40.56 m3 Total Trench excvation for ST (1.5-3m) 1 30.1 DDT for Beam (L3)
1.6 Trench Excavation for ST (3-4.5m) 0.2
1 1 6.02 m2
27.04 2 28.1 DDT for Beam (L4)
1.16 0.2
31.37 m3 11.24 m2
31.37 m3 Total Trench excvation for ST (3-4.5m) 7 9.5 DDT for Beam (L5)
1.7 Back Fill 0.2
1 1 Under hardcore 13.30 m2
46.86 m2
BAR SCHEDULE FOR G+1 RESIDENTAIL BUILDING
Reinforcement Diameter
Location Dia C/C Length Size No Member Total length
6 8 10 12 14 16 20 24.00
A-SUB STRUCTURE
Ground Floor Slab
5.1 Apply three coat of cement sand plaster to internal and external surface. M² 1874.99 220 412,497.80
5.2 Gypsum plastering to all internal plastered surface. M² 1054.57 110 116,002.70
3cm thick cement screed ratio 1:3 applied on floor with proper well
5.3 smoothed finish.
M² 356.05 160 56,968.00
5.4 Half concrete pipe open side Ditch diameter of 30 cm ML 65.4 400 26,160.00
Sub Total (5)…........................... 611,628.50
6. Painting Work
Apply three coats of product plastic emulsion paint to all internal wall
6.1 and structural members.
M² 1054.57 110 116,002.70
Apply three coats of oil paint to all toilet and shower rooms internal
6.2 wall and structural members.
M² 138.11 180 24,858.90
6.3 Apply Quartiz paint to all external wall and structural members. M² 820.42 290 237,921.80
6.4 Oil piant skirting to wall with 10cm thickness. ML 186.20 25 4,655.00
Sub Total (6)…........................... 383,438.40
7. Metal Work
Supply, produce and fix doors & windows fully metal 38 LTZ with all
acessories such as hing, lock. Doors are with ribbed sheet metal. Price
7.1 include cost for door ribbed sheet and all accessories. Cost for Glazing
is seprate.
W1 (1200x1500mm) No 8 6480 51,840.00
W2 (1600x1500mm) No 1 8640 8,640.00
W3 (1500x3000mm) No 2 16200 32,400.00
W4 (1200x600mm) No 2 2592 5,184.00
W5 (1050x600mm) No 2 2268 4,536.00
D1 (1000x2500mm) No 10 9000 90,000.00
D2 (900x2500mm) No 3 8100 24,300.00
D3 (2000x2500mm) No 1 18000 18,000.00
D4 (650x2500mm) No 8 5850 46,800.00
D5 (700x2500mm) No 2 6300 12,600.00
Sub Total (7)…........................... 294,300.00
8. Glazing
4 mm thick tinted sheet glass glazed with beads & rubber gasket and
8.1 sealant to LTZ profile frames of windows and window-doors
M² 46.86 2000 93,720.00
Sub Total (8)…........................... 93,720.00
BOQ For Dire Dawa Airport Police Residence
Item
Description Unit Quantity Rate Amount
No
9. Sanitary Installation
Water Supply Pipes & fittings
Supply and install PPR pipes to water distribution to all sanitary
9.1
fixtures as shown on the drawing
Diameter 20 mm ml 32.00 130.00 4,160.00
Supply and install gate valves made of brass complete with rubber
9.2 gaskets, hand wheels and connecting pieces such as unions etc., for all
fixtures
Diameter 20 mm No 3.00 600.00 1,800.00
Sanitary Fixtures -
Supply and fix wash down WC with Low level Flush Cistern,
9.3 Complete with all necessary accessories.
No 4.00 4,000.00 16,000.00
9.4 750x750mm shower tray with all necessary fixtures. No 4.00 2,500.00 10,000.00
Supply and install hand wash basins made of white vitreous China
9.5 with two tap holes complete with all the necessary accessories No 1.00 4,500.00 4,500.00
Size 1200 x 600 mm
Supply and mount 5m³ plastic water tank on the ground with 20cm
9.6 thick concrete slab. Price include all the necessary accessories and No 1.00 30,000.00 30,000.00
required base foundation for plastic tanker.
Waste water & Ventilation Pipe
Supply and install , waste and vent pipe in horizontal branches and
vertical stacks made of PVC including the necessary fittings such as
9.7 bends, branches tees, elbow etc. All horizontal branches should be laid
at a slope of 2% .
Diameter 110 mm ml 24.00 200.00 4,800.00
Supply and install vent caps made of PVC at vent pipes fitted with
9.8 PVC pipe roof weathering slate at roof level.
Diameter 110 mm pcs 2.00 500.00 1,000.00
Sub Total (9)…........................... 72,260.00
10. Electrical Installation
10.1 Two way switch No 9 350.00 3,150.00
10.2 Single switch No 12 300.00 3,600.00
10.3 Surface mounted 1x60W Incandnscent Fitting type No2 No 22 1,400.00 30,800.00
10.4 Surface mounted 2x36W Fluorescent fitting type No 1 No 21 1,800.00 37,800.00
10.5 Surface mounted twin-socket 16A/1P+N+E No 28 350.00 9,800.00
10.6 Electric Cable installation with 2.5mm thick wire ML 282 60.00 16,920.00
Sub Total (10)…........................... 102,070.00