CONCRETING WORK FIRST FLOOR

a. DETERMINING THE VOLUME OF A CONCRETE


FOOTING FORMULA: VOLUME = L * W * T
FOOTING 1 CLASS AA CONCRETE MIX
Enter length L(m) 1.55 M
Enter width W(m) 1.55 M
Enter thickness T(m) 0.25 M
TOTAL VOLUME OF CONCRETE: 0.660688 CU.M
Number of footing Units 4 Units
TOTAL VOLUME OF CONCRETE: 2.6427500 CU.M
# of Cement Bags 19.220 BAGS
# of Sand CU.M 52.615 BAGS
# of gravel CU.M 73.036 BAGS

WALL FOOTING FORMULA: VOLUME = L * W * T


FOOTING 1 CLASS AA CONCRETE MIX
Enter length L(m) 1.55 M
Enter width W(m) 1.55 M
Enter thickness T(m) 0.25 M
TOTAL VOLUME OF CONCRETE: 0.7 CU.M
# of Cement Bags 4.8 Bags
# of Sand CU.M 13.15 BAGS
# of graavel CU.M 18.26 BAGS

FLOOR SLAB FORMULA: VOLUME = L * W * T


SLAB 1 CLASS B CONCRETE MIX
Enter length L(m) 2.7 M
Enter width W(m) 2.7 M
Enter thickness T(m) 0.15 M
TOTAL VOLUME OF CONCRETE: 1.20285
# of Cement Bags 5.6605 BAGS
# of Sand Bags 25.8259 BAGS
# of gravel Bags 35.849647058824 BAGS

CONCRETE COLUMN COLUMN 1 Width 1 0.3 M


Width 2 0.3 M
FORMULA: VOLUME = H*W1*W2
CLASS B CONCRETE MIX
Enter height L(m) 3.05 M
VOLUME OF CONCRETE FOR EACH COLUMN 0.2745 CU.M
Number of column Units 8 Units
TOTAL VOLUME OF CONCRETE: 2.4156 CU.M
# of Cement Bags 11.367529411765 BAGS
# of Sand Bags 51.864352941177 BAGS
# of gravel Bags 71.994352941177 BAGS

CONCRETE BEAM FORMULA: VOLUME = L * W * T


1st Floor TB1a CLASS B CONCRETE MIX
Length L(m) 2.55 M
Enter width W(m) 0.3 M
Enter depth T(m) 0.4 M
TOTAL VOLUME OF CONCRETE: 0.3366
# of Cement Bags 1.584 BAGS
# of sand Bags 7.227 BAGS
# of gravel Bags 10.032 BAGS

CONCRETE STAIRS
FORMULA: VOLUME = L * W * T FORMULA: VOLUME = L * W * T
FOOTING 2 CLASS AA CONCRETE MIX FOOTING 3 CLASS AA CONCRETE MIX
Enter length L(m) 1.9 M Enter length L(m)
Enter width W(m) 1.9 M Enter width W(m)
Enter thickness T(m) 0.25 M Enter thickness T(m)
TOTAL VOLUME OF CONCRETE: 0.99 CU.M TOTAL VOLUME OF CONCRETE:
Number of footing Units 6 Units Number of footing Units
TOTAL VOLUME OF CONCRETE: 5.96 CU.M TOTAL VOLUME OF CONCRETE:
# of Cement Bags 43 BAGS # of Cement Bags
# of Sand CU.M 118.59 BAGS # of Sand CU.M
# of graavel CU.M 246.92 BAGS # of graavel CU.M

FORMULA: VOLUME = L * W * T FORMULA: VOLUME = L * W * T


FOOTING 2 CLASS AA CONCRETE MIX FOOTING 2 CLASS AA CONCRETE MIX
Enter length L(m) 1.9 M Enter length L(m)
Enter width W(m) 1.9 M Enter width W(m)
Enter thickness T(m) 0.25 M Enter thickness T(m)
TOTAL VOLUME OF CONCRETE: 1.0 CU.M TOTAL VOLUME OF CONCRETE:
# of Cement Bags 7.2 Bags # of Cement Bags
# of Sand CU.M 19.76 CU.M # of Sand CU.M
# of gravel CU.M 27.44 CU.M # of gravel CU.M

FORMULA: VOLUME = L * W * T FORMULA: VOLUME = L * W * T


SLAB 2 CLASS B CONCRETE MIX SLAB 3 CLASS B CONCRETE MIX
Enter length L(m) 2.7 M Enter length L(m)
Enter width W(m) 2.7 M Enter width W(m)
Enter thickness T(m) 0.15 M Enter thickness T(m)
TOTAL VOLUME OF CONCRETE: 1.20285 TOTAL VOLUME OF CONCRETE:
# of Cement Bags 5.660471 BAGS # of Cement Bags
# of Sand Bags 25.8259 BAGS # of Sand Bags
# of gravel Bags 35.84965 BAGS # of gravel Bags

COLUMN 2 Width 1 0.4 M


Width 2 0.25 M
FORMULA: VOLUME = H*W1*W2
CLASS B CONCRETE MIX
Enter height L(m) 3.05 M
VOLUME OF CONCRETE FOR EACH COLUMN 0.3355 CU.M
Number of column Units 4 Units
TOTAL VOLUME OF CONCRETE: 1.342 CU.M
# of Cement Bags 6.315294 BAGS
# of Sand CU.M 28.81353 BAGS
# of gravel CU.M 39.99686 BAGS

FORMULA: VOLUME = L * W * T FORMULA: VOLUME = L * W * T


1st Floor TB1b CLASS B CONCRETE MIX 1st Floor TB1c CLASS B CONCRETE MIX
Length L(m) 2.55 M Length L(m)
Enter width W(m) 0.3 M Enter width W(m)
Enter depth T(m) 0.4 M Enter depth T(m)
TOTAL VOLUME OF CONCRETE: 0.3366 CU.M TOTAL VOLUME OF CONCRETE:
# of Cement Bags 1.584 BAGS # of Cement Bags
# of sand Bags 7.227 BAGS # of sand Bags
# of gravel Bags 10.032 BAGS # of gravel Bags
VOLUME = L * W * T
CLASS AA CONCRETE MIX
2 M
2 M
0.25 M
1.10 CU.M
2 Units
2.20 CU.M
16 BAGS
43.80 BAGS
60.80 BAGS

VOLUME = L * W * T
CLASS AA CONCRETE MIX
2 M
2 M
0.25 M
1.1 CU.M
8.0 Bags
21.90 CU.M
30.40 CU.M

VOLUME = L * W * T FORMULA: VOLUME = L * W * T FORMULA:


CLASS B CONCRETE MIX SLAB 4 CLASS B CONCRETE MIX SLAB 5
3 M Enter length L(m) 3 M Enter length
2.7 M Enter width W(m) 2.7 M Enter width
0.15 M Enter thickness T(m) 0.15 M Enter thickness
1.3365 TOTAL VOLUME OF CONCRETE: 1.3365 TOTAL VOLUME OF CONCRE
6.289412 BAGS # of Cement Bags 6.289412 BAGS # of Cement
28.69544 BAGS # of Sand Bags 28.69544 BAGS # of Sand
39.83294 BAGS # of gravel Bags 39.83294 BAGS # of graavel
VOLUME = L * W * T FORMULA: VOLUME = L * W * T FORMULA:
CLASS B CONCRETE MIX 1st Floor TB1d CLASS B CONCRETE MIX 1st Floor TB2a
2.55 M Length L(m) 2.55 M Length
0.3 M Enter width W(m) 0.3 M Enter width
0.4 M Enter depth T(m) 0.4 M Enter depth
0.3366 CU.M TOTAL VOLUME OF CONCRETE: 0.3366 CU.M TOTAL VOLUME OF CONCRE
1.584 BAGS # of Cement Bags 1.584 BAGS # of Cement
7.227 BAGS # of sand Bags 7.227 BAGS # of sand
10.032 BAGS # of gravel Bags 10.032 BAGS # of gravel
FORMULA: VOLUME = L * W * T FORMULA: VOLUME = L * W * T
SLAB 5 CLASS B CONCRETE MIX SLAB 6 CLASS B CONCRETE MIX
Enter length L(m) 2.7 M Enter length L(m) 2.7 M
Enter width W(m) 2.7 M Enter width W(m) 2.7 M
Enter thickness T(m) 0.15 M Enter thickness T(m) 0.15 M
TOTAL VOLUME OF CONCRETE: 1.20285 TOTAL VOLUME OF CONCRETE: 1.20285
# of Cement Bags 5.660471 BAGS # of Cement Bags 5.660471 BAGS
# of Sand Bags 25.8259 BAGS # of Sand Bags 25.8259 BAGS
# of graavel Bags 35.84965 BAGS # of graavel Bags 35.84965 BAGS
FORMULA: VOLUME = L * W * T FORMULA: VOLUME = L * W * T
1st Floor TB2a CLASS B CONCRETE MIX 1st Floor TB2b CLASS B CONCRETE MIX
Length L(m) 2.5 M Length L(m) 2.6 M
Enter width W(m) 0.3 M Enter width W(m) 0.3 M
Enter depth T(m) 0.4 M Enter depth T(m) 0.4 M
TOTAL VOLUME OF CONCRETE: 0.33 CU.M TOTAL VOLUME OF CONCRETE: 0.3432 CU.M
# of Cement Bags 1.552941 BAGS # of Cement Bags 1.615059 BAGS
# of sand Bags 7.085294 BAGS # of sand Bags 7.368706 BAGS
# of gravel Bags 9.835294 BAGS # of gravel Bags 10.22871 BAGS
VOLUME = L * W * T FORMULA: VOLUME = L * W * T
1st Floor TB2c CLASS B CONCRETE MIX 1st Floor TB2d CLASS B CONCRETE MIX
Length L(m) 2.5 M Length L(m)
Enter width W(m) 0.3 M Enter width W(m)
Enter depth T(m) 0.4 M Enter depth T(m)
TOTAL VOLUME OF CONCRETE: 0.33 CU.M TOTAL VOLUME OF CONCRETE:
# of Cement Bags 1.552941 BAGS # of Cement Bags
# of sand Bags 7.085294 BAGS # of sand Bags
# of gravel Bags 9.835294 BAGS # of gravel Bags
VOLUME = L * W * T FORMULA: VOLUME = L * W * T FORMULA:
CLASS B CONCRETE MIX 1st Floor TB2e CLASS B CONCRETE MIX 1st Floor TB2f
2.6 M Length L(m) 2.8 M Length
0.3 M Enter width W(m) 0.3 M Enter width
0.4 M Enter depth T(m) 0.4 M Enter depth
0.3432 CU.M TOTAL VOLUME OF CONCRETE: 0.3696 CU.M TOTAL VOLUME OF CONCRE
1.615059 BAGS # of Cement Bags 2.688 BAGS # of Cement
7.368706 BAGS # of sand Bags 7.935529 BAGS # of sand
10.22871 BAGS # of gravel Bags 11.01553 BAGS # of gravel
FORMULA: VOLUME = L * W * T
1st Floor TB2f CLASS B CONCRETE MIX
Length L(m) 2.6 M
Enter width W(m) 0.3 M
Enter depth T(m) 0.4 M
TOTAL VOLUME OF CONCRETE: 0.3432 CU.M
# of Cement Bags 1.615059 BAGS
# of sand Bags 7.368706 BAGS
# of gravel Bags 10.22871 BAGS
CONCRETING WORK SECOND FLOOR
FLOOR SLAB FORMULA: VOLUME = L * W * T
SLAB 1 CLASS B CONCRETE MIX
Enter length L(m) 2.7 M
Enter width W(m) 2.7 M
Enter thickness T(m) 0.15 M
TOTAL VOLUME OF CONCRETE: 1.20285
# of cement Bags 9.021375 BAGS
# of sand Bags 12.91295 BAGS
# of Gravel Bags 17.21726 BAGS

CONCRETE COLUMN COLUMN 1 Width 1 0.3 M


Width 2 0.3 M
FORMULA: VOLUME = H*W1*W2
CLASS B CONCRETE MIX
Enter height L(m) 3.05 M
VOLUME OF CONCRETE FOR EACH COLUMN 0.2745 CU.M
Number of column Units 8 Units
TOTAL VOLUME OF CONCRETE: 2.4156 CU.M
# of Cement Bags 18.117 BAGS
volume of sand Bags 25.93218 BAGS
Vol. of 3/4" gravel Bags 71.99435 BAGS

CONCRETE BEAM FORMULA: VOLUME = L * W * T


2nd Floor B1a CLASS B CONCRETE MIX
Length L(m) 2.55 M
Enter width W(m) 0.25 M
Enter depth T(m) 0.45 M
TOTAL VOLUME OF CONCRETE: 0.315563 CU.M
# of Cement Bags 2.366719 BAGS
# of sand Bags 3.387656 BAGS
# of gravel Bags 9.405 BAGS
FORMULA: VOLUME = L * W * T FORMULA: VOLUME = L * W * T
SLAB 2 CLASS B CONCRETE MIX SLAB 3 CLASS B CONCRETE MIX
Enter length L(m) 2.7 M Enter length L(m) 3
Enter width W(m) 2.7 M Enter width W(m) 2.7
Enter thickness T(m) 0.15 M Enter thickness T(m) 0.15
TOTAL VOLUME OF CONCRETE: 1.20285 TOTAL VOLUME OF CONCRETE: 1.3365
# of cement Bags 9.021375 BAGS # of cement Bags 10.02375
# of sand Bags 12.91295 BAGS # of sand Bags 14.34772
# of Gravel Bags 17.21726 BAGS # of Gravel Bags 19.13029

COLUMN 2 Width 1 0.4 M COLUMN 3


Width 2 0.25 M
FORMULA: VOLUME = H*W1*W2 FORMULA:
CLASS B CONCRETE MIX
Enter height L(m) 3.05 M Enter height
VOLUME OF CONCRETE FOR EACH COLUMN 0.3355 CU.M VOLUME OF CONCRETE FOR EACH COLUMN
Number of column Units 4 Units Number of column
TOTAL VOLUME OF CONCRETE: 1.342 CU.M TOTAL VOLUME OF CONCRETE:
# of Cement Bags 5.368 BAGS # of Cement
volume of sand CU.M 14.40676 CU.M volume of sand
Vol. of 3/4" gravel CU.M 39.99686 CU.M Vol. of 3/4" gravel

FORMULA: VOLUME = L * W * T FORMULA: VOLUME = L * W * T


2nd Floor B1b CLASS B CONCRETE MIX 2nd Floor B1c CLASS B CONCRETE MIX
Length L(m) 2.55 M Length L(m) 2.55
Enter width W(m) 0.25 M Enter width W(m) 0.25
Enter depth T(m) 0.45 M Enter depth T(m) 0.45
TOTAL VOLUME OF CONCRETE: 0.315563 CU.M TOTAL VOLUME OF CONCRETE: 0.315563
# of Cement Bags 2.366719 BAGS # of Cement Bags 2.366719
# of sand Bags 3.387656 BAGS # of sand Bags 3.387656
# of gravel Bags 9.405 BAGS # of gravel Bags 9.405
UME = L * W * T FORMULA: VOLUME = L * W * T FORMULA:
ONCRETE MIX SLAB 4 CLASS B CONCRETE MIX SLAB 5
M Enter length L(m) 3 M Enter length
M Enter width W(m) 2.7 M Enter width
M Enter thickness T(m) 0.15 M Enter thickness
TOTAL VOLUME OF CONCRETE: 1.3365 TOTAL VOLUME OF CONCRETE:
BAGS # of cement Bags 10.02375 BAGS # of cement
BAGS # of sand Bags 14.34772 BAGS # of sand
BAGS # of Gravel Bags 19.13029 BAGS # of Gravel

Width 1 0.25 M
Width 2 0.25 M
VOLUME = H*W1*W2
CLASS B CONCRETE MIX
L(m) 3.05 M
TE FOR EACH COLUMN 0.209688 CU.M
Units 4 Units
OLUME OF CONCRETE: 0.83875 CU.M
Bags 3.355 BAGS
CU.M 9.004228 CU.M
CU.M 24.99804 CU.M

UME = L * W * T FORMULA: VOLUME = L * W * T FORMULA:


ONCRETE MIX 2nd Floor B1d CLASS B CONCRETE MIX 2nd Floor B2a
M Length L(m) 2.55 M Length
M Enter width W(m) 0.25 M Enter width
M Enter depth T(m) 0.45 M Enter depth
CU.M TOTAL VOLUME OF CONCRETE: 0.315563 CU.M TOTAL VOLUME OF CONCRETE:
BAGS # of Cement Bags 2.366719 BAGS # of Cement
BAGS # of sand Bags 3.387656 BAGS # of sand
BAGS # of gravel Bags 9.405 BAGS # of gravel
VOLUME = L * W * T FORMULA: VOLUME = L * W * T
CLASS B CONCRETE MIX SLAB 6 CLASS B CONCRETE MIX
L(m) 2.7 M Enter length L(m) 2.7 M
W(m) 2.7 M Enter width W(m) 2.7 M
T(m) 0.15 M Enter thickness T(m) 0.15 M
OLUME OF CONCRETE: 1.20285 TOTAL VOLUME OF CONCRETE: 1.20285
Bags 9.021375 BAGS # of cement Bags 9.021375 BAGS
Bags 12.91295 BAGS # of sand Bags 12.91295 BAGS
Bags 17.21726 BAGS # of Gravel Bags 17.21726 BAGS

VOLUME = L * W * T FORMULA: VOLUME = L * W * T


CLASS B CONCRETE MIX 2nd Floor B2b CLASS B CONCRETE MIX
L(m) 2.575 M Length L(m) 2.6 M
W(m) 0.25 M Enter width W(m) 0.25 M
T(m) 0.45 M Enter depth T(m) 0.45 M
OLUME OF CONCRETE: 0.318656 CU.M TOTAL VOLUME OF CONCRETE: 0.32175 CU.M
Bags 2.389922 BAGS # of Cement Bags 2.413125 BAGS
Bags 3.420869 BAGS # of sand Bags 3.454081 BAGS
Bags 9.497206 BAGS # of gravel Bags 9.589412 BAGS
VOLUME = L * W * T FORMULA: VOLUME = L * W * T
2nd Floor B2c CLASS B CONCRETE MIX 2nd Floor B2d CLASS B CONCRETE MIX
Length L(m) 2.8 M Length L(m) 2.6
Enter width W(m) 0.25 M Enter width W(m) 0.25
Enter depth T(m) 0.45 M Enter depth T(m) 0.45
TOTAL VOLUME OF CONCRETE: 0.3465 CU.M TOTAL VOLUME OF CONCRETE: 0.32175
# of Cement Bags 2.59875 BAGS # of Cement Bags 2.413125
# of sand Bags 3.719779 BAGS # of sand Bags 3.454081
# of gravel Bags 10.32706 BAGS # of gravel Bags 9.589412
UME = L * W * T FORMULA: VOLUME = L * W * T FORMULA:
ONCRETE MIX 2nd Floor B2e CLASS B CONCRETE MIX 2nd Floor B3a
M Length L(m) 2.575 M Length
M Enter width W(m) 0.25 M Enter width
M Enter depth T(m) 0.45 M Enter depth
CU.M TOTAL VOLUME OF CONCRETE: 0.318656 CU.M TOTAL VOLUME OF CONCRETE:
BAGS # of Cement Bags 2.389922 BAGS # of Cement
BAGS # of sand Bags 3.420869 BAGS # of sand
BAGS # of gravel Bags 9.497206 BAGS # of gravel
VOLUME = L * W * T FORMULA: VOLUME = L * W * T
CLASS B CONCRETE MIX 2nd Floor B3b CLASS B CONCRETE MIX
L(m) 2.3 M Length L(m) 2.3 M
W(m) 0.3 M Enter width W(m) 0.3 M
T(m) 0.45 M Enter depth T(m) 0.45 M
OLUME OF CONCRETE: 0.34155 CU.M TOTAL VOLUME OF CONCRETE: 0.34155 CU.M
Bags 2.561625 BAGS # of Cement Bags 2.561625 BAGS
Bags 3.66664 BAGS # of sand Bags 3.66664 BAGS
Bags 10.17953 BAGS # of gravel Bags 10.17953 BAGS
FORMULA: VOLUME = L * W * T FORMULA: VOLUME = L * W * T
2nd Floor B4a CLASS B CONCRETE MIX 2nd Floor B4b CLASS B CONCRETE MIX
Length L(m) 2.5 M Length L(m) 2.6
Enter width W(m) 0.25 M Enter width W(m) 0.25
Enter depth T(m) 0.45 M Enter depth T(m) 0.45
TOTAL VOLUME OF CONCRETE: 0.309375 CU.M TOTAL VOLUME OF CONCRETE: 0.32175
# of Cement Bags 2.320313 BAGS # of Cement Bags 2.413125
# of sand Bags 3.321232 BAGS # of sand Bags 3.454081
# of gravel Bags 9.220588 BAGS # of gravel Bags 9.589412
UME = L * W * T FORMULA: VOLUME = L * W * T FORMULA:
ONCRETE MIX 2nd Floor B5a CLASS B CONCRETE MIX 2nd Floor B6a
M Length L(m) 2.5 M Length
M Enter width W(m) 0.25 M Enter width
M Enter depth T(m) 0.45 M Enter depth
CU.M TOTAL VOLUME OF CONCRETE: 0.309375 CU.M TOTAL VOLUME OF CONCRETE:
BAGS # of Cement Bags 2.320313 BAGS # of Cement
BAGS # of sand Bags 3.321232 BAGS # of sand
BAGS # of gravel Bags 9.220588 BAGS # of gravel
VOLUME = L * W * T FORMULA: VOLUME = L * W * T
CLASS B CONCRETE MIX 2nd Floor B6b CLASS B CONCRETE MIX
L(m) 2.6 M Length L(m) 2.8 M
W(m) 0.25 M Enter width W(m) 0.25 M
T(m) 0.45 M Enter depth T(m) 0.45 M
OLUME OF CONCRETE: 0.32175 CU.M TOTAL VOLUME OF CONCRETE: 0.3465 CU.M
Bags 2.413125 BAGS # of Cement Bags 2.59875 BAGS
Bags 3.454081 BAGS # of sand Bags 3.719779 BAGS
Bags 9.589412 BAGS # of gravel Bags 10.32706 BAGS
FORMULA: VOLUME = L * W * T
2nd Floor B6c CLASS B CONCRETE MIX
Length L(m) 2.6 M
Enter width W(m) 0.25 M
Enter depth T(m) 0.45 M
TOTAL VOLUME OF CONCRETE: 0.32175 CU.M
# of Cement Bags 2.413125 BAGS
# of sand Bags 3.454081 BAGS
# of gravel Bags 9.589412 BAGS
REINFORCEMENT & GI WIRES
FORMULA: Longitudinal+Traverse
Longtitudinal Bars (8 - 16mm Ø)
FOOTING 1
Transvere Bars (8 - 16mm Ø)
Enter longitudinal 9 PCS
Enter traverse 9 PCS
TOTAL AREA 18 PCS
GI Wires 18 KGs

FORMULA: Longitudinal+Traverse
Longtitudinal Bars (10 - 16mm Ø)
FOOTING 2
Transvere Bars (10- 16mm Ø)
Enter longitudinal 19 PCS
Enter traverse 19 PCS
TOTAL AREA 38 PCS
GI Wires 37 KGs

FORMULA: Longitudinal+Traverse
Longtitudinal Bars (12 - 16mm Ø)
FOOTING 3
Transvere Bars (12 - 16mm Ø)
Enter longitudinal 8 PCS
Enter traverse 8 PCS
TOTAL AREA 16 PCS
GI Wires 16 KGs

Main Bars (7 - 16mm Ø)


BEAM TB1
Stirrups (24 - 10mm Ø)
Main Bars 12 PCS
Stirrups 23 PCS
GI wires 21 KGs

Main Bars (6 - 16mm Ø)


BEAM TB2
Stirrups (24 - 10mm Ø)
Main Bars 10 PCS
Stirrups 23 PCS
GI wires 19 KGs

Main Bars (6 - 16mm Ø)


BEAM TB3
Stirrups (21 - 10mm Ø)
Main Bars 5 PCS
Stirrups 10 PCS
GI wires 9 KGs
Main Bars (9 - 16mm Ø)
BEAM B1
Stirrups (24 - 10mm Ø)
Main Bars 16 PCS
Stirrups 23 PCS
GI wires 25 KGs

Main Bars (9 - 16mm Ø)


BEAM B2
Stirrups (27 - 10mm Ø)
Main Bars 10 PCS
Stirrups 13 PCS
GI wires 15 KGs

Main Bars (9 - 16mm Ø)


BEAM B2
Stirrups (55 - 10mm Ø)
Main Bars 12 PCS
Stirrups 13 PCS
GI wires 17 KGs

Main Bars (6 - 16mm Ø)


BEAM B3
Stirrups (23 - 10mm Ø)
Main Bars 4 PCS
Stirrups 12 PCS
GI wires 9 KGs

Main Bars (9 - 16mm Ø)


BEAM B4
Stirrups (22 - 10mm Ø)
Main Bars 7 PCS
Stirrups 10 PCS
GI wires 11 KGs

Main Bars (6 - 16mm Ø)


BEAM B5
Stirrups (24 - 10mm Ø)
Main Bars 3 PCS
Stirrups 6 PCS
GI wires 6 KGs

Main Bars (9 - 16mm Ø)


BEAM B6
Stirrups (23 - 10mm Ø)
Main Bars 11 PCS
Stirrups 17 PCS
GI wires 18 KGs

Main Bars (4 - 16mm Ø)


BEAM RB1
Stirrups (24 - 10mm Ø)
Main Bars 7 PCS
Stirrups 23 PCS
GI wires 16 KGs

Main Bars (4- 16mm Ø)


BEAM RB1
Stirrups (27- 10mm Ø)
Main Bars 5 PCS
Stirrups 13 PCS
GI wires 9 KGs

Main Bars (4- 16mm Ø)


BEAM RB1
Stirrups (55 - 10mm Ø)
Main Bars 6 PCS
Stirrups 13 PCS
GI wires 11 KGs

Main Bars (4- 16mm Ø)


BEAM RB1
Stirrups (23 - 10mm Ø)
Main Bars 4 PCS
Stirrups 12 PCS
GI wires 9 KGs

Main Bars (4- 16mm Ø)


BEAM RB1
Stirrups (24 - 10mm Ø)
Main Bars 7 PCS
Stirrups 21 PCS
GI wires 15 KGs

Main Bars (4- 16mm Ø)


BEAM RB1
Stirrups (21 - 10mm Ø)
Main Bars 3 PCS
Stirrups 10 PCS
GI wires 7 KGs

Main Bars (27- 16mm Ø)


COLUMN 1 (1st)
Stirrups (33- 10mm Ø)
Main Bars 164 PCS
Stirrups 53 PCS
GI wires 176 KGs

Main Bars (9- 16mm Ø)


COLUMN 2 (1st)
Stirrups (33- 10mm Ø)
Main Bars 28 PCS
Stirrups 29 PCS
GI wires 38 KGs
Main Bars (27- 16mm Ø)
COLUMN 1 (2nd)
Stirrups (23- 10mm Ø)
Main Bars 54 PCS
Stirrups 19 PCS
GI wires 60 KGs

Main Bars (27- 16mm Ø)


COLUMN 1 (2nd)
Stirrups (32- 10mm Ø)
Main Bars 40 PCS
Stirrups 13 PCS
GI wires 43 KGs

Main Bars (9- 16mm Ø)


COLUMN 2 (2nd)
Stirrups (23- 10mm Ø)
Main Bars 9 PCS
Stirrups 10 PCS
GI wires 13 KGs

Main Bars (9- 16mm Ø)


COLUMN 2 (2nd)
Stirrups (32- 10mm Ø)
Main Bars 14 PCS
Stirrups 14 PCS
GI wires 20 KGs

Main Bars (9- 16mm Ø)


COLUMN 3 (2nd)
Stirrups (23- 10mm Ø)
Main Bars 9 PCS
Stirrups 8 PCS
GI wires 12 KGs

FORMULA: Longitudinal+Traverse
10mm Ø, 200mm O.C. SPACING ON BOTH DIRECTIONS
SLAB ON GRADE
Longtitudinal Bars (8 - 16mm Ø)
Transvere Bars (8 - 16mm Ø)
Enter longitudinal 36 PCS
Enter traverse 36 PCS
TOTAL AREA 72 PCS
GI Wires 27 KGs

FORMULA: Longitudinal+Traverse
10mm Ø, 200mm O.C. SPACING ON BOTH DIRECTIONS
SLAB 1
Longtitudinal Bars (8 - 16mm Ø)
Transvere Bars (8 - 16mm Ø)
Enter longitudinal 4 PCS
Enter traverse 4 PCS
TOTAL AREA 8 PCS
GI Wires 3 KGs

FORMULA: Longitudinal+Traverse
10mm Ø, 200mm O.C. SPACING ON BOTH DIRECTIONS
SLAB 1
Longtitudinal Bars (8 - 16mm Ø)
Transvere Bars (8 - 16mm Ø)
Enter longitudinal 7 PCS
Enter traverse 7 PCS
TOTAL AREA 14 PCS
GI Wires 6 KGs

FORMULA: Longitudinal+Traverse
10mm Ø, 200mm O.C. SPACING ON BOTH DIRECTIONS
SLAB 1
Longtitudinal Bars (8 - 16mm Ø)
Transvere Bars (8 - 16mm Ø)
Enter longitudinal 3 PCS
Enter traverse 4 PCS
TOTAL AREA 7 PCS
GI Wires 3 KGs

FORMULA: Longitudinal+Traverse
10mm Ø, 200mm O.C. SPACING ON BOTH DIRECTIONS
SLAB 1
Longtitudinal Bars (8 - 16mm Ø)
Transvere Bars (8 - 16mm Ø)
Enter longitudinal 3 PCS
Enter traverse 4 PCS
TOTAL AREA 7 PCS
GI Wires 3 KGs

FORMULA: Longitudinal+Traverse
10mm Ø, 200mm O.C. SPACING ON BOTH DIRECTIONS
SLAB 2
Longtitudinal Bars (8 - 16mm Ø)
Transvere Bars (8 - 16mm Ø)
Enter longitudinal 1 PCS
Enter traverse 3 PCS
TOTAL AREA 4 PCS
GI Wires 2 KGs
CHB First Floor
FRONT ELEVATION FORMULA: Area = L * H
AREA
Enter length L(m) 5.1 M
Enter Height W(m) 2.6 M
TOTAL AREA 13.260000 CU.M
Area Window 1 m2 1.902 m2
Area Window 2 m2 1.8357 m2
TOTAL AREA 9.522 m2

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 9.522 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 131 Pcs

REAR ELEVATION FORMULA: Area = L * H


AREA
Enter length L(m) 5.1 M
Enter Height W(m) 2.6 M
TOTAL AREA 13.260000 CU.M
Area Window 1 m2 0.36 m2
Area Door m2 1.6880 m2
TOTAL AREA 11.212 m2

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 11.212 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 154.2 Pcs

RIGHT SIDE ELEVATION FORMULA: Area = L * H


AREA
Enter length L(m) 9.41 M
Enter Height W(m) 2.6 M
TOTAL AREA 24.466000 CU.M

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 24.466 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 336.4 Pcs

LEFT SIDE EVELATION FORMULA: Area = L * H


AREA
Enter length L(m) 8.4 M
Enter Height W(m) 2.6 M
TOTAL AREA 21.840000 CU.M
Area Window 1 m2 1.68 m2
Area Door m2 1.5400 m2
TOTAL AREA 18.620 m2

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 18.620 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 256.025 Pcs
FORMULA: Total Vol. on CHB = Total CHB* V.hole
MORTAR
TOTAL AREA m2 131 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.30245205 m³

Volume Cement m³ 0.07561301 m³


Volume Sand m³ 0.22683904 m³

Mass of Cement Kg 120.980822 Kg


Mass of Sand Kg 331.184999 Kg

Bags of Cement Bags 3.02452054 Bags


Bags of Sand Bags 16.5592499 Bags

FORMULA: Total Vol. on CHB = Total CHB* V.hole


MORTAR
TOTAL AREA m2 154 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.35612115 m³

Volume Cement m³ 0.08903029 m³


Volume Sand m³ 0.26709086 m³

Mass of Cement Kg 142.44846 Kg


Mass of Sand Kg 389.952659 Kg

Bags of Cement Bags 3.6 Bags


Bags of Sand Bags 19.5 Bags

FORMULA: Total Vol. on CHB = Total CHB* V.hole


MORTAR
TOTAL AREA m2 336 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.77710133 m³

Volume Cement m³ 0.19427533 m³


Volume Sand m³ 0.58282599 m³
Mass of Cement Kg 310.84053 Kg
Mass of Sand Kg 850.925951 Kg

Bags of Cement Bags 7.8 Bags


Bags of Sand Bags 42.5 Bags

FORMULA: Total Vol. on CHB = Total CHB* V.hole


MORTAR
TOTAL AREA m2 256 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.59141775 m³

Volume Cement m³ 0.14785444 m³


Volume Sand m³ 0.44356331 m³

Mass of Cement Kg 236.5671 Kg


Mass of Sand Kg 647.602436 Kg

Bags of Cement Bags 5.9 Bags


Bags of Sand Bags 32.4 Bags
CHB 2nd Floor
FRONT ELEVATION FORMULA: Area = L * H
AREA
Enter length L(m) 5.1 M
Enter Height W(m) 2.55 M
TOTAL AREA 13.005000 CU.M
Area Window 1 m2 2.28 m2
Area Door m2 3.4000 m2
TOTAL AREA 7.325 m2

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 7.325 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 101 Pcs

REAR ELEVATION FORMULA: Area = L * H


AREA
Enter length L(m) 5.1 M
Enter Height W(m) 2.55 M
TOTAL AREA 13.005000 CU.M
Area Window 1 m2 3.08 m2
TOTAL AREA 9.925 m2

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 9.925 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 136.5 Pcs

RIGHT SIDE ELEVATION FORMULA: Area = L * H


AREA
Enter length L(m) 8.11 M
Enter Height W(m) 2.55 M
TOTAL AREA 20.680500 CU.M

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 20.6805 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 285.0 Pcs

LEFT SIDE ELEVATION FORMULA: Area = L * H


AREA
Enter length L(m) 7.1 M
Enter Height W(m) 2.55 M
TOTAL AREA 18.105000 CU.M
Area Window m2 3.08 m2
Area Door m2 2.2800 m2
TOTAL AREA 12.745 m2

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 12.745 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 176.000 Pcs
FORMULA: Total Vol. on CHB = Total CHB* V.hole
MORTAR
TOTAL AREA m2 101 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.23266031 m³

Volume Cement m³ 0.05816508 m³


Volume Sand m³ 0.17449523 m³

Mass of Cement Kg 93.064125 Kg


Mass of Sand Kg 254.763042 Kg

Bags of Cement Bags 2.32660313 Bags


Bags of Sand Bags 12.7381521 Bags

FORMULA: Total Vol. on CHB = Total CHB* V.hole


MORTAR
TOTAL AREA m2 136 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.31524281 m³

Volume Cement m³ 0.0788107 m³


Volume Sand m³ 0.23643211 m³

Mass of Cement Kg 126.097125 Kg


Mass of Sand Kg 345.19088 Kg

Bags of Cement Bags 3.2 Bags


Bags of Sand Bags 17.3 Bags

FORMULA: Total Vol. on CHB = Total CHB* V.hole


MORTAR
TOTAL AREA m2 285.0 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.65835 m³

Volume Cement m³ 0.1645875 m³


Volume Sand m³ 0.4937625 m³
Mass of Cement Kg 263.34 Kg
Mass of Sand Kg 720.89325 Kg

Bags of Cement Bags 6.6 Bags


Bags of Sand Bags 36.04 Bags

FORMULA: Total Vol. on CHB = Total CHB* V.hole


MORTAR
TOTAL AREA m2 176 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.40656 m³

Volume Cement m³ 0.10164 m³


Volume Sand m³ 0.30492 m³

Mass of Cement Kg 162.624 Kg


Mass of Sand Kg 445.1832 Kg

Bags of Cement Bags 4.1 Bags


Bags of Sand Bags 22.3 Bags
CHB ROOF PLAN
FRONT ELEVATION FORMULA: Area = L * H
AREA
Enter length L(m) 5.4 M
Enter Height W(m) 1.35 M
TOTAL AREA 3.645000 m³

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 3.645 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 51.0 Pcs

REAR ELEVATION FORMULA: Area = L * H


AREA
Enter length L(m) 5.4 M
Enter Height W(m) 1.35 M
TOTAL AREA 3.645000 m³

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 3.645 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 51.0 Pcs

RIGHT SIDE ELEVATION FORMULA: Area = L * H


AREA
Enter length L(m) 7.1 M
Enter Height W(m) 1.05 M
TOTAL AREA 7.455000 CU.M

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 7.4550 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 103.0 Pcs

LEFT SIDE ELEVATION FORMULA: Area = L * H


AREA
Enter length L(m) 7.1 M
Enter Height W(m) 2.55 M
TOTAL AREA 18.105000 CU.M
Area Window m2 3.08 m2
Area Door m2 2.2800 m2
TOTAL AREA 12.745 m2

FORMULA: No. of CHB = Area Total * 12.5


CHB
TOTAL AREA m2 12.745 m2
1m2 = 12.5 CHB Pcs 12.5 Pcs
TOTAL # OF CHB 176.000 Pcs
FORMULA: Total Vol. on CHB = Total CHB* V.hole
MORTAR
TOTAL AREA m2 51 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.11781 m³

Volume Cement m³ 0.0294525 m³


Volume Sand m³ 0.0883575 m³

Mass of Cement Kg 47.124 Kg


Mass of Sand Kg 129.00195 Kg

Bags of Cement Bags 1.1781 Bags


Bags of Sand Bags 6.4500975 Bags

FORMULA: Total Vol. on CHB = Total CHB* V.hole


MORTAR
TOTAL AREA m2 51 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.11781 m³

Volume Cement m³ 0.0294525 m³


Volume Sand m³ 0.0883575 m³

Mass of Cement Kg 47.124 Kg


Mass of Sand Kg 129.00195 Kg

Bags of Cement Bags 1.1781 Bags


Bags of Sand Bags 6.4500975 Bags

FORMULA: Total Vol. on CHB = Total CHB* V.hole


MORTAR
TOTAL AREA m2 103.0 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.23793 m³

Volume Cement m³ 0.0594825 m³


Volume Sand m³ 0.1784475 m³
Mass of Cement Kg 95.172 Kg
Mass of Sand Kg 260.53335 Kg

Bags of Cement Bags 2.4 Bags


Bags of Sand Bags 13.03 Bags

FORMULA: Total Vol. on CHB = Total CHB* V.hole


MORTAR
TOTAL AREA m2 176 m³
1 CHB: V. Hole = .0021 m³ 0.0021 m³
TOTAL V. HOLE 0.40656 m³

Volume Cement m³ 0.10164 m³


Volume Sand m³ 0.30492 m³

Mass of Cement Kg 162.624 Kg


Mass of Sand Kg 445.1832 Kg

Bags of Cement Bags 4.1 Bags


Bags of Sand Bags 22.3 Bags
PLasterinG
FORMULA: TOTAL AREA = Area1st + Area2nd + Arearp
EXTERIOR WALL
AREA OF 1st FLOOR 63.8203
AREA OF 2nd FLOOR 50.6755
AREA OF ROOF PLAN 14.745
TOTAL AREA 129.2408

TOTAL AREA 129.2408


THICKNESS 0.05
TOTAL V. HOLE 7.108244

Volume Cement m³ 1.777061 m³


Volume Sand m³ 5.331183 m³

Mass of Cement Kg 2843.2976 Kg


Mass of Sand Kg 7783.52718 Kg

Bags of Cement Bags 71.08244 Bags


Bags of Sand Bags 389.176359 Bags
ExTERIOR WALL REBARS
FRONT ELEVATION FORMULA: Total Area = Area * Height
AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 6.05 M
TOTAL AREA 9.918033 m2

FORMULA: Total Area = Area * Height


REBARS
Rebar 6
TOTAL 59.50820
Length 6
TOTAL PCS OF REBAR 9.918033 PCS

REAR ELEVATION FORMULA: Total Area = Area * Height


AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 6.05 M
TOTAL AREA 9.918033 m2

FORMULA: Total Area = Area * Height


REBARS
Rebar 6
TOTAL 59.50820
Length 6
TOTAL PCS OF REBAR 9.918033 PCS

LEFT ELEVATION FORMULA: Total Area = Area * Height


AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 6.05 M
TOTAL AREA 9.918033 m2

FORMULA: Total Area * Length


REBARS
Length 8.5
TOTAL 84.30328
Rebar 6
TOTAL PCS OF REBAR 14.050546 PCS

RIGHT ELEVATION FORMULA: Total Area = Area * Height


AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 7.1 M
TOTAL AREA 11.639344 m2

FORMULA: Total Area * Length


REBARS
Length 8.5
TOTAL 98.93443
Rebar 6
TOTAL PCS OF REBAR 16.489071 PCS
FORMULA: Total Area = Area * Height
m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 6 M
TOTAL AREA 9.836066 m2

FORMULA: Total Area = Area * Height


REBARS
Rebar 6
TOTAL 59.01639
Length 6
TOTAL PCS OF REBAR 9.836066 PCS

FORMULA: Total Area = Area * Height


m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 6 M
TOTAL AREA 9.836066 m2

FORMULA: Total Area = Area * Height


REBARS
Rebar 6
TOTAL 59.01639
Length 6
TOTAL PCS OF REBAR 9.836066 PCS

FORMULA: Total Area = Area * Height


m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 6.05 M
TOTAL AREA 9.918033 m2

FORMULA: Total Area * Length


REBARS
Length 8.5
TOTAL 84.30328
Rebar 6
TOTAL PCS OF REBAR 14.0505464 PCS

FORMULA: Total Area = Area * Height


m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 8.5 M
TOTAL AREA 13.934426 m2

FORMULA: Total Area * Length


REBARS
Length 7.1
TOTAL 98.93443
Rebar 6
TOTAL PCS OF REBAR 16.4890710 PCS
ExTERIOR WALL REBARS
TB1 FORMULA: Total Area = Area * Height
AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 3.05 M
TOTAL AREA 5.000000 m2

FORMULA: Total Area * Length


REBARS
Length 3
TOTAL 15.00000
Rebar 6
TOTAL PCS OF REBAR 2.500000 PCS

TB1 FORMULA: Total Area = Area * Height


AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 3.05 M
TOTAL AREA 5.000000 m2

FORMULA: Total Area * Length


REBARS
Length 1.23
TOTAL 12.30000
Rebar 6
TOTAL PCS OF REBAR 2.050000 PCS

BR1 FORMULA: Total Area = Area * Height


AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 3.05 M
TOTAL AREA 5.000000 m2

FORMULA: Total Area * Length


REBARS
Length 3
TOTAL 15.00000
Rebar 6
TOTAL PCS OF REBAR 2.500000 PCS

BR1 FORMULA: Total Area = Area * Height


AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 3.05 M
TOTAL AREA 5.000000 m2

FORMULA: Total Area * Length


REBARS
Length 2.1098
TOTAL 10.54900
Rebar 6
TOTAL PCS OF REBAR 1.758167 PCS

BR1 FORMULA: Total Area = Area * Height


AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 3.05 M
TOTAL AREA 5.000000 m2

FORMULA: Total Area * Length


REBARS
Length 0.8902
TOTAL 4.45100
Rebar 6
TOTAL PCS OF REBAR 0.741833 PCS

BR1 FORMULA: Total Area = Area * Height


AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 3.05 M
TOTAL AREA 5.000000 m2

FORMULA: Total Area * Length


REBARS
Length 1.0064
TOTAL 5.03200
Rebar 6
TOTAL PCS OF REBAR 0.838667 PCS

BR3 FORMULA: Total Area = Area * Height


AREA HORINZONTAL 10mm Ø@ 0.61m O.C
Enter Height 3 M
TOTAL AREA 9.836066 m2

FORMULA: Total Area * Length


REBARS
Length 2.48
TOTAL 24.39344
Rebar 6
TOTAL PCS OF REBAR 4.065574 PCS
FORMULA: Total Area = Area * Height
m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 3 M
TOTAL AREA 4.918033 m2

FORMULA: Total Area * Length


REBARS
Length 3.05
TOTAL 15.00000
Rebar 6
TOTAL PCS OF REBAR 2.50000 PCS

FORMULA: Total Area = Area * Height


m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 1.23 M
TOTAL AREA 2.016393 m2

FORMULA: Total Area * Length


REBARS
Length 3.05
TOTAL 6.15000
Rebar 6
TOTAL PCS OF REBAR 1.02500 PCS

FORMULA: Total Area = Area * Height


m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 3 M
TOTAL AREA 4.918033 m2

FORMULA: Total Area * Length


REBARS
Length 3.05
TOTAL 15.00000
Rebar 6
TOTAL PCS OF REBAR 2.50000 PCS

FORMULA: Total Area = Area * Height


m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 2.1098 M
TOTAL AREA 3.458689 m2

FORMULA: Total Area * Length


REBARS
Length 3.05
TOTAL 10.54900
Rebar 6
TOTAL PCS OF REBAR 1.75817 PCS

FORMULA: Total Area = Area * Height


m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 0.8902 M
TOTAL AREA 1.459344 m2

FORMULA: Total Area * Length


REBARS
Length 3.05
TOTAL 4.45100
Rebar 6
TOTAL PCS OF REBAR 0.74183 PCS

FORMULA: Total Area = Area * Height


m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 1.0064 M
TOTAL AREA 1.649836 m2

FORMULA: Total Area * Length


REBARS
Length 3.05
TOTAL 5.03200
Rebar 6
TOTAL PCS OF REBAR 0.83867 PCS

FORMULA: Total Area = Area * Height


m Ø@ 0.61m O.C AREA VERTICAL 10mm Ø@ 0.61m O.C
Enter Height 2.48 M
TOTAL AREA 4.065574 m2

FORMULA: Total Area * Length


REBARS
Length 3
TOTAL 12.19672
Rebar 6
TOTAL PCS OF REBAR 2.03279 PCS