft Cu.ft 0
Cu.ft Cu.ft 0

No of Bricks 10 1 Brick 0

No of Bags 550 1 Bag 0


Cu.ft 14 Cu.ft 0
Cu.ft 18 Cu.ft 0

No of Bricks 10 1 Brick 167640

No of bags 550 1 Bag 36300


Cu.ft 14 Cu.ft 5650.26

No of Bags 550 1 Bag 57750


Cu.ft 14 Cu.ft 3618.72
Cu.ft 18 Cu.ft 9305.46

No of Bags 550 1 Bag 7150


Cu.ft 14 Cu.ft 1327.06
No of Bags 550 1 Bag 3300
Cu.ft 14 Cu.ft 661.64

Quintal 10700 Quintal 218387

No 1000 1 No 2000
No 1000 1 No 2000

No 1000 1 No 5000
No 1000 1 No 8000
No 1000 1 No 2000
No 1500 1 No 1500

No 1000 1 No 75000
No 1000 1 No 8000
No 1500 1 No 63000

No 1000 1 No 27000
No 1000 1 No 27000
No 1000 1 No 12000
No 1500 1 No 7500

No 1000 1 No 102000
No 1500 1 No 153000
No 1000 1 No 34000

1373284

137328
109863
109863
68664

1799002
Total wet volume of Concrete (1:4:8) in Foundation 1500 Cuft
Dry volume of concrete 2250 Cuft
Cement 173.08 Cuft
Sand 692.31 Cuft
Crush 1384.62 Cuft

Total wet volume of Concrete (1:4:8) in UWT 96 Cuft


Dry volume of concrete 144 Cuft
Cement 11.08 Cuft
Sand 44.31 Cuft
Crush 88.62 Cuft

Total wet volume of Concrete (1:4:8) of Retaining wall 768.75 Cuft


Dry volume of concrete 1153.125 Cuft
Cement 88.7 Cuft
Sand 354.81 Cuft
Crush 709.62 Cuft

Total wet volume of Concrete (1:4:8) of Column C-1 84.38 Cuft


Dry volume of concrete 126.57 Cuft
Cement 9.74 Cuft
Sand 38.94 Cuft
Crush 77.89 Cuft

Total wet volume of Concrete (1:4:8) of Column C-2 1500 Cuft


Dry volume of concrete 2250 Cuft
Cement 173.08 Cuft
Sand 692.31 Cuft
Crush 1384.62 Cuft

Brick Quantity in Foundation and Plinth 0 Cuft

Total wet volume of Concrete (1:2:4) in DPC 0 Cuft


Dry volume of concrete 0 Cuft
Cement 0 Cuft
Sand 0 Cuft
Crush 0 Cuft

Brick work in super structure 1241.81 Cuft

Total wet volume of Concrete (1:2:4) in Slab 603.13 Cuft


Dry volume of concrete 904.695 Cuft
Cement 129.24 Cuft
Sand 258.48 Cuft
Crush 516.97 Cuft

Total wet Volume of Mortar for Plaster (1:6) inside 85.07 Cuft
Dry volume of Mortar 110.591 Cuft
Cement 15.8 Cuft
Sand 94.79 Cuft

Total wet Volume of Mortar for Plaster (1:3) Ceiling 42.41 Cuft
Dry volume of Mortar 55.133 Cuft
Cement 7.88 Cuft
Sand 47.26 Cuft

Total wet Volume of Mortar for Brick work (1:5) 372.543 Cuft
Dry volume of Mortar 484.3059 Cuft
Cement 80.72 Cuft
Sand 403.59 Cuft

MILD STEEL 1% OF SLAB (VOLUME) IN R.C.C 7850 Kg/cum


490 Lb/cuft
Volume of Steel in Cum 0.17 Cum
Volume of Steel in Cuft 9.05 Cuft
Quantity of Steel in Pound 4434.5 Lb
Quantity of Steel in Kg 1334.5 Kg
Quantity of Steel in Quintal 13.345 Quintal

Labours for Earth Work


Quantity of work 398.92 Cuft
Beldar 2 No
Mazdoor 2 No

Concrete Work in Foundation (2 Beldar, 3 Mazdoor, 3/4 Bhishti, 1/4 Mason


Quantity of work 2250 Cuft
Beldar 45 No
Mazdoor 68 No
Bhishti 17 No
Mason 1 No

Brick work in Sub Structure / Super Structure


Quantity of work 1241.81 Cuft
Mazdoor 56 No
Bhishti 6 No
Mason 31 No
RCC work (3 Beldar, 3 Mazdoor, 1.33 Bhishti, 1/2 Maso
Quantity of work 904.695 Cuft
Beldar 27 No
Mazdoor 27 No
Bhishti 12 No
Mason 5 No

Finishing/Plastering (3 Mason, 3 Mazdoor, and 1 Bhishti can do 400 Sq


Quantity of work 2181.25 Sq.ft
Mason 65 No
Mazdoor 65 No
Bhishti 22 No
50% Increase the volume of concrete
141 bags 1cement bag 1.23 cuft (0.0347 cu.m)

50% Increase the volume of concrete


9 bags 1cement bag 1.23 cuft (0.0347 cu.m)

50% Increase the volume of concrete


72 bags 1cement bag 1.23 cuft (0.0347 cu.m)

50% Increase the volume of concrete


8 bags 1cement bag 1.23 cuft (0.0347 cu.m)

50% Increase the volume of concrete


141 bags 1cement bag 1.23 cuft (0.0347 cu.m)

0 Bricks 1350 No.s of Brick required for 100 Cuft

50% Increase the volume of concrete


0 bags

16764 Bricks

50% Increase the volume of concrete


105 bags

(30% Increase the volume of mortar


13 bags

(30% Increase the volume of mortar


6 bags

(30% Increase the volume of mortar


66 bags

Unit Weight of Steel in Kg/cum


Unit Weight of Steel in Lb/cuft

(1 Quintal equal to 100 Kg)

(5 Beldar and 4 Mazdoor can do 1000 Cuft Per day)

oor, 3/4 Bhishti, 1/4 Mason can do 100 Cuft Per day)

(4.5 Mazdoor, 0.5 Bhishti, 2.5 Mason can do 100 Cuft Per day)
or, 1.33 Bhishti, 1/2 Mason can do 100 Cuft Per day)

nd 1 Bhishti can do 400 Sq.ft 12 mm thick plaster per day

You might also like