CONSTRUCTION ESTIMATE CALCULATOR (BY ENGR. RONALD JOHN R. CAJILLA) (JUST INPUT THE
DATA INSIDE THE YELLOW CELL)
L
WALL FOOTING
T
L = LENGTH
W
FORMULA: VOLUME = L * W * T
CLASS A CONCRETE MIX
Enter Length LT (M) 32.00 M
Enter Width W (M) 0.30 M
Enter Thickness T (M) 0.15 M
LT = TOTAL LENGTH/PERIMETER
UME OF CONCRETE: 1.44 CU.M.
# OF CEMENT BAGS 13.00 BAGS VOL. OF SAND CU.M. 0.80 CU.M.
4" GRAVEL CU.M. 1.50 CU.M.
FLOOR SLAB FORMULA: VOLUME = L * W * T
A CONCRETE MIX
Enter Length L (M) 6.00 M
Enter Width W (M) 9.00 M
W1 Width 1 0.25 M
Width 2 0.25 M
W2
FORMULA: VOLUME = H * W1 * W2
H CLASS A CONCRETE MIX
Enter Height L (M) 1.22 M
VOLUME OF CONCRETE FOR EACH COLUME: 0.08 CU.M.
Number of Columns Units 10.00 Units
TOTAL VOLUME OF CONCRETE: 0.76 CU.M.
# OF CEMENT BAGS 7.00 BAGS
VOL. OF SAND CU.M. 0.40 CU.M.
VOL. OF 3/4" GRAVEL CU.M. 0.80 CU.M.
D1 Diameter 0.30 M
AreaCirc 0.07 SQ.M.
FORMULA: VOLUME = H * AreaCirc
H CLASS A CONCRETE MIX
Enter Height L (M) 3.00 M
VOLUME OF CONCRETE EACH COLUMN: 0.21 CU.M.
Columns Units 6.00 Units
UME OF CONCRETE: 1.27 CU.M.
W TR
RH
TOTAL VOLUME OF CONCRETE: 0.71 CU.M.
TS
# OF CEMENT BAGS 7.00 BAGS
VOL. OF SAND CU.M. 0.40 CU.M.
VOL. OF 3/4" GRAVEL CU.M. 0.80 CU.M.
BY: ENGR. RONALD JOHN R. CAJILLA
ITEM - II MASONRY WORKS
A. DETERMINING THE NUMBER OF CONCRETE HOLLOW BLOCKS USED
B. DETERMINING THE NUMBER OF CEMENT & VOLUME OF SAND FOR MORTAR & PLASTERING
Enter Wall Height H (M) 6.00 M
Enter Wall Length L (M) 20.00 M
Enter Area of Window AW (SQ.M.) 2.88 SQ.M
Enter Area of Door AD (SQ.M) 1.47 SQ.M.
Breakage Allowance % 5.00 %
TOTAL WALL AREA: 115.65 SQ.M.
TOTAL NUMBER OF CHB: 1,518.00 PCS
MORTAR USING 4" CHB
# OF CEMENT BAGS 61.00 BAGS
VOL. OF SCREENED SAND CU.M. 5.10 CU.M.
MORTAR USING 6" CHB
# OF CEMENT BAGS 118.00 BAGS
VOL. OF SCREENED SAND CU.M. 9.80 CU.M.
PLASTER : 16mm thk Mix: 1:2
One face ofthe wall only
# OF CEMENT BAGS 34.00 BAGS
VOL. OF FINE SAND CU.M. 1.90 CU.M.
PLASTER : 16mm thk Mix: 1:2
Two faces of the wall
# OF CEMENT BAGS 67.00 BAGS
VOL. OF FINE SAND CU.M. 3.80 CU.M.
RIPRAPING WORKS
W1
L
Enter Height H (M) 2.00 M
Enter Width 1 W1 (M) 0.30 M Enter Width 2 W2 (M) 0.60 M Enter Length L (M) 20.00 M
Using:
H
Stones ranging from 15 to 25 kgs with atleast
50% of stones weighing more than 20 kgs, & Class A Mixture
TOTAL SIDE AREA: 0.90 SQ.M.
TOTAL VOLUME: 18.00 CU.M.
VOL. OF BOULDERS CU.M. 18.00 CU.M.
# OF CEMENT BAGS 47.00 BAGS
VOL. OF SAND CU.M. 2.60 CU.M.
W2
BY: ENGR. RONALD JOHN R. CAJILLA
ITEM - III STEEL REINFORCEMENT
LENGTH OF REINFORCING BARS FOR CHB IN METERS
VERT. (M) LENGTH SPACEING (M) LENGTH
SPACING OF LAYER OF
(CM) VERTICAL HORIZONTAL
REIN./SQ.M. REIN./ SQ.M.
40 2.93 2 Layers 3.300
vertical spacing
spacing
layer
DETERMINING THE NUMBER OF BARS USED
H (M) 3.50 M
L (M) 10.00 M
SQ.M 1.68 SQ.M.
VERTICAL 2.13 60cm
HORIZONTAL 2.15 3 layers
33.32 SQ.M.
12.00 PCS @ 6M
12.00 PCS @ 6M
1.60 Kgs
Enter Wall Height
r Constant Factor
TOTAL WALL AREA:
# OF VERTICAL BARS USED:
# OF HORIZONTAL BARS USED:
#16 TIE WIRE USED:
OOTING MATTING
L
Enter Footing Length
Enter Footing Width Enter # of Bars along L
Enter Number of Bars along W Enter Number of Footing
Enter Clear Cover
Note: Standard Clear Cover for footing =0.05m to 0.075m
L (M) 0.60 M
W (M) 0.60 M
# 4.00 Pcs
# 4.00 Pcs
# 10.00 Units
Cc (M) 0.050 M
# of Bars
per Side
W
Net. Length along L
Net. Length along W
# OF REIN. BARS USED:
#16 TIE WIRE USED:
0.50 M
0.50 M
8.00 LHS
1.30 Kgs
Clear
Cover
BY: ENGR. RONALD JOHN R. CAJILLA
WALL FOOTING REINFORCEMENT
Enter Wall Footing Width
Enter Wall Footing Total Length
W (M) 0.30 M
LT (M) 32.00 M
(M) 0.40 M
Enter Spacing of Tie Bars for Wall footing
81.00 PCS
12.00 LHS
17.00 LHS
1.30 Kgs
Total # of Ties:
Total # of Horizontal Bars Used:
W
Tie Bars
LT = TOTAL LENGTH/PERIMETER
RECTANGULAR COLUMN REINFORCEMENT
H D1
- - 12.00 mm
2 - 16.00 mm
10.00 mm
0.20 M
L/4
0.15L
L = Span
Column Width
TOP BARS
3.00 PCS
- PCS
# of 6m Length Deformed Bars required as Continuous Bars
# of 6m Length Deformed Bars required as Non-Continuous Bars
WEB BARS
- PCS
# of 6m Length Deformed Bars required as Web Bars
BOTTOM BARS
2.00 PCS
- PCS
# of 6m Length Deformed Bars required as Continuous Bars
# of 6m Length Deformed Bars required as Non-Continuous Bars
BY: ENGR. RONALD JOHN R. CAJILLA
5.00 PCS
- PCS
6.00 PCS
0.80 Kgs
Number of 16mm bars used as main bars
Number of 12mm bars used as web bars Number of 10mm bars used as stirrups
#16 TIE WIRE USED:
BEAM REINFORCEMENT (TWO BAYS) CONTINUOUS BEAM
Enter Beam Width
L1 (M) 5.00 M
L2 (M) 5.00 M
W (M) 0.20 M
D (M) 0.30 M
Cw(M) 0.30 M
# of Bars # of Non- Size of Bars Units
Continuous Continuous
Bars
2 1 12.00 mm
L1
W
L/4
0.15 L
L2
Top Bars
D
Web Bars Bottom Bars
L = Span1
Enter Beam Depth
Enter Column Width Max
Top Bars Web Bars
ut "0" zero if web bars not applicable
Bottom Bars
Enter Stirrup Bars Diameter required:
Enter Stirrup Spacing:
L = Span2
L/4
0.15 L
- - 10.00 mm
2 1 12.00 mm
10.00 mm
0.20 M
Column Width
TOP BARS
4.00 PCS
2.00 PCS
# of 6m Length Deformed Bars required as Continuous Bars
# of 6m Length Deformed Bars required as Non-Continuous Bars
WEB BARS
- PCS
# of 6m Length Deformed Bars required as Web Bars
BOTTOM BARS
4.00 PCS
2.00 PCS
# of 6m Length Deformed Bars used as Continuous Bars
# of 6m Length Deformed Bars required as Non-Continuous Bars
BY: ENGR. RONALD JOHN R. CAJILLA
12.00 PCS
- PCS
2.00 PCS
2.20 Kgs
ONE WAY SLAB
Number of 12mm bars required as main bars
Number of 10mm bars required as web bars Number of 10mm bars required as stirrups
#16 TIE WIRE USED:
QUANTITY OF REINFORCING STEEL BARS IN A ONEWAY REINFORCED CONCRETE SLAB
BAR SPACING IN CM. NUMBER OF STEEL BARS PER SQUARE METER TIES (KGS)
10.000 3.764 0.474
12.500 3.062 0.316
15.000 2.584 0.228
17.500 2.232 0.168
20.000 1.980 0.132
22.200 1.786 0.110
25.000 1.627 0.089
L (M) 9.00 M
W (M) 7.00 M
cm 22.20 CM
Enter Length
Enter Width
Enter Bar Spacing
c 1.786
c 0.110
PCS @ 6M 113.00 PCS
KGS 7.00 KGS
# of Steel Bar Constant factor
# of Ties #16 Constant factor
12
TS
Enter Spacing (M)
16
0.30
Enter Spacing (M) Enter Steps Lateral Bar diameter (mm)
0.30
12
Enter Stringer Horizontal Bar diameter (mm)
12
PCS @ 6M 5.00 PCS
PCS @ 6M 5.00 PCS
PCS @ 6M 4.00 PCS
PCS @ 6M 2.00 PCS
1.00 KGS
KGS
required @ Steps
quired @ Stringer
16 TIE WIRE USED
NOTES: DOWELS FOR LATERAL BARS ARE ALREADY INCLUDED IN THE ESTIMATES
FOR STAIRS LANDINGS YOU MAY USE THE SLAB REINFORCEMENT CALCULATOR
BY: ENGR. RONALD JOHN R. CAJILLA
CONCRETE CANAL
TOP OPENING WIDTH
Stiffener
(M) 100.00 M
(M) 0.80 M
(M) 0.50 M
(M) 0.30 M
(M) 0.50 M
(M) 0.15 M
BOTTOM
OPENING
WIDTH
er Canal Total Length
ottom Opening width
ooring Bottom Width
nal Flooring Thickness
Layer 3.00 layers
4"= 0.10, 0.10 M
6" = 0.15
% 10 %
Enter # of layers of CHB used (1 Side)
Enter Size of CHB required
TCF
CHB Breakage % allowance
NAL FLOORING BOTTOM WIDTH
Enter # of Horizonal Barsfor Walling (2 sides)
Enter # of Horizonal Bars for flooring
Enter U bar spacing
PCS 4.00 PCS
PCS 3.00 PCS
(M) 0.60 M
A or B B 1:3:6
CONCRETING Enter Concrete Mix Design (CLASS)
Canal Flooring Total Volume 7.50 cu.m.
Canal Top Stiffener Total Volume 1.00 cu.m.
# of Bags cement 66.00 BAGS
Volume of Sand 29.13 CU.M.
Volume of 3/4 Gravel 7.50 CU.M.
MASONRY
# of CHB used 550.00 PCS
# OF CEMENT
VOL. OF SCREENED SAND
# OF CEMENT VOL. OF SCREENED SAND
MORTAR USING 4" CHB
MORTAR USING 6" CHB
BAGS 63.00 BAGS
CU.M. 5.30 CU.M.
BAGS 122.00 BAGS
CU.M. 10.20 CU.M.
PLASTER : 16mm thk Mix: 1:2
# OF CEMENT
VOL. OF FINE SAND
One face ofthe wall only
BAGS 35.00 BAGS
CU.M. 2.00 CU.M.
2 Overlap
M 4.38 M
FT 8 FT
FT 8 FT
0.42 M 1.37 FT
OK Roof Sheet combination
NG THREE SHEETS
1 Total Roofing Net Length Enter Roof Sheet Length 1
2 Enter Roof Sheet Length 2
3 Enter Roof Sheet Length 3 Overlap
M 4.38 M
FT 8 FT
FT 8 FT
FT 8 FT
1.41 M 4.62 FT
OK Roof Sheet combination
ou more money! End Lapping must not be more than 2 ft
DETERMINING THE NUMBER OF ROOF SHEETS
Side Lapping 2 1/2 1 1/2
Effective Width 0.60 0.70
M 11.00 M
M 0.70 M
Total Roof Width
Enter Roofing total with
Enter Effective Width
USING ONLY TWO SHEETS
Number of the 1st Roof sheet used @ 8 feet long at one side only 16 Sheets
Number of the 2nd Roof sheet used @ 8 feet long at one side only 16 Sheets
Number of Umbrella Nails/Tekscrews 5 KGS
Note: Must multiply by two if the other side of the roof is similar
USING THREE SHEETS
Number of the 1st Roof sheet used @ 8 feet long at one side only 16 Sheets
Number of the 2nd Roof sheet used @ 8 feet long at one side only 16 Sheets
Number of the 3rd Roof sheet used @ 8 feet long at one side only 16 Sheets
Number of Umbrella Nails/Tekscrews 8 KGS
Not recommended, cost you more money!
Note: Must multiply by two if the other side of the roof is similar
BY: ENGR. RONALD JOHN R. CAJILLA
Roof Width
ROOF ACCESSORIES
Enter Total Covered Length
Enter Effective Length Number of Roof Accessories Used
11.00 M
2.20 M
5 PCS
BY: ENGR. RONALD JOHN R. CAJILLA
TILING WORKS
Enter Wall or Floor Area
Enter Breakage Allowance (5 - 10%)
48.00 SQ.M.
5.00 %
Tile Size # of PCS
Inches cm per Sq.m.
3x3 7.5 x 7.5 8,962.00
4x4 10 x 10 5,040.00
4 1/4 x 4 1/4 10.6 x 10.6 4,456.00
4x8 10 x 20 2,520.00
6x6 15 x 15 2,240.00
6x8 15 x 20 1,680.00
6 x 12 15 x 30 1,120.00
8x8 20 x 20 1,260.00
8 x 12 20 x 30 840.00
8 x 16 20 x 40 630.00
10 x 16 25 x 25 807.00
12 x 12 30 x 30 560.00
12 x 24 30 x 60 281.00
16 x 16 40 x 40 315.00
20 x 20 50 x 50 202.00
24 x 24 60 x 60 141.00
Cement Mortar 5.00 BAGS
White Cement 24.00 KGS
Adhesive 6.00 BAGS
BY: ENGR. RONALD JOHN R. CAJILLA
PAINTING WORKS
27.00 SQ.M.
25.00 Coverage/
Gal
2.00 Coats
3.00 Gals
Unit Conversion1 Gallon = 4 Liters Enter Wall Area
Simplified Construction Estimate Enter Coverage
Table 10-6 Kinds of Paint, Uses and Area Coverage Enter # of Coats
PRIMERS Number of Gallons
KIND OF PAINT USES THINING DRYING TIME COVERAGE/Gal
1. Interior For interior 2 hrs, allow
Primer & Sealer wood surfaces overnight b4
Paint Thinner recoating 25 to 30 sq.m.
ROOF PAINT
KIND OF PAINT USES THINING DRYING TIME COVERAGE/Gal
1. All weather for G.I. Shts, water 4 hrs. allow 40 to 50 sq.m.
acylic roof asbestos bricks overnight before
shield concrete and recoating
stucco
118.68 Bd.ft
W1 (in) W2 (in) L (ft)
2 3 8
f Lumber: d 30.00 PCS
required: 2 4.00 Sheet(s)
CWNails: 1.00 KGS
hing Nails: 0.40 Kgs
Total Number o
Number of #1 Finis
DETERMINING THE TOTAL MATERIALS USED FOR BEAMS & GIRDER FORMS
nter Beam Length
Number of Beams
M 7.00
M 0.30
M 0.20
Units 4.00
Total Beam Length
Total # of Bd.ft of frame required:
252.00 Bd.ft
W1 (in) W2 (in) L (ft)
2 3 8
f Lumber: d 63.00 PCS
required: 2 9.00 Sheet(s)
CWNails: 2.10 KGS
hing Nails: 0.90 Kgs
Total Number o
D Total Number of Plywoo
l Number of #2 1/
Number of #1 Finis
B
BY: ENGR. RONALD JOHN R. CAJILLA
SCAFFOLDINGS
PARTS OF SCAFFOLDINGS
1. Vertical Support
2. Base of Vertical Support
3. Horizontal Member
4. Diagonal Braces
5. Block and Wedges
6. Nails & Bolts
BY: ENGR. RONALD JOHN R. CAJILLA
COLUMN
Enter Column Height M 3.00
Enter # of Columns Units 10.00
Total Column Height: 30.00 M. Ht.
BEAM
Enter Beam Length M 3.50
Enter # of Beams Units 6.00
Total Beam Length: 21.00 M. Ht.
FLOORING
Enter Floor Area SQ.M. 80.00
QUANTITY OF LUMBER FOR SCAFFOLDING OR STAGING
Lumber Column Beam Flooring
Size Vertical Horizontal Brace Vertical Horizontal
2" x 2" 141.00 630.00 351.00 84.00 98.70 488.00
2" x 3" 210.00 950.10 525.00 126.00 147.00 728.00
2" x 4" 280.50 1,267.50 700.50 168.00 196.35 968.00
224.40 Bd.ft
W1 (in) W2 (in) L (ft)
2 4 8
f Lumber: 4 43.00 PCS
CWNails: 22.00 KGS
Enter total # of Bd.ft of Lumber required:
Total Number o
Total Number of #
om Downloaded from http://CivilEngineeringBible.com Downloaded from http://CivilEngineeringBible.com
20.00 M
USED (TWO SIDES)